CN106639489A - 500 kV large-angle ladder type ground wire single circuit penetrating-crossing tower - Google Patents

500 kV large-angle ladder type ground wire single circuit penetrating-crossing tower Download PDF

Info

Publication number
CN106639489A
CN106639489A CN201710022914.1A CN201710022914A CN106639489A CN 106639489 A CN106639489 A CN 106639489A CN 201710022914 A CN201710022914 A CN 201710022914A CN 106639489 A CN106639489 A CN 106639489A
Authority
CN
China
Prior art keywords
ground wire
tower
arm
cross
wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710022914.1A
Other languages
Chinese (zh)
Inventor
赵枫
刘建伟
李金超
郝艳勇
刘剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ceec Tianjin Electric Power Design Institute Co Ltd
Original Assignee
Ceec Tianjin Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ceec Tianjin Electric Power Design Institute Co Ltd filed Critical Ceec Tianjin Electric Power Design Institute Co Ltd
Priority to CN201710022914.1A priority Critical patent/CN106639489A/en
Publication of CN106639489A publication Critical patent/CN106639489A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • E04H12/10Truss-like structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/20Spatial arrangements or dispositions of lines or cables on poles, posts or towers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention provides a 500 kV large-angle ladder type ground wire single circuit penetrating-crossing tower. The 500kV large-angle ladder type ground wire single circuit penetrating-crossing tower is used in penetrating and crossing of a power transmission line being 500 kV or above in a 500 kV single-circuit power transmission line. The penetrating-crossing tower comprises a tower body, an upper layer ground wire cross arm and a lower layer wire cross arm. The upper layer ground wire cross arm is arranged on the top of a tower head of the tower body. The lower layer wire cross arm is arranged on the position, below the upper layer ground wire cross arm, of the tower body. The upper layer ground wire cross arm is in a V shape and provided with a plurality of ground wire hanging points. Ground wires adopt a ladder-type hanging method. Wires are horizontally arranged on the lower layer wire cross arm. The penetrating-crossing tower is designed and optimized by adopting the ground wire suspension ladder-type hanging method and the horizontal wire arranging mode, and the problems that according to an existing tension resistant tower, due to existing of a jumper wire, a tower head is complex in structure, and the height of the tower head is difficult to compress are solved; the design is reasonable, stress is safe and reliable, the appearance is attractive, and the tower is easy to machine and install, has the low tower head height and the low tower body height and meets the requirement of a large-angle corner.

Description

500kV wide-angle staged ground wire single loop drillings get over tower
Technical field
The invention belongs to brill and gets over tower technology field, more particularly, to a kind of single time of 500kV wide-angles staged ground wire Bore and get over tower in road.
Background technology
With the fast development of China's economy, electrical network achieves great-leap-forward development.Newly-built 500kV circuits bore get over 500kV and The situation of Above Transmission Lines gradually increases, and when circuit is bored and got over, sometimes due to boring the restriction for getting over tower structure, the brill of current structure is got over Tower can only using detouring, rises the modes such as tower transformation, this make that the technical scheme of the construction of line becomes it is extremely complex, power failure may be needed Construction, big difficulty of construction, investment height, inconvenient operation maintenance.
At present, 500kV is bored for mono- time and is got over tower major part using anchor support pattern, because anchor support can be reduced to greatest extent Steel tower exhales height, on the basis of ensureing that the electric clearance after engineering builds up and ambient influnence meet the requirement of national regulation, with Reduce the width of corridor of UHV transmission line, so as to further solve the corridor resource of China's transmission line of electricity.But anchor support by More complicated in the presence tower head structure of wire jumper, tower head is highly difficult to compress, and wire jumper sag often governs steel tower and exhale high to enter One step is reduced.
The content of the invention
In view of this, the invention is directed to a kind of 500kV wide-angles staged ground wire single loop drilling and gets over tower, with full Demand is got in sufficient power system extra-high voltage, extra high voltage network for 500kV wide-angle single loop drillings.
To reach above-mentioned purpose, what the technical scheme of the invention was realized in:
500kV wide-angle staged ground wire single loop drillings get over tower, including tower body, upper strata ground wire cross-arm and lower layer conductor horizontal stroke Load, the upper strata ground wire cross-arm is arranged on the top of tower body tower head, and the lower layer conductor cross-arm is arranged on upper strata ground wire on tower body The bottom of cross-arm;
Tower body is more located in brill, and the horizontal bottom of the upper strata ground wire arranges three brills and gets over side ground wire hanging point;Tower body is in non- Bore and more locate, the horizontal top of the upper strata ground wire arranges non-boring and gets over side ground wire hanging point, the staged for realizing ground wire hangs method;
The lower layer conductor cross-arm is trapezoid structure, and pendant point before and after some jumper string hanging points and wire is distributed thereon, Realize that wire is horizontally arranged.
Further, the upper strata ground wire cross-arm is inverted trapezoidal structure, and two outboard ends of inverted trapezoidal structure are all provided with oriented The triangular structure of lower extension;A non-brill is respectively equipped with the transverse supporting rod on inverted trapezoidal structure top at the position at two ends The transverse supporting rod connection of more side ground wire hanging point, two triangular structure bottoms of inverted trapezoidal structure and the bottom of upper strata ground wire cross-arm Brill is equipped with wherein the one of tower body and gets over side ground wire hanging point.
Further, the lower layer conductor cross-arm is divided into the interior angle side wire cross-arm and lengthening exterior angle side being wholely set up and down Cross-arm, lengthens the length of the length more than interior angle side wire cross-arm of exterior angle side cross-arm.
Further, the two ends of the lower layer conductor cross-arm, be respectively equipped with pendant before and after wire at the position of three, middle part Point, lengthens the outer side in front and back in exterior angle side cross-arm two ends and interior angle side wire cross-arm middle part and is provided with jumper string hanging point;Specifically, institute Phase strain insulator hanging point in brill more outside setting foreign minister's strain insulator hanging point, the middle part setting of lower layer conductor cross-arm is stated, to be bored and arrange interior on the inside of more Phase strain insulator hanging point, the middle phase conductor is connected by hard wire jumper.
Further, the interior angle side of the wire is connected by flexible jumper, and exterior angle side and middle phase conductor are connected by hard wire jumper Connect.
Relative to prior art, the invention has the advantage that:
(1) by hanging design and optimization that method, the horizontally arranged mode of wire are bored more tower using the outstanding staged of ground wire, solution Certainly existing anchor support is highly difficult to the problem compressed due to the presence tower head complex structure of wire jumper, tower head;
(2) the interior angle side of wire is connected by flexible jumper, and exterior angle side and middle phase conductor are connected by hard wire jumper.Especially initiate Middle phase conductor is hung on tower body by ground employing carries out hard wire jumper, the electric property that tower head is arranged more is optimized, and outward Shape is attractive in appearance, rational in infrastructure.
(3) the more conventional 500kV of tower head size bores more tower (14m tower heads) and can greatly reduce, and can both save steel, again may be used Meet the electrical distance requirement across at point with abundant.
(4) tower body has the advantages that to bore more convenient, rational in infrastructure, good looking appearance, and its use at the scene will be favourable In optimization line route, reduce construction costs, shorten the engineering construction cycle, with obvious economic benefit and social benefit. Under the conditions of scissors crossing is run into, the technical program can effectively solve the problem that problem for extra-high voltage, extra high voltage network.
Description of the drawings
The accompanying drawing for constituting the part of the invention is used for providing further understanding the invention, present invention wound The schematic description and description made does not constitute the improper restriction to the invention for explaining the invention. In accompanying drawing:
Fig. 1 is that the structural representation for getting over tower is bored described in the invention embodiment;
Fig. 2 is that the jumper string windage yaw gap circle diagram for getting over tower is bored described in the invention embodiment.
Description of reference numerals:
Non- the boring of 1- gets over side ground wire hanging point, and 2- is bored and got over side ground wire hanging point, 3- jumper string hanging points, pendant point, 5- before and after 4- wires Tower body, 6- upper stratas ground wire cross-arm, 7- interior angles side wire cross-arm, 8- lengthens exterior angle side cross-arm.
Specific embodiment
It should be noted that in the case where not conflicting, the feature in example and example in the invention can phase Mutually combination.
The invention is described in detail below with reference to the accompanying drawings and with reference to example.
500kV wide-angle staged ground wire single loop drillings get over tower, as shown in figure 1, including tower body 5, the and of upper strata ground wire cross-arm 6 Lower layer conductor cross-arm, the upper strata ground wire cross-arm 6 is arranged on the top of the tower head of tower body 5, and the lower layer conductor cross-arm is arranged on tower The bottom of upper strata ground wire cross-arm on body 5;
The lower layer conductor cross-arm is divided into the interior angle side wire cross-arm 7 of left-right integrated setting and lengthens exterior angle side cross-arm 8, plus Length of the length of long exterior angle side cross-arm 8 more than interior angle side wire cross-arm 7.
The present embodiment bores more 24 meters of tower and exhales height, steel tower root to open as 12 meters, and steel tower top width is 2.2 meters.
Tower body 5 is respectively provided with three brills and gets over side ground in more place, the two ends and middle part of the bottom of the upper strata ground wire horizontal stroke 6 are bored Line hanging point 2;Tower body is more located in non-boring, and the both upper ends thereof of the upper strata ground wire horizontal stroke 6 is respectively provided with 1 non-boring and gets over side ground wire hanging point 1, the staged for realizing ground wire hangs method;
The lower layer conductor cross-arm is trapezoid structure, and pendant point before and after some jumper string hanging points 3 and wire is distributed thereon 4, realize that wire is horizontally arranged.
Specifically, the upper strata ground wire cross-arm 6 is inverted trapezoidal structure, and two outboard ends of inverted trapezoidal structure are equipped with downwards The triangular structure of extension;A non-brill is respectively equipped with the transverse supporting rod on inverted trapezoidal structure top at the position at two ends to get over The transverse supporting rod connection of side ground wire hanging point 1, two triangular structure bottoms of inverted trapezoidal structure and the bottom of upper strata ground wire cross-arm Brill more side ground wire hanging point 2 is equipped with wherein the one of tower body, the staged for realizing ground wire hangs method.
The lower layer conductor cross-arm is trapezoid structure, and pendant point before and after some jumper string hanging points 3 and wire is distributed thereon 4, realize that wire is horizontally arranged;The interior exterior angle side of the wire is connected by flexible jumper, and middle phase conductor is connected by hard wire jumper.
The brill of lower layer conductor cross-arm described in this example gets over outside and arranges mutually resistance in foreign minister's strain insulator hanging point, middle part setting hanging up Point, brill get over inner side and arrange interior phase strain insulator hanging point;The brill of the lower layer conductor cross-arm gets over outside and arranges jumper string hanging point, closes on brill and gets over Medial extremity arranges middle phase jumping wire string hanging point.
Jumper string windage yaw gap circle diagram is illustrated in figure 2, the windage yaw angle of jumper string hanging point is 19 degree.
The interior angle side of the wire is connected by flexible jumper, and exterior angle side and middle phase conductor are connected by hard wire jumper.
Both sides at the two ends of the lower layer conductor cross-arm, three, middle part position are respectively by pendant point and jump before and after wire Line insulator chain connects the wire that two neighboring tower comes, and realizes the wide-angle turnover of wire;The brill of the invention gets over tower can The turnover for realizing the wide-angle that circuit angular range is 40 ° -90 ° is supported.
The technical parameter of the invention is as follows:
1st, meteorological condition
2nd, lead wire and earth wire model and tension force
3rd, use condition
3rd, load table
4th, root is opened
5th, basic role power (kN)
Exhale high (m) Tmax Tx Ty Nmax Nx Ny
18 1739.73 439.85 338.55 2068.00 504.99 399.57
21 1797.12 448.35 347.52 2137.18 508.21 413.20
24 1845.43 448.44 357.51 2190.14 510.48 421.97
The present embodiment is used when the mono- back transmission lines of 500kV are bored and get over 500kV and above transmission line of electricity, is solved existing resistance to Tower is opened due to the presence tower head complex structure of wire jumper, tower head is highly difficult to the problem compressed, safely may be used with reasonable in design, stress By, good looking appearance, it is easily manufactured and installed, with relatively low tower head and tower body height, meet the requirement of wide-angle corner.
The preferred embodiment of the invention is the foregoing is only, it is all at this not to limit the invention Within the spirit and principle of innovation and creation, any modification, equivalent substitution and improvements made etc. should be included in the invention Protection domain within.

Claims (5)

1.500kV wide-angle staged ground wire single loop drillings get over tower, it is characterised in that:Including tower body (5), upper strata ground wire cross-arm (6) and lower layer conductor cross-arm, the upper strata ground wire cross-arm (6) is arranged on the top of tower body (5) tower head, the lower layer conductor cross-arm It is arranged on the bottom of upper strata ground wire cross-arm (6) on tower body (5);
Tower body (5) is bored and gets over side ground wire hanging point (2) in more place, the bottom setting three of upper strata ground wire horizontal stroke (6) is bored;At tower body More locate in non-boring, the top of upper strata ground wire horizontal stroke (6) arranges non-boring and gets over side ground wire hanging point (1), and the staged for realizing ground wire is hung Method;
The lower layer conductor cross-arm is trapezoid structure, and pendant point before and after some jumper string hanging points (3) and wire is distributed thereon (4), realize that wire is horizontally arranged.
2. 500kV wide-angles staged ground wire single loop drilling according to claim 1 gets over tower, it is characterised in that:On described Layer ground wire cross-arm (6) is inverted trapezoidal structure, and two outboard ends of inverted trapezoidal structure are equipped with the triangular structure for extending downwardly; Non- boring is respectively equipped with the transverse supporting rod on trapezium structure top at the position at two ends and gets over side ground wire hanging point (1), ladder It is equal at wherein the one of the transverse supporting rod connection tower body of two triangular structure bottoms of shape structure and the bottom of upper strata ground wire cross-arm It is provided with brill and gets over side ground wire hanging point (2).
3. 500kV wide-angles staged ground wire single loop drilling according to claim 1 gets over tower, it is characterised in that:Under described Layer conductor cross-arm is divided into interior angle side wire cross-arm (7) of left-right integrated setting and lengthens exterior angle side cross-arm (8), lengthens exterior angle side horizontal Length of the length of load (8) more than interior angle side wire cross-arm (7).
4. 500kV wide-angles staged ground wire single loop drilling according to claim 1 gets over tower, it is characterised in that:Under described Pendant point (4) before and after wire is respectively equipped with the two ends of layer conductor cross-arm, three, middle part position, is lengthened exterior angle side cross-arm (8) The outer side in front and back in two ends and interior angle side wire cross-arm (7) middle part is provided with jumper string hanging point (3).
5. 500kV wide-angles staged ground wire single loop drilling according to claim 1 gets over tower, it is characterised in that:It is described to lead The interior angle side of line is connected by flexible jumper, and exterior angle side and middle phase conductor are connected by hard wire jumper.
CN201710022914.1A 2017-01-12 2017-01-12 500 kV large-angle ladder type ground wire single circuit penetrating-crossing tower Pending CN106639489A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710022914.1A CN106639489A (en) 2017-01-12 2017-01-12 500 kV large-angle ladder type ground wire single circuit penetrating-crossing tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710022914.1A CN106639489A (en) 2017-01-12 2017-01-12 500 kV large-angle ladder type ground wire single circuit penetrating-crossing tower

Publications (1)

Publication Number Publication Date
CN106639489A true CN106639489A (en) 2017-05-10

Family

ID=58842901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710022914.1A Pending CN106639489A (en) 2017-01-12 2017-01-12 500 kV large-angle ladder type ground wire single circuit penetrating-crossing tower

Country Status (1)

Country Link
CN (1) CN106639489A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469399A (en) * 2018-12-14 2019-03-15 贵阳电力设计院有限公司 Single loop steel tower that is a kind of while solving to bore more and cross over demand
CN109898913A (en) * 2019-01-30 2019-06-18 中国电建集团河北省电力勘测设计研究院有限公司 A kind of double loop 500kV straight line, which bores, gets over tower
CN114458069A (en) * 2022-03-10 2022-05-10 中国能源建设集团湖南省电力设计院有限公司 Big corner "does" style of calligraphy transformer substation strain insulator tower of being qualified for next round of competitions

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2005135571A (en) * 2005-11-16 2007-06-10 Юрий Робертович Гунгер (RU) SUPPORT FOR HIGH AND ULTRA HIGH VOLTAGE ELECTRIC TRANSMISSION LINES AND FOR MULTI-CHAIN ELECTRIC TRANSMISSION LINES
CN201953131U (en) * 2011-01-21 2011-08-31 河北省电力勘测设计研究院 220kV one-tower double-loop straight corner penetrating tower
CN201963014U (en) * 2011-03-31 2011-09-07 河北省电力勘测设计研究院 220-kilovolt full-angle single circuit drilling tower
CN202017375U (en) * 2011-01-21 2011-10-26 河北省电力勘测设计研究院 220 kV olecranon butterfly drilling and crossing tower

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2005135571A (en) * 2005-11-16 2007-06-10 Юрий Робертович Гунгер (RU) SUPPORT FOR HIGH AND ULTRA HIGH VOLTAGE ELECTRIC TRANSMISSION LINES AND FOR MULTI-CHAIN ELECTRIC TRANSMISSION LINES
CN201953131U (en) * 2011-01-21 2011-08-31 河北省电力勘测设计研究院 220kV one-tower double-loop straight corner penetrating tower
CN202017375U (en) * 2011-01-21 2011-10-26 河北省电力勘测设计研究院 220 kV olecranon butterfly drilling and crossing tower
CN201963014U (en) * 2011-03-31 2011-09-07 河北省电力勘测设计研究院 220-kilovolt full-angle single circuit drilling tower

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
宋岩等: ""200kV同塔双回路钻越500kV线路方案研究"", 《中国电力建设科技成果专辑 2012年度下册》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469399A (en) * 2018-12-14 2019-03-15 贵阳电力设计院有限公司 Single loop steel tower that is a kind of while solving to bore more and cross over demand
CN109898913A (en) * 2019-01-30 2019-06-18 中国电建集团河北省电力勘测设计研究院有限公司 A kind of double loop 500kV straight line, which bores, gets over tower
CN114458069A (en) * 2022-03-10 2022-05-10 中国能源建设集团湖南省电力设计院有限公司 Big corner "does" style of calligraphy transformer substation strain insulator tower of being qualified for next round of competitions

Similar Documents

Publication Publication Date Title
CN205243135U (en) Two times overhead transmission line alternately bores tower more
CN106639489A (en) 500 kV large-angle ladder type ground wire single circuit penetrating-crossing tower
CN104201634B (en) A kind of single back line intersects cutoff method
CN206016402U (en) Tape cable platform directly draws following formula double back cable terminal steel pipe pole
CN205116866U (en) Device is down drawn to transmission line cable termination solid
CN104901255A (en) High-voltage overhead line crossing method and safe distance separating device
CN106150177A (en) A kind of terminal anchor support for double-layer frame outlet
CN105155902B (en) A kind of compact double circuit, which becomes, exhales high shaft tower
CN201953131U (en) 220kV one-tower double-loop straight corner penetrating tower
CN201963014U (en) 220-kilovolt full-angle single circuit drilling tower
CN104196301A (en) Novel crossed transposition tower
CN105257061A (en) Single-circuit tower with variable nominal height
CN206554592U (en) 220kV single loop wine glass-shapeds strain insulator, which is bored, gets over tower
CN204691370U (en) The novel butterfly in 110kV double loop, high altitude localities bores more tower
CN204299268U (en) A kind of mixed pressure three loop steel tube tower
CN209924555U (en) 220kV single-loop strain drill crossing tower
CN104763208A (en) 110kV dual-loop novel butterfly-shaped penetrating and spanning tower in high-altitude area
CN204370879U (en) A kind of novel crossed transposition tower
CN106567597A (en) Novel double-loop variable-norminal-height tower
CN203452435U (en) Dual-loop spanning-and-ducking steel pipe rod
CN206220619U (en) A kind of single time overhead transmission line cable T joint draws lower anchor support
CN206128807U (en) Four return circuit steel pipe towers are thoughtlessly pressed to wild goose wing type
CN206091522U (en) Existing single loop strain insulator iron tower cable draws lower beam
CN204928052U (en) Rod -type vertical arrangement compact transmission line
CN105155903B (en) A kind of double loop, which becomes, exhales high shaft tower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170510

RJ01 Rejection of invention patent application after publication