CN206128797U - Novel two return circuits become exhales high tower - Google Patents

Novel two return circuits become exhales high tower Download PDF

Info

Publication number
CN206128797U
CN206128797U CN201621080207.5U CN201621080207U CN206128797U CN 206128797 U CN206128797 U CN 206128797U CN 201621080207 U CN201621080207 U CN 201621080207U CN 206128797 U CN206128797 U CN 206128797U
Authority
CN
China
Prior art keywords
arm
cross
newly
cross arm
ground wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621080207.5U
Other languages
Chinese (zh)
Inventor
葛细武
谢涛
马玉
赵敏
章媛
胡红兰
康卫伟
汪碧霞
肖滢
王力
罗正帮
赵晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Anhui Electric Power Co Ltd, Anhui Huadian Engineering Consulting and Design Co Ltd, Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201621080207.5U priority Critical patent/CN206128797U/en
Application granted granted Critical
Publication of CN206128797U publication Critical patent/CN206128797U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model provides a novel two return circuits become exhales high tower, includes body of the tower, top layer ground wire cross arm, and top layer ground wire cross arm below is provided with upper wire cross arm, and upper wire cross arm below is provided with the supplementary cross arm in middle level, and the supplementary cross arm below in middle level sets up lower floor's ground wire cross arm, and lower floor ground wire cross arm below sets up lower floor's wire cross arm, top layer ground wire cross arm is the one deck altogether, arranges the both sides cross arm from the newly -built circuit direction of body of the tower perpendicular to, upper strata wire cross arm divides the three -layer. The beneficial effect of the utility model: this novel two return circuits become exhales high tower's circuit bores the wire that inclines more and is the drum type and arranges, and is the same with conventional line arrangement mode, has avoided the influence of arranging adjacent tower wire, bores the wire that inclines more and adopts the horizontal arrangement mode, compressed lead, wire pair ground height, further optimized brill vietnamese side case, the possibility that reduced old circuit transformation, put cable underground, single two return circuits varies.

Description

A kind of novel double-loop becomes exhales high tower
Technical field
This utility patent is related to ultra-high-tension power transmission line technical field, more particularly to high tower is exhaled in a kind of change of novel double-loop.
Background technology
In view of the facility such as transmission line of electricity, railway, high speed is identical to the principle of selecting the best qualified in corridor, account for for reduces cost, reduction The consideration on ground, generally selects parallel cabling.Affected by transformer station's drop point site, newly-built circuit Jing often with built circuit, railway, High speed etc. is intersected, and requires with reference to related Regulations, therefore transmission line of electricity is first across rear brill(Or after subdrilling across)Situation occur repeatedly.
At present, for need it is continuous bore across double back transmission line engineering, when using 1 base routine shaft tower cannot realize continuously Bore across when, logical conventional solution is:1. by rising voltage levels higher line road or reducing the relatively low circuit of electric pressure Mode, exist cross link have a power failure it is longer, the problems such as the wasting of resources;2. by the way of putting cable underground, exist construction cost compared with The problems such as height, circuit O&M difficulty;3. by the way of single double loop conversion, it is longer to there is building time, bores that to get over number of times more, The problems such as floor space is larger.Therefore such scheme constructional difficulties and comprehensive cost is higher, it is unfavorable for engineering construction.
Utility model content
In order to overcome the deficiencies in the prior art, this utility model to provide a kind of novel double-loop change and exhale high tower, this is new double Loop becomes exhales the line crossing side wire of high tower in drum type arrangement, identical with conventional line arrangement, it is to avoid adjacent tower is led Line arrangement impact, bore get over side wire adopt horizontally arranged mode, have compressed lead, ground wire to ground level, further optimize brill More scheme, reduce old track remodelling, put cable underground, the possibility of single double loop conversion.
This utility model solves the technical scheme that adopted of above-mentioned technical problem:
A kind of novel double-loop becomes exhales high tower, including tower body, top layer ground wire cross-arm, is provided with below top layer ground wire cross-arm Layer conductor cross-arm, is provided with middle level auxiliary cross-arm, arranges lower floor's ground wire horizontal below the auxiliary cross-arm of middle level below topping wire cross-arm Load, arranges lower layer conductor cross-arm, totally one layer of the top layer ground wire cross-arm, from tower body perpendicular to newly-built line below lower floor's ground wire cross-arm Both sides cross-arm is arranged in road direction, and the topping wire cross-arm divides three layers, and each layer is arranged from tower body perpendicular to newly-built line direction Both sides cross-arm, the middle level aid in cross-arm from tower body perpendicular to newly-built line direction arranging multiplayer both sides cross-arm, the lower floor ground Totally one layer of line cross-arm, arranges both sides cross-arm, the lower layer conductor cross-arm totally a layer, from tower perpendicular to newly-built line direction from tower body Body arranges both sides cross-arm perpendicular to newly-built line direction.
The higher one layer of both sides cross-arm of the topping wire cross-arm is provided with the jumper string with support tube, in the middle of the cross-arm of both sides One post insulator substring of side setting is got over towards boring;Two post insulators are provided with the middle of every layer of both sides cross-arm of lower two layers Son, one of support insulator is parallel to newly-built line direction and is located at span line side, and another is parallel to newly-built line Road direction and be located at bore get over circuit side.
The middle level auxiliary cross-arm is provided with three support insulators in each layer of both sides cross-arm, parallel to newly-built circuit side To, wherein, support insulator is located in the middle part of cross-arm and span line side, a support insulator be located in the middle part of cross-arm and Bore and get over circuit side, another support insulator is located at cross-arm taper and bores gets over circuit side.
Lower floor's ground wire cross-arm is provided with three support insulators on each layer of both sides cross-arm, in the middle part of cross-arm, Parallel to newly-built line direction, wherein, a support insulator is located to bore gets over circuit side, and another two support insulator is located at and bores More circuit side.
The lower layer conductor cross-arm is provided with two support insulators on the cross-arm of both sides, in the middle part of cross-arm, bores and gets over Circuit side and parallel to newly-built line direction;And both sides cross-arm taper and middle part be each provided with one respectively with support tube V-type jumper string.
This utility model realizes double loop change by a base shaft tower and exhales high boring to cross over, and reduces first across rear brill(Or subdrilling Afterwards across)In engineering cross link transform, put cable underground, the probability of single double loop conversion, it is to avoid the power failure of cross link, increase Electric network reliability, reduces construction cost, while further have compressed boring the newly-built circuit lead wire and earth wire distance to the ground for getting over shelves.
The beneficial effects of the utility model:The novel double-loop becomes exhales the circuit of high tower to bore more side wire in drum type arrangement, It is identical with conventional line arrangement, it is to avoid impact to adjacent tower wire arrangements, bore and get over side wire and adopt horizontally arranged mode, Have compressed lead, ground wire to ground level, further optimize brill and get over scheme, reduce old track remodelling, put cable underground, single double loop The possibility of conversion.
Description of the drawings
Further illustrate with reference to the accompanying drawings and examples.
Fig. 1 is the new structural representation of this utility model;
Fig. 2 is wiring construction schematic diagram of the present utility model.
Specific embodiment
A kind of novel double-loop as Figure 1-Figure 2 becomes exhales high tower, including tower body 1, top layer ground wire cross-arm 2, top layer ground Topping wire cross-arm 3 is provided with below line cross-arm 2, middle level auxiliary cross-arm 4, middle level auxiliary below topping wire cross-arm 3, is provided with Lower floor ground wire cross-arm 5 is set below cross-arm 4, lower layer conductor cross-arm 6 is set below lower floor ground wire cross-arm 5, the top layer ground wire is horizontal 2 totally one layer of load, arranges both sides cross-arm perpendicular to newly-built line direction from tower body 1, and 3 points three layers of the topping wire cross-arm is each Layer arranges both sides cross-arm perpendicular to newly-built line direction from tower body 1, and the middle level aids in cross-arm 4 from tower body 1 perpendicular to newly-built line Road direction arranging multiplayer both sides cross-arm, 5 totally one layer of lower floor's ground wire cross-arm are arranged from tower body 1 perpendicular to newly-built line direction Both sides cross-arm, 6 totally one layer of the lower layer conductor cross-arm arrange both sides cross-arm perpendicular to newly-built line direction from tower body 1.
The length and the spacing with wire cross-arm of the top layer ground wire cross-arm 2, need to meet lightning protection, lead wire and earth wire spacing Require, topping wire cross-arm 3, the middle level auxiliary cross-arm 4, the lower floor's ground wire cross-arm 5, length of lower layer conductor cross-arm 6 and interlayer Away from meeting electric requirement, the upper strata also needs reference across side line line conductor arrangement form with spacing across the length of cross-arm 3, The number of plies of the middle level auxiliary cross-arm 4 more put and determined across the discrepancy in elevation between point by being bored, and the discrepancy in elevation gets over upper mesophere auxiliary cross-arm 4 The number of plies is more, 5 length of lower floor's ground wire cross-arm and need to meet lead wire and earth wire spacing, lightning protection with the spacing of lower floor ground wire cross-arm 6 and protects The requirement of shield.
The higher one layer of both sides cross-arm of horizontal 3 load of the topping wire is provided with the jumper string 11 with support tube, both sides cross-arm It is middle to get over 1 post insulator substring 10 of side setting towards brill;Two are provided with the middle of every layer of both sides cross-arm of lower two layers Post insulator chain 10, one of post insulator substring 10 are parallel to newly-built line direction and positioned at span line side, another It is individual parallel to newly-built line direction and be located at bore get over circuit side.
The middle level auxiliary cross-arm 4 is provided with three post insulator substrings 10 in each layer of both sides cross-arm, parallel to newly-built Line direction, wherein, a support insulator displacement in the middle part of cross-arm and bore get over circuit side, a support insulator displacement in In the middle part of cross-arm and span line side, another support insulator displacement is in cross-arm taper and span line side.
Lower floor's ground wire cross-arm 5 is provided with three post insulator substrings 10 on each layer of both sides cross-arm, positioned at cross-arm Middle part, parallel to newly-built line direction, wherein, a support insulator displacement gets over circuit side, another two post insulator in brill Substring is located at span line side.
The lower layer conductor cross-arm 6 is provided with two post insulator substrings 10 on the cross-arm of both sides, in the middle part of cross-arm, Span line side and parallel to newly-built line direction;And both sides cross-arm taper and middle part be each provided with respectively one band support The V-type jumper string 9 of pipe.
10 powered dot spacing of the support insulator, powered point and wire, distance between centers of tracks, the spacing of powered point and tower body, Electric requirement should be met.
Leap side ground wire 7 is hung on top layer ground wire cross-arm 2, and the more side ground wire 8 that bores is suspended on lower floor's ground wire horizontal stroke Load 5, according to lightning protection, the requirement of lead wire and earth wire spacing, determines the radical and hanging position of ground wire.
High steel tower is exhaled a newly-built basic utility model double loop change more between circuit and span line is bored, across side wire It is suspended at topping wire cross-arm 3, is suspended at top layer ground wire cross-arm 2 across side ground wire, brill more side wire is suspended on lower floor and leads At line cross-arm 6, bore and get over side ground wire and be suspended at lower floor ground wire cross-arm 5, phase conductor utilizes 3 highest of topping wire cross-arm across on side One layer of jumper string 7 with support tube and 3 lower two layers cross-arm of topping wire cross-arm and middle level auxiliary cross-arm 4, lower floor ground wire cross-arm 5 Bore and get over circuit side support insulator 10, be connected to 6 brills at lower layer conductor cross-arm and get over wire of the side near tower body;Mutually lead across in side Line aids in crossing in the middle part of cross-arm 4, lower floor's ground wire cross-arm 5, lower layer conductor cross-arm 6 using 3 lower two layers of topping wire cross-arm, centre V-type jumper string 9 with support tube in the middle part of circuit side support insulator 10 and lower layer conductor cross-arm 6, is connected to lower layer conductor cross-arm Bore the phase conductor got in the middle of side in place 6;Across under side, phase conductor is exhausted using middle auxiliary cross-arm 4 taper span line, one lateral brace In the middle part of edge 10, lower floor's ground wire cross-arm 5, lower layer conductor cross-arm 6 away from tower body span line side support insulator 10 and under V-type jumper string 9 with support tube in the middle part of layer conductor cross-arm 6, is connected to and bores the wire for getting over side away from tower body.Shelves wire is crossed over after enforcement Arrange in drum type, bore and shelves wire is got in horizontally disposed.
According to lightning protection, the requirement of lead wire and earth wire spacing, when needing to retain ground wire, need to meet across side wire with by across More the spacing of line grounding wire, brill more side ground wire and drilled more line conductor, when ground wire is cancelled, need to meet across side wire and quilt Span line ground wire, the spacing for boring more side wire and drilled more line conductor, cancellation lower floor ground wire cross-arm.
This utility model is illustrated by above-described embodiment, but it is to be understood that, above-described embodiment is For citing and descriptive purpose, and it is not intended to this utility model is limited in described scope of embodiments.In addition ability Field technique personnel it is understood that this utility model is not limited to above-described embodiment, according to teaching of the present utility model also More kinds of variants and modifications can be made, these variants and modifications all fall within this utility model scope required for protection with It is interior.

Claims (5)

1. high tower is exhaled in a kind of novel double-loop change, it is characterised in that including tower body, top layer ground wire cross-arm, under top layer ground wire cross-arm Side is provided with topping wire cross-arm, is provided with middle level auxiliary cross-arm, arranges below the auxiliary cross-arm of middle level below topping wire cross-arm Lower floor's ground wire cross-arm, arranges lower layer conductor cross-arm below lower floor's ground wire cross-arm, totally one layer of the top layer ground wire cross-arm hangs down from tower body Straight to arrange both sides cross-arm in newly-built line direction, the topping wire cross-arm divides three layers, and each layer is from tower body perpendicular to newly-built line Both sides cross-arm is arranged in road direction, and the middle level aids in cross-arm from tower body perpendicular to newly-built line direction arranging multiplayer both sides cross-arm, Totally one layer of lower floor's ground wire cross-arm, arranges both sides cross-arm, the lower layer conductor cross-arm perpendicular to newly-built line direction from tower body Totally one layer, both sides cross-arm is arranged perpendicular to newly-built line direction from tower body.
2. a kind of novel double-loop according to claim 1 becomes and exhales high tower, it is characterised in that the topping wire cross-arm compared with High one layer of both sides cross-arm is provided with the jumper string with support tube, gets over side towards brill and arrange a post insulator in the middle of the cross-arm of both sides Substring;Two support insulators are provided with the middle of every layer of both sides cross-arm of lower two layers, one of support insulator is parallel In newly-built line direction and positioned at span line side, another is parallel to newly-built line direction and is located at brill more circuit side.
3. high tower is exhaled in a kind of novel double-loop change according to claim 1, it is characterised in that the middle level auxiliary cross-arm exists Each layer of both sides cross-arm is provided with three support insulators, parallel to newly-built line direction, wherein, a support insulator is located at In the middle part of cross-arm and brill more circuit side, a support insulator are located in the middle part of cross-arm and span line side, and another pillar is exhausted Edge is located at cross-arm taper and span line side.
4. high tower is exhaled in a kind of novel double-loop change according to claim 1, it is characterised in that lower floor's ground wire cross-arm exists Three support insulators are provided with each layer of both sides cross-arm, in the middle part of cross-arm, parallel to newly-built line direction, wherein, one Individual support insulator is located to bore gets over circuit side, and another two support insulator is located to bore gets over circuit side.
5. high tower is exhaled in a kind of novel double-loop change according to claim 1, it is characterised in that the lower layer conductor cross-arm exists Two support insulators are provided with the cross-arm of both sides, in the middle part of cross-arm, are bored and is got over circuit side and parallel to newly-built circuit side To;And both sides cross-arm taper and middle part be each provided with a V-type jumper string with support tube respectively.
CN201621080207.5U 2016-09-26 2016-09-26 Novel two return circuits become exhales high tower Active CN206128797U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621080207.5U CN206128797U (en) 2016-09-26 2016-09-26 Novel two return circuits become exhales high tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621080207.5U CN206128797U (en) 2016-09-26 2016-09-26 Novel two return circuits become exhales high tower

Publications (1)

Publication Number Publication Date
CN206128797U true CN206128797U (en) 2017-04-26

Family

ID=58568910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621080207.5U Active CN206128797U (en) 2016-09-26 2016-09-26 Novel two return circuits become exhales high tower

Country Status (1)

Country Link
CN (1) CN206128797U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567597A (en) * 2016-09-26 2017-04-19 安徽华电工程咨询设计有限公司 Novel double-loop variable-norminal-height tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567597A (en) * 2016-09-26 2017-04-19 安徽华电工程咨询设计有限公司 Novel double-loop variable-norminal-height tower

Similar Documents

Publication Publication Date Title
CN205243135U (en) Two times overhead transmission line alternately bores tower more
CN106567597A (en) Novel double-loop variable-norminal-height tower
CN105257061B (en) A kind of single loop, which becomes, exhales high shaft tower
CN105155902B (en) A kind of compact double circuit, which becomes, exhales high shaft tower
CN104901255A (en) High-voltage overhead line crossing method and safe distance separating device
CN206016402U (en) Tape cable platform directly draws following formula double back cable terminal steel pipe pole
CN206128797U (en) Novel two return circuits become exhales high tower
CN205046908U (en) Two return circuits of compact become exhales high shaft tower
CN105155903B (en) A kind of double loop, which becomes, exhales high shaft tower
CN210622429U (en) 110 kilovolt bores and strides dual-purpose strain insulator tower
CN205036145U (en) Single loop becomes exhales high shaft tower
CN209924555U (en) 220kV single-loop strain drill crossing tower
CN204983860U (en) Two return circuits become exhales high shaft tower
CN106639489A (en) 500 kV large-angle ladder type ground wire single circuit penetrating-crossing tower
CN206894191U (en) A kind of single loop drilling is across transmission line of electricity
CN110453959A (en) A kind of double loop, which is bored, gets over steel pipe pole and transmission system
CN206128807U (en) Four return circuit steel pipe towers are thoughtlessly pressed to wild goose wing type
CN210622425U (en) Single-loop staggered-layer power transmission line tower
CN204928052U (en) Rod -type vertical arrangement compact transmission line
CN205445086U (en) It changes novel steel pipe pole of T to be applicable to cross link
CN202012226U (en) Narrow base tower
CN211524297U (en) Single-loop drilling and spanning integrated tower
CN111173346A (en) Single-loop drill span steel pipe rod
CN207469872U (en) Around anchor support on the horizontally arranged wire jumper of common-tower double-return
CN110259252A (en) A kind of 110 kilovolts are bored across dual-purpose anchor support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant