CN206157708U - Gather husky sand barrier - Google Patents

Gather husky sand barrier Download PDF

Info

Publication number
CN206157708U
CN206157708U CN201621217812.2U CN201621217812U CN206157708U CN 206157708 U CN206157708 U CN 206157708U CN 201621217812 U CN201621217812 U CN 201621217812U CN 206157708 U CN206157708 U CN 206157708U
Authority
CN
China
Prior art keywords
sand
barrier
protecting barrier
protecting
sand barrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621217812.2U
Other languages
Chinese (zh)
Inventor
刘淑娟
袁宏波
刘虎俊
万翔
李菁菁
刘开琳
李学敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Desert Control Research Institute
Original Assignee
Gansu Desert Control Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Desert Control Research Institute filed Critical Gansu Desert Control Research Institute
Priority to CN201621217812.2U priority Critical patent/CN206157708U/en
Application granted granted Critical
Publication of CN206157708U publication Critical patent/CN206157708U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a gather husky sand barrier, include sand barrier spine and sand barrier wall, sand barrier spine surface is equipped with the nail form and rivets, and the sand barrier wall of riveting both sides through the nail form links up the constitution sand barrier body, sand barrier body cavity, the no end. The utility model discloses an advantage embodies: the utility model discloses simple structure gathers sha jisha, forms the husky ridge to husky desertification, but the exclusive use gathers sha jisha, also can make up into the sand barrier in flakes of different grade type, desertification prevention and control, it is fast convenient to set up, can form sand barrier area in flakes by the sand barrier that lay of large tracts of land in the short time, plays good windbreak and sand fixation and disaster alleviation effect, also can repeat to use save material many times.

Description

The poly- barrier that rustles
Technical field
This utility model is related to a kind of field of environment protection, more particularly to a kind of poly- barrier that rustles, in particular with hollow sand-protecting barrier Collection sand, can be arranged to the forms such as trellis, determinant according to sand ground, sand dune landforms and wind regime, collect, fix and stop drift sand Low vertical sand barrier.
Background technology
China's arid biogeographic zone area accounts for the 30% of land surface, and this region hazards of sand storms is one of main disaster, if It is effective ways of checking winds and fixing drifting sand to put sand-protecting barrier.It is typically based on height, material and form to classify sand-protecting barrier.Can according to sand-protecting barrier form It is divided into ridge shape, palisading type, template, plate hole type, mesh-type, bag-shaped etc..The material of sand-protecting barrier is gathered materials on the spot mostly, to reduce into This.Wherein wheat straw grid sand-protecting barrier application area is maximum, mainly because its material is abundant.Scientific research personnel has invented each according to reality Plant sand-protecting barrier, the such as sand-protecting barrier of clay sand-protecting barrier, plastic wire sand-protecting barrier, cotton stalk or branch palisading type sand-protecting barrier, cobble sand-protecting barrier material and form. These sand-protecting barriers draw materials conveniently, be widely used, serve good effect of checking winds and fixing drifting sand.But different type sand-protecting barrier is each Defective, for example wheat straw sand-protecting barrier is arranged and just loses function in 3~5 years.The performance of clay sand-protecting barrier and gravel sand-protecting barrier fixed dune is very It is good, but sand-protecting barrier is arranged and limited by drawing materials, it is impossible to without the popularization and application of material region.Chemical material sand-protecting barrier, such as plastics The new material sand-protecting barrier such as net and nylon wire, preventing and fixing sand works well, but this kind of material sand-protecting barrier setup cost is of a relatively high.And on Stating sand-protecting barrier only clay sand-protecting barrier, wheat straw sand-protecting barrier and bag-shaped sand-protecting barrier itself has certain volume, and other kinds of sand-protecting barrier is all one-dimensional One side, these sand-protecting barriers are only combined into a fixed structure, could hinder husky or fix the sand, and sand-protecting barrier itself does not build up sand.
Utility model content
The purpose of this utility model is for deficiency of the prior art, there is provided the poly- barrier that rustles of one kind, based on above-mentioned situation, This utility model aims to provide a kind of making simply, arranges easy, builds up the sand-protecting barrier of sand.
For achieving the above object, the utility model discloses following technical scheme:
One kind poly- rustle barrier, including sand-protecting barrier ridge and sand-protecting barrier wall, sand-protecting barrier ridge surface is provided with spike riveting, by spike riveting by both sides Sand-protecting barrier wall link up composition sand-protecting barrier body, sand-protecting barrier body is hollow, bottomless.
Further, the sand-protecting barrier wall is from bottom to top portion:Sand-protecting barrier wall bottom is real wall, and sand-protecting barrier wall top is provided with hollow out Hua Kong.
Further, the sand-protecting barrier cross section is semicircle, and sand-protecting barrier ridge is arranged at top.
Further, the sand-protecting barrier cross section is isosceles triangle or isosceles trapezoid, and sand-protecting barrier ridge is arranged at top.
Further, the sand-protecting barrier total high 20cm, the high 5cm of sand-protecting barrier ridge, 30~40cm of bottom width, 0~20cm of top width, long by 50~ 100cm, sand-protecting barrier wall thickness 3mm.
Further, the sand-protecting barrier wall is from the structure of bottom to top:Bottom 6cm is highly real wall, successively 8cm height upwards It is colored hole that aperture is Φ 0.5cm, topmost 5cm is aperture for the colored hole of Φ 1.0cm.
Further, the sand-protecting barrier be it is inside and outside can noose embedded riveting, side port one end internal diameter is less than the other end, and this is little The long 1cm of mouth of internal side diameter, two sections of sand-protecting barriers are connected by embedded riveting.
A kind of poly- barrier that rustles, has the advantages that disclosed in this utility model:
This utility model simple structure, gathers sand sand, forms the husky ridge, and with husky sand control, can be used alone poly- sand sand, also may be used Different types of sand-protecting barrier in flakes is combined into, is defended and controlled sand, fast and easy is set, being capable of large-area laying sand-protecting barrier at short notice Sand-protecting barrier band in flakes is formed, good checking winds and fixing drifting sand and Function of reducing disaster is played;Also application, material-saving be can be repeated several times.
Description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is sand-protecting barrier wall schematic diagram of the present utility model.
Fig. 3 is a kind of cross-sectional view of embodiment of this utility model.
Fig. 4 is a kind of cross-sectional view of embodiment of this utility model.
Fig. 5 is a kind of cross-sectional view of embodiment of this utility model.
Fig. 6 is spike riveting schematic diagram of the present utility model.
Wherein:
1- sand-protecting barrier ridges, 2- sand-protecting barrier walls, the embedded rivetings of 3-, 4- spike rivetings.
Specific embodiment
This utility model is further described with reference to embodiment.
Embodiment 1
See Fig. 1, Fig. 2, Fig. 6, one kind gathers rustle barrier, including sand-protecting barrier ridge 1 and sand-protecting barrier wall 2, and the surface of sand-protecting barrier ridge 1 is provided with spike riveting 3, the sand-protecting barrier wall of both sides is linked up by composition sand-protecting barrier body by spike riveting, sand-protecting barrier body is hollow, bottomless, by sand, Gypsum Fibrosum or doses The plastic or other material manufacture of radiation hardness material.
Embodiment 2
In the present embodiment, the sand-protecting barrier wall 2 is from bottom to top portion:The bottom of sand-protecting barrier wall 2 is real wall, and the top of sand-protecting barrier wall 2 is provided with The colored hole of hollow out, it is that flower pore structure is husky beneficial to gathering that side wall is engraved.Remaining technical scheme of the present embodiment is consistent with embodiment 1, and this The technical scheme that embodiment is adopted is also applied for remaining embodiment.
Embodiment 3
See Fig. 3, in the present embodiment, the sand-protecting barrier cross section is semicircle, and sand-protecting barrier ridge 1 is arranged at top.Remaining of the present embodiment Technical scheme is consistent with embodiment 1, and the technical scheme that the present embodiment is adopted is also applied for remaining embodiment.
Embodiment 4
See Fig. 4, Fig. 5, in the present embodiment, the sand-protecting barrier cross section is isosceles triangle or isosceles trapezoid, and sand-protecting barrier is arranged at top Ridge 1.Remaining technical scheme of the present embodiment is consistent with embodiment 1, and the technical scheme that the present embodiment is adopted is also applied for it Remaining embodiment.
Embodiment 5
In the present embodiment, the sand-protecting barrier total high 20cm, sand-protecting barrier ridge 1 high 5cm, 30~40cm of bottom width, 0~20cm of top width are long 50~100cm, the thickness 3mm of sand-protecting barrier wall 2.Remaining technical scheme of the present embodiment is consistent with embodiment 1, and the present embodiment is adopted Technical scheme is also applied for remaining embodiment.
Embodiment 6
In the present embodiment, the sand-protecting barrier wall 2 is from the structure of bottom to top:Bottom 6cm is highly real wall, successively 8cm upwards Height is the colored hole that aperture is Φ 0.5cm, and topmost 5cm is the colored hole that aperture is Φ 1.0cm.Remaining technical side of the present embodiment Case is consistent with embodiment 2, and the technical scheme that the present embodiment is adopted is also applied for remaining embodiment.
Embodiment 7
In the present embodiment, the sand-protecting barrier be it is inside and outside can noose embedded riveting 3, side port one end internal diameter is less than the other end, and The long 1cm of mouth of the little internal side diameter, two sections of sand-protecting barriers are connected by embedded riveting 3.Remaining technical scheme of the present embodiment and embodiment 1 Unanimously, and the technical scheme that adopted of the present embodiment is also applied for remaining embodiment.
The poly- barrier that rustles of the present utility model can be combined as 50 × 50cm or 1 × 1m on flowing, semi-mobile dune, or 1 × The lattice-valued automata of 2m or 2 × 2m, or the determinant sand-protecting barrier of line space 2-3m.
The poly- barrier that rustles can gather sand, after husky consolidation is gathered, removable sand-protecting barrier;Again sand-protecting barrier is combined into into new checking winds and fixing drifting sand Engineering.When may also set up sand-protecting barrier, plant seed is added in sand-protecting barrier body, to promote germination to grow, improve direct seeding forestation Success rate.
Sand-protecting barrier body is combined, and the sand-protecting barrier wall 2 that can in advance make two pieces has been linked by the spike riveting 3 on the surface of sand-protecting barrier ridge 1 Come, be grouped together, or mould is made according to the structure of sand-protecting barrier wall 2, one-step casting forms cross section for semicircle or isoceles triangle The poly- barrier that rustles of shape or isosceles trapezoid, for checking winds and fixing drifting sand.The poly- barrier that rustles is placed directly on drift sand face during setting so as to Shamian Island is fully contacted, and does not interspace, and fills sand by means of wind and enters to hinder body, forms the husky ridge.The poly- barrier that rustles mutually can be connected with riveting, be arranged to Grid-like or other shapes, sand-protecting barrier is mutually supported so as to is constituted firm shape, is so difficult to be fallen by wind.By the big face of sand-protecting barrier Product spreads out, and forms sand-protecting barrier band in flakes, and wind drift sand is accumulated in sand-protecting barrier, and such sand-protecting barrier can both gather drift sand, can also pass through it The sand-protecting barrier in flakes of composition hinders husky and fixes the sand, and reaches with husky sand control, the effect checked winds and fixed drifting sand, and mitigates drift sand and causes disaster.
The above is only preferred implementation of the present utility model, rather than a limitation;Although it should be pointed out that with reference to upper State each embodiment to be described in detail this utility model, it will be understood by those within the art that, it still can be with Technical scheme described in the various embodiments described above is modified, or equivalent is carried out to which part or all technical characteristic and replaced Change;And these modifications and replacement, do not make each embodiment technical scheme of essence disengaging this utility model of corresponding technical scheme Scope.

Claims (7)

1. the barrier that rustles is gathered, it is characterised in that including sand-protecting barrier ridge and sand-protecting barrier wall, sand-protecting barrier ridge surface is provided with spike riveting, by spike riveting The sand-protecting barrier wall of both sides is linked up into composition sand-protecting barrier body, sand-protecting barrier body is hollow, bottomless.
2. the poly- barrier that rustles according to claim 1, it is characterised in that the sand-protecting barrier wall is from bottom to top portion:Under sand-protecting barrier wall Portion is real wall, and sand-protecting barrier wall top is provided with the colored hole of hollow out.
3. it is according to claim 1 to gather the barrier that rustles, it is characterised in that the sand-protecting barrier cross section is semicircle, and sand is arranged at top Barrier ridge.
4. it is according to claim 1 to gather the barrier that rustles, it is characterised in that the sand-protecting barrier cross section is isosceles triangle or isosceles Trapezoidal, sand-protecting barrier ridge is arranged at top.
5. it is according to claim 1 to gather the barrier that rustles, it is characterised in that the total high 20cm of the sand-protecting barrier, the high 5cm of sand-protecting barrier ridge, bottom Wide 30~40cm, 0~20cm of top width, long 50~100cm, sand-protecting barrier wall thickness 3mm.
6. the poly- barrier that rustles according to claim 2, it is characterised in that the sand-protecting barrier wall is from the structure of bottom to top:Bottom 6cm is highly real wall, and successively upwards 8cm height is the colored hole that aperture is Φ 0.5cm, and it is Φ 1.0cm that topmost 5cm is aperture Hua Kong.
7. the poly- barrier that rustles according to claim 1, it is characterised in that the sand-protecting barrier be inside and outside can noose embedded riveting, Side port one end internal diameter is less than the other end, and the long 1cm of mouth of the little internal side diameter, and two sections of sand-protecting barriers are connected by embedded riveting.
CN201621217812.2U 2016-11-11 2016-11-11 Gather husky sand barrier Expired - Fee Related CN206157708U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621217812.2U CN206157708U (en) 2016-11-11 2016-11-11 Gather husky sand barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621217812.2U CN206157708U (en) 2016-11-11 2016-11-11 Gather husky sand barrier

Publications (1)

Publication Number Publication Date
CN206157708U true CN206157708U (en) 2017-05-10

Family

ID=58658561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621217812.2U Expired - Fee Related CN206157708U (en) 2016-11-11 2016-11-11 Gather husky sand barrier

Country Status (1)

Country Link
CN (1) CN206157708U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106498921A (en) * 2016-11-11 2017-03-15 甘肃省治沙研究所 A kind of poly- barrier that rustles

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106498921A (en) * 2016-11-11 2017-03-15 甘肃省治沙研究所 A kind of poly- barrier that rustles
CN106498921B (en) * 2016-11-11 2019-10-25 甘肃省治沙研究所 The poly- barrier that rustles of one kind

Similar Documents

Publication Publication Date Title
CN105210494B (en) Loess steep slope is mixed to hand over Afforestation method
CN205305500U (en) Vegetation carpet capable of preventing washout of surface soil
CN206157708U (en) Gather husky sand barrier
CN102415244A (en) Planting design method for sand-binding plant community
CN106284281A (en) One utilizes the cellular method of defending and controlling sand of plant living body
CN104488652B (en) Method for cultivating Paris polyphylla by using grape forest lands
CN102334399B (en) soilless sod, preparation method and application thereof
CN104488674A (en) Field cultivation method for dendrobium
CN106498921B (en) The poly- barrier that rustles of one kind
CN207185442U (en) A kind of passion fruit bilayer seeks connections with frame
CN106193068A (en) A kind of biodegradable assembled lattice for slope ecological greening and using method
CN208242140U (en) The intercept net band system of tumbleweed
CN104674765B (en) A kind of self-locking eco-concrete irrigation canals and ditches bank protection of embedded haydite
CN203735123U (en) Adjustable garden rake
CN107873325B (en) Desert plant planting bag
CN109555138A (en) One kind is from nutrition anti-impact slope protection ecologic blanket and preparation method thereof
CN102349406B (en) Vegetation member for protecting karst region slope and protecting method using member
CN206189418U (en) Short silk adds muscle ecological grass and irritates blanket bank protection
CN206438494U (en) A kind of latticed pair of eyebrow formula sand-protecting barrier of wheat straw
CN202202330U (en) Vegetation member for slope face protection of side slope in karst region
CN208152002U (en) One kind is kept a full stand of seedings sand-fixation apparatus
CN208175606U (en) A kind of Scattered bamboos fast obstacle device
CN207869957U (en) A kind of gold bead sand pear row collection rain irrigation rig
CN207369643U (en) A kind of charcoal roadbed adsorbs vegetation
CN204080826U (en) Ecological slope protection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170510

Termination date: 20201111