CN206153423U - Take plate link chain's necking machine material feeding unit - Google Patents
Take plate link chain's necking machine material feeding unit Download PDFInfo
- Publication number
- CN206153423U CN206153423U CN201621119717.9U CN201621119717U CN206153423U CN 206153423 U CN206153423 U CN 206153423U CN 201621119717 U CN201621119717 U CN 201621119717U CN 206153423 U CN206153423 U CN 206153423U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- closing
- gear shift
- link chain
- plate link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pusher Or Impeller Conveyors (AREA)
Abstract
The utility model discloses a take plate link chain's necking machine material feeding unit, be in including work or material rest and setting on the work or material rest: plate link chain comprises chain and a plurality of delivery board, just is equipped with the arc that matches and be used for supporting the steel pipe on two adjacent delivery boards, what be located plate link chain one side connects the material support establishes in, and connects the silo, be used for accepting by the steel pipe of plate link chain output, still including set up the work or material rest top and with connect silo length to parallel crossbeam, follow the gliding removal of crossbeam seat, the removal seat on install the push pedal that promotes to connect the steel pipe in the silo to get into necking machine. The utility model is simple in operation, reasonable in design adopts full automatic mechanized operation, and the steel pipe that will treat processing one by one need not the manual work intervention in sending into necking machine, can improve production efficiency by a wide margin.
Description
Technical field
The utility model is related to gas cylinder processing technique field, more particularly, to a kind of dress of the closing-up machine feeding with conveying plate chain
Put.
Background technology
Seamless steel gas cylinder is widely used in filling pressure-air, oxygen, nitrogen, argon gas, carbon dioxide and in automobile
Compressed natural gas (CNG), ship, public place etc. are stored in dynamical system.
In the manufacture process of steel gas cylinder, the production link of most critical is that the closing in of gas cylinder two ends is molded, the work of the link
Skill quality directly influences the quality of product quality.Existing closing in moulding process has two kinds:One kind is that closed die forging is closed up, one
It is by closing-up machine spinning closing-in to plant.Rotary press modelling is good, efficiency high excellent with Forming Quality compared with closed die forging shaping
Point.
Present is carried out during shell nosing treatment to seamless steel gas cylinder, by manually steel pipe to be processed being pushed into closing-up machine
Spinning closing-in, inefficiency, high labor intensive are inside carried out, and there is certain potential safety hazard.
Utility model content
For problems of the prior art, the utility model provides a kind of dress of the closing-up machine feeding with conveying plate chain
Put, using full automatic mechanized operation, one by one steel pipe to be processed is sent in closing-up machine, without the need for manually being intervened, can
Greatly improve production efficiency.
The concrete technical scheme that the utility model is adopted is as follows:
A kind of closing-up machine pay-off with conveying plate chain, including bin and be arranged on the bin:Delivery board
Chain, is made up of chain and some delivery boards, and adjacent two pieces of delivery boards are provided with the arc merged for supporting steel pipe that matches;
Positioned at the splicing support of conveying plate chain side, splicing groove is inside set, for accepting the steel pipe exported by the conveying plate chain;
Also include being arranged on bin top and with splicing slot length to parallel crossbeam, along the movement that the crossbeam slides
Seat;The push pedal for promoting the steel pipe in splicing groove to enter closing-up machine is installed on described Mobile base.
The steel pipe for treating shell nosing treatment is placed on conveying plate chain, more specifically, is located in the arc of adjacent two pieces of delivery boards
On shape plate, the support cambered surface of two pieces of arcs is attached to two side bottoms of steel pipe, and by chain-driving delivery board, dragging steel pipe is carried out
Export to splicing support.
On crossbeam install Mobile base be active delivery device, Mobile base along crossbeam move when, drive push pedal push away forward
Enter, gradually promote the steel pipe in splicing support to enter closing-up machine, until after steel pipe is advancing to the position, driving push pedal to answer by Mobile base
Position, waits enabling signal next time.
As the base that preferred, described splicing support includes being fixed on bin, the support column on base;
Two gear shift levers are installed, often each pin in row separates distribution on the support column, are described splicing groove between two gear shift levers.
In the utility model, the splicing groove that V-shape is formed between two gear shift levers on the support columns is installed, mainly passes through two rows
The weight of pin supporting steel pipe, it is less with the contact area of steel pipe because every gear shift lever is be spaced apart many, be conducive to subtracting
The resistance of few steel pipe propulsion.
Used as preferred, the conveying plate chain is provided with some spaced apart guide plates with intercolumniation is supported, and guides by conveying
The steel pipe of plate chain output is entered in splicing groove.
Used as preferred, each pin in the first gear shift lever is arranged on the gap between adjacent two guide plate, described the
In one gear shift lever, every pin is arranged on the gap between adjacent two guide plate, and the end of pin should be slightly below the table of guide plate
Face is parallel with surface, it is to avoid the steel pipe to falling is formed and stopped, and remaining position of pin should be higher by guide plate so that fallen into
Steel pipe by the first gear shift lever supported weight;Further, the inclination angle of the second gear shift lever more has more than the inclination angle of the first gear shift lever
Beneficial to the steel pipe that prevention is scrolled down through, it is to avoid it is tumbled to ground.In two gear shift levers, each pin should pacify along the radial direction of support column
Dress, as it is further preferred that each pin is the rotating roller of activity, i.e., using two row's rotating rollers come supporting steel pipe, pushes steel pipe
While, rotating roller rotation can be greatly reduced the resistance of steel pipe propulsion, and equipment operation is more stable.
As being provided with the tooth bar and slide rail that coordinate the Mobile base to slide on preferred, described crossbeam, on Mobile base
Motor is installed and by Motor drive and with tooth bar meshed gears.
Closing-up machine pay-off of the present utility model also includes a connecting bracket, and push pedal is located at the bottom of the connecting bracket
Portion, the top of connecting bracket is fixedly connected with described Mobile base, so as to realize the linkage of push pedal and Mobile base.
The utility model is simple to operate, reasonable in design, using full automatic mechanized operation, one by one by steel pipe to be processed
Send in closing-up machine, without the need for manually being intervened, production efficiency can be greatly improved.
Description of the drawings
Fig. 1 is the structure chart of closing-up machine pay-off in the utility model.
Specific embodiment
Closing-up machine pay-off as shown in Figure 1, including bin 1, bin 1 is installed by 17 groups of chain 18 and some delivery boards
Into conveying plate chain, adjacent two pieces of delivery boards 17 be provided with match merge for supporting steel pipe arc 16, pending steel
Pipe is placed on the arc 16 of adjacent two pieces of delivery boards 17, and the support cambered surface of two pieces of arcs 16 is attached to the both sides bottom of steel pipe
Portion, drags delivery board 17 and drives steel pipe by the splicing groove that splicing support 4 is dropped down onto under output end by chain 18.
Splicing support 4 includes the base 2 being fixed on bin 1, the support column 3 on base 2;Pacify on support column 3
Equipped with two gear shift levers, including the first gear shift lever 9 and the second gear shift lever 5, often each pin in row separates distribution, between two gear shift levers
For splicing groove.In the present embodiment, the splicing groove of V-shape is formed between two gear shift levers on support column 3, mainly pass through two rows
The weight of pin supporting steel pipe, it is less with the contact area of steel pipe because every gear shift lever is be spaced apart many, be conducive to subtracting
The resistance of few steel pipe propulsion.
Some spaced apart guide plates 7 are provided between loading plate 25 and support column 3, are fallen by conveying plate chain for guiding
Steel pipe is entered in splicing groove.In the first gear shift lever 9, every pin is arranged on the gap between adjacent two guide plate 7, and pin
End should be slightly below the surface of guide plate 7 or parallel with surface, it is to avoid the steel pipe to falling is formed and stopped, and remaining position of pin
Putting should be higher by guide plate 7 so that the steel pipe for falling into is supported by the first gear shift lever 7.In addition, the inclination angle for arranging the second gear shift lever 5 is big
In the inclination angle of the first gear shift lever 9, the steel pipe for preventing to roll is more beneficial for, it is to avoid it is tumbled to ground.In two gear shift levers, each gear
Bar should be along the radially installed of support column 3.
The top of bin 1 is arranged with splicing slot length to parallel crossbeam 15, is supported by the column 8 positioned at the both sides of bin 1, and
The Mobile base 12 slided along crossbeam 15 is provided with, the push pedal for promoting the steel pipe in splicing groove to enter closing-up machine is installed on Mobile base 12
6.The tooth bar 14 and slide rail 11 for coordinating Mobile base 12 to slide is installed on crossbeam 15, motor 13 is installed and by electricity on Mobile base 12
Machine 13 drive and with the meshed gears of tooth bar 14.It is provided with the connecting bracket 10 that top is fixedly connected with Mobile base 12, push pedal 6
In the bottom of connecting bracket 10, the linkage of push pedal 6 and Mobile base 12 is realized.
In the present embodiment, each pin is the rotating roller of activity, i.e., push steel pipe come supporting steel pipe using two row's rotating rollers
Meanwhile, rotating roller rotation can be greatly reduced the resistance of steel pipe propulsion, and equipment operation is more stable.
On crossbeam install Mobile base 12 be active delivery device, Mobile base 12 along crossbeam 15 move when, drive push pedal 6
Push ahead, gradually promote the steel pipe in splicing support 4 to enter closing-up machine, until after steel pipe is advancing to the position, being driven by Mobile base
Push pedal resets, and waits enabling signal next time.
Preferable implementation example of the present utility model is the foregoing is only, the utility model is not limited to, it is all in this reality
Within new spirit and principle, any modification, equivalent substitution and improvements made etc. should be included in guarantor of the present utility model
Within the scope of shield.
Claims (7)
1. a kind of closing-up machine pay-off with conveying plate chain, it is characterised in that including bin and be arranged on the bin
's:
Conveying plate chain, is made up of chain and some delivery boards, and adjacent two pieces of delivery boards are provided with matching and merge for supporting steel
The arc of pipe;
Positioned at the splicing support of conveying plate chain side, splicing groove is inside set, for accepting the steel pipe exported by the conveying plate chain;
Also include being arranged on bin top and with splicing slot length to parallel crossbeam, along the Mobile base that the crossbeam slides;Institute
The push pedal for promoting the steel pipe in splicing groove to enter closing-up machine is installed on the Mobile base stated.
2. closing-up machine pay-off as claimed in claim 1, it is characterised in that described splicing support includes being fixed on bin
On base, the support column on base;
Two gear shift levers are installed, often each pin in row separates distribution on the support column, are described connecing between two gear shift levers
Hopper.
3. closing-up machine pay-off as claimed in claim 2, it is characterised in that if the conveying plate chain is provided with intercolumniation is supported
Do spaced apart guide plate.
4. closing-up machine pay-off as claimed in claim 3, it is characterised in that each pin in the first gear shift lever is arranged on phase
Gap between adjacent two guide plates, and the inclination angle of the second gear shift lever is more than the inclination angle of the first gear shift lever.
5. closing-up machine pay-off as claimed in claim 4, it is characterised in that each pin is the rotating roller of activity.
6. closing-up machine pay-off as claimed in claim 5, it is characterised in that the cooperation shifting is provided with described crossbeam
Tooth bar and slide rail that dynamic seat is slided, motor is installed on Mobile base and by Motor drive and with tooth bar meshed gears.
7. closing-up machine pay-off as claimed in claim 6, it is characterised in that also including a connecting bracket, push pedal is located at institute
The bottom of connecting bracket is stated, the top of connecting bracket is fixedly connected with described Mobile base.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621119717.9U CN206153423U (en) | 2016-10-13 | 2016-10-13 | Take plate link chain's necking machine material feeding unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621119717.9U CN206153423U (en) | 2016-10-13 | 2016-10-13 | Take plate link chain's necking machine material feeding unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206153423U true CN206153423U (en) | 2017-05-10 |
Family
ID=58653900
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621119717.9U Expired - Fee Related CN206153423U (en) | 2016-10-13 | 2016-10-13 | Take plate link chain's necking machine material feeding unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206153423U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108502443A (en) * | 2018-04-02 | 2018-09-07 | 襄阳科威电气有限公司 | A kind of steel tube shaping machine automatic charging control system |
CN111546047A (en) * | 2020-04-30 | 2020-08-18 | 嘉兴市永大消防配件有限公司 | Fastening device for fire-fighting steel cylinder valve |
-
2016
- 2016-10-13 CN CN201621119717.9U patent/CN206153423U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108502443A (en) * | 2018-04-02 | 2018-09-07 | 襄阳科威电气有限公司 | A kind of steel tube shaping machine automatic charging control system |
CN111546047A (en) * | 2020-04-30 | 2020-08-18 | 嘉兴市永大消防配件有限公司 | Fastening device for fire-fighting steel cylinder valve |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101372286B (en) | Marshalling machine for transporting blank | |
CN203033350U (en) | Roller feeding mechanism of bearing assembling machine | |
CN105947686A (en) | Automatic offline stacking production line | |
CN201124514Y (en) | Composite floor board overlaying production line | |
CN204702084U (en) | Magic cube type multirow vertical revolution cabinet | |
CN207402858U (en) | A kind of efficient draw cutting means | |
CN107322355B (en) | Pipe jacking and feeding device for full-automatic pipe sawing machine | |
CN206153423U (en) | Take plate link chain's necking machine material feeding unit | |
CN106904460A (en) | Cardboard automatic charging machine | |
CN206382459U (en) | Feeding device for gas bottle necking-in machine | |
CN101943024B (en) | Whole pulling and moving type whole-process unloading belt conveyor for coal mine underground filling | |
CN206153425U (en) | Gas cylinder necking machine's steel pipe pusher | |
CN206782908U (en) | Cardboard automatic charging machine | |
CN206203343U (en) | Oral liquid bottle automatic loading machine | |
CN107686022A (en) | A kind of Novel palletizer | |
CN209291450U (en) | Realize the feed device of automatic removable disk | |
CN207288471U (en) | A kind of interlocked numerical controlled plate bending machine of dual stage | |
CN205470015U (en) | Noodless packing extension distributing device | |
CN205952485U (en) | On / underlay mechanism | |
CN201086116Y (en) | Material distributing and head aligning device of steel bar bender | |
CN209668211U (en) | Elevator gasket automatic feeder | |
CN204310458U (en) | The adjustable speed change feeder of a kind of leg | |
CN211219128U (en) | Feeding device of press welder | |
CN113716095A (en) | Drug delivery device | |
CN207596191U (en) | A kind of Novel palletizer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170510 Termination date: 20181013 |
|
CF01 | Termination of patent right due to non-payment of annual fee |