CN206146861U - Fast cold circulation of fast heat of solid -liquid phase -change material and material stability test system - Google Patents

Fast cold circulation of fast heat of solid -liquid phase -change material and material stability test system Download PDF

Info

Publication number
CN206146861U
CN206146861U CN201620918994.XU CN201620918994U CN206146861U CN 206146861 U CN206146861 U CN 206146861U CN 201620918994 U CN201620918994 U CN 201620918994U CN 206146861 U CN206146861 U CN 206146861U
Authority
CN
China
Prior art keywords
water
storage box
quickly cooling
water storage
speed heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620918994.XU
Other languages
Chinese (zh)
Inventor
宋孟杰
陈颖
廖立元
杨庆成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong University of Technology
Original Assignee
Guangdong University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong University of Technology filed Critical Guangdong University of Technology
Application granted granted Critical
Publication of CN206146861U publication Critical patent/CN206146861U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The utility model discloses a fast cold circulation of fast heat of solid -liquid phase -change material and material stability test system, including cold hot -water circulation supply subsystem and the fast cold sample test district of fast heat, cold hot -water circulation supply subsystem includes cold water water storage box, hot water water storage box and heat pump cycle module, compressor in the heat pump cycle module is connected with water cooled condenser, and water cooled condenser is connected with the expansion valve, and the expansion valve is connected with water cooling type evaporator, and water cooling type evaporator is connected with the compressor, water cooled condenser arranges in in the hot water water storage box, water cooling type evaporator arranges in in the cold water water storage box. The beneficial effects of the utility model are that: the function is simple, and is with strong points, can realize up to ten thousand times the cold phase transition circulation of fast heat / speed, equipment structure is simple, and the installation degree of difficulty is low, and the strong operability realizes automated control, saves electric power, the succinct high efficiency of whole design, and the manufacturability is good, and occupation space is little, and economic cost low, equipment do not contain mechanically moving parts, stop frequent maintenance, and long service life has very high engineering application and worth.

Description

A kind of solid-liquid phase change material speed heat quickly cooling circulation and stability of material test system
【Technical field】
This utility model is related to testing of materials field, and especially a kind of solid-liquid phase change material speed heat quickly cooling circulation and material are steady Qualitative test system.
【Background technology】
Phase-change material is carried out after multiple phase transformation circulation, and the stability of its hot physical property is to determine the phase-change material application Important indicator.Existing achievable quickly cooling, the experimental apparatus of speed heat function are mainly used in studying material after sample quickly cooling or speed heat Thermal physical property parameter, therefore only once freezed or heated, do not made with the multiple speed heat quickly cooling phase transformation circulation of phase-change material and counting For target.Additionally, existing equipment complex structure, greatly, price is high, generally requires 3~50,000 yuan/platform or so for installation difficulty.If It realizes that the multiple phase transformation to phase-change material is circulated, and not only needs control manually, and with high costs, and Technical Economy is low.
In order to solve the defect of prior art presence, someone is improved equipment, Application No. 201010283704.6, it is entitled《A kind of system for testing stability of solid-liquid phase change materials》Utility application;Application Number be 201210142242.5, it is entitled《A kind of phase-changing energy storage material automatization thermal cycle experiment device and method》Practicality it is new Type patent application describes respectively two kinds of different improvement projects.But above two is improved equal scheme and is had the following disadvantages:1st, it is every The secondary circulation measurement that can only realize individual sample, inefficiency;2nd, it is low using efficiency during semiconductor refrigerating, need to consume very Many electric energy, very high initial cost is needed using water bath with thermostatic control as Cooling and Heat Source;3rd, all material is placed in test tube, test tube is placed in water In bath, the heat transfer of phase-change material is all low than teaching in the heat transfer of test tube and test tube.
【Utility model content】
The purpose of this utility model is to overcome the shortcomings of that above-mentioned prior art is present, and proposes that one kind is with strong points, speed heat/ Quickly cooling phase transformation cycle-index is more, and simple structure, installation difficulty is low, and Financial cost is low, solid-liquid phase change the advantages of long service life Material speed heat quickly cooling is circulated and stability of material test system.
To achieve these goals, this utility model is realized in:A kind of solid-liquid phase change material speed heat quickly cooling circulation And stability of material test system, including hot and cold water circulation-supplied subsystem and speed heat quickly cooling sample test area, the hot and cold water Circulation-supplied subsystem includes cold water water storage box, hot water water storage box and heat pump cycle module, and the heat pump cycle module includes pressure Contracting machine, water cooled condenser, expansion valve, water-cooled vaporizer, the compressor are connected by pipeline with water cooled condenser, institute State water cooled condenser to be connected with the expansion valve by pipeline, the expansion valve is connected by pipeline with the water-cooled vaporizer Connect, the water-cooled vaporizer is connected by pipeline with the compressor, form heat pump cycle;The water cooled condenser is placed in In the hot water water storage box;The water-cooled vaporizer is placed in the cold water water storage box.
Ball-cock assembly and automatic water-replenishing device are set in the hot water water storage box, and automatic water-replenishing device is positioned using ball-cock assembly Moisturizing, when the water level in water tank is less than setting value, ball-cock assembly can be automatically turned on to hot water water storage box moisturizing.
Electrical auxiliary heater is provided with hot water water storage box.
The arrival end in the speed heat quickly cooling sample test area is connected respectively by pipeline with cold water water storage box and hot water water storage box Connect, set respectively on the pipeline that is connected with cold water water storage box and hot water water storage box of arrival end in the speed heat quickly cooling sample test area Put electric check valve;Arrival end in the speed heat quickly cooling sample test area arranges water circulating pump;The speed heat quickly cooling sample is surveyed The port of export in examination area is connected respectively by pipeline with cold water water storage box and hot water water storage box, in the speed heat quickly cooling sample test area The pipeline that is connected with cold water water storage box and hot water water storage box of the port of export on be respectively provided with electric check valve.
The speed heat quickly cooling sample test area include into water supervisor, water outlet main pipe and be arranged on it is described enter water supervisor and water outlet Some arms composition of same Cheng Liudao is formed between supervisor, several sample test holes are set on the arm.
The arm can be root, per arm described in root on be provided with 10 sample test holes.
In the water inlet end of the arm, hand stop valve is set.
The sample test hole includes the bulge and rubber seal plug being fixed on the arm, the rubber seal Gag is at the opening of the bulge.
The bulge includes container outer shroud and container internal ring, is provided between the container outer shroud and container internal ring For containing the sample cavity of test sample, the sample cavity inside middle is provided with thermocouple.
Solid-liquid phase change material in solid-liquid phase change because caning absorb or discharging a large amount of heat energy and keep stationary temperature, tool simultaneously There is the energy storage density bigger than sensible heat energy-accumulation material, therefore can be applied in the energy storage equipment of various energy resources system, for example too The hold over system of positive energy heat utilization, the cold accumulation system of air-conditioning, heat recovery system of industrial exhaust heat etc..Solid-liquid phase change material can be divided into Organic phase change material and inorganic phase-changing material, during due to practical engineering application, phase-change material needs dry hundred times or even tens thousand of times instead Remelt, solidification, this requires to test the stability and reliability of nucleator and stabilizer life-time service.If used Manually repeat this process, by quite time-consuming effort.The phase-change material of other type, through being repeatedly used for a long, also may be used Can there is latent heat of phase change reduction, phase transition temperature is unstable to wait relaxation phenomenon, therefore also has the demand of stability test.
Heat stability after the cold and hot phase transformation circulation repeatedly of phase-change material is the important indicator for determining phase-change material application, The equipment that speed heat quickly cooling phase transformation circulation is carried out currently for it belongs to technology and the market vacancy.This utility model patent is a kind of solid Liquid phase-change material speed heat quickly cooling is circulated and stability of material test system, by providing cold water hot water for sample and then realizing cold and hot Phase transformation is circulated, while realizing the metering of cycle-index during valve transfer.Not only technically realize phase-change material The phase transformation of speed heat quickly cooling circulation problem, the patent equipment be also equipped with delicate structure, with material saving, low cost, occupy little space Plurality of advantages.Additionally, the motion of whole service process mechanical, without abrasion, long working life, reliability is high.Therefore, the practicality is new Type has not only captured current technology difficult point, while with very high engineering application value.
Generally speaking, compared with prior art, the beneficial effects of the utility model are:Function is simple, with strong points, can be with Realize the speed heat/quickly cooling phase transformation circulation of up to ten thousand times;Device structure is simple, and installation difficulty is low, strong operability, realizes that automatization is controlled System, saves electric power, and whole design is succinct, and efficiently good manufacturability takes up room little, and Financial cost is low, and equipment does not contain mechanical movement Part, prevents frequently maintenance, long service life, with very high engineering application value.
【Description of the drawings】
Fig. 1 is the system of a kind of solid-liquid phase change material speed heat quickly cooling circulation of this utility model and stability of material test system Schematic diagram;
Fig. 2 is a kind of solid-liquid phase change material speed heat quickly cooling circulation of this utility model and the sample in stability of material test system Product test section structure chart;
Fig. 3 is a kind of solid-liquid phase change material speed heat quickly cooling circulation of this utility model and the sample in stability of material test system Arm sectional view in product test section;
Fig. 4 is a kind of solid-liquid phase change material speed heat quickly cooling circulation of this utility model and the sample in stability of material test system The top view of the bulge in product test section.
【Specific embodiment】
Explanation is described in detail to this utility model below in conjunction with the drawings and specific embodiments.
A kind of solid-liquid phase change material speed heat quickly cooling circulation and stability of material test system, can be used for phase-change material thermally-stabilised Property test, as shown in figure 1, it includes hot and cold water circulation-supplied subsystem, speed heat quickly cooling sample test area 7, pattern switching from Dynamic control subsystem, data measurin system and data acquisition cycle-index number system.
Wherein, the hot and cold water circulation-supplied subsystem includes cold water water storage box 11, hot water water storage box 12 and heat pump cycle Module, the heat pump cycle module includes compressor 1, water cooled condenser 2, expansion valve 3, water-cooled vaporizer 4, the compression Machine 1 is connected by pipeline with water cooled condenser 2, and the water cooled condenser 2 is connected by pipeline with the expansion valve 3, institute State expansion valve 3 to be connected with the water-cooled vaporizer 4 by pipeline, the water-cooled vaporizer 4 is by pipeline and the compression Machine 1 connects, and forms heat pump cycle.Wherein, the water cooled condenser 2 is placed in the hot water water storage box 12, for heating heat Water in water water storage box 12, arranges ball-cock assembly and automatic water-replenishing device 9, automatic water-replenishing device 9 in the hot water water storage box 12 Moisturizing is positioned using ball-cock assembly, ball-cock assembly can be automatically turned on to hot water water storage box 12 when the water level in water tank is less than setting value Moisturizing.Electrical auxiliary heater 10 is provided with hot water water storage box 12, the electrical auxiliary heater 10 can be heating wire, be used for Auxiliary heating.The water-cooled vaporizer 4 is placed in the cold water water storage box 11, for cooling down the water in cold water water storage box 11. Ball-cock assembly 9 and automatic water-replenishing device are arranged in the cold water water storage box 11 to be used to prevent overflow and automatic water supplement.
The arrival end in the speed heat quickly cooling sample test area 7 by pipeline respectively with cold water water storage box 11 and hot water water storage box 12 connections, the pipeline that the arrival end in the speed heat quickly cooling sample test area is connected with cold water water storage box 11 and hot water water storage box 12 On be respectively provided with (the SV of electric check valve 81, SV3);Arrival end in the speed heat quickly cooling sample test area arranges water circulating pump 5, For extracting the liquid of cold water water storage box 11 and hot water water storage box 12.The port of export in the speed heat quickly cooling sample test area 7 passes through Pipeline is connected respectively with cold water water storage box 11 and hot water water storage box 12, the speed heat quickly cooling sample test area 7 the port of export with (the SV of electric check valve 8 is respectively provided with cold water water storage box 11 and the pipeline of the connection of hot water water storage box 122, SV4)。
The speed heat quickly cooling sample test area 7 is as shown in Fig. 2 including entering water supervisor 71, water outlet main pipe 74 and be arranged on institute State and form some arms 72 of same Cheng Liudao between water supervisor 71 and water outlet main pipe 74 and constitute, the arm 72 can be 5. Several sample test holes 73 are set on the arm 72, for installing sample test container.Set on per arm described in root 72 It is equipped with 10 sample test holes 73.Entering to arrange 5 arms 72 between water supervisor 71 and water outlet main pipe 72 described, such 5 50 sample test holes 73 can be set on the arm 72, therefore 50 sample test containers altogether can be disposed.In the institute per root The water inlet end for stating arm 72 arranges stop valve 6, the preferred manual stop valve 6 of the stop valve 6, in order to manual operation.
1 hand stop valve control, hand stop valve 10 sample test holes 73 disposed behind, institute are set on each arm Stating the tube wall hole position upper band in sample test hole 73 has screw thread, is sealed for tightening rubber closure.Whole sample area has 50 sample test holes 73, for selecting to use in test process.The switch of the hand stop valve in manually adjustable arm 72 comes The entrance of control current, untapped sample test hole 73 need to screw on threaded rubber closure, prevent leak.Wherein, institute State into water supervisor 71 and water outlet main pipe 72 internal diameter h be 7.5mm, length a be 550mm.Length g of the arm 72 is 800mm, The one end of the arm 72 to length f of the one end of stop valve 6 is 600mm, and internal diameter i is 60mm.The center of circle in the sample test hole 73 Spacing e is 60mm.The internal diameter i in the sample test hole 73 is 38mm.Outermost side branch 72 and entrance and exit end distance (k, D) be 50mm, sample test hole 73 and water outlet main pipe 74 it is nearest apart from c be 70mm.
As shown in Figure 3 and Figure 4, the sample test hole 73 includes the He of bulge 731 being fixed on the arm 72 Rubber seal plug 732, the rubber seal plug 732 is placed at the opening of the bulge 731, is threaded connection.It is described Bulge 731 includes container outer shroud 733 and container internal ring 734, sets between the container outer shroud 733 and container internal ring 734 The sample cavity 735 for containing test sample is equipped with, the inside middle of the sample cavity 735 is provided with thermocouple 736, it is to avoid touched Touch side wall and produce test error.Rubber seal ring 737 is lined between bulge 731 and arm 72.The container internal ring 734 external diameter p is 19mm, and the height s of the container internal ring 734 is 50mm;The external diameter q of the container outer shroud 733 is 35mm;Institute The height o for stating container outer shroud 733 is 60mm.
The bulge 731 is copper into can be by the copper pipe and copper ring welding processing of DN35 and DN19 containers Into, rubber seal plug 732 is cased with, it is closely excessively to coordinate between container outer shroud 733 and rubber seal ring 737.Rubber seal The periphery of ring 737 has screw thread, is screwed on the sample test hole 73 on arm 72, need to ensure to be fitted close prevent leakage.Test sample After loading container, thermocouple 736 is inserted, thermocouple limit need to be guaranteed in centre position, it is to avoid touched side wall and produce test and miss Difference.
Electric check valve connection mode switches automatic control system, and by measured temperature value the opening and closing of electric check valve is instructed.
The pattern switching automatic control system is by program setting, with sample measurement temperature as the multiple electricity of control indexes The opening and closing of dynamic stop valve, it is final to realize surveying phase-change material and heating up melting so as to realize the switching between speed heat and quickly cooling two-mode With the phase transition process of cooling solidification.
The data measurin system is the turnover to cold water in the hot water entrance in hot water water storage box, cold water water storage box The positions such as mouth, each arm import and export and sample material carry out temperature survey (such as adopting thermocouple), afterwards by measured temperature value As the judge index of control logic in pattern switching automatic control system, the Automated condtrol of the system is realized.
The data acquisition cycles counting how many times system be temperature involved in record system, flow, compressor and The acquisition system of the measured values such as the power consumption of water pump and electric check valve switching times data.Speed heat cooling pattern is circulated 1 time, I.e. electric check valve switches 2 times, is designated as completing 1 phase transformation circulation.
In order to more clearly describe this utility model, the course of work of the present utility model such as following table is described below:
Different operation modes electric check valve door state table in experimentation
Sequence number Pattern Heat pump Electric check valve state
1 Plus heat fusing pattern Open SV1 is closed, and SV2 is closed, and SV3 is opened, and SV4 is opened, and SV5 is opened
2 Cooled and solidified pattern Open SV1 is opened, and SV2 is opened, and SV3 is closed, and SV4 is closed, and SV5 is opened
3 It is out of service Stop SV1 is closed, and SV2 is closed, and SV3 is closed, and SV4 is closed, and SV5 is closed
First, heat pump starts, and high-temperature gas cold-producing medium is discharged from compressor outlet, into water cooled condenser by heat Amount passes to the water in hot water water storage box, is condensed into liquid, and liquid refrigerant becomes gas-liquid two-phase refrigeration after expansion valve throttling Agent, two phase refrigerant enters the heat that vaporizer absorbs cold water, becomes gas and finally enter compressor to complete a kind of refrigeration cycle.
Then, when the water temperature of cold water water storage box and hot water water storage box is reached value set in advance by heat pump, start Water circulating pump, to sample test area hot and cold water is conveyed.
Working method under set forth below plus heat fusing and cooled and solidified both of which:
1st, heat fusing pattern is added:Water circulating pump extracts hot water from heating water tank, is transported to sample area, afterwards hot water Boiler is returned, in water circulation route such as Fig. 1 shown in red solid line arrow;Treat that sample is completely melt, its temperature rises to and is System setting value Thigh (typically takes the temperature value higher than 10 degree of the sample phase transition temperature), the electronic cut-off of automatic control system regulation Valve, by operating mode refrigerating mode is switched to;
2nd, cooled and solidified pattern:Water circulating pump (5) extracts cold water from cold water storage cistern, is transported to sample area, Zhi Houleng Water Returning water case, in water circulation route such as Fig. 1 shown in blue dotted arrow;Treat that sample solidifies completely, its temperature is reduced to Default value Tlow (typically takes the temperature value less than 10 degree of the sample phase transition temperature), and automatic control system adjusts electronic cut-off Valve, by operating mode heating mode is switched to.
When electromagnetic valve switches after 2 times, enumerator is designated as 1 circulation;Heating/cooling operating mode iterative cycles, it is to be counted When device counts cycle-index and reaches the cycle-index set by system, program can make remind and termination device operation, successively Stop heat pump and water circulating pump and close electric check valve valve.The harvesters such as temperature, flow and counting assembly continue Carry out, treat that manual operation is stopped.
Preferred embodiment of the present utility model described in detail above, it will be appreciated that the ordinary skill of this area without Need creative work just can make many modifications and variations according to design of the present utility model.Therefore, it is all in the art Technical staff is conceived in prior art basis by logical analyses, reasoning or can according to limited experiment according to this utility model With the technical scheme for obtaining, should be among the protection domain determined by the claims.

Claims (9)

1. a kind of solid-liquid phase change material speed heat quickly cooling is circulated and stability of material test system, including hot and cold water circulation-supplied subsystem System and speed heat quickly cooling sample test area, it is characterised in that the hot and cold water circulation-supplied subsystem includes cold water water storage box, hot water Water storage box and heat pump cycle module, the heat pump cycle module includes that compressor, water cooled condenser, expansion valve, water-cooled are steamed Send out device, the compressor to be connected with water cooled condenser by pipeline, the water cooled condenser is by pipeline and the expansion Valve connects, and the expansion valve is connected by pipeline with the water-cooled vaporizer, and the water-cooled vaporizer is by pipeline and institute Compressor connection is stated, heat pump cycle is formed;The water cooled condenser is placed in the hot water water storage box;The water-cooled evaporation Device is placed in the cold water water storage box.
2. circulate and stability of material test system according to a kind of solid-liquid phase change material speed heat quickly cooling described in claim 1, its It is characterised by, ball-cock assembly and automatic water-replenishing device is set in the hot water water storage box.
3. circulate and stability of material test system according to a kind of solid-liquid phase change material speed heat quickly cooling described in claim 2, its It is characterised by, in hot water water storage box electrical auxiliary heater is provided with.
4. circulate and stability of material test system according to a kind of solid-liquid phase change material speed heat quickly cooling described in claim 1, its It is characterised by, the arrival end in the speed heat quickly cooling sample test area is connected respectively by pipeline with cold water water storage box and hot water water storage box Connect, set respectively on the pipeline that is connected with cold water water storage box and hot water water storage box of arrival end in the speed heat quickly cooling sample test area Put electric check valve;Arrival end in the speed heat quickly cooling sample test area arranges water circulating pump;The speed heat quickly cooling sample is surveyed The port of export in examination area is connected respectively by pipeline with cold water water storage box and hot water water storage box, in the speed heat quickly cooling sample test area The pipeline that is connected with cold water water storage box and hot water water storage box of the port of export on be respectively provided with electric check valve.
5. circulate and stability of material test system according to a kind of solid-liquid phase change material speed heat quickly cooling described in claim 4, its Be characterised by, the speed heat quickly cooling sample test area by enter water supervisor, water outlet main pipe and be arranged on it is described enter water supervisor and water outlet Some arms composition of same Cheng Liudao is formed between supervisor, several sample test holes are set on the arm.
6. circulate and stability of material test system according to a kind of solid-liquid phase change material speed heat quickly cooling described in claim 5, its Be characterised by, the arm can be root, per arm described in root on be provided with 10 sample test holes.
7. circulate and stability of material test system according to a kind of solid-liquid phase change material speed heat quickly cooling described in claim 5, its It is characterised by, stop valve is set in the water inlet end of the arm.
8. circulate and stability of material test system according to a kind of solid-liquid phase change material speed heat quickly cooling described in claim 5, its It is characterised by, the sample test hole includes the bulge and rubber seal plug being fixed on the arm, the rubber is close Blocking is placed at the opening of the bulge.
9. circulate and stability of material test system according to a kind of solid-liquid phase change material speed heat quickly cooling described in claim 8, its It is characterised by, the bulge includes container outer shroud and container internal ring, arranges between the container outer shroud and container internal ring There is the sample cavity for containing test sample, the sample cavity inside middle is provided with thermocouple.
CN201620918994.XU 2015-12-30 2016-08-22 Fast cold circulation of fast heat of solid -liquid phase -change material and material stability test system Expired - Fee Related CN206146861U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2015211407168 2015-12-30
CN201521140716 2015-12-30

Publications (1)

Publication Number Publication Date
CN206146861U true CN206146861U (en) 2017-05-03

Family

ID=58627868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620918994.XU Expired - Fee Related CN206146861U (en) 2015-12-30 2016-08-22 Fast cold circulation of fast heat of solid -liquid phase -change material and material stability test system

Country Status (1)

Country Link
CN (1) CN206146861U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108195875A (en) * 2017-12-12 2018-06-22 中国科学院过程工程研究所 A kind of rapid automatized system and its assay method for measuring phase-change material cold cycling of width warm area
CN109406561A (en) * 2018-12-13 2019-03-01 西安交通大学 A kind of metal foam Ice-storing ball visual experimental apparatus

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108195875A (en) * 2017-12-12 2018-06-22 中国科学院过程工程研究所 A kind of rapid automatized system and its assay method for measuring phase-change material cold cycling of width warm area
CN108195875B (en) * 2017-12-12 2020-01-21 中国科学院过程工程研究所 System and method for rapidly and automatically measuring cold and hot circulation of phase change material in wide temperature area
CN109406561A (en) * 2018-12-13 2019-03-01 西安交通大学 A kind of metal foam Ice-storing ball visual experimental apparatus

Similar Documents

Publication Publication Date Title
CN105928967A (en) Novel test system for thermal stability of phase-change material
CN203518746U (en) Multi-grade heat recovery phase change heat accumulator
Liu et al. Performance of bypass cycle defrosting system using compressor casing thermal storage for air-cooled household refrigerators
CN103557674B (en) A kind of safety control system for the defrosting of freezer warm refrigerant
CN206146861U (en) Fast cold circulation of fast heat of solid -liquid phase -change material and material stability test system
CN104930584B (en) Parallel superconductive solar heat-pump hot-water water bathing heating system
CN211577035U (en) Phase change material cycle life testing arrangement
CN105954312B (en) A kind of heat stability testing system of solid-liquid phase change material
CN109883234A (en) A kind of normal pressure phase change material device
CN108332321A (en) A kind of phase-change energy storage device
CN105783160A (en) Environmental energy-saving system for storing residual cool of air conditioner
CN209541174U (en) A kind of conduction oil energy storage heat-exchange system
CN208579446U (en) A kind of multifunctional efficient air-conditioning system
CN103912942A (en) Air conditioning system with indoor automatic air interchanger coupled with phase-change refrigerator
CN106969449A (en) Mesolimnion cuts down the water energy-storage system and its application method with utilizing
CN108344005B (en) Waste heat recycling system for large and medium-sized kitchen
CN205861586U (en) A kind of heat stability testing device of solid-liquid phase change material
CN208026660U (en) Phase-change material thermal stability automatic test device for building
CN103016951B (en) Residual liquid emptier
CN208332412U (en) Distributing solar energy assists phase transformation thermal storage heating system
CN110043941A (en) Centralized phase-transition heat-storage and air source heat pump combined heating system
CN108489841A (en) A kind of phase-change material cold cycling endurance testing device and test method
CN205771141U (en) A kind of material trough outer circulation cooling system
CN209116541U (en) A kind of thermal stratification heat storage water tank including heat flux distribution device and phase change heat accumulator
CN208635366U (en) Quickly cooling device is used in a kind of processing of tea-seed oil

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170503

Termination date: 20170822