CN206157919U - Connected node of prefab - Google Patents
Connected node of prefab Download PDFInfo
- Publication number
- CN206157919U CN206157919U CN201620784264.5U CN201620784264U CN206157919U CN 206157919 U CN206157919 U CN 206157919U CN 201620784264 U CN201620784264 U CN 201620784264U CN 206157919 U CN206157919 U CN 206157919U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- prefabricated parts
- parts
- splicing
- prefabricated part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Building Environments (AREA)
Abstract
本实用新型属于建筑工程技术领域,公开了一种预制件的连接节点,一种预制件的连接节点,两个预制件密拼对接,所述的两个预制件的拼接端均设置有连接件,所述连接件采用螺栓连接,所述两个预制件的拼接端均开设有操作口。在预制件的装配过程中,所述两个预制件任意一个落位好后,吊装另一个使二者密拼对接,然后通过操作口使用螺栓将分别预埋在两个预制件中的连接件连接成整体,如此,实现预制件的连接,二者形成整体共同受力。本实用新型的预制件采用密拼对接,在装配过程中无需现浇混凝土,成本节约,施工速度快,施工周期短,预制件之间通过套筒和连接件连接成整体,增加了预制件联结拉紧能力,满足建筑的建筑质量和技术性能。
The utility model belongs to the technical field of construction engineering, and discloses a connection node of a prefabricated part, a connection node of a prefabricated part, two prefabricated parts are closely spliced and butted, and the splicing ends of the two prefabricated parts are provided with connectors , the connecting parts are connected by bolts, and the splicing ends of the two prefabricated parts are provided with operation ports. During the assembly process of the prefabricated parts, after any one of the two prefabricated parts is in place, the other is hoisted to make the two close butt joints, and then the connecting parts embedded in the two prefabricated parts are respectively embedded in the two prefabricated parts through the operation port using bolts. Connected into a whole, in this way, the connection of prefabricated parts is realized, and the two form a whole to bear force together. The prefabricated parts of the utility model adopt close splicing butt joint, no need for cast-in-place concrete in the assembly process, cost saving, fast construction speed, short construction period, the prefabricated parts are connected as a whole by sleeves and connectors, increasing the connection of prefabricated parts Tensioning capacity to meet the architectural quality and technical performance of the building.
Description
技术领域technical field
本实用新型属于建筑工程技术领域,具体涉及一种预制件的连接节点。The utility model belongs to the technical field of construction engineering, in particular to a connection node of a prefabricated part.
背景技术Background technique
装配式建筑相对于传统钢筋混凝土现场现浇式建筑,无疑是技术上的一大进步,装配式建筑的预制构件工厂化生产,现场组装,因而能工厂标准化生产,质量可控,高效快捷,材料节约无浪费,生产现场和施工现场无环境污染。但是,现有技术中,装配式建筑中预制件的装配过程中,仍然有节点需要采用现浇,如剪力墙与楼板的连接,为了连接稳固,楼板通常会采用叠合楼板,即在预制楼板的上部再浇筑一层现浇层,安装过程中,需等叠合楼板的现浇层固化后才能在此基础上进行下一步预制件的安装,这样严重影响施工速度,降低施工效率,同时现场浇筑必然得进行支模、混凝土浇筑等操作,造成施工现场复杂化,造成安全隐患的同时增加了施工成本。Compared with traditional reinforced concrete cast-in-place buildings, prefabricated buildings are undoubtedly a major technological advancement. The prefabricated components of prefabricated buildings are produced in a factory and assembled on site, so they can be standardized in the factory, with controllable quality, high efficiency and fast materials. Saving without waste, no environmental pollution at the production site and construction site. However, in the prior art, during the assembly process of prefabricated parts in prefabricated buildings, there are still nodes that need to be cast-in-situ, such as the connection between the shear wall and the floor. A cast-in-place layer is poured on the upper part of the slab. During the installation process, it is necessary to wait for the cast-in-place layer of the laminated slab to solidify before proceeding with the installation of prefabricated parts on this basis. This will seriously affect the construction speed and reduce the construction efficiency. On-site pouring must carry out operations such as formwork support and concrete pouring, which complicates the construction site, causes safety hazards and increases construction costs.
综上所述,故亟需开发一种施工速度快、成本节约、连接牢固的预制件连接节点。To sum up, there is an urgent need to develop a prefabricated connection node with fast construction speed, low cost and strong connection.
实用新型内容Utility model content
本实用新型的目的是提供一种施工速度快、成本节约、连接牢固的预制件连接节点。The purpose of the utility model is to provide a prefabricated connection node with fast construction speed, cost saving and firm connection.
上述目的是通过如下技术方案实现:一种预制件的连接节点,两个预制件密拼对接,所述的两个预制件的拼接端均设置有连接件,所述连接件采用螺栓连接,所述两个预制件的拼接端均开设有操作口。预制件的预制过程中,在其拼接端预埋连接件,并在设置连接件处预留操作口。在预制件的装配过程中,所述两个预制件任意一个落位好后,吊装另一个使二者密拼对接,然后通过操作口使用螺栓将分别预埋在两个预制件中的连接件连接成整体,如此,实现预制件的连接,二者形成整体共同受力。本实用新型在两个预制件的拼接端均设有操作口,方便连接件之间的连接,且两个操作口在拼接处构成一个较大的操作口,操作空间更大,这样更有利于螺栓连接连接件时的操作施工,同时制作预制件的模具统一,制作过程也更为简便。本实用新型的预制件采用密拼对接,在装配过程中无需现浇混凝土,成本节约,施工速度快,施工周期短,预制件通过螺栓和连接件连接成整体,增加了预制件联结拉紧能力,有利于墙板之间力的传导,满足建筑的建筑质量和技术性能。The above purpose is achieved through the following technical solution: a connection node of a prefabricated part, two prefabricated parts are closely spliced and butt jointed, and the splicing ends of the two prefabricated parts are provided with connecting parts, and the connecting parts are connected by bolts. The splicing ends of the two prefabricated parts are provided with operation ports. During the prefabrication process of prefabricated parts, connectors are pre-embedded at the splicing ends, and operation ports are reserved where the connectors are set. During the assembly process of the prefabricated parts, after any one of the two prefabricated parts is in place, the other is hoisted to make the two close butt joints, and then the connecting parts embedded in the two prefabricated parts are respectively embedded in the two prefabricated parts through the operation port using bolts. Connected into a whole, in this way, the connection of prefabricated parts is realized, and the two form a whole to bear force together. The utility model is provided with an operation port at the splicing end of the two prefabricated parts, which is convenient for the connection between the connecting parts, and the two operation ports form a larger operation port at the splicing place, and the operation space is larger, which is more conducive to The operation and construction when the bolts are connected, and the mold for making the prefabricated part is unified, and the manufacturing process is more convenient. The prefabricated parts of the utility model adopt dense butt joint, no need to cast-in-situ concrete in the assembly process, cost saving, fast construction speed, short construction period, the prefabricated parts are connected into a whole by bolts and connectors, which increases the connection and tension capacity of the prefabricated parts , which is conducive to the transmission of force between the wall panels and meets the architectural quality and technical performance of the building.
进一步,所述连接件设有穿接孔,所述螺栓穿接所述穿接孔将连接件连接成整体,并通过螺母拧紧固定。如此设置,将螺栓穿过穿接孔,然后拧紧螺栓,使得连接件紧固的连接成整体,预制件之间通过连接件传递剪切力。Further, the connecting piece is provided with a penetration hole, and the bolt passes through the penetration hole to connect the connecting piece as a whole, and is tightened and fixed by a nut. In this way, the bolts are passed through the piercing holes, and then the bolts are tightened, so that the connecting parts are tightly connected as a whole, and the shear force is transmitted between the prefabricated parts through the connecting parts.
进一步,所述操作口内填充有浆料。如此设置,一方面可解决因预留操作口导致的不美观问题,另一方面,当操作口中的浆料凝固后,能够起到固定螺栓的作用,避免使用年限久或外力影响下螺栓松动。此时填充浆料并不影响施工进度,无需等待浆料硬化再进行下一预制件节点的安装。Further, the operation port is filled with slurry. Such setting, on the one hand, can solve the unsightly problem caused by the reserved operation port, on the other hand, when the slurry in the operation port is solidified, it can play the role of fixing the bolts and avoid the bolts from loosening under the influence of long service life or external force. Filling the slurry at this time does not affect the construction progress, and there is no need to wait for the slurry to harden before installing the next prefabricated node.
进一步,所述预制件的拼接面上设置有SBS自粘式改性沥青卷材。如此设置,可起到防水效果,有效防止水沿预制件的拼接面渗漏,尤其是预制件为外墙板时。Further, SBS self-adhesive modified asphalt coils are arranged on the splicing surface of the prefabricated parts. Such setting can achieve a waterproof effect and effectively prevent water from leaking along the splicing surfaces of the prefabricated parts, especially when the prefabricated parts are external wall panels.
进一步,预制件的拼接端的侧面设有缺口,所述缺口内填充有防水密封胶。如此设置,可防止水进入第预制件的拼接面,进而防止水沿拼接面渗漏。Further, a gap is provided on the side of the splicing end of the prefabricated part, and the gap is filled with waterproof sealant. Such arrangement can prevent water from entering the splicing surface of the second prefabricated part, thereby preventing water from leaking along the splicing surface.
进一步,所述连接件包括连接板以及设置在连接板上的锚固支腿。如此设置,可有效增加连接件在预制件中的锚固力,提高了连接件与预制件连接的结构强度。Further, the connecting piece includes a connecting plate and anchoring legs arranged on the connecting plate. Such an arrangement can effectively increase the anchoring force of the connector in the prefabricated part, and improve the structural strength of the connection between the connector and the prefabricated part.
进一步,所述预制件为楼板和/或墙板。Further, the prefabricated parts are floor slabs and/or wall slabs.
进一步,所述预制件的拼接面嵌有弹性防水体。在预制件的制作过程中,将弹性防水体嵌在预制件的拼接面,当预制件密拼对接后,预制件将防水弹性体紧紧挤压在二者的拼接面,如此,可防止水沿预制件的拼接面渗漏。当然,由于预制件采用密拼,弹性防水体不宜过宽,预制件的拼接面可嵌有多个弹性防水体。优选,可在预制件与弹性防水体的接触面设置凹槽,弹性防水体一侧嵌入其中一个预制件的拼接面,另一侧挤压入相对应另一预制件拼接面的凹槽中,这样既可起到防水效果,也不影响预制件的密拼。Further, the splicing surface of the preform is embedded with an elastic waterproof body. During the production process of the prefabricated parts, the elastic waterproof body is embedded in the splicing surface of the prefabricated parts. Leakage along the joint face of the prefabricated part. Of course, since the prefabricated parts are densely assembled, the elastic waterproof body should not be too wide, and multiple elastic waterproof bodies can be embedded in the splicing surface of the prefabricated parts. Preferably, a groove can be provided on the contact surface between the prefabricated part and the elastic waterproof body, one side of the elastic waterproof body is embedded in the splicing surface of one of the prefabricated parts, and the other side is pressed into the groove corresponding to the splicing surface of the other prefabricated part, This can not only play a waterproof effect, but also does not affect the close-fitting of the prefabricated parts.
进一步,所述预制件的拼接面设置注浆槽,所述注浆槽内灌注有防水浆料。如此设置,当预制件拼装完成后,在注浆槽内灌注有防水浆料,当防水浆料硬化后,在预制件的拼接面形成防水层,可有效防止水沿拼接面渗漏。Further, a grouting groove is provided on the splicing surface of the prefabricated part, and the waterproof grout is poured into the grouting groove. In this way, when the prefabricated parts are assembled, the grouting tank is filled with waterproof slurry. When the waterproof slurry is hardened, a waterproof layer is formed on the splicing surface of the prefabricated parts, which can effectively prevent water from leaking along the splicing surface.
进一步,所述预制件的拼接端的侧面有防水钢板,相邻的防水钢板焊接成整体。如此设置,此时的防水钢板起到封闭或挡住拼接面的作用,可有效防止水沿拼接面渗漏。当然,防水钢板焊接后可通过打磨机将焊接部位打磨平整,使其更加美观。Further, there are waterproof steel plates on the sides of the splicing ends of the prefabricated parts, and adjacent waterproof steel plates are welded into a whole. So set, the waterproof steel plate at this time plays the role of sealing or blocking the splicing surface, which can effectively prevent water from leaking along the splicing surface. Of course, after the waterproof steel plate is welded, the welded part can be polished by a grinder to make it more beautiful.
附图说明Description of drawings
构成本实用新型的一部分的附图用来提供对本实用新型的进一步理解,本实用新型的示意性实施例及其说明用于解释本实用新型,并不构成对本实用新型的不当限定。The accompanying drawings constituting a part of the utility model are used to provide a further understanding of the utility model, and the schematic embodiments of the utility model and their descriptions are used to explain the utility model, and do not constitute improper limitations to the utility model.
图1和图2分别为本实用新型一种实施方式所涉及的预制件的连接节点的结构示意图;Fig. 1 and Fig. 2 are respectively the structural schematic diagrams of the connecting nodes of the prefabricated parts involved in an embodiment of the present invention;
图3为图1中所涉及的连接件的左视图;Fig. 3 is a left view of the connector involved in Fig. 1;
图4为图1中所涉及的连接件的俯视图;Fig. 4 is a top view of the connector involved in Fig. 1;
图5为图1中所涉及的预制件的连接节点的A—A截面的剖示图。Fig. 5 is a cross-sectional view of the A-A section of the connection node of the prefabricated element involved in Fig. 1 .
图中:In the picture:
1预制件 2连接件 3螺栓 4连接板1 Prefabricated part 2 Connector 3 Bolt 4 Connecting plate
5穿接孔 6锚固支腿 7操作口 8防水钢板5 piercing hole 6 anchor leg 7 operation port 8 waterproof steel plate
9缺口 10螺母9 Notch 10 Nut
具体实施方式detailed description
下面结合附图对本实用新型进行详细描述,本部分的描述仅是示范性和解释性,不应对本实用新型的保护范围有任何的限制作用。此外,本领域技术人员根据本文件的描述,可以对本文件中实施例中以及不同实施例中的特征进行相应组合。The utility model will be described in detail below in conjunction with the accompanying drawings. The description in this part is only exemplary and explanatory, and should not have any limiting effect on the protection scope of the utility model. In addition, those skilled in the art can make corresponding combinations of features in the embodiments in this document and in different embodiments according to the descriptions in this document.
本实用新型实施例如下,参照图1和图5,一种预制件的连接节点,两个预制件1密拼对接,所述的两个预制件1的拼接端均设置有连接件2,所述连接件2采用螺栓3连接,所述两个预制件1的拼接端均开设有操作口7。本实用新型所述的密拼对接是指预制件1的拼接处不留缝隙,应当理解,此处所述的不留缝隙是相对现有技术中预留一定间隔距离用以灌浆或浇筑混凝土的技术方案而言,并不是指预制件1的拼接处完全没有缝隙,而在实际的施工过程中,由于装配误差或拼接面不平整,往往在拼接的过程中会存在细小的缝隙。当然,为达到上述效果,优选拼接面光滑平整。预制件1的预制过程中,在其拼接端预埋连接件2,并在设置连接件2处预留操作口7。在预制件1的装配过程中,所述两个预制件1任意一个落位好后,吊装另一个使二者密拼对接,然后通过操作口7使用螺栓3将分别预埋在两个预制件1中的连接件2连接成整体,如此,实现预制件1的连接,二者形成整体共同受力。本实用新型在两个预制件1的拼接端均设有操作口7,方便连接件2之间的连接,且两个操作口7在拼接处构成一个较大的操作口7,操作空间更大,这样更有利于螺栓3连接连接件2时的操作施工,同时制作预制件1的模具统一,制作过程也更为简便。本实用新型的预制件1采用密拼对接,在装配过程中无需现浇混凝土,成本节约,施工速度快,施工周期短,预制件1通过螺栓3和连接件2连接成整体,增加了预制件1联结拉紧能力,有利于墙板之间力的传导,满足建筑的建筑质量和技术性能。The embodiment of the present utility model is as follows, referring to Fig. 1 and Fig. 5, a connection node of a prefabricated part, two prefabricated parts 1 are closely spliced and butted, and the splicing ends of the two prefabricated parts 1 are provided with connectors 2, so The connecting parts 2 are connected by bolts 3 , and the splicing ends of the two prefabricated parts 1 are provided with operation ports 7 . The dense splicing butt joint described in the utility model means that no gap is left at the splicing part of the prefabricated part 1. It should be understood that the no gap mentioned here is to reserve a certain distance for grouting or pouring concrete in the prior art. As far as the technical solution is concerned, it does not mean that there are no gaps at the splicing part of the prefabricated part 1, but in the actual construction process, due to assembly errors or uneven splicing surfaces, small gaps often exist during the splicing process. Of course, in order to achieve the above effects, it is preferable that the splicing surface is smooth and flat. During the prefabrication process of the prefabricated part 1, the connecting part 2 is pre-embedded at its splicing end, and the operation port 7 is reserved at the place where the connecting part 2 is arranged. During the assembly process of the prefabricated part 1, after any one of the two prefabricated parts 1 is in place, the other is hoisted to make the two close butt joints, and then the bolts 3 are used to pre-embed the two prefabricated parts through the operation port 7. The connecting piece 2 in 1 is connected as a whole, so that the connection of the prefabricated part 1 is realized, and the two form a whole to bear force together. The utility model is equipped with an operation port 7 at the splicing end of the two prefabricated parts 1, which facilitates the connection between the connecting parts 2, and the two operation ports 7 form a larger operation port 7 at the splicing point, and the operation space is larger , which is more conducive to the operation and construction when the bolt 3 is connected to the connecting part 2, and at the same time, the mold for making the prefabricated part 1 is unified, and the manufacturing process is also simpler. The prefabricated part 1 of the utility model adopts close splicing butt joint, no need for cast-in-place concrete in the assembly process, cost saving, fast construction speed, and short construction period. 1 The tensioning ability of the connection is beneficial to the force transmission between the wall panels and meets the architectural quality and technical performance of the building.
在上述实施例的基础上,本实用新型另一实施例中,如图3,所述连接件2设有穿接孔5,所述螺栓3穿接所述穿接孔5将连接件2连接成整体,并通过螺母10拧紧固定。如此设置,将螺栓3穿过穿接孔5,然后拧紧螺栓3,使得连接件2紧固的连接成整体,预制件1之间通过连接件2传递剪切力。On the basis of the above-mentioned embodiments, in another embodiment of the present utility model, as shown in Figure 3, the connecting piece 2 is provided with a piercing hole 5, and the bolt 3 passes through the piercing hole 5 to connect the connecting piece 2 Into a whole, and tightened and fixed by nut 10. In this arrangement, the bolts 3 are passed through the piercing holes 5, and then the bolts 3 are tightened, so that the connecting pieces 2 are tightly connected as a whole, and the shearing force is transmitted between the prefabricated parts 1 through the connecting pieces 2.
在上述实施例的基础上,本实用新型另一实施例中,所述操作口7内填充有浆料。如此设置,一方面可解决因预留操作口7导致的不美观问题,另一方面,当操作口7中的浆料凝固后,能够起到固定螺栓3的作用,避免使用年限久或外力影响下螺栓3松动。此时填充浆料并不影响施工进度,无需等待浆料硬化再进行下一预制件1节点的安装。On the basis of the above embodiments, in another embodiment of the present invention, the operation port 7 is filled with slurry. Such setting, on the one hand, can solve the unsightly problem caused by the reserved operation port 7, on the other hand, when the slurry in the operation port 7 solidifies, it can play the role of fixing the bolt 3, avoiding long service life or external force influence Loosen the lower bolt 3. Filling the slurry at this time does not affect the construction progress, and there is no need to wait for the slurry to harden before installing the next prefabricated part 1 node.
在上述实施例的基础上,本实用新型另一实施例中,所述预制件1的拼接面上设置有SBS自粘式改性沥青卷材。如此设置,可起到防水效果,有效防止水沿预制件1的拼接面渗漏,尤其是预制件1为外墙板时。On the basis of the above embodiments, in another embodiment of the present invention, SBS self-adhesive modified asphalt coils are arranged on the splicing surface of the prefabricated part 1 . Such setting can achieve a waterproof effect and effectively prevent water from leaking along the joint surface of the prefabricated part 1, especially when the prefabricated part 1 is an exterior wall panel.
在上述实施例的基础上,本实用新型另一实施例中,如图1和图2,预制件1的拼接端的侧面设有缺口9,所述缺口9内填充有防水密封胶。如此设置,可防止水进入第预制件1的拼接面,进而防止水沿拼接面渗漏。On the basis of the above embodiments, in another embodiment of the present invention, as shown in Fig. 1 and Fig. 2, a gap 9 is provided on the side of the splicing end of the prefabricated part 1, and the gap 9 is filled with waterproof sealant. Such an arrangement can prevent water from entering the splicing surface of the first preform 1 , thereby preventing water from leaking along the splicing surface.
在上述实施例的基础上,本实用新型另一实施例中,如图1~4,所述连接件2包括连接板4以及设置在连接板4上的锚固支腿6。如此设置,可有效增加连接件2在预制件1中的锚固力,提高了连接件2与预制件1连接的结构强度。On the basis of the above embodiments, in another embodiment of the present invention, as shown in FIGS. 1 to 4 , the connecting piece 2 includes a connecting plate 4 and an anchoring leg 6 arranged on the connecting plate 4 . Such an arrangement can effectively increase the anchoring force of the connector 2 in the prefabricated part 1, and improve the structural strength of the connection between the connector 2 and the prefabricated part 1.
在上述实施例的基础上,本实用新型另一实施例中,所述预制件1为楼板和/或墙板。On the basis of the above embodiments, in another embodiment of the present utility model, the prefabricated part 1 is a floor slab and/or a wall slab.
在上述实施例的基础上,本实用新型另一实施例中,所述预制件1的拼接面嵌有弹性防水体。在预制件1的制作过程中,将弹性防水体嵌在预制件1的拼接面,当预制件1密拼对接后,预制件1将防水弹性体紧紧挤压在二者的拼接面,如此,可防止水沿预制件1的拼接面渗漏。当然,由于预制件1采用密拼,弹性防水体不宜过宽,预制件1的拼接面可嵌有多个弹性防水体。优选,可在预制件1与弹性防水体的接触面设置凹槽,弹性防水体一侧嵌入其中一个预制件1的拼接面,另一侧挤压入相对应另一预制件1拼接面的凹槽中,这样既可起到防水效果,也不影响预制件1的密拼。On the basis of the above-mentioned embodiments, in another embodiment of the present utility model, the splicing surface of the prefabricated part 1 is embedded with an elastic waterproof body. During the production process of the prefabricated part 1, the elastic waterproof body is embedded in the splicing surface of the prefabricated part 1, and when the prefabricated part 1 is tightly joined, the prefabricated part 1 tightly squeezes the waterproof elastic body on the splicing surface of the two parts, so that , can prevent water from leaking along the splicing surface of the prefabricated part 1. Certainly, since the prefabricated part 1 adopts dense jointing, the elastic waterproof body should not be too wide, and the joint surface of the prefabricated part 1 can be embedded with multiple elastic waterproof bodies. Preferably, a groove can be provided on the contact surface between the prefabricated part 1 and the elastic waterproof body, one side of the elastic waterproof body is embedded in the splicing surface of one of the prefabricated parts 1, and the other side is squeezed into the corresponding groove of the splicing surface of the other prefabricated part 1. In the groove, it can not only play a waterproof effect, but also not affect the close fitting of the prefabricated part 1.
在上述实施例的基础上,本实用新型另一实施例中,所述预制件1的拼接面设置注浆槽,所述注浆槽内灌注有防水浆料。如此设置,当预制件1拼装完成后,在注浆槽内灌注有防水浆料,当防水浆料硬化后,在预制件1的拼接面形成防水层,可有效防止水沿拼接面渗漏。On the basis of the above embodiments, in another embodiment of the present invention, a grouting groove is provided on the splicing surface of the prefabricated part 1, and the waterproof grout is poured into the grouting groove. In this way, when the prefabricated part 1 is assembled, the grouting tank is filled with waterproof slurry. When the waterproof slurry is hardened, a waterproof layer is formed on the joint surface of the prefabricated part 1, which can effectively prevent water from leaking along the joint surface.
在上述实施例的基础上,本实用新型另一实施例中,如图2,所述预制件1的拼接端的侧面有防水钢板8,相邻的防水钢板8焊接成整体。如此设置,此时的防水钢板8起到封闭或挡住拼接面的作用,可有效防止水沿拼接面渗漏。当然,防水钢板8焊接后可通过打磨机将焊接部位打磨平整,使其更加美观。On the basis of the above-mentioned embodiments, in another embodiment of the present invention, as shown in Fig. 2 , there are waterproof steel plates 8 on the side of the splicing end of the prefabricated part 1, and the adjacent waterproof steel plates 8 are welded into a whole. So set, the waterproof steel plate 8 at this time plays the role of closing or blocking the splicing surface, which can effectively prevent water from leaking along the splicing surface. Of course, after the waterproof steel plate 8 is welded, the welded part can be polished smooth by a grinder to make it more beautiful.
以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。The above is only a preferred embodiment of the utility model, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the utility model, some improvements and modifications can also be made, these improvements and Retouching should also be regarded as the scope of protection of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620784264.5U CN206157919U (en) | 2016-07-22 | 2016-07-22 | Connected node of prefab |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620784264.5U CN206157919U (en) | 2016-07-22 | 2016-07-22 | Connected node of prefab |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206157919U true CN206157919U (en) | 2017-05-10 |
Family
ID=58647963
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620784264.5U Expired - Fee Related CN206157919U (en) | 2016-07-22 | 2016-07-22 | Connected node of prefab |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206157919U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108149825A (en) * | 2018-01-11 | 2018-06-12 | 厦门华旸建筑工程设计有限公司 | A kind of connection mode and construction method for the prefabricated board of assembled architecture, prefabricated board and beam |
| CN110700423A (en) * | 2018-07-10 | 2020-01-17 | 青岛中科坤泰管廊有限公司 | Locking device |
| CN111560796A (en) * | 2020-04-29 | 2020-08-21 | 中铁二院工程集团有限责任公司 | Assembly type mass spring floating plate system inter-plate connecting assembly |
-
2016
- 2016-07-22 CN CN201620784264.5U patent/CN206157919U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108149825A (en) * | 2018-01-11 | 2018-06-12 | 厦门华旸建筑工程设计有限公司 | A kind of connection mode and construction method for the prefabricated board of assembled architecture, prefabricated board and beam |
| CN108149825B (en) * | 2018-01-11 | 2019-10-29 | 厦门华旸建筑工程设计有限公司 | A kind of connection type and construction method for the prefabricated board of assembled architecture, prefabricated board and beam |
| CN110700423A (en) * | 2018-07-10 | 2020-01-17 | 青岛中科坤泰管廊有限公司 | Locking device |
| CN111560796A (en) * | 2020-04-29 | 2020-08-21 | 中铁二院工程集团有限责任公司 | Assembly type mass spring floating plate system inter-plate connecting assembly |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108049498B (en) | Prefabricated column and prefabricated beam connection structure and method of prefabricated building frame structure | |
| CN205917945U (en) | Floor connected node | |
| CN105862538B (en) | The oblique bond-retarded prestressed concrete pavement structure of assembled | |
| CN206034631U (en) | Connected node of wallboard and floor | |
| CN205857448U (en) | A kind of assembly concrete shear wall structure | |
| CN206189455U (en) | a corridor | |
| CN204059601U (en) | A steel bar connection structure of prefabricated concrete components | |
| CN205711596U (en) | Assembled oblique bond-retarded prestressed concrete pavement structure | |
| CN108643031A (en) | A kind of Precast Concrete Segmental Bridges bridge pier steel reinforced concrete jointing | |
| CN107313455B (en) | Cast-in-place and prefabricated combined single-bin comprehensive pipe gallery node and construction method | |
| CN206157970U (en) | Floor connected node | |
| CN107905424B (en) | Full-prefabricated one-way plate structure with splicing grooves, manufacturing and assembling methods | |
| CN205917839U (en) | Connected node of wallboard and floor | |
| CN111749365A (en) | A prefabricated composite wall based on H-beam and its construction method | |
| CN206157919U (en) | Connected node of prefab | |
| CN108661190B (en) | A gusseted prefabricated panel structure | |
| CN206034662U (en) | Connected node of wallboard and floor | |
| CN110468708A (en) | A kind of combined bridge deck structure and its construction method of steel-UHPC prefabricated board | |
| CN206189454U (en) | Piping lane | |
| CN115234071B (en) | A combined connection structure and method of self-tapping screw blocks and post-cast strips for assembled one-shaped composite wall panels | |
| CN108560795A (en) | A kind of light steel of assembled-foam concrete composite floor and its construction method | |
| CN207525960U (en) | Easy connect band shear key reinforced concrete slab structure | |
| CN205917874U (en) | Connected node of prefab | |
| CN219175602U (en) | Assembled ribbed laminated plate structure | |
| CN209163130U (en) | A precast concrete-steel plate composite shear wall splicing joint |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Nanning Zhongmin zhuyou Intelligent Manufacturing Technology Co.,Ltd. Assignor: Zhongmin Zhuyou Technology Investment Co.,Ltd. Contract record no.: X2019430000004 Denomination of utility model: Connected node of prefab Granted publication date: 20170510 License type: Common License Record date: 20191105 |
|
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Xiangxi Zhongmin zhuyou Technology Co.,Ltd. Assignor: Zhongmin Zhuyou Technology Investment Co.,Ltd. Contract record no.: X2020430000002 Denomination of utility model: Connected node of prefab Granted publication date: 20170510 License type: Common License Record date: 20200305 |
|
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000 Patentee after: Zhuyou Zhizao Technology Investment Co.,Ltd. Address before: 410205 comprehensive building in Hunan province Changsha Kaifu District, No. 30 Xingang Road, Changsha Jinxia bonded logistics center room 3005 Patentee before: Zhongmin Zhuyou Technology Investment Co.,Ltd. |
|
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Nantong Zhongmin zhuyou Zhizao Technology Co.,Ltd. Assignor: Zhuyou Zhizao Technology Investment Co.,Ltd. Contract record no.: X2020980007488 Denomination of utility model: A kind of connection joint of prefabricated parts Granted publication date: 20170510 License type: Common License Record date: 20201105 |
|
| EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Hunan Yuanfeng Construction Engineering Co.,Ltd. Assignor: Zhuyou Zhizao Technology Investment Co.,Ltd. Contract record no.: X2021980000884 Denomination of utility model: A kind of connection joint of prefabricated parts Granted publication date: 20170510 License type: Common License Record date: 20210203 |
|
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Hunan Hailong Construction Engineering Co.,Ltd. Assignor: Zhuyou Zhizao Technology Investment Co.,Ltd. Contract record no.: X2021980001039 Denomination of utility model: A kind of connection joint of prefabricated parts Granted publication date: 20170510 License type: Common License Record date: 20210207 |
|
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Henan YingYuan Construction Service Co.,Ltd. Assignor: Zhuyou Zhizao Technology Investment Co.,Ltd. Contract record no.: X2021980001160 Denomination of utility model: A kind of connection joint of prefabricated parts Granted publication date: 20170510 License type: Common License Record date: 20210218 |
|
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Henan guochi Construction Service Co.,Ltd. Assignor: Zhuyou Zhizao Technology Investment Co.,Ltd. Contract record no.: X2021980001282 Denomination of utility model: A kind of connection joint of prefabricated parts Granted publication date: 20170510 License type: Common License Record date: 20210225 |
|
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Linzhou Hongen Construction Service Co.,Ltd. Assignor: Zhuyou Zhizao Technology Investment Co.,Ltd. Contract record no.: X2021980001340 Denomination of utility model: A connection node of prefabricated parts Granted publication date: 20170510 License type: Common License Record date: 20210302 |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170510 |