CN105155903B - A kind of double loop, which becomes, exhales high shaft tower - Google Patents

A kind of double loop, which becomes, exhales high shaft tower Download PDF

Info

Publication number
CN105155903B
CN105155903B CN201510562175.6A CN201510562175A CN105155903B CN 105155903 B CN105155903 B CN 105155903B CN 201510562175 A CN201510562175 A CN 201510562175A CN 105155903 B CN105155903 B CN 105155903B
Authority
CN
China
Prior art keywords
arm
cross
newly
layer
line direction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510562175.6A
Other languages
Chinese (zh)
Other versions
CN105155903A (en
Inventor
王力
赵晖
罗正帮
于永洋
葛娜
刘西民
王成化
陈焱
王世斌
聂小涛
应志富
陈彦焰
夏威
郑少将
梁东跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Huadian Engineering Consulting and Design Co Ltd
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
Anhui Huadian Engineering Consulting and Design Co Ltd
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Huadian Engineering Consulting and Design Co Ltd, Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Anhui Huadian Engineering Consulting and Design Co Ltd
Priority to CN201510562175.6A priority Critical patent/CN105155903B/en
Publication of CN105155903A publication Critical patent/CN105155903A/en
Application granted granted Critical
Publication of CN105155903B publication Critical patent/CN105155903B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

A kind of double loop, which becomes, exhales high shaft tower.It includes tower body, top layer ground wire cross-arm, totally one layer of the top layer ground wire cross-arm, from tower body both sides cross-arm is arranged perpendicular to newly-built line direction, three layers of the topping wire cross-arm point, each layer arranges one layer of both sides cross-arm from tower body perpendicular to newly-built line direction, and the middle level auxiliary cross-arm has multilayer, and each layer arranges one layer of both sides cross-arm from tower body perpendicular to newly-built line direction, totally three layers of the lower layer conductor cross-arm, each layer arranges one layer of both sides cross-arm from tower body perpendicular to newly-built line direction.The present invention realizes double loop change by a basic invention shaft tower and exhales high bore to cross over, reduce first across cross link transformation in rear driller's journey, put cable underground and the conversion of single double loop probability, avoid the power failure of cross link, add electric network reliability, construction cost is reduced, while further have compressed the newly-built circuit ground wire distance to the ground for boring and getting over shelves.

Description

A kind of double loop, which becomes, exhales high shaft tower
Technical field:
High shaft tower is exhaled the present invention relates to ultra-high-tension power transmission line technical field, more particularly to a kind of change of double loop.
Background technology:
Work transmission line construction is the important component in power grid construction, and transmission is taken in power system, is divided Match somebody with somebody, the effect of pressure regulation.In view of transmission line of electricity to transmit corridor principle of selecting the best qualified it is identical, for reduce cost, reduce take up an area examine Consider, transmission line of electricity generally parallel cabling.Influenceed by newly-built transformer station's drop point site, newly-built circuit often with built transmission line of electricity Often intersect, according to regulatory requirements, preferably cross over the relatively low circuit of voltage class and bore and get over the higher circuit of voltage class, therefore transmission of electricity Circuit is first bored across rear(Or after subdrilling across)Situation occur repeatedly.
In Practical Project, first bored for transmission line of electricity across rear(Or after subdrilling across)Situation, by landform and site environment Influence, is often difficult to be directly realized by, it usually needs take following several means only with 1 base shaft tower:
1)By raising voltage class higher line road or the reduction relatively low circuit of voltage class, but cause line outage, increase Ledger line road construction cost.
2)By the way of overhead crossing, cable drill are got over, but cost of putting cable underground is higher, and circuit is not easy to patrol after building up Inspection.
3)Double loop is changed to single loop, newly-built 2 base single loop drilling more tower, which is realized, to be bored more, there is that floor space is big, build The problem of cost is high.
In summary, such scheme constructional difficulties and comprehensive cost is higher, are unfavorable for engineering construction.
The content of the invention:
Become it is an object of the invention to provide a kind of double loop and exhale high shaft tower, the line crossing side of the shaft tower, brill get over side wire Arranged in drum type, it is identical with conventional line arrangement, brill is optimized across scheme, it is to avoid influence to adjacent tower wire arrangements, Avoid old track remodelling and put cable underground.
In order to solve problem present in background technology, the present invention uses following technical scheme:It is with including tower body, top layer It is provided with below line cross-arm, top layer ground wire cross-arm below topping wire cross-arm, topping wire cross-arm and is provided with middle level auxiliary cross-arm, Lower layer conductor cross-arm, totally one layer of the top layer ground wire cross-arm, from tower body perpendicular to newly-built circuit are set below the auxiliary cross-arm of middle level Both sides cross-arm is arranged in direction, and three layers of the topping wire cross-arm point, each layer arranges one from tower body perpendicular to newly-built line direction Layer both sides cross-arm, the middle level auxiliary cross-arm has multilayer, and each layer arranges one layer of both sides from tower body perpendicular to newly-built line direction Cross-arm, totally three layers of the lower layer conductor cross-arm, each layer arranges one layer of both sides cross-arm from tower body perpendicular to newly-built line direction;
Topmost one layer of both sides cross-arm is provided with a support insulator, the post insulator to the topping wire cross-arm Son is arranged on cross-arm taper and is provided with two branch on newly-built line direction, two layers below of every layer of both sides cross-arm Post insulator, wherein there is one to be arranged on cross-arm taper and perpendicular to newly-built line direction, another is arranged in the middle part of cross-arm Span line side and each parallel to newly-built line direction;
The middle level auxiliary cross-arm is provided with three support insulators in each layer of both sides cross-arm, and one of pillar is exhausted Edge is arranged on cross-arm taper and perpendicular to newly-built line direction, and one is arranged on cross-arm taper positioned at span line side and puts down Row is in newly-built line direction, and another is arranged on cross-arm middle part span line side and parallel to newly-built line direction;
Lower layer conductor cross-arm two layers of both sides cross-arm below is provided with the jumper string with support tube, in highest one Three support insulators are provided with the cross-arm of layer both sides, wherein there is one to be arranged on cross-arm taper and perpendicular to newly-built circuit side To one is arranged on cross-arm taper positioned at span line side and parallel to newly-built line direction, and another is arranged in cross-arm One layer of both sides cross-arm is provided with two branch in the middle of portion span line side and parallel to newly-built line direction, lower layer conductor cross-arm Post insulator, wherein there is one to be arranged on cross-arm taper positioned at span line side and parallel to newly-built line direction, another It is arranged on cross-arm middle part span line side and parallel to newly-built line direction, lower layer conductor cross-arm bottom both sides cross-arm is all provided with A support insulator is equipped with, support insulator is arranged on cross-arm middle part span line side and parallel to newly-built line direction.
The present invention realizes double loop change by a basic invention shaft tower and exhales high bore to cross over, and reduces first across rear brill(Or first After brill across)Cross link transformation in engineering, put cable underground and the conversion of single double loop probability, it is to avoid the power failure of cross link, Electric network reliability is added, construction cost is reduced, the newly-built circuit ground wire for getting over shelves is bored to distance while further have compressed From.
Brief description of the drawings:
Fig. 1 is structural representation of the invention;
Fig. 2 is wiring schematic diagram of the invention.
Embodiment:
Reference picture 1-2, it includes tower body 1, top layer ground wire cross-arm 2, and it is horizontal that the lower section of top layer ground wire cross-arm 2 is provided with topping wire Load 3, the lower section of topping wire cross-arm 3 is provided with middle level auxiliary cross-arm 4, and the lower section of middle level auxiliary cross-arm 4 sets lower layer conductor cross-arm 5, Totally one layer of 2 load of top layer ground wire horizontal stroke, arranges both sides cross-arm, the topping wire is horizontal from tower body 1 perpendicular to newly-built line direction 3 points three layers of load, each layer arranges one layer of both sides cross-arm from tower body 1 perpendicular to newly-built line direction, and the middle level auxiliary cross-arm 4 has Multilayer, each layer from tower body 1 perpendicular to newly-built line direction arrange one layer of both sides cross-arm, totally three layers of the lower layer conductor cross-arm 5, Each layer arranges one layer of both sides cross-arm from tower body 1 perpendicular to newly-built line direction.
The length of the top layer ground wire cross-arm 2 and the spacing with wire cross-arm, need to meet lightning protection, ground wire spacing It is required that, the topping wire cross-arm 3, middle level auxiliary cross-arm 4, the length of lower layer conductor cross-arm 5 and spacing need to meet wire pitch, The requirement of electric clearance, lightning protection, the number of plies of the middle level auxiliary cross-arm 4 is more put by boring and determined across the discrepancy in elevation between point Fixed, the number of plies of the discrepancy in elevation more upper mesophere auxiliary cross-arm is more.
Topmost one layer of both sides cross-arm is provided with a support insulator 6 to the topping wire cross-arm 3, and the pillar is exhausted Edge 6 is arranged on cross-arm taper and is provided with two on newly-built line direction, two layers below of every layer of both sides cross-arm Individual support insulator 6, wherein there is one to be arranged on cross-arm taper and perpendicular to newly-built line direction, another is arranged on cross-arm Middle part span line side and each parallel to newly-built line direction.
The middle level auxiliary cross-arm 4 is provided with three support insulators 6, one of pillar in each layer of both sides cross-arm Insulator 6 is arranged on cross-arm taper and perpendicular to newly-built line direction, and one is arranged on cross-arm taper positioned at span line side And parallel to newly-built line direction, another is arranged on cross-arm middle part span line side and parallel to newly-built line direction.
The lower layer conductor cross-arm 5 is provided with the jumper string 7 with support tube in lower two layers of both sides cross-arm, in highest one Three support insulators 6 are provided with the cross-arm of layer both sides, wherein there is one to be arranged on cross-arm taper and perpendicular to newly-built circuit Direction, one is arranged on cross-arm taper positioned at span line side and parallel to newly-built line direction, and another is arranged on cross-arm One layer of both sides cross-arm is provided with two in the middle of middle part span line side and parallel to newly-built line direction, lower layer conductor cross-arm 6 Individual support insulator 6, wherein thering is one to be arranged on cross-arm taper positioned at span line side and parallel to newly-built line direction, separately One is arranged on cross-arm middle part span line side and parallel to newly-built line direction, and the lower bottom both sides of layer conductor cross-arm 6 are horizontal Load is provided with a support insulator 6, and support insulator 6 is arranged on cross-arm middle part span line side and parallel to newly-built line Road direction.
Described powered spacing of support insulator 6, powered point and wire, ground wire spacing, the spacing of powered point and tower body should Meet electric requirement.
Leap side ground wire is hung on top layer ground wire cross-arm 2, and the more side ground wire that bores is suspended on middle level auxiliary cross-arm 4 Place, according to lightning protection, the requirement of ground wire spacing, determines the radical and hanging position of ground wire.
Reference picture 2, exhales high shaft tower, across side boring newly-built one basic invention double loop change more between circuit and span line Wire is suspended at topping wire cross-arm 3, is suspended on across side ground wire at top layer ground wire cross-arm 2, is bored more side wire and is suspended on down At layer conductor cross-arm 5, bore get over side ground wire be suspended on middle level auxiliary cross-arm 4 at, across side on phase conductor utilize topping wire cross-arm 3rd, middle level auxiliary cross-arm 4, on lower layer conductor cross-arm 5 vertical newly-built line direction support insulator 6, be connected to brill and get over and mutually led on side Line, phase conductor is using under one layer of jumper string 7 and topping wire cross-arm 3 with support tube in the middle of lower layer conductor cross-arm 5 across in side Two layers of face, middle level auxiliary cross-arm 4, the lower cross-arm of layer conductor cross-arm 5 middle part support insulator 6, are connected to brill and get over phase conductor under side, cross over Phase conductor utilizes lower 5 minimum one layers of jumper string 7 with support tube of layer conductor cross-arm and middle level auxiliary cross-arm 4, lower layer conductor under side The cross-arm taper of cross-arm 5 is connected to brill and gets over phase conductor in side, shelves are crossed over after implementation parallel to the support insulator 6 of newly-built line direction Wire, brill are got over shelves wire and arranged in drum type.
According to lightning protection, the requirement of ground wire spacing, when needing to retain ground wire, need to meet across side wire with by across More line grounding wire, bore the spacing of more side ground wire and drilled more line conductor;When cancelling ground wire, it need to meet across side wire and quilt Span line ground wire, the spacing for boring more side wire and drilled more line conductor.

Claims (1)

1. a kind of double loop, which becomes, exhales high shaft tower, it is characterised in that it is included under tower body, top layer ground wire cross-arm, top layer ground wire cross-arm Side, which is provided with below topping wire cross-arm, topping wire cross-arm, is provided with middle level auxiliary cross-arm, is set below the auxiliary cross-arm of middle level Lower layer conductor cross-arm, totally one layer of the top layer ground wire cross-arm arranges both sides cross-arm from tower body perpendicular to newly-built line direction, described Three layers of topping wire cross-arm point, each layer arranges one layer of both sides cross-arm from tower body perpendicular to newly-built line direction, and the middle level is auxiliary Cross-arm is helped to have multilayer, each layer arranges one layer of both sides cross-arm, the lower layer conductor cross-arm from tower body perpendicular to newly-built line direction Totally three layers, each layer arranges one layer of both sides cross-arm from tower body perpendicular to newly-built line direction;
Topmost one layer of both sides cross-arm is provided with a support insulator to the topping wire cross-arm, and the support insulator is set Put in cross-arm taper and on newly-built line direction, two layers below of every layer of both sides cross-arm to be provided with two pillars exhausted Edge, wherein there is one to be arranged on cross-arm taper and perpendicular to newly-built line direction, another is arranged on leap in the middle part of cross-arm Circuit side and each parallel to newly-built line direction;
The middle level auxiliary cross-arm is provided with three support insulators, one of support insulator in each layer of both sides cross-arm Be arranged on cross-arm taper and perpendicular to newly-built line direction, one be arranged on cross-arm taper positioned at span line side and parallel to Newly-built line direction, another is arranged on cross-arm middle part span line side and parallel to newly-built line direction;
Lower layer conductor cross-arm two layers of both sides cross-arm below is provided with the jumper string with support tube, in one layer two of highest Three support insulators are provided with the cross-arm of side, wherein there is one to be arranged on cross-arm taper and perpendicular to newly-built line direction, One is arranged on cross-arm taper positioned at span line side and parallel to newly-built line direction, another be arranged in the middle part of cross-arm across To be provided with two pillars exhausted for one layer of both sides cross-arm in the middle of more circuit side and parallel to newly-built line direction, lower layer conductor cross-arm Edge, wherein there is one to be arranged on cross-arm taper positioned at span line side and parallel to newly-built line direction, another setting The span line side and parallel to newly-built line direction in the middle part of cross-arm, lower layer conductor cross-arm bottom both sides cross-arm is provided with One support insulator, support insulator is arranged on cross-arm middle part span line side and parallel to newly-built line direction.
CN201510562175.6A 2015-09-07 2015-09-07 A kind of double loop, which becomes, exhales high shaft tower Active CN105155903B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510562175.6A CN105155903B (en) 2015-09-07 2015-09-07 A kind of double loop, which becomes, exhales high shaft tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510562175.6A CN105155903B (en) 2015-09-07 2015-09-07 A kind of double loop, which becomes, exhales high shaft tower

Publications (2)

Publication Number Publication Date
CN105155903A CN105155903A (en) 2015-12-16
CN105155903B true CN105155903B (en) 2017-08-11

Family

ID=54796909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510562175.6A Active CN105155903B (en) 2015-09-07 2015-09-07 A kind of double loop, which becomes, exhales high shaft tower

Country Status (1)

Country Link
CN (1) CN105155903B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484554A (en) * 2016-01-06 2016-04-13 国网浙江省电力公司湖州供电公司 High-voltage staggered-layer penetrating and crossing tower
CN106567597A (en) * 2016-09-26 2017-04-19 安徽华电工程咨询设计有限公司 Novel double-loop variable-norminal-height tower

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006311774A (en) * 2005-05-02 2006-11-09 Chugoku Electric Power Co Inc:The Cable-mounting arm
CN202416965U (en) * 2011-12-27 2012-09-05 江苏省电力设计院 Mixed voltage multiloop cross-shaped crossover tower
CN202810314U (en) * 2012-09-11 2013-03-20 河北省电力勘测设计研究院 220kV T-shaped double-circuit drilling tower
CN103603536B (en) * 2013-10-25 2016-02-10 国家电网公司 Multiloop cross is handed over across steel pipe pole
CN203951136U (en) * 2014-07-03 2014-11-19 福建永福工程顾问有限公司 The switching Wiring device of overhead power transmission conducting wire and cable
CN204983860U (en) * 2015-09-07 2016-01-20 安徽华电工程咨询设计有限公司 Two return circuits become exhales high shaft tower

Also Published As

Publication number Publication date
CN105155903A (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN105155902B (en) A kind of compact double circuit, which becomes, exhales high shaft tower
CN105257061B (en) A kind of single loop, which becomes, exhales high shaft tower
CN205243135U (en) Two times overhead transmission line alternately bores tower more
CN104901255A (en) High-voltage overhead line crossing method and safe distance separating device
CN105155903B (en) A kind of double loop, which becomes, exhales high shaft tower
CN106567597A (en) Novel double-loop variable-norminal-height tower
CN104821490B (en) A kind of 500kV HGIS power distribution equipment arrangement
CN205046908U (en) Two return circuits of compact become exhales high shaft tower
CN106150177A (en) A kind of terminal anchor support for double-layer frame outlet
CN205036145U (en) Single loop becomes exhales high shaft tower
CN204983860U (en) Two return circuits become exhales high shaft tower
CN206128797U (en) Novel two return circuits become exhales high tower
CN206272192U (en) A kind of new 330kV power distribution equipments in high altitude localities
CN210622429U (en) 110 kilovolt bores and strides dual-purpose strain insulator tower
CN106639489A (en) 500 kV large-angle ladder type ground wire single circuit penetrating-crossing tower
CN206894191U (en) A kind of single loop drilling is across transmission line of electricity
CN205577567U (en) Two return circuits double T connects steel pipe pole
CN104763208A (en) 110kV dual-loop novel butterfly-shaped penetrating and spanning tower in high-altitude area
CN204927814U (en) 330kV distribution device's double -deck outlet structure
CN203452435U (en) Dual-loop spanning-and-ducking steel pipe rod
CN110453959A (en) A kind of double loop, which is bored, gets over steel pipe pole and transmission system
CN202718447U (en) Steel tower for 110kV double circuits to penetrate through
CN210622425U (en) Single-loop staggered-layer power transmission line tower
CN105735731B (en) A kind of double T connection steel pipe poles in double loop
CN102817491A (en) 110kV dual-loop line drilling iron tower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant