CN206090616U - Dam structure of general industrial solid waste landfill yard - Google Patents

Dam structure of general industrial solid waste landfill yard Download PDF

Info

Publication number
CN206090616U
CN206090616U CN201621067107.9U CN201621067107U CN206090616U CN 206090616 U CN206090616 U CN 206090616U CN 201621067107 U CN201621067107 U CN 201621067107U CN 206090616 U CN206090616 U CN 206090616U
Authority
CN
China
Prior art keywords
solid waste
bearing unit
diamond block
industrial solid
general industrial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621067107.9U
Other languages
Chinese (zh)
Inventor
唐奇军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Environmental Protection Ltd By Share Ltd
Original Assignee
Hunan Environmental Protection Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Environmental Protection Ltd By Share Ltd filed Critical Hunan Environmental Protection Ltd By Share Ltd
Priority to CN201621067107.9U priority Critical patent/CN206090616U/en
Application granted granted Critical
Publication of CN206090616U publication Critical patent/CN206090616U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

Dam structure of general industrial solid waste landfill yard, including a plurality of bearing unit and connect adjacent bearing unit's stand, the diamond block who closely just is the indent among the bearing unit including a plurality of connections, diamond block's long diagonal and comparing for 3: 1~2: 1 of short cornerwise length, the vertical section of indent part is obtuse triangle, and the indent degree of depth in addition, is put at every diamond block's central point and is provided with the reinforcement stock that a slant is inserted needed reinforced (rfd) side slope soil body for 12~13 of short diagonal length. The utility model discloses can strengthen the stability and antidumping ability of load -bearing platform in the side slope soil body greatly, stability is good simultaneously, and anti -seismic performance is superior, can effectively improve the life of wall body itself.

Description

The dam structure of general industrial solid waste landfill yard
Technical field
This utility model is related to the dam structure in civil engineering structure, and specially one kind is applied to offal treatment field In general industrial solid waste landfill yard dam structure.
Background technology
With it is economical develop rapidly, the quickening of industrialization and urbanization process, Municipal Domestic Garbage Output drastically increases It is many, bring detrimental effect to environmental conservation.At present, the mode of landfill is mainly taken in the domestic process to rubbish, even if early stage Rubbish is processed using other processing modes such as burning or compost, its last residue also will be disappeared by way of landfill Receive.
In general, this refuse landfill is generally all enclosed for the cell body structure being excavated, two sides or three face rings, and Build dam body and closed on one side or two sides in addition.But refuse landfill dam body of the prior art is only in design It is designed with reference to Reinforced Earth Retaining Wall Structure, does not carry out special reinforcement and process, there is rib tape surface and be difficult to anti-corrosion and right Packing adaptability is poor, and shingle nail is made up of that globality is poor blockwork, the defect such as construction quality is not easily controlled, and work Industry solid waste is different from the homogeneous substance (such as fluid, the cubic metre of earth and stone, sandy soil) accommodated in traditional dam body, and its internal stress is not , the exudate in not being in consecutive variations, and industrial solid castoff to the pressure of dam body in diverse location has and often possesses Certain corrosivity, thus larger is affected on dam body intensity, stability and service life.
Utility model content
The technical problem that this utility model is solved is the dam body knot for providing a kind of general industrial solid waste landfill yard Structure, to solve above-mentioned background technology in shortcoming.
The technical problem that this utility model is solved employs the following technical solutions to realize:
The dam structure of general industrial solid waste landfill yard, including some load bearing units and the adjacent load bearing unit of connection Column, the load bearing unit include it is some be completely embedded and the diamond block in indent, the long-diagonal of these diamond blocks with The length ratio of short diagonal is 3: 1~2: 1, and the longitudinal section of female parts is obtuse triangle, and hollow depth is short diagonal The 1/2~1/3 of line length, in addition, being provided with the side slope soil that an oblique insertion need to be reinforced in the center of each diamond block The reinforcing anchor pole of body.
In this utility model, the diamond block number in described each load bearing unit is preferably 8 or 11.
In this utility model, the angle for reinforcing the oblique insertion slope soil of anchor pole is 10 °~30 °.
In this utility model, the column is square column, and be provided with body of wall one side in column plus Strong rib.
In this utility model, the bottom of the column is provided with the buried piece for improving column strength.
Beneficial effect:Solid refuse is evenly spread to each bearing unit by this utility model to the lateral pressure of dam body, Further the lateral pressure in bearing unit is carried out into block cutting using the diamond block in bearing unit, increasing friction force is simultaneously Buffering lateral pressure, with high strength and stability, while shock resistance, anti-seismic performance are superior, the body of wall knot of itself Structure concrete certain corrosion resistance when concrete wall surface is equipped with, while can also increase anti-in surface-coated corrosion-resistant finishes Corrosive effect.
Description of the drawings
Fig. 1 is the schematic diagram of this utility model preferred embodiment.
Fig. 2 is the front schematic view of the single load bearing unit of this utility model.
Wherein:1st, ribs;2nd, square column;3rd, diamond block;4th, base for post;5th, buried piece;6th, anchor pole is reinforced;7th, side slope soil Body.
Specific embodiment
In order that technological means, creation characteristic, reached purpose and effect that this utility model is realized are easy to understand, under Face combines and is specifically illustrating, and this utility model is expanded on further.
Referring to the preferred embodiment of the dam structure of the general industrial solid waste landfill yard of Fig. 1, Fig. 2, in the present embodiment In, the dam structure of general industrial solid waste landfill yard includes some load bearing units side by side, between adjacent load bearing unit It is connected by square column 2, the bottom of square column 2 is fixed on base for post 4, and embedment side slope soil is then provided with the bottom of base for post 4 The buried piece 5 reinforced in body 7.
In the present embodiment, each load bearing unit includes eight diamond blocks 3, and these consistent sizes of diamond block 3, its length is right Linea angulata is 3: 1, is completely embedded with the length ratio of short diagonal and in indent, the longitudinal section of female parts is obtuse triangle, And hollow depth is the 1/3 of short diagonal length.And the position of centre of gravity in diamond block 3 is provided with oblique insertion slope soil 7 Anchor pole 6 is reinforced, the angle for reinforcing the oblique insertion slope soil of anchor pole 6 is 10 °.
Ultimate principle of the present utility model, principal character and advantage of the present utility model has been shown and described above.One's own profession The technical staff of industry it should be appreciated that this utility model is not restricted to the described embodiments, described in above-described embodiment and description Simply illustrate principle of the present utility model, on the premise of without departing from this utility model spirit and scope, this utility model is also Various changes and modifications are had, these changes and improvements are both fallen within the range of claimed this utility model.This utility model Claimed scope is by appending claims and its equivalent thereof.

Claims (4)

1. the dam structure of general industrial solid waste landfill yard, including some load bearing units and adjacent load bearing unit is connected Column, it is characterised in that the load bearing unit include it is some be completely embedded and the diamond block in indent, the length of the diamond block The length ratio of diagonal and short diagonal is 3: 1~2: 1, and the longitudinal section of female parts is obtuse triangle, and hollow depth For the 1/2~1/3 of short diagonal length, in addition, the center of each diamond block is provided with an oblique insertion to need to reinforce Slope soil reinforcing anchor pole.
2. the dam structure of general industrial solid waste landfill yard according to claim 1, it is characterised in that it is described each Diamond block number in load bearing unit is 8 or 11.
3. the dam structure of general industrial solid waste landfill yard according to claim 1, it is characterised in that the reinforcing The angle of the oblique insertion slope soil of anchor pole is 10 °~30 °.
4. the dam structure of general industrial solid waste landfill yard according to claim 1, it is characterised in that the column Bottom be provided with buried piece.
CN201621067107.9U 2016-09-01 2016-09-01 Dam structure of general industrial solid waste landfill yard Active CN206090616U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621067107.9U CN206090616U (en) 2016-09-01 2016-09-01 Dam structure of general industrial solid waste landfill yard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621067107.9U CN206090616U (en) 2016-09-01 2016-09-01 Dam structure of general industrial solid waste landfill yard

Publications (1)

Publication Number Publication Date
CN206090616U true CN206090616U (en) 2017-04-12

Family

ID=58480365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621067107.9U Active CN206090616U (en) 2016-09-01 2016-09-01 Dam structure of general industrial solid waste landfill yard

Country Status (1)

Country Link
CN (1) CN206090616U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115299282A (en) * 2022-05-27 2022-11-08 中国科学院、水利部成都山地灾害与环境研究所 Method for soil stabilization and sand adjustment of slope

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115299282A (en) * 2022-05-27 2022-11-08 中国科学院、水利部成都山地灾害与环境研究所 Method for soil stabilization and sand adjustment of slope
CN115299282B (en) * 2022-05-27 2023-09-19 中国科学院、水利部成都山地灾害与环境研究所 Method for soil fixation and sand adjustment of slope

Similar Documents

Publication Publication Date Title
CN203821412U (en) Supporting structure with scattered row piles and continuous walls
CN205422773U (en) Novel hollow grouting anchor bolt
CN206090616U (en) Dam structure of general industrial solid waste landfill yard
CN202124863U (en) Screw anchor excavated composite foundation
CN205653804U (en) Slope assembled warp self -adaptation protection skeleton
CN207959202U (en) A kind of CFG bracing means
CN203654267U (en) Concrete prefabricated pile
CN206233232U (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN102619214A (en) U-shaped interface steel sheet pile and application thereof in enclosure for foundation pit
CN202530442U (en) Buckle steel pipe pile
CN201202120Y (en) Mixing pile foundation pit supporting construction
CN214530638U (en) Multi-shaft stirring stiffness composite pile
CN201162229Y (en) Anti-floating pit structure
CN205676886U (en) One pile for one column reducing steel reinforcement cage
CN107829428A (en) A kind of variable diameters bamboo joint type mortar pile
CN205154208U (en) Novel multi -functional stock
CN205012333U (en) Recoverable FRP stock with enlarged footing
CN205954618U (en) Double -walled bellows precast tubular pile pile extension structure
CN204590241U (en) The fast-assembling steel structure basis of barracks is built in a kind of hillside fields
CN203514325U (en) Foundation pit stair support system with gravity type cement cob wall in combination with single rank of piles
CN204000846U (en) Floral tube slip casting uplift pile
CN201268857Y (en) Soil shovel
CN207775875U (en) Rod of soil nailing wall end reinforces sleeve
CN205776251U (en) A kind of Phyllostachys pubescens Mazei ex H.de Lebaie stake composite S MW engineering method pile-type steel early pulling body system
CN204491592U (en) A kind of composite pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Dam structure of general industrial solid waste landfill

Effective date of registration: 20220302

Granted publication date: 20170412

Pledgee: China Everbright Bank Co.,Ltd. Changsha Wanjiali road sub branch

Pledgor: ZHONGXIANG ENVIRONMENTAL PROTECTION CO.,LTD.

Registration number: Y2022430000014

PE01 Entry into force of the registration of the contract for pledge of patent right