CN207331720U - A kind of cofferdam with Combined steel tube sheet pile - Google Patents
A kind of cofferdam with Combined steel tube sheet pile Download PDFInfo
- Publication number
- CN207331720U CN207331720U CN201721052015.8U CN201721052015U CN207331720U CN 207331720 U CN207331720 U CN 207331720U CN 201721052015 U CN201721052015 U CN 201721052015U CN 207331720 U CN207331720 U CN 207331720U
- Authority
- CN
- China
- Prior art keywords
- sheet pile
- steel
- steel sheet
- cofferdam
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model discloses a kind of cofferdam with Combined steel tube sheet pile, it is related to engineering construction field, the device includes some steel pipe sheet piles, the steel pipe sheet pile includes a steel pipe and steel sheet pile, the steel sheet pile both ends are respectively provided with a fore shaft, a receiving space is offered in the steel sheet pile along its length, the steel sheet pile is divided into the first steel sheet pile and the second steel sheet pile by the receiving space, a steel pipe is set in the receiving space, the steel pipe is respectively with first steel sheet pile and the second steel sheet pile away from fore shaft end sealed set;The adjacent steel pipe sheet pile is locked successively by the fore shaft is connected into the cofferdam entirety, the utility model can solve the problems, such as in cofferdam be used alone steel sheet pile be easily deformed it is higher with the cost of independent steel-pipe pile, so as to improve supporting intensity, and reduce cost.
Description
Technical field
It the utility model is related to engineering construction field, and in particular to a kind of cofferdam with Combined steel tube sheet pile.
Background technology
With the development of bridge construction, the method in existing construction underwater support table cofferdam is more, currently used to be mainly
Precast reinforced concrete pile, cast-in-situ bored pile, steel sheet pile and steel-pipe pile etc., the steel sheet pile support rigidity used in the prior art compared with
It is small, moderate finite deformation can occur relative to other forms supporting under equal soil pressure, while cause foundation pit surrounding soil is big to sink
Drop deformation, so as to endanger foundation pit Adjacent Buildings, this in order to solve the problems, such as, selection uses steel-pipe pile, and entirety uses steel pipe
Stake, there are its steel quantity consumption is big and the problem of cost is higher.
Utility model content
For defect existing in the prior art, the purpose of this utility model is to provide one kind to have Combined steel tube plate
The cofferdam of stake, can solve the problems, such as that being easily deformed for steel sheet pile is higher with the cost of steel-pipe pile.
To achieve the above objectives, the technical scheme adopted by the utility model is that:A kind of enclosing with Combined steel tube sheet pile
Weir, including:
Some steel pipe sheet piles, the steel pipe sheet pile include a steel pipe and steel sheet pile, and the steel sheet pile both ends are respectively provided with a lock
Mouthful, a receiving space is offered along its length in the steel sheet pile, and the steel sheet pile is divided into the first steel by the receiving space
Sheet pile and the second steel sheet pile, set a steel pipe in the receiving space, the steel pipe respectively with first steel sheet pile and
Two steel sheet piles are away from fore shaft end sealed set;
The adjacent steel pipe sheet pile is locked successively by the fore shaft is connected into the cofferdam entirety.
Based on the above technical solutions, the steel pipe edge between first steel sheet pile and the second steel sheet pile respectively
The length of steel pipe direction is uniformly provided with some ribs, and first steel sheet pile and the second steel sheet pile both sides be equipped with it is described
Ribs.
Based on the above technical solutions, distance of the adjacent ribs on the length of steel pipe direction is
1000mm。
Based on the above technical solutions, first steel sheet pile and the second steel sheet pile size are identical.
Based on the above technical solutions, the extended line of first steel sheet pile and the second steel sheet pile passes through the steel
Tube hub.
Based on the above technical solutions, lower nozzle is equipped with stiffener on the steel pipe.
Based on the above technical solutions, the diameter of steel tube is 630mm, and the steel sheet pile width is 500mm.
Based on the above technical solutions, the length of steel pipe is 24000mm, and the steel plate pile length is 23000mm.
Compared with prior art, the utility model has the advantage of:
(1) a kind of cofferdam with Combined steel tube sheet pile in the utility model, by setting some steel pipe sheet piles, energy
Enough solve the problems, such as in cofferdam be used alone steel sheet pile be easily deformed it is higher with the cost of independent steel-pipe pile, so as to improve supporting
Intensity, and reduce cost.
(2) by setting some ribs further to increase the supporting intensity of the steel pipe sheet pile.
Brief description of the drawings
Fig. 1 is the overlooking the structure diagram of steel pipe sheet pile in the utility model embodiment;
Fig. 2 is the facade structures schematic diagram of steel pipe sheet pile in the utility model embodiment;
Fig. 3 is the overlooking the structure diagram in cofferdam in the utility model embodiment;
In figure:1- steel pipe sheet piles, 2- steel pipes, 21- ribs, 22- stiffeners, 3- steel sheet piles, the first steel sheet piles of 31-, 32-
Second steel sheet pile, 33- fore shafts, 34- receiving spaces, 4- cofferdam.
Embodiment
The embodiment of the utility model is described in further detail below in conjunction with attached drawing.
Referring to shown in Fig. 1 to Fig. 3, the utility model embodiment provides a kind of cofferdam with Combined steel tube sheet pile, bag
Some steel pipe sheet piles 1 are included, which includes a steel pipe 2 and steel sheet pile 3, wherein, steel sheet pile 3 is cross bar stake, steel sheet pile
3 both ends are respectively provided with a fore shaft 33, and it is integral that two fore shafts 33 can mutually fasten shape, is offered along its length in steel sheet pile 3
One receiving space 34, the receiving space 34 divide steel sheet pile 3 for the first steel sheet pile 31 and the second steel sheet pile 32, wherein, this first
Steel sheet pile 31 is identical with 32 size of the second steel sheet pile, can make the ability to bear phase of the first steel sheet pile 31 and the second steel sheet pile 32
Together, ensure that the overall support capacity in cofferdam 4 is uniform, can also facilitate the installation of the steel pipe sheet pile 1, be carried out without specially choice direction
Installation, receiving space 34 is interior to be equipped with a steel pipe 2, and steel pipe 2 is respectively with the first steel sheet pile 31 and the second steel sheet pile 32 away from fore shaft 33
Sealed set is held, and two adjacent steel pipe sheet piles 1 are locked and are connected into the entirety of a cofferdam 4 successively by fore shaft 33, it is some by setting
Steel pipe sheet pile 1, and by some steel pipe sheet piles 1 lock connection it is integral, can solve that steel is used alone present in existing cofferdam 4
The problem of easily deforming during sheet pile, i.e., when steel sheet pile is used alone, support rigidity is smaller, opposite under equal soil pressure
The problem of moderate finite deformation can occur in other forms supporting, and individually use cost during steel-pipe pile higher, i.e., make integrally
During with steel-pipe pile, have the shortcomings that steel quantity consumption is big and cost is higher, pass through the steel pipe for setting steel pipe 2 and steel sheet pile 3 to combine to form
It is overall that sheet pile 1 forms cofferdam 4, it is possible to increase the supporting intensity in cofferdam 4, reduces the auxiliary equipment for being used for strengthening supporting intensity, phase
That answers reduces cost, and this is simple in structure, easy construction, can shorten the construction period accordingly.
Referring to shown in Fig. 1, Fig. 2, further, between 2 and first steel sheet pile 31 of steel pipe between 2 and second steel sheet pile 32 of steel pipe
Some ribs 21 are uniformly provided with along 2 length direction of steel pipe, and the first steel sheet pile 31 and 32 both sides of the second steel sheet pile are equipped with and add
Strong rib 21, distance of the adjacent ribs 21 on 2 length direction of steel pipe is 1000mm, can strengthen the first steel sheet pile 31 and second
The bond strength of steel sheet pile 32 and steel pipe 2, so that the further support rigidity of the structural reform steel pipe sheet pile 1.
Referring to shown in Fig. 1, Fig. 2, the extended line of the first steel sheet pile 31 and the second steel sheet pile 32 passes through 2 center of steel pipe, energy
Enough ensure that the stress in cofferdam 4 that is linked to be by steel pipe sheet pile 1 is clear and definite, adjacent fore shaft 33 closely pastes when being connected at the fore shaft 33 of connection
Close, without Concrete Filled can sealing, cost can be reduced, lower nozzle is equipped with stiffener 22 on steel pipe 2, can prevent
2 nozzle distortion of steel pipe caused by stress in work progress, 2 a diameter of 630mm of steel pipe, 3 width of steel sheet pile is 500mm, and steel pipe 2 is grown
It is 23000mm to spend for 24000mm, 3 length of steel sheet pile.
The utility model is not only limited to above-mentioned preferred forms, anyone can obtain under the enlightenment of the utility model
Go out other various forms of products, however, make any change in its shape or structure, it is every to have and the utility model phase
Same or close technical solution, within its protection domain.
Claims (8)
- A kind of 1. cofferdam with Combined steel tube sheet pile, it is characterised in that including:Some steel pipe sheet piles (1), the steel pipe sheet pile (1) include a steel pipe (2) and steel sheet pile (3), steel sheet pile (3) both ends A fore shaft (33) is respectively provided with, a receiving space (34), the receiving space are offered along its length in the steel sheet pile (3) (34) steel sheet pile (3) is divided into the first steel sheet pile (31) and the second steel sheet pile (32), one is set in the receiving space (34) The steel pipe (2), the steel pipe (2) are held with first steel sheet pile (31) and the second steel sheet pile (32) away from fore shaft (33) respectively Sealed set;The adjacent steel pipe sheet pile (1) is locked successively by the fore shaft (33) is connected into cofferdam (4) entirety.
- A kind of 2. cofferdam with Combined steel tube sheet pile as claimed in claim 1, it is characterised in that:The steel pipe (2) point Not between first steel sheet pile (31) and the second steel sheet pile (32) some add is uniformly provided with along the steel pipe (2) length direction Strong rib (21), and first steel sheet pile (31) and the second steel sheet pile (32) both sides are equipped with the ribs (21).
- A kind of 3. cofferdam with Combined steel tube sheet pile as claimed in claim 2, it is characterised in that:The adjacent ribs (21) distance on the steel pipe (2) length direction is 1000mm.
- A kind of 4. cofferdam with Combined steel tube sheet pile as claimed in claim 1, it is characterised in that:First steel sheet pile (31) it is identical with the second steel sheet pile (32) size.
- A kind of 5. cofferdam with Combined steel tube sheet pile as claimed in claim 1, it is characterised in that:First steel sheet pile (31) and the extended line of the second steel sheet pile (32) passes through the steel pipe (2) center.
- A kind of 6. cofferdam with Combined steel tube sheet pile as claimed in claim 1, it is characterised in that:On the steel pipe (2) Lower nozzle is equipped with stiffener (22).
- A kind of 7. cofferdam with Combined steel tube sheet pile as claimed in claim 1, it is characterised in that:The steel pipe (2) is straight Footpath is 630mm, and steel sheet pile (3) width is 500mm.
- A kind of 8. cofferdam with Combined steel tube sheet pile as claimed in claim 1, it is characterised in that:The steel pipe (2) is long Spend for 24000mm, steel sheet pile (3) length is 23000mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721052015.8U CN207331720U (en) | 2017-08-21 | 2017-08-21 | A kind of cofferdam with Combined steel tube sheet pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721052015.8U CN207331720U (en) | 2017-08-21 | 2017-08-21 | A kind of cofferdam with Combined steel tube sheet pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207331720U true CN207331720U (en) | 2018-05-08 |
Family
ID=62373174
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721052015.8U Active CN207331720U (en) | 2017-08-21 | 2017-08-21 | A kind of cofferdam with Combined steel tube sheet pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207331720U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610477A (en) * | 2019-01-31 | 2019-04-12 | 上海宝钢工程咨询有限公司 | Large area mud liquid soil layer foundation pit suspension supporting integrated construction structures and methods |
CN109610476A (en) * | 2019-01-31 | 2019-04-12 | 上海宝钢工程咨询有限公司 | Steel pipe Larsen sheet pile precipitation building enclosure |
CN114855841A (en) * | 2022-06-15 | 2022-08-05 | 中交三公局第一工程有限公司 | Steel pipe pile and steel sheet pile combined cofferdam structure of bearing platform in complex water area |
-
2017
- 2017-08-21 CN CN201721052015.8U patent/CN207331720U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610477A (en) * | 2019-01-31 | 2019-04-12 | 上海宝钢工程咨询有限公司 | Large area mud liquid soil layer foundation pit suspension supporting integrated construction structures and methods |
CN109610476A (en) * | 2019-01-31 | 2019-04-12 | 上海宝钢工程咨询有限公司 | Steel pipe Larsen sheet pile precipitation building enclosure |
CN109610476B (en) * | 2019-01-31 | 2024-05-17 | 上海宝钢工程咨询有限公司 | Steel pipe Larson sheet pile precipitation building envelope |
CN114855841A (en) * | 2022-06-15 | 2022-08-05 | 中交三公局第一工程有限公司 | Steel pipe pile and steel sheet pile combined cofferdam structure of bearing platform in complex water area |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207331720U (en) | A kind of cofferdam with Combined steel tube sheet pile | |
CN201661009U (en) | Concrete-filled square steel tubular column | |
CN206000538U (en) | A kind of shield machine trailing type trestle device | |
CN104153384A (en) | On-sea sandwich steel pipe pile foundation and construction method | |
CN204676584U (en) | A kind of high stake truss-like offshore wind turbine foundation structure | |
CN205676882U (en) | A kind of novel supporting construction | |
CN203429648U (en) | Large steel cylinder cofferdam structure | |
CN201347558Y (en) | Ring-shaped bracing structure system of deep and large foundation pit | |
CN207775909U (en) | A kind of cofferdam with combination shaped steel plate pile | |
CN204401628U (en) | Large-span steel supports multidirectional connector | |
CN101666086B (en) | Cement cast-in-situ pile of prefabricated part and construction method thereof | |
CN201686983U (en) | Double-seam steel sheet pile | |
CN203846512U (en) | Supporting device for long edges of strip-shaped and rectangular foundation pit | |
CN207538054U (en) | A kind of combined type cofferdam | |
CN206941338U (en) | A kind of multi-functional truss machine | |
CN203034468U (en) | Novel cofferdam for deep water foundation construction | |
CN207360534U (en) | Load-bearing construction platform locking device waterborne | |
CN204626451U (en) | A kind of concrete-filled steel tubular hollow Cantilever Retaining Wall for high roadbed district | |
CN101761240A (en) | Method and structure for adding partition in prior pool | |
CN204662493U (en) | A kind of concrete filled steel tube Cantilever Retaining Wall for high roadbed district | |
CN201924600U (en) | Cast-in-place crossbeam construction formwork supporting system with beam type switching layer | |
CN206256476U (en) | A kind of use W-shaped steel plate control immersed segment and the on the bank structure of section differential settlement | |
CN101914990B (en) | Beam-type transition layer cast-in-situ crossbeam construction formwork supporting system | |
CN207228105U (en) | A kind of deep hole blasting steel reinforcement cage | |
CN207727555U (en) | I-shaped prestressed concrete slabs staking pilework |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |