CN206110793U - Do not take framework of ground area - Google Patents

Do not take framework of ground area Download PDF

Info

Publication number
CN206110793U
CN206110793U CN201621103082.3U CN201621103082U CN206110793U CN 206110793 U CN206110793 U CN 206110793U CN 201621103082 U CN201621103082 U CN 201621103082U CN 206110793 U CN206110793 U CN 206110793U
Authority
CN
China
Prior art keywords
framework
column
master control
control building
building frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621103082.3U
Other languages
Chinese (zh)
Inventor
吴伟康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd
Original Assignee
China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd filed Critical China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd
Priority to CN201621103082.3U priority Critical patent/CN206110793U/en
Application granted granted Critical
Publication of CN206110793U publication Critical patent/CN206110793U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a do not take framework of ground area, include: first framework and second framework. First framework and second framework integrated into one piece, first framework is qualified for the next round of competitions along north, and the second framework is qualified for the next round of competitions along east, and first framework makes up " L " type framework with the second framework, the third framework that first framework and second framework constitute is equipped with frame girder, framework post, intercolumniation support and bracing, and the third framework is arranged on master control building frame construction post capital. The utility model discloses a framework is arranged at master control building frame construction post capital, and the abundant effectual transformer substation's land used area that has utilized has slowed down electric power construction and has robbed the contradiction on ground and greatly saved the framework volume with city construction.

Description

A kind of framework for being not take up ground area
Technical field
This utility model is related to mechanical engineering field, more particularly to a kind of framework for being not take up ground area.
Background technology
Transformer substation framework typically adopts bent structure, truss column to adopt A type straight seam welding round steel pipes, frame girder to adopt triangle Deformation section, steel pipe chord member, angle steel web member, bolted lattice girder steel, it is beam-column hinged, post and beam chord member joints it is equal Connected using rigidity or flexible flange, truss column capital sets ground terminal and discharging rod, galvanizing anti-corrosion, framework adopts reinforced concrete Native isolated footing, plug-in type rim of a cup.
Above-mentioned arrangement has the disadvantage that:1st, in the case where urban land is very rare, a large amount of soils are taken; 2nd, framework amount is big.
In order to solve the above problems, this utility model urgent need develops one kind can not be accounted for soil and can save framework work The framework of journey amount.
Utility model content
The purpose of this utility model is to provide a kind of framework for being not take up ground area, is taken with solving current transformer substation framework A large amount of soils and the big problem of framework amount.
In this utility model, there is provided a kind of framework for being not take up ground area, including:First framework and the second framework, First framework and the second framework are integrally formed;
, along northern outlet, second framework is along eastern outlet, first framework and the second framework combinations for first framework Into " L " type framework;
The 3rd framework that first framework and the second framework are constituted is provided with frame girder, truss column, column braces and tiltedly Support;And
3rd framework is arranged on master control building frame structure post capital.
In another preference, the 3rd framework along north side set 2-10 across, along east side set 2-10 across.
In another preference, the described 3rd be framed in end bay and in have the column braces.
In another preference, the frame girder, truss column, column braces and diagonal brace adopt straight seam welding single steel pipe; And
The frame girder is connected using flexible flange with truss column, and the column braces are connected using plate with the truss column Connect.
In another preference, the truss column suspension column is uniformly placed in the master control building frame structure post post with diagonal brace suspension column Top;
The master control building frame structure post capital pre-embedded anchoring bolts;
Also, the truss column suspension column and diagonal brace suspension column are using the foundation bolt and the master control building frame structure post post Top is connected.
In another preference, the height of the 3rd framework is 5-25m, and length is 10-50m, and width is 10- 50m。
It should be understood that in the range of this utility model, above-mentioned each technical characteristic of the present utility model and below (as implemented Example) in can be combined with each other between each technical characteristic for specifically describing, so as to constitute new or preferred technical scheme.It is limited to Length, this is no longer going to repeat them.
Description of the drawings
Fig. 1 is the structural representation of the framework that ground area is not take up in the embodiment of this utility model one.
Specific embodiment
The present inventor develops first a kind of framework for being not take up ground area, the framework through extensively in-depth study Master control building frame structure post capital is arranged in, it is sufficiently effective to make use of transformer station's land area along two different directions outlets, Slow down power construction and rob the contradiction on ground with urban construction, this utility model is completed on this basis.
It is not take up the framework of ground area
This utility model provides a kind of framework for being not take up ground area, including:First framework and the second framework, described One framework and the second framework are integrally formed.
, along northern outlet, second framework is along eastern outlet, first framework and the second framework combinations for first framework Into " L " type framework.
The 3rd framework that first framework and the second framework are constituted is provided with frame girder, truss column, column braces and tiltedly Support.
3rd framework is arranged on master control building frame structure post capital.
The framework work progress that this is not take up ground area is as follows:
A () is in master control building frame structure post capital pre-embedded anchoring bolts;
B () lifting framework post and frame girder, by truss column suspension column pre-embedded anchoring bolts are directed at, bolt is tightened after laminating, Gu Determine truss column, frame girder flexible flange is connected with truss column;
C () lifts column braces, column braces are connected in plate mode with truss column;
D () lifts diagonal brace, diagonal brace suspension column alignment pre-embedded anchoring bolts tighten bolt, fixed diagonal brace after laminating;
E () construction is completed.
Major advantage of the present utility model includes:
A framework is arranged in master control building frame structure post capital, sufficiently effective profit by () by optimizing framework arrangement With transformer station's land area, slow down power construction and rob the contradiction on ground with urban construction.
B the () framework scheme dramatically saves on framework amount.
With reference to specific embodiment, this utility model is expanded on further.It should be understood that these embodiments are merely to illustrate this Utility model rather than restriction scope of the present utility model.The experimental technique of unreceipted actual conditions in the following example, leads to Often according to normal condition, or according to the condition proposed by manufacturer.Unless otherwise indicated, otherwise percentage ratio and number are weight Percentage ratio and parts by weight.
It should be noted that in the claim and description of this patent, such as first and second or the like relation Term is used merely to make a distinction an entity or operation with another entity or operation, and not necessarily requires or imply There is any this actual relation or order between these entities or operation.And, term " including ", "comprising" or its Any other variant is intended to including for nonexcludability so that process, method, article including a series of key elements or Equipment not only includes those key elements, but also including other key elements being not expressly set out, or also include for this process, The intrinsic key element of method, article or equipment.In the absence of more restrictions, by wanting that sentence " including " is limited Element, it is not excluded that also there is other identical element in the process including the key element, method, article or equipment.
Embodiment 1
As shown in figure 1, a kind of framework for being not take up ground area is present embodiments provided, including:First framework 1 and the second structure Frame 2, the framework 2 of first framework 1 and second is integrally formed.
, along northern outlet, second framework 2 is along eastern outlet, the framework 2 of first framework 1 and second for first framework 1 It is combined into " L " type framework.
The 3rd framework 3 that the framework 2 of first framework 1 and second is constituted is provided with frame girder 4, truss column 5, column braces 6 and diagonal brace 7.
In the present embodiment, the 3rd framework 3 end bay and in have the column braces 6, and the 3rd framework 3 It is arranged on master control building frame structure post capital.
Embodiment 2
A kind of framework for being not take up ground area is present embodiments provided, the framework in the present embodiment is similar in embodiment 1 Framework, difference is:
In the present embodiment, the 3rd framework along north side set 8 across, along east side set 2 across;
The frame girder, truss column, column braces and diagonal brace adopt straight seam welding single steel pipe;
The frame girder is connected using flexible flange with truss column, and the column braces are connected using plate with the truss column Connect;
The truss column suspension column is uniformly placed in the master control building frame structure post capital with diagonal brace suspension column;
The master control building frame structure post capital pre-embedded anchoring bolts;
The truss column suspension column and diagonal brace suspension column are using the foundation bolt and the master control building frame structure post capital phase Even;
The height of the 3rd framework is 15m, and length is 30m, and width is 20m.
The all documents referred in this utility model are all incorporated as in this application reference, just as each document quilt It is individually recited as with reference to such.In addition, it is to be understood that after above-mentioned teachings of the present utility model have been read, this area skill Art personnel can make various changes or modifications to this utility model, and these equivalent form of values equally fall within the application claims Book limited range.

Claims (6)

1. a kind of framework for being not take up ground area, it is characterised in that include:First framework and the second framework, first framework It is integrally formed with the second framework;
Along northern outlet, along eastern outlet, first framework and the second framework combinations are into " L " for second framework for first framework Type framework;
The 3rd framework that first framework and the second framework are constituted is provided with frame girder, truss column, column braces and diagonal brace;With And
3rd framework is arranged on master control building frame structure post capital.
2. framework according to claim 1, it is characterised in that the 3rd framework sets 2-10 across setting along east side along north side 2-10 across.
3. framework according to claim 1, it is characterised in that the described 3rd be framed in end bay and in have the intercolumniation Support.
4. framework according to claim 1, it is characterised in that the frame girder, truss column, column braces and diagonal brace are adopted Use straight seam welding single steel pipe;And
The frame girder is connected using flexible flange with truss column, and the column braces are connected using plate with the truss column.
5. framework according to claim 1, it is characterised in that the truss column suspension column is uniformly placed in described with diagonal brace suspension column Master control building frame structure post capital;
The master control building frame structure post capital pre-embedded anchoring bolts;
Also, the truss column suspension column and diagonal brace suspension column are using the foundation bolt and the master control building frame structure post capital phase Even.
6. framework according to claim 1, it is characterised in that the height of the 3rd framework is 5-25m, length is 10-50m, width is 10-50m.
CN201621103082.3U 2016-09-30 2016-09-30 Do not take framework of ground area Active CN206110793U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621103082.3U CN206110793U (en) 2016-09-30 2016-09-30 Do not take framework of ground area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621103082.3U CN206110793U (en) 2016-09-30 2016-09-30 Do not take framework of ground area

Publications (1)

Publication Number Publication Date
CN206110793U true CN206110793U (en) 2017-04-19

Family

ID=58528766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621103082.3U Active CN206110793U (en) 2016-09-30 2016-09-30 Do not take framework of ground area

Country Status (1)

Country Link
CN (1) CN206110793U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107178228A (en) * 2017-06-30 2017-09-19 中国能源建设集团安徽省电力设计院有限公司 The outlet structure of transformer station
CN107237537A (en) * 2017-06-29 2017-10-10 江苏铭远杆塔有限公司 Triangle steel tubular beam substation framework

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107237537A (en) * 2017-06-29 2017-10-10 江苏铭远杆塔有限公司 Triangle steel tubular beam substation framework
CN107178228A (en) * 2017-06-30 2017-09-19 中国能源建设集团安徽省电力设计院有限公司 The outlet structure of transformer station

Similar Documents

Publication Publication Date Title
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN206110793U (en) Do not take framework of ground area
CN102261043A (en) Assembled steel pipe upright post system
CN207331720U (en) A kind of cofferdam with Combined steel tube sheet pile
CN202809494U (en) Bracket for pouring 0# block to rigid continuous girder bridge
CN102691267A (en) High pier construction method for external whole operation platform
CN107313551A (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system and its construction method
CN107419825A (en) The full precast shear wall of steel skeleton and its construction method of weak edge member arrangement of reinforcement
CN207905104U (en) A kind of assembled architecture truss structure
CN203499259U (en) Tool type cantilevered unloading platform
CN202152442U (en) Assembling type steel tube-vertical post system
CN103982076A (en) Single cycle 110 kV/35 stay wire type aluminum alloy urgent repair tower
CN101775876A (en) Spacial steel roof truss
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN211037548U (en) Truss structure for roof
CN204825924U (en) Square steel tube concrete waist rail
CN210395394U (en) Steel structure foundation for long-distance construction of large modular structure
CN113944309A (en) Cold-formed steel support beam framework and construction method thereof
CN206144246U (en) Framework that lattice formula framework post and A type framework post combined together
CN211547754U (en) High slope anchor bolt support working platform
CN101914990B (en) Beam-type transition layer cast-in-situ crossbeam construction formwork supporting system
CN201924600U (en) Cast-in-place crossbeam construction formwork supporting system with beam type switching layer
CN204326658U (en) LNG storage tank reinforced mesh wind-resistant column bracing means
CN205777810U (en) A kind of steel tower being applicable to high slope
CN204919363U (en) High mound pin -connected panel strength nature skeleton of anti high wind

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant