CN206127788U - Town road - Google Patents
Town road Download PDFInfo
- Publication number
- CN206127788U CN206127788U CN201620983506.3U CN201620983506U CN206127788U CN 206127788 U CN206127788 U CN 206127788U CN 201620983506 U CN201620983506 U CN 201620983506U CN 206127788 U CN206127788 U CN 206127788U
- Authority
- CN
- China
- Prior art keywords
- base
- road
- main
- greenbelt
- main road
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a town road, including the road bed, the road bed adopts full cobblestone to spread, be equipped with the main road base on the road bed, the quantity of main road base is a plurality of, all is equipped with median owner base between adjacent main road base, and all installs greenbelt owner base outside the main road base, the main road has been laid to main road base top, all installs the curb at main road both sides edge, and still installs the hard shoulder in the main road inboard, median owner's base top is equipped with greenbelt and isolated column, it has the afforestation soil layer all to fill in median owner base and the greenbelt owner base, and also all installs the isolated column outside greenbelt owner base, slightly reforms transform present road to combine median and road surface washing blowdown facility, reducing the construction costs, can play isolation and effectively clear away the surface gathered water and the effect of absorption road surface pollutant.
Description
Technical field
The utility model is related to urban operating mechanism technical field, specially a kind of town road.
Background technology
Town road, as one of the infrastructure of urban construction, is very crucial important, in particular with China Jing
The development of Ji, the improvement of people's living standards, the quickening of urban construction, urban population saturation is improved constantly, various motor vehicles
Quantity also being on the increase, pedestrian crosses in violation of rules and regulations the phenomenon of motor vehicle also being on the increase, and motor vehicle take in violation of rules and regulations to
The phenomenon in track is also being on the increase, and causes other dirts such as dust, greasy dirt on the confusion of urban transportation, particularly urban road
On town road, not only the environmental factor such as air to urban road causes greatly pollution to dye thing long-term aggregated, also gives
Urban road maintenance brings great difficulty.
Solve at present the two problems be for setting up respectively corresponding isolation strip and using sprinkling truck carry out road surface watering come
Isolation and the purpose cleaned are reached, but the pollutant of watering is still attached on road surface, is not tackled the problem at its root, and
It is the larger urban construction of a cost individually to carry out isolation strip construction and Street surface cleaning, carries out full up transformation and faces larger being stranded
It is difficult.
Utility model content
For problem above, the utility model provides a kind of town road, current road is slightly transformed, and
Isolation strip and Street surface cleaning sewage disposal facility are combined, is reducingd the construction costs, can be with the problem in effectively solving background technology.
For achieving the above object, the utility model provides following technical scheme:A kind of town road, including roadbed, it is described
Roadbed is paved into using full cobblestone, and the roadbed is provided with main road base, and the quantity of the main road base is several, in adjacent main road
The main base in isolation strip is equipped between base, and the main base of greenbelt is mounted on the outside of main road base, the main road base top is equipped with
Main road, in main road both sides of the edge kerbstone is mounted on, and hard shoulder is also equipped with the inside of main road, on the main base in the isolation strip
Side is provided with greenbelt and isolated column, and in the main base in the isolation strip and the main base of greenbelt greening soil layer is filled with, and in greenbelt
Main base outside is also mounted on isolated column.
Used as a kind of preferred technical scheme of the utility model, the main base in the isolation strip and the main base of greenbelt are directly and road
Base connects.
Used as a kind of preferred technical scheme of the utility model, the main base inside in the isolation strip is connected by crossbeam with main road base
Connect, the isolated column is fixedly mounted on crossbeam.
Used as a kind of preferred technical scheme of the utility model, bottom is left in " product " font between the adjacent kerbstone
Water seepage hole.
Used as a kind of preferred technical scheme of the utility model, the height of the greening soil layer is less than 10 lis of main road upper surface
Rice.
Compared with prior art, the beneficial effects of the utility model are:The town road, by arranging main road base, isolation
With main base and the main base of greenbelt, the roadbed of different parts is separated completely, and on the main base in isolation strip and the main base of greenbelt
The greening soil layer that side is arranged is slightly below main road upper surface so that the ponding and dust or other greasy dirts on main road face is in watering
During greening soil layer can be automatically flowed after car cleaning, it is to avoid assemble on road surface, and solidified by greenbelt plant
And organic process, and Chinese character pin-shaped structure then can also recycle part rainwater in the rainwater phase by water seepage hole, and
Rain penetration is goed deep into into again earth formation deep into roadbed, current road is slightly transformed, and isolation strip and road surface is clear
Wash sewage disposal facility to combine, reducing the construction costs.
Description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model curb structure schematic diagram.
In figure:1- roadbeds;2- main road bases;The main base in 3- isolation strip;The main base of 4- greenbelts;5- main roads;6- kerbstones;7- isolates
Pier;8- isolated columns;9- afforests soil layer;10- crossbeams;11- water seepage holes.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Embodiment:
Fig. 1 and Fig. 2 is referred to, the utility model provides a kind of technical scheme:A kind of town road, including roadbed 1, it is described
Roadbed 1 is paved into using full cobblestone, and the roadbed 1 is provided with main road base 2, and the quantity of the main road base 2 is several, adjacent
The main base 3 in isolation strip is equipped between main road base 2, and the main base 4 of greenbelt is mounted in the outside of main road base 2, on the main road base 2
Side is equipped with main road 5, and in the both sides of the edge of main road 5 kerbstone 6 is mounted on, and is also equipped with hard shoulder 7, institute in the inner side of main road 5
State the top of the main base in isolation strip 3 and be provided with isolated column 8, in the main base 3 in the isolation strip and the main base 4 of greenbelt greening soil layer 9 is filled with,
And also it is mounted on isolated column 8 in the main outside of base 4 of greenbelt.
Preferably, the main base 3 in the isolation strip and the main base 4 of greenbelt are directly connected with roadbed 1, can be by isolation strip master
Water used by the rainwater and cleaning road surface of base 3 and the main base 4 of greenbelt directly gos deep into earth formation deep after plant purification, supplements
Stratum water;The main inside of base 3 in the isolation strip is connected by crossbeam 10 with main road base 2, and the isolated column 8 is fixedly mounted on crossbeam 10
On, play a part of fixed isolated column 8, it is not strong to prevent from afforesting the crystallized ability of soil layer 9, solves the problems, such as to be difficult to fixed;The phase
Water seepage hole 11 is left in bottom in " product " font between adjacent kerbstone 6, by road surface water penetrate into both sides, in Chinese character pin-shaped structure, can in case
Only excessive water penetrates into, more than absorbability;The height of greening soil layer 9 is stated less than 10 centimetres of 5 upper surface of main road, is easy to water to enter two
Side.
The utility model has the advantage of:The town road, by arranging main road base, the main base in isolation strip and greenbelt master
Base, the roadbed of different parts is separated completely, and the greening soil layer arranged above the main base in isolation strip and the main base of greenbelt
Slightly below main road upper surface so that the ponding and dust or other greasy dirts on main road face can after sprinkling truck cleaning from
Dynamic stream is in greening soil layer, it is to avoid assembles on road surface, and is solidified by greenbelt plant and organic process, and product word
The structure of type then can also recycle part rainwater in the rainwater phase by water seepage hole, and rain penetration is entered into roadbed
Go deep into earth formation deep again, current road slightly transformed, and isolation strip and Street surface cleaning sewage disposal facility are combined,
Reducing the construction costs.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model
Any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model
Protection domain within.
Claims (5)
1. a kind of town road, it is characterised in that:Including roadbed(1), the roadbed(1)It is paved into using full cobblestone, the road
Base(1)It is provided with main road base(2), the main road base(2)Quantity be several, in adjacent main roadbed(2)Between be equipped with every
From the main base of band(3), and in main road base(2)Outside is mounted on the main base of greenbelt(4), the main road base(2)Top is equipped with master
Road(5), in main road(5)Both sides of the edge are mounted on kerbstone(6), and in main road(5)Inner side is also equipped with hard shoulder(7), institute
State the main base in isolation strip(3)Top is provided with isolated column(8), the main base in the isolation strip(3)With the main base of greenbelt(4)Inside it is filled with green
Change soil layer(9), and in the main base of greenbelt(4)Outside is also mounted on isolated column(8).
2. a kind of town road according to claim 1, it is characterised in that:The main base in the isolation strip(3)With greenbelt master
Base(4)Directly and roadbed(1)Connection.
3. a kind of town road according to claim 1, it is characterised in that:The main base in the isolation strip(3)Inside is by horizontal stroke
Beam(10)With main road base(2)Connection, the isolated column(8)It is fixedly mounted on crossbeam(10)On.
4. a kind of town road according to claim 1, it is characterised in that:The adjacent kerbstone(6)Between bottom be in
" product " font leaves water seepage hole(11).
5. a kind of town road according to claim 1, it is characterised in that:The greening soil layer(9)Height less than master
Road(5)10 centimetres of upper surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620983506.3U CN206127788U (en) | 2016-08-30 | 2016-08-30 | Town road |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620983506.3U CN206127788U (en) | 2016-08-30 | 2016-08-30 | Town road |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206127788U true CN206127788U (en) | 2017-04-26 |
Family
ID=58565716
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620983506.3U Expired - Fee Related CN206127788U (en) | 2016-08-30 | 2016-08-30 | Town road |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206127788U (en) |
-
2016
- 2016-08-30 CN CN201620983506.3U patent/CN206127788U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202359478U (en) | Multifunctional environmentally-friendly road surface | |
CN202898938U (en) | Seepage and drainage combined pavement structure for urban road and landscape road | |
CN206127788U (en) | Town road | |
CN202181504U (en) | Box beam | |
CN201924255U (en) | Permeable roadside curbstone | |
CN203625916U (en) | Highway soft soil layer composite pile foundation | |
CN206396632U (en) | A kind of elevated bridge road surface drainage structure | |
CN205804256U (en) | A kind of obstructiveless road sprinkling truck | |
CN202187383U (en) | Road water sprinkling pool | |
CN205727268U (en) | A kind of greenbelt device | |
CN202007548U (en) | Ecological parking lot | |
CN205443855U (en) | Highway road surface with drainage water collection function | |
CN208762819U (en) | Wisdom reservoir catchment system is descended in a kind of city on a large scale | |
CN204343747U (en) | The dolly parking lot in overhead, a kind of street | |
CN207919284U (en) | A kind of sponge city, which can ooze, can store water-permeable pavement | |
CN206887696U (en) | A kind of sponge city water permeable sidewalk | |
CN203129650U (en) | Underground open type rail traffic vehicle park | |
CN203546551U (en) | Water-permeable ecological garden road | |
CN202899683U (en) | Urban river overhead garden type parking building | |
CN206554116U (en) | A kind of alternating expression underground traffic piping lane vehicle in and out port structure | |
CN201526178U (en) | Low-mounted track parking bridge | |
CN207244385U (en) | A kind of kerbstone for the green road surface of pervious asphalt | |
CN201942972U (en) | Multifunctional tunnel and parking multiple-use building | |
CN206418439U (en) | Environmental sanitation sweeper multifunctional washing device | |
CN204959525U (en) | Road drainage system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170426 Termination date: 20170830 |