CN206086719U - Urban rail transit holds arrangement structure at formula station to greatest extent - Google Patents

Urban rail transit holds arrangement structure at formula station to greatest extent Download PDF

Info

Publication number
CN206086719U
CN206086719U CN201620782998.XU CN201620782998U CN206086719U CN 206086719 U CN206086719 U CN 206086719U CN 201620782998 U CN201620782998 U CN 201620782998U CN 206086719 U CN206086719 U CN 206086719U
Authority
CN
China
Prior art keywords
station
main track
island platform
straight line
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620782998.XU
Other languages
Chinese (zh)
Inventor
傅萃清
袁晓萍
刘志涛
罗聪
徐振廷
王念念
陈先文
刘铮
胡立发
谷亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201620782998.XU priority Critical patent/CN206086719U/en
Application granted granted Critical
Publication of CN206086719U publication Critical patent/CN206086719U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an urban rail transit holds arrangement structure at formula station to greatest extent, including the island platform who is the curved edge trapezium structure, island platform's both sides are provided with first main track and second main track respectively, first main track is connected through scissors crossing before island platform's station with the second main track, scissors crossing constitutes by first single entry branch -cut bridge and second single entry branch -cut bridge are crossing, first main track, second main track are connected through first safety line, second safety line and gate terminal point respectively behind island platform's station, first safety line and the mutual parallel arrangement of second safety line, circular curve and first single entry branch -cut bridge transitional coupling are passed through to first safety line, straightway and the preceding positive line connection of second in island platform station are passed through to the second safety line. The utility model discloses a platform design is the curved edge trapezium structure, and through circle first safety line of curve connection and scissors crossing, realization distance between lines's quick change shortens station length.

Description

The arrangement at formula station is held to the greatest extent in urban track traffic
Technical field
The utility model is related to the technical field of city rail traffic route, holds to the greatest extent in particular to a kind of urban track traffic The arrangement at formula station.
Background technology
In recent years, China's rapid economic development, urbanization process is gradually accelerated, as a density of population is larger and resource Relatively deficient country, traffic congestion has become the Tough questions that city faces.Therefore, it is to ensure that city is sent out healthy and stablely Exhibition, promote public transport has become trend of the times, urban track traffic with its large conveying quantity, it is comfortable, quick the characteristics of obtained people The consistent favorable comment of the people, multiple cities are in be greatly developed among city rail.
Urban track traffic holds to the greatest extent formula station to need to meet the requirement that vehicle is turned back in addition to the function that need to meet station, also, folding Returning the arrangement of line should determine with reference to station platform pattern, be to ensure line turning-back capacity, and station is typically taken and turn back behind station pattern, As shown in figure 1, the front-end and back-end of platform 11 are wide, platform 11 sets up single branch-cut bridge 12 before station, for underground island station, platform 11 Two turn back lines 13 are set after standing, and line length of turning back need to be more than train length plus 50m, and track switch adopts No. 9 track switches, and need to meet letter Requirement number with track switch specification, because distance between centers of tracks is larger, even if taking shortening branch-cut bridge before standing, its branch-cut bridge is still longer.Take State station method for arranging, station total length about 500m.
But in actual design process, then some complex situations can be run into, such as be had a lot of social connections by neighboring buildings, road The impact and restriction of the factors such as degree, engineering geological condition and other circuit transfer patterns, to the arrangement at station unfavorable shadow is caused Ring.Open-cut is typically taken in underground station, and scope is larger to take the most end formula station turned back behind station to excavate, and China city Multiple regions often face the problems such as road is narrower, and building is intensive, stream of people's wagon flow is complicated, if carry out large-scale open cut applying Work, then can face periphery traffic organization and discongest difficulty, and removal amount is larger, difficulty of construction increase and construction risk it is excessive the problems such as, And in the increasingly complex region of certain situation, the station turned back after standing even cannot be arranged completely.For such case, it is necessary to A kind of method for arranging at station is studied, the turning-back capacity of circuit can be met while end formula station total length to the greatest extent is reduced.
The content of the invention
The purpose of this utility model seeks to provide a kind of city that can shorten station length, reduce difficulty of construction and risk The arrangement at formula station is held to the greatest extent in city's track traffic.
For achieving the above object, a kind of urban track traffic designed by the utility model holds to the greatest extent the arrangement at formula station to tie Structure, including an island platform in curl trapezium structure, the width of an island platform is gradually increased from end of entering the station to outbound end, institute The both sides for stating an island platform are respectively arranged with the first main track and the second main track, and first main track and the second main track are in an island platform Station before connected by double crossover, the double crossover is constituted by the first single entry branch-cut bridge and the second single entry branch-cut bridge are intersecting, described First main track, the second main track pass through respectively the first safety line, the second safety line behind the station of an island platform and are connected with circuit terminal, First safety line is arranged in parallel with the second safety line;First safety line is by circular curve and the first single entry branch-cut bridge Transition connects, and second safety line is connected by straightway with the second main track before an island platform station.
Further, an island platform is the song enclosed by first straight line, second straight line, the 3rd straight line and curve Side trapezium structure, the first straight line and second straight line are arranged vertically with straightway, and the first straight line is leaned on second straight line One end of nearly straightway is connected by the 3rd straight line, and the first straight line passes through curve with second straight line near one end of circular curve Connection.
Further, the curve and circular curve are opening towards the circular arc line on the inside of an island platform.
Further, the radius >=1000m of the circular curve.
Yet further, the track switch at the double crossover adopts No. 9 track switches.
Further, it is smaller than an island platform station between the first main track and the second main track before an island platform station Spacing between first main track and the second main track afterwards.
Compared with prior art, the utility model has the advantage that:
First, Design of platform of the present utility model is curl trapezium structure, will can lead in the line construction of existing station part Cross a circular curve to connect the first safety line and double crossover, realize the quick change of distance between centers of tracks, shorten station length.
Second, taking double crossover to turn back before the utility model station, safety line is adopted after standing so that station total length is significantly Reduce, reduce its difficulty of construction and risk.
Third, being smaller than an island platform between first main track and the second main track before an island platform station of the present utility model Spacing after standing between the first main track and the second main track, before an island platform station of main track interval between the first main track and the second main track Spacing may be controlled to minimum shield distance between centers of tracks, shorten the length of double crossover, improve the turning-back capacity at station.
Description of the drawings
Fig. 1 is the structural representation that traditional urban track traffic holds to the greatest extent formula station to arrange;
Fig. 2 is the schematic diagram of the arrangement that formula station is held to the greatest extent in urban track traffic of the present utility model;
Fig. 3 is an island platform front end sectional schematic diagram in the utility model;
Fig. 4 is an island platform rear end sectional schematic diagram in the utility model;
Wherein:1- an island platforms, 1.1- first straight lines, 1.2- second straight lines, the straight lines of 1.3- the 3rd, 1.4- curves, 2- One main track, the main tracks of 3- second, 4- double crossovers, 5- the first single entry branch-cut bridges, 6- the second single entry branch-cut bridges, the safety lines of 7- first, 8- Two safety lines, 9- circular curves, 10- straightways, 11- platforms, the mono- branch-cut bridges of 12-, 13- turn back lines.
Specific embodiment
Below in conjunction with the accompanying drawings the utility model is described in further detail with specific embodiment.
As shown in figs. 2 to 4, the arrangement at formula station is held to the greatest extent in the urban track traffic of the present embodiment, including in curl ladder An island platform 1 of shape structure, the width of an island platform 1 is gradually increased from end of entering the station to outbound end, and an island platform 1 is straight by first The curl trapezium structure that line 1.1, second straight line 1.2, the 3rd straight line 1.3 and curve 1.4 are enclosed, first straight line 1.1 and Two straight lines 1.2 are arranged vertically with straightway 10, and first straight line 1.1 passes through with second straight line 1.2 near one end of straightway 10 3rd straight line 1.3 connects, and first straight line 1.1 is connected near one end of circular curve 9 with second straight line 1.2 by curve 1.4.Platform Front end width h is 8.4m, and platform rear end width H is 12m.Station total length is greatly shortened, about 300m length, is particularly suited for engineering specifications Extremely difficult position.
The both sides of an island platform 1 are respectively arranged with the first main track 2 and the second main track 3, and the first main track 2 and the second main track 3 exist Connected by double crossover 4 before the station of an island platform 1, double crossover 4 is intersected by the first single entry branch-cut bridge 5 and the second single entry branch-cut bridge 6 Constitute, the first main track 2, the second main track 3 pass through respectively the first safety line 7, the second safety line 8 and line behind the station of an island platform 1 Road terminal connection, the first safety line 7 is arranged in parallel with the second safety line 8;First safety line 7 passes through circular curve 9 and first The transition of single entry branch-cut bridge 5 connects, and the second safety line 8 is connected by straightway 10 with the second main track 3 before the station of an island platform 1.Curve 1.4 and circular curve 9 be the circular arc line being open towards the inner side of an island platform 1, the radius >=1000m of circular curve 9.Double crossover 4 The track switch at place adopts No. 9 track switches.So, while speed can be met using No. 9 track switches, track switch is reduced as far as possible long Degree.
The first main track 2 behind the station of an island platform 1 is smaller than before the station of an island platform 1 between first main track 2 and the second main track 3 With the spacing between the second main track 3.Spacing before an island platform station of main track interval between the first main track and the second main track can be controlled Minimum shield distance between centers of tracks is made as, distance between centers of tracks is 9m, shortens the length of double crossover 4, improves the turning-back capacity at station.
The above, specific embodiment only of the present utility model, it is noted that any to be familiar with those skilled in the art In the technical scope disclosed in the utility model, the change or replacement that can be readily occurred in all should be covered in the utility model member Protection domain within.

Claims (6)

1. the arrangement at formula station is held to the greatest extent in a kind of urban track traffic, it is characterised in that:Including the island in curl trapezium structure Formula platform (1), the width of an island platform (1) is gradually increased from end of entering the station to outbound end, the both sides of an island platform (1) The first main track (2) and the second main track (3) are respectively arranged with, first main track (2) is with the second main track (3) in an island platform (1) Station before by double crossover (4) connect, the double crossover (4) is by the first single entry branch-cut bridge (5) and the second single entry branch-cut bridge (6) phase Hand over and constitute, first main track (2), the second main track (3) behind the station of an island platform (1) respectively by the first safety line (7), the Two safety lines (8) are connected with circuit terminal, and first safety line (7) is arranged in parallel with the second safety line (8);Described One safety line (7) is connected by circular curve (9) with the first single entry branch-cut bridge (5) transition, and second safety line (8) is by straightway (10) the second main track (3) before standing with an island platform (1) is connected.
2. the arrangement at formula station is held to the greatest extent in urban track traffic according to claim 1, it is characterised in that:The island Platform (1) is the curl enclosed by first straight line (1.1), second straight line (1.2), the 3rd straight line (1.3) and curve (1.4) Trapezium structure, the first straight line (1.1) and second straight line (1.2) are arranged vertically with straightway (10), the first straight line (1.1) it is connected by the 3rd straight line (1.3) near one end of straightway (10) with second straight line (1.2), the first straight line (1.1) it is connected by curve (1.4) near one end of circular curve (9) with second straight line (1.2).
3. the arrangement at formula station is held to the greatest extent in urban track traffic according to claim 2, it is characterised in that:The curve (1.4) it is and is open towards the circular arc line on the inside of an island platform (1) with circular curve (9).
4. the arrangement at formula station is held to the greatest extent in the urban track traffic according to claim 1 or 2 or 3, it is characterised in that:Institute State the radius >=1000m of circular curve (9).
5. the arrangement at formula station is held to the greatest extent in urban track traffic according to claim 1, it is characterised in that:The intersection The track switch at branch-cut bridge (4) place adopts No. 9 track switches.
6. the arrangement at formula station is held to the greatest extent in urban track traffic according to claim 1, it is characterised in that:The island Platform (1) stand between front first main track (2) and the second main track (3) be smaller than after an island platform (1) is stood the first main track (2) with Spacing between second main track (3).
CN201620782998.XU 2016-07-22 2016-07-22 Urban rail transit holds arrangement structure at formula station to greatest extent Active CN206086719U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620782998.XU CN206086719U (en) 2016-07-22 2016-07-22 Urban rail transit holds arrangement structure at formula station to greatest extent

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620782998.XU CN206086719U (en) 2016-07-22 2016-07-22 Urban rail transit holds arrangement structure at formula station to greatest extent

Publications (1)

Publication Number Publication Date
CN206086719U true CN206086719U (en) 2017-04-12

Family

ID=58467434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620782998.XU Active CN206086719U (en) 2016-07-22 2016-07-22 Urban rail transit holds arrangement structure at formula station to greatest extent

Country Status (1)

Country Link
CN (1) CN206086719U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106143501A (en) * 2016-07-22 2016-11-23 中铁第四勘察设计院集团有限公司 The arrangement at formula station is held to the greatest extent in urban track traffic
CN108639066A (en) * 2018-06-20 2018-10-12 中铁第四勘察设计院集团有限公司 A kind of half curve side platform and track structure of rail traffic
CN109131361A (en) * 2018-09-14 2019-01-04 中铁第四勘察设计院集团有限公司 A kind of bulb-type intelligence rail is turned back cable architecture

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106143501A (en) * 2016-07-22 2016-11-23 中铁第四勘察设计院集团有限公司 The arrangement at formula station is held to the greatest extent in urban track traffic
CN108639066A (en) * 2018-06-20 2018-10-12 中铁第四勘察设计院集团有限公司 A kind of half curve side platform and track structure of rail traffic
CN108639066B (en) * 2018-06-20 2023-06-27 中铁第四勘察设计院集团有限公司 Semi-curve side platform and track structure for track traffic
CN109131361A (en) * 2018-09-14 2019-01-04 中铁第四勘察设计院集团有限公司 A kind of bulb-type intelligence rail is turned back cable architecture

Similar Documents

Publication Publication Date Title
CN106143501A (en) The arrangement at formula station is held to the greatest extent in urban track traffic
CN206086719U (en) Urban rail transit holds arrangement structure at formula station to greatest extent
CN206938741U (en) A kind of line arrangement structure of two rail lines transfer of built by separate periods
CN108016450B (en) It turns back before a kind of city rail traffic station island station arragement construction
WO2017185918A1 (en) Cpiii planar network measurement method
CN108891423B (en) Track line structure of reserved branch line condition
CN107585166A (en) A kind of track traffic turn back line arrangement
CN107858877B (en) Rotary type crossing crossover monorail turnout
CN107901918A (en) A kind of rail traffic vehicles circuit gets in touch with structure
CN106114522A (en) Urban track traffic eight word formula washing track three curve shortens branch-cut bridge compact Layout structure
CN107128315A (en) The arrangement of main line and branch line and the track traffic for having the structure integrate with station
CN107748939A (en) A kind of computer approach of fire station layout optimization
CN207809379U (en) A kind of rail traffic is turned back trajectory arrangement
CN108639066B (en) Semi-curve side platform and track structure for track traffic
CN108589566B (en) Underground side type station line structure with single crossover and construction method
CN106087603A (en) Urban track traffic eight word formula washing track hyperbola shortens branch-cut bridge compact Layout structure
CN202039261U (en) Combined bridge of two right-turning and straight-going Y-shaped bifurcation bridges
CN107139936A (en) It is a kind of to be turned back cable architecture using the interval track traffic turned back
CN206552033U (en) A kind of single line suitable for urban track traffic gets in touch with cable architecture
CN206157479U (en) Compact arrangement structure of urban rail transit eight characters formula carwash line hyperbola shortened crossover
CN202298397U (en) Road facility capable of keeping vehicles on urban cross road smooth
CN207657814U (en) A kind of rail traffic vehicles circuit contact structure
CN107687115A (en) The bus rapid transit runtime of most simple province
CN212332631U (en) Arrangement structure of rail transit wedge-shaped rail connecting station
CN206278094U (en) A kind of line arrangement structure of two subway lines transfer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant