CN204691370U CN201520209954.3U CN201520209954U CN204691370U CN 204691370 U CN204691370 U CN 204691370U CN 201520209954 U CN201520209954 U CN 201520209954U CN 204691370 U CN204691370 U CN 204691370U
Authority
CN
China
Prior art keywords
wire
hanging point
cross arm
arm
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520209954.3U
Other languages
Chinese (zh)
Inventor
施文江
金世王
李晓勇
陈庆胜
詹伟
吴桂峰
张中
张岳
刘学东
林永
丁国鹏
马亮
徐欣
曹杉
郭芳
李钢梁
林银河
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Gansu Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Gansu Electric Power Co Ltd
Fujian Yongfu Power Engineering Co Ltd
Original Assignee
FUJIAN YONG FU PROJECT CONSULTANT Co Ltd
State Grid Corp of China SGCC
State Grid Gansu Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Gansu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN YONG FU PROJECT CONSULTANT Co Ltd, State Grid Corp of China SGCC, State Grid Gansu Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Gansu Electric Power Co Ltd filed Critical FUJIAN YONG FU PROJECT CONSULTANT Co Ltd
Priority to CN201520209954.3U priority Critical patent/CN204691370U/en
Application granted granted Critical
Publication of CN204691370U publication Critical patent/CN204691370U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型公开了一种高海拔地区110kV双回路新型蝶形钻越塔,包括塔身,以及自上而下与塔身连接的地线横担、上导线横担和中下导线横担,地线横担、上导线横担和中下导线横担沿塔身竖向中轴线对称分布,地线横担的两端设置地线挂点,且地线横担上地线挂点处设置上导线跳线用双角钢,上导线横担的两端设置上导线挂点,中下导线横担的两端设置中相导线挂点,在下导线横担上端点和塔身之间设置下相导线挂点,且在中相导线挂点处设置中导线跳线用双角钢,在下相导线挂点处设置下导线跳线用双角钢,所述上导线挂点、中相导线挂点和下相导线挂点成三角形分布。具有场地适用广泛,杆塔结构高度低、安装施工简单,检修维护方便,结构安全性好的优点。

The utility model discloses a 110kV double-circuit new butterfly drilling tower in a high-altitude area, including a tower body, and a ground wire cross arm, an upper wire cross arm and a middle and lower wire cross arm connected to the tower body from top to bottom. The ground wire cross arm, the upper wire cross arm and the middle and lower wire cross arm are symmetrically distributed along the vertical central axis of the tower body. Double-angle steel is used for the upper conductor jumper. The upper conductor hanging points are set at both ends of the upper conductor cross arm, the middle phase conductor hanging points are set at both ends of the middle and lower conductor cross arm, and the lower phase conductor is set between the upper end point of the lower conductor cross arm and the tower body. The hanging point of the wire is set at the hanging point of the middle wire, and the double angle steel for the jumper of the middle wire is set at the hanging point of the middle wire, and the double angle steel for the jumper of the lower wire is set at the hanging point of the lower phase wire. The hanging points of the phase conductors are distributed in a triangle. It has the advantages of wide application in the field, low height of the pole tower structure, simple installation and construction, convenient maintenance and good structural safety.

Description

高海拔地区110kV双回路新型蝶形钻越塔110kV double circuit new butterfly drilling tower in high altitude area

技术领域 technical field

本实用新型涉及输电线路设备领域,具体地,涉及一种高海拔地区110kV双回路新型蝶形钻越塔。 The utility model relates to the field of power transmission line equipment, in particular to a novel butterfly-shaped drilling tower with a double circuit of 110kV in a high-altitude area.

背景技术 Background technique

随着我国西部大开发的进展,我国西部高海拔地区的输送电电网建设取得很大的发展,不同电压等级之间或同电压等级之间必然会有很多地方交叉,尤其是110kV输电线路应用的普遍性,将会出现110kV输电线路钻越110kV、220kV和500kV等输电线路。 With the progress of my country's western development, the construction of power transmission grids in high-altitude areas in western China has made great progress. There will inevitably be many crossovers between different voltage levels or between the same voltage levels, especially the widespread application of 110kV transmission lines. Sexuality, there will be 110kV transmission lines drilling through 110kV, 220kV and 500kV transmission lines.

目前,新建110kV输电线路大都以同塔双回路为主,其杆塔结构主要采用伞型或鼓型结构形式。伞型或鼓型杆塔结构设置有四层横担,包括由上而下的地线横担、上导线横担、中导线横担、下导线横担。由于这种垂直排列导地线布置形式,其杆塔结构塔头较高,钻越输电线路时往往非常困难。因此、通常采用110kV输电线路绕行、双回局部变单回或原线路升塔改造等措施,造成线路技术方案复杂,施工难度大,投资成本高、运行维修部方便,甚至需要停电施工等。 At present, most of the new 110kV transmission lines are based on double circuits on the same tower, and the tower structure mainly adopts umbrella or drum structure. The umbrella-shaped or drum-shaped pole tower structure is equipped with four layers of cross-arms, including ground wire cross-arms, upper wire cross-arms, middle wire cross-arms, and lower wire cross-arms from top to bottom. Due to the layout of the vertically arranged ground wires, the tower head of the tower structure is relatively high, and it is often very difficult to drill through the transmission line. Therefore, measures such as bypassing 110kV transmission lines, partial transformation of double circuits into single circuits, or transformation of original line towers are usually adopted, resulting in complicated line technical schemes, difficult construction, high investment costs, convenient operation and maintenance, and even power outage construction.

实用新型内容 Utility model content

本实用新型的目的在于,针对上述问题,提出一种高海拔地区110kV双回路新型蝶形钻越塔,以实现场地适用广泛,杆塔结构高度低、安装施工简单,检修维护方便,结构安全性好的优点。 The purpose of this utility model is to solve the above problems and propose a new type of 110kV double-circuit butterfly drilling tower in high-altitude areas, so as to realize wide application in the field, low pole tower structure height, simple installation and construction, convenient maintenance and good structural safety. The advantages.

为实现上述目的,本实用新型采用的技术方案是: For realizing above-mentioned object, the technical scheme that the utility model adopts is:

一种高海拔地区110kV双回路新型蝶形钻越塔,包括塔身,以及自上而下与塔身连接的地线横担、上导线横担和中下导线横担,所述地线横担、上导线横担和中下导线横担沿塔身竖向中轴线对称分布,所述地线横担的两端设置地线挂点,且所述地线横担上地线挂点处设置上导线跳线用双角钢,所述上导线横担的两端设置上导线挂点,所述中下导线横担的两端设置中相导线挂点,在下导线横担上端点和塔身之间设置下相导线挂点,且在中相导线挂点处设置中导线跳线用双角钢,在下相导线挂点处设置下导线跳线用双角钢,所述上导线挂点、中相导线挂点和下相导线挂点成三角形分布。 A 110kV double-circuit new butterfly drilling tower in high-altitude areas, including a tower body, and a ground wire cross arm, an upper wire cross arm, and a middle and lower wire cross arm connected to the tower body from top to bottom. The pole, the upper wire cross arm and the middle and lower wire cross arm are symmetrically distributed along the vertical central axis of the tower body. The two ends of the ground wire cross arm are provided with ground wire hanging points, and the ground wire hanging points on the ground wire cross arm are Set the double angle steel for the upper conductor jumper, set the upper conductor hanging point at both ends of the upper conductor cross arm, set the middle phase conductor hanging point at both ends of the middle and lower conductor cross arm, and set the upper end point of the lower conductor cross arm and the tower body Set the hanging point of the lower phase wire between them, and set the double angle steel for the middle wire jumper at the hanging point of the middle phase wire, set the double angle steel for the lower wire jumper at the hanging point of the lower phase wire, the hanging point of the upper wire, the middle phase The hanging points of the wires and the hanging points of the lower phase wires are distributed in a triangle.

优选的,所述地线横担和上导线横担采用共面叠合结构,且地线横担和上导线横担为一体结构。 Preferably, the cross-arm of the ground wire and the cross-arm of the upper wire adopt a coplanar superimposed structure, and the cross-arm of the ground wire and the cross-arm of the upper wire are of an integral structure.

优选的,所述中相导线挂点与塔身竖向中轴线的间距为3500mm,所述下相导线挂点与中相导线挂点的间距为4300mm,所述上导线挂点与塔身竖向中轴线的间距为4300mm,所述地线挂点与塔身竖向中轴线的间距为6800 mm。 Preferably, the distance between the hanging point of the middle phase wire and the vertical central axis of the tower body is 3500mm, the distance between the hanging point of the lower phase wire and the hanging point of the middle phase wire is 4300mm, and the hanging point of the upper wire and the vertical axis of the tower body The distance to the central axis is 4300 mm, and the distance between the ground wire hanging point and the vertical central axis of the tower is 6800 mm.

优选的,所述下相导线挂点与塔身底部的垂直间距为12m,所述下相导线挂点与上导线挂点的垂直间距为3.8m,所述上导线挂点与地线挂点的垂直间距为2.3m。 Preferably, the vertical distance between the hanging point of the lower phase wire and the bottom of the tower body is 12m, the vertical distance between the hanging point of the lower phase wire and the hanging point of the upper wire is 3.8m, and the hanging point of the upper wire and the hanging point of the ground wire The vertical spacing is 2.3m.

本实用新型的技术方案具有以下有益效果: The technical solution of the utility model has the following beneficial effects:

本实用新型的技术方案,采用三相导线三角形排列新型蝶形的塔式结构,通过有效降低杆塔挂点结构高度,从而减低的地线、导线高度,实现输电线路在满足高压线路电气安全间隙要求下具有良好的钻越性能。具有场地适用广泛,杆塔结构高度低、安装施工简单,检修维护方便,结构安全性好的优点。 The technical scheme of the utility model adopts a new butterfly-shaped tower structure with three-phase conductors arranged in a triangle, and by effectively reducing the height of the pole tower hanging point structure, thereby reducing the height of the ground wire and conductors, and realizing the transmission line meeting the electrical safety clearance requirements of the high-voltage line It has good drilling performance. It has the advantages of wide application in the field, low height of the tower structure, simple installation and construction, convenient maintenance and good structural safety.

下面通过附图和实施例,对本实用新型的技术方案做进一步的详细描述。 The technical solutions of the present utility model will be further described in detail through the drawings and embodiments below.

附图说明 Description of drawings

图1为本实用新型实施例所述的高海拔地区110kV双回路新型蝶形钻越塔的结构示意图; Fig. 1 is the structural representation of the 110kV double circuit novel butterfly drilling and jumping tower described in the embodiment of the utility model;

图2为图1所示的高海拔地区110kV双回路新型蝶形钻越塔的侧视结构示意图; Fig. 2 is a schematic diagram of the side view structure of the 110kV double-circuit new butterfly drilling tower shown in Fig. 1;

图3为图1所示的高海拔地区110kV双回路新型蝶形钻越塔的俯视结构示意图。 Fig. 3 is a top view structural diagram of the 110kV double-circuit new butterfly drilling tower shown in Fig. 1 in the high-altitude area.

结合附图,本实用新型实施例中附图标记如下: In conjunction with the accompanying drawings, reference signs are as follows in the utility model embodiment:

1:地线挂点;2:上导线挂点;3中相导线挂点;4:下相导线挂点; 6:塔身;7:地线横担;8:上导线横担;9:中下导线横担;10:地线;11:上导线;12:中下导线;13:跳线绝缘子串;14:导线绝缘子串;15:跳线;16:下导线;17:中导线;18:上导线跳线用双角钢;19:下导线跳线用双角钢;20:中导线跳线用双角钢。 1: Hanging point of the ground wire; 2: Hanging point of the upper wire; 3: Hanging point of the middle phase wire; 4: Hanging point of the lower phase wire; 6: Tower body; 7: Cross arm of the ground wire; 8: Cross arm of the upper wire; 9: Middle and lower wire cross arm; 10: ground wire; 11: upper wire; 12: middle and lower wire; 13: jumper insulator string; 14: wire insulator string; 15: jumper; 16: lower wire; 17: middle wire; 18: double-angle steel for upper conductor jumper; 19: double-angle steel for lower conductor jumper; 20: double-angle steel for middle conductor jumper.

具体实施方式 Detailed ways

以下结合附图对本实用新型的优选实施例进行说明,应当理解,此处所描述的优选实施例仅用于说明和解释本实用新型,并不用于限定本实用新型。 The preferred embodiments of the present utility model are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described here are only used to illustrate and explain the present utility model, and are not intended to limit the present utility model.

如图1、图2和图3所示,一种高海拔地区110kV双回路新型蝶形钻越塔,包括塔身6,以及自上而下与塔身6连接的地线横担7、上导线横担8和中下导线横担9,地线横担6、上导线横担7和中下导线横担9沿塔身竖向中轴线对称分布,地线横担7的两端设置地线挂点1,且地线横担上地线挂点处设置上导线跳线用双角钢18,上导线横担8的两端设置上导线挂点2,中下导线横担9的两端设置中相导线挂点3,在下导线横担上端点和塔身之间设置下相导线挂点4,且在中相导线挂点3处设置中导线跳线用双角钢20,在下相导线挂点4处设置下导线跳线用双角钢19,上导线挂点2、中相导线挂点3和下相导线挂点4成三角形分布。图1中的虚线即为竖向中轴线。 As shown in Figure 1, Figure 2 and Figure 3, a 110kV double-circuit new butterfly drilling tower in high altitude areas, including the tower body 6, and the ground wire crossarm 7 connected to the tower body 6 from top to bottom, the upper Conductor crossarm 8 and middle and lower conductor crossarm 9, ground wire crossarm 6, upper conductor crossarm 7 and middle and lower conductor crossarm 9 are symmetrically distributed along the vertical central axis of the tower body, and ground wire crossarm 7 is arranged at both ends. Line hanging point 1, and double angle steel 18 for upper wire jumper is set at the upper ground wire hanging point of the ground wire cross arm, the upper wire hanging point 2 is set at both ends of the upper wire cross arm 8, and the two ends of the middle and lower wire cross arm 9 Set the hanging point 3 of the middle phase wire, set the hanging point 4 of the lower phase wire between the upper end point of the crossarm of the lower wire and the tower body, and set the double angle steel 20 for the middle wire jumper at the hanging point 3 of the middle phase wire, and hang the lower phase wire Point 4 is provided with double angle steel 19 for the lower wire jumper, and the upper wire hanging point 2, the middle phase wire hanging point 3 and the lower phase wire hanging point 4 are distributed in a triangle. The dotted line in Fig. 1 is the vertical central axis.

地线横担7、上导线横担8和中下导线横担9为由角钢组成的塔身桁架结构。塔身隔面采用矩形或正方形形式,塔身自上而下布置地线横担7、上导线横担8和中下导线横担9。 The ground wire cross arm 7, the upper wire cross arm 8 and the middle and lower wire cross arm 9 are tower body truss structures composed of angle steel. The partition of the tower body adopts a rectangular or square form, and the tower body is arranged with a ground wire cross arm 7, an upper wire cross arm 8 and a middle and lower wire cross arm 9 from top to bottom.

本技术方案的钻越塔根据高海拔地区导线对地距离要求规划最小呼高12m,输电线路三相导线采用三角形排列,有效降低杆塔结构高度。地线横担与上导线横担采用叠合布置,共同连接塔身结构,有效降低地线架高度。 The drill-through tower of this technical solution is planned to have a minimum height of 12m according to the distance between the wires and the ground in high-altitude areas, and the three-phase wires of the transmission line are arranged in a triangle, which effectively reduces the structural height of the tower. The cross-arm of the ground wire and the cross-arm of the upper wire are superimposed and connected to the structure of the tower body, effectively reducing the height of the ground wire frame.

本技术方案的钻越塔跳线采用悬垂跳线串形式,其上导线跳线串挂点位于地线横担上设置的上导线跳线用双角钢上,有效保证跳线间隙对杆塔结构的电气间距。中相导线挂点位置及下相导线挂点位置直接设置跳线挂点用双角钢。 The jumper jumper of the drilling tower in this technical scheme adopts the form of a hanging jumper string, and the hanging point of the jumper string of the upper wire is located on the double angle steel for the jumper of the upper wire set on the cross arm of the ground wire, which effectively ensures that the gap between the jumper wires is stable to the tower structure. electrical spacing. The hanging point position of the middle phase wire and the hanging point position of the lower phase wire are directly set with double angle steel for jumper hanging point.

其中,地线横担7和上导线横担8采用共面叠合结构,且地线横担7和上导线横担8为一体结构。 Wherein, the ground wire cross arm 7 and the upper wire cross arm 8 adopt a coplanar superimposed structure, and the ground wire cross arm 7 and the upper wire cross arm 8 are of an integrated structure.

中相导线挂点3与塔身竖向中轴线的间距为3500mm,下相导线挂点4与中相导线挂点的间距为4300mm,上导线挂点2与塔身竖向中轴线的间距为4300mm,地线挂点1与塔身竖向中轴线的间距为6800 mm。 The distance between the hanging point 3 of the middle phase conductor and the vertical central axis of the tower body is 3500mm, the distance between the hanging point 4 of the lower phase conductor and the hanging point of the middle phase conductor is 4300mm, and the distance between the hanging point 2 of the upper conductor and the vertical central axis of the tower body is 4300mm, the distance between the ground wire hanging point 1 and the vertical central axis of the tower body is 6800 mm.

下相导线挂点4与塔身底部的垂直间距为12m,下相导线挂点4与上导线挂点2的垂直间距为3.8m,上导线挂点2与地线挂点1的垂直间距为2.3m。 The vertical distance between the hanging point 4 of the lower phase conductor and the bottom of the tower body is 12m, the vertical distance between the hanging point 4 of the lower phase conductor and the hanging point 2 of the upper conductor is 3.8m, and the vertical distance between the hanging point 2 of the upper conductor and the hanging point 1 of the ground wire is 2.3m.

钻越塔地线横担7与上导线横担8采用叠合布置,共同连接塔身6结构,有效降低地线架高度,横担地线横担7与上导线横担8共面设计,减少结构剖口焊后火曲,使结构受力更简洁合理。 The ground wire cross arm 7 and the upper wire cross arm 8 of the drilling tower adopt a superimposed arrangement, and they are jointly connected to the tower body 6 structure to effectively reduce the height of the ground wire frame. The cross arm ground wire cross arm 7 and the upper wire cross arm 8 are coplanar design, Reduce the bending of the structure after welding, and make the structure more concise and reasonable.

中相导线挂点4位置S4根据跳线间隙圆确定为3500mm;下相导线挂点3位置S3根据导线相间距离确定为4300mm;上导线挂点2的位置S3根据跳线间隙圆和地线对上导线有效的保护范围确定为4300mm;地线挂点1位置S1根据地线10对下导线16的-10°保护角确定为6800 mm。 The position S4 of the hanging point 4 of the middle phase conductor is determined as 3500mm according to the jumper gap circle; the position S3 of the hanging point 3 of the lower phase conductor is determined as 4300mm according to the distance between the conductors; the position S3 of the hanging point 2 of the upper conductor is determined according to the jumper gap circle and the ground wire The effective protection range of the upper wire is determined to be 4300 mm; the position S1 of the ground wire hanging point 1 is determined to be 6800 mm according to the -10° protection angle of the ground wire 10 to the lower wire 16.

钻越塔根据高海拔地区输电线路导线的最小对地距离设计最小呼高H1为12m;导线垂直相间距离H2为3.8m,地线对上导线的有效保护距离设计地线架高度H3为2.3m。 According to the minimum ground-to-ground distance of transmission line conductors in high-altitude areas, the drill-through tower design minimum height H1 is 12m; the vertical phase-to-phase distance H2 of conductors is 3.8m, and the effective protection distance of ground wires to upper conductors is designed to be 2.3m. .

本技术方案根据高海拔地区规划设计,适用于1500m~2500m海拔地区,可根据塔位的现场条件设计全方位塔腿,具有场地适用广泛,杆塔结构高度低、安装施工简单,检修维护方便,结构安全性好等优点。 This technical solution is designed according to the planning and design of high-altitude areas, and is suitable for areas with an altitude of 1500m~2500m. All-round tower legs can be designed according to the site conditions of the tower position. Good security and other advantages.

最后应说明的是:以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。 Finally, it should be noted that: the above is only a preferred embodiment of the utility model, and is not intended to limit the utility model, although the utility model has been described in detail with reference to the foregoing embodiments, for those skilled in the art , it is still possible to modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements for some of the technical features. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.

Claims (4)

1.一种高海拔地区110kV双回路新型蝶形钻越塔,其特征在于,包括塔身,以及自上而下与塔身连接的地线横担、上导线横担和中下导线横担,所述地线横担、上导线横担和中下导线横担沿塔身竖向中轴线对称分布,所述地线横担的两端设置地线挂点,且所述地线横担上地线挂点处设置上导线跳线用双角钢,所述上导线横担的两端设置上导线挂点,所述中下导线横担的两端设置中相导线挂点,在下导线横担上端点和塔身之间设置下相导线挂点,且在中相导线挂点处设置中导线跳线用双角钢,在下相导线挂点处设置下导线跳线用双角钢,所述上导线挂点、中相导线挂点和下相导线挂点成三角形分布。 1. A 110kV double-circuit new butterfly drilling tower in high altitude areas, characterized in that it includes the tower body, and the ground wire cross arm, the upper wire cross arm and the middle and lower wire cross arm connected to the tower body from top to bottom , the ground wire cross-arm, the upper wire cross-arm and the middle and lower wire cross-arm are symmetrically distributed along the vertical central axis of the tower body, the two ends of the ground wire cross-arm are provided with ground wire hanging points, and the ground wire cross-arm Double-angle steels for the upper wire jumper are set at the hanging point of the upper ground wire, the upper wire hanging points are set at both ends of the upper wire cross arm, the middle phase wire hanging points are set at both ends of the middle and lower wire cross arm, and the lower wire cross arm Set the hanging point of the lower phase wire between the upper end point and the tower body, and set the double angle steel for the jumper wire of the middle wire at the hanging point of the middle phase wire, and set the double angle steel for the jumper wire of the lower wire at the hanging point of the lower phase wire. The hanging points of the conductors, the hanging points of the middle phase conductors and the hanging points of the lower phase conductors are distributed in a triangle. 2.根据权利要求1所述的高海拔地区110kV双回路新型蝶形钻越塔,其特征在于,所述地线横担和上导线横担采用共面叠合结构,且地线横担和上导线横担为一体结构。 2. The 110kV double-circuit new butterfly drilling tower for high-altitude areas according to claim 1, wherein the cross-arm of the ground wire and the cross-arm of the upper wire adopt a coplanar superimposed structure, and the cross-arm of the ground wire and the cross-arm of the upper wire adopt a coplanar superimposed structure. The upper wire cross arm is an integrated structure. 3.根据权利要求1或2所述的高海拔地区110kV双回路新型蝶形钻越塔,其特征在于,所述中相导线挂点与塔身竖向中轴线的间距为3500mm,所述下相导线挂点与中相导线挂点的间距为4300mm,所述上导线挂点与塔身竖向中轴线的间距为4300mm,所述地线挂点与塔身竖向中轴线的间距为6800 mm。 3. The 110kV double-circuit new butterfly drilling tower for high-altitude areas according to claim 1 or 2, characterized in that the distance between the hanging point of the middle-phase conductor and the vertical central axis of the tower body is 3500 mm, and the lower The distance between the hanging point of the phase wire and the hanging point of the middle phase wire is 4300mm, the distance between the hanging point of the upper wire and the vertical central axis of the tower body is 4300mm, and the distance between the hanging point of the ground wire and the vertical central axis of the tower body is 6800mm mm. 4.根据权利要求1或2所述的高海拔地区110kV双回路新型蝶形钻越塔,其特征在于,所述下相导线挂点与塔身底部的垂直间距为12m,所述下相导线挂点与上导线挂点的垂直间距为3.8m,所述上导线挂点与地线挂点的垂直间距为2.3m。 4. According to claim 1 or 2, the 110kV double-circuit new butterfly drilling tower in high-altitude areas is characterized in that the vertical distance between the hanging point of the lower phase conductor and the bottom of the tower body is 12m, and the lower phase conductor The vertical spacing between the hanging point and the hanging point of the upper wire is 3.8m, and the vertical spacing between the hanging point of the upper wire and the hanging point of the ground wire is 2.3m.
CN201520209954.3U 2015-04-09 2015-04-09 The novel butterfly in 110kV double loop, high altitude localities bores more tower Expired - Fee Related CN204691370U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520209954.3U CN204691370U (en) 2015-04-09 2015-04-09 The novel butterfly in 110kV double loop, high altitude localities bores more tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520209954.3U CN204691370U (en) 2015-04-09 2015-04-09 The novel butterfly in 110kV double loop, high altitude localities bores more tower

Publications (1)

Publication Number Publication Date
CN204691370U true CN204691370U (en) 2015-10-07

Family

ID=54231676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520209954.3U Expired - Fee Related CN204691370U (en) 2015-04-09 2015-04-09 The novel butterfly in 110kV double loop, high altitude localities bores more tower

Country Status (1)

Country Link
CN (1) CN204691370U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763208A (en) * 2015-04-09 2015-07-08 国家电网公司 110kV dual-loop novel butterfly-shaped penetrating and spanning tower in high-altitude area
CN109356429A (en) * 2018-11-26 2019-02-19 中国能源建设集团陕西省电力设计院有限公司 A 110kV double-circuit drilling tower
CN109914897A (en) * 2019-03-31 2019-06-21 中国电建集团福建省电力勘测设计院有限公司 Double back overhead transmission line is cut-off with three-dimensional cross-arm steel pipe pole

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763208A (en) * 2015-04-09 2015-07-08 国家电网公司 110kV dual-loop novel butterfly-shaped penetrating and spanning tower in high-altitude area
CN109356429A (en) * 2018-11-26 2019-02-19 中国能源建设集团陕西省电力设计院有限公司 A 110kV double-circuit drilling tower
CN109356429B (en) * 2018-11-26 2024-05-31 中国能源建设集团陕西省电力设计院有限公司 110KV double-loop drilling tower
CN109914897A (en) * 2019-03-31 2019-06-21 中国电建集团福建省电力勘测设计院有限公司 Double back overhead transmission line is cut-off with three-dimensional cross-arm steel pipe pole
CN109914897B (en) * 2019-03-31 2024-02-23 中国电建集团福建省电力勘测设计院有限公司 Three-way cross arm steel pipe pole for cutting off double-circuit overhead line

Similar Documents

Publication Publication Date Title
CN202266069U (en) Extra high voltage direct-current single loop strain tower in the shape of Chinese character 'Gan'
CN103603536B (en) Multiloop cross is handed over across steel pipe pole
CN103362343B (en) A six-circuit pole tower with the same tower
CN204691370U (en) The novel butterfly in 110kV double loop, high altitude localities bores more tower
CN104763208A (en) 110kV dual-loop novel butterfly-shaped penetrating and spanning tower in high-altitude area
CN104201634A (en) Crossover connecting and disconnecting method of single-loop line
CN201433592Y (en) An ultra-high voltage iron tower
CN108756428A (en) It is a kind of to be used to make somebody a mere figurehead the bearing platform type narrow base tower under double-circuit line cable T joint draws
CN104295147A (en) Framework applicable to transformer substation outgoing lines
CN206554592U (en) 220kV single loop wine glass-shapeds strain insulator, which is bored, gets over tower
CN203603572U (en) Multi-loop cross striding steel pipe pole
CN201635469U (en) 500 kV compact type transmission line straight small angle tower
CN204391660U (en) A kind of ultra-high-tension power transmission line list returns strain rod tower lead wire and earth wire arrangement system
CN207813168U (en) Singly cut-off π sections towers in double loop
CN203536911U (en) Double loop high-voltage power line through rod
CN206071191U (en) Bore and get over tower in 110kV common-tower double-returns road
CN205046930U (en) Positive negative phase sequence of single loop transform angle -steel tower
CN103956705A (en) Full-coverage-type lightning protection device for overhead transmission lines
CN108005458A (en) Singly cut-off π sections towers in double loop
CN102409888B (en) Improved cat-head type tower
CN103354319A (en) 220kV outdoor GIS double-dragonfly-type outlet wire arrangement structure
CN103147617B (en) The steel pipe pole that transmission pressure is buried can be realized
CN205276991U (en) Shaft tower is worn to stride by high pressure staggered floor
CN209976137U (en) 110kV double-loop drilling and crossing tower
CN203706749U (en) Bilaterally symmetrical windage yaw resistant insulator set

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: State Grid Gansu Electric Power Company

Patentee after: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE, STATE GRID GANSU ELECTRIC POWER CO., LTD.

Patentee after: FUJIAN YONGFU POWER ENGINEERING CO., LTD.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee before: State Grid Corporation of China

Patentee before: State Grid Gansu Electric Power Company

Patentee before: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE, STATE GRID GANSU ELECTRIC POWER CO., LTD.

Patentee before: Fujian Yong Fu Project Consultant Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151007

Termination date: 20190409