CN108016450B - It turns back before a kind of city rail traffic station island station arragement construction - Google Patents

It turns back before a kind of city rail traffic station island station arragement construction Download PDF

Info

Publication number
CN108016450B
CN108016450B CN201711236921.8A CN201711236921A CN108016450B CN 108016450 B CN108016450 B CN 108016450B CN 201711236921 A CN201711236921 A CN 201711236921A CN 108016450 B CN108016450 B CN 108016450B
Authority
CN
China
Prior art keywords
main track
station
track
island
curve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711236921.8A
Other languages
Chinese (zh)
Other versions
CN108016450A (en
Inventor
徐瑰麟
张华龙
刘志涛
李洪强
王念念
刘欧阳
毛帅
田猎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201711236921.8A priority Critical patent/CN108016450B/en
Publication of CN108016450A publication Critical patent/CN108016450A/en
Application granted granted Critical
Publication of CN108016450B publication Critical patent/CN108016450B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B1/00General arrangement of stations, platforms, or sidings; Railway networks; Rail vehicle marshalling systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B1/00General arrangement of stations, platforms, or sidings; Railway networks; Rail vehicle marshalling systems
    • B61B1/02General arrangement of stations and platforms including protection devices for the passengers

Abstract

The present invention provides island station arragement construction of turning back before a kind of city rail traffic station, the two sides of an island platform are respectively arranged with the first main track and the second main track, first curve connects first main track and double crossover, second curve connects second main track and double crossover, first interval main track are connected with second interval main track by the double crossover.It turns back before city rail traffic station provided by the invention island station arragement construction, effectively shortens station total length, reduces project scale;It is distance travelled to shorten train operation of turning back, improves train and turns back operating efficiency;Applicability is wide, flexibility ratio is high, can meet the station arragement construction of overhead station, underground station, the island station arragement construction suitable for a variety of platform widths.

Description

It turns back before a kind of city rail traffic station island station arragement construction
Technical field
The present invention relates to city rail traffic route design fields, more particularly, to a kind of urban track traffic It turns back before standing island station arragement construction.
Background technique
In recent years, China's rapid economic development, urbanization process are gradually accelerated, and resource larger as a density of population Deficient country, traffic congestion have become the serious problem that city faces relatively.Therefore, it is sent out healthy and stablely for guarantee city Exhibition promotes public transport and has become trend of the times, and urban track traffic has obtained people with its large conveying quantity, comfortable, quick feature The consistent favorable comment of the people, multiple cities, which are in, to be greatly developed among city rail.
In track traffic design, train should be set and turned back at terminus station and intermediate switchback station according to organization of driving's cross-channel Line meets train and turns back job requirements, and station necessarily causes station scale to become larger after turn back line is arranged, and construction investment accordingly increases Add.
Switchback station is connected between main track with double crossover before station before rail traffic station in the prior art, as shown in Figure 1, intersecting Spacing between 6 place first interval main track 7 of branch-cut bridge and second interval main track 8 is the same as platform two sides the first main track 1 and the second main track 2 Between spacing it is identical, 6 length of double crossover influenced by spacing between the first main track 1 and the second main track 2 it is big, cause station compared with Length, project scale are larger.
Summary of the invention
In order at least partly overcome the above-mentioned problems in the prior art, the present invention provides a kind of urban track traffic It turns back before standing island station arragement construction.
The present invention provides island station arragement construction of turning back before a kind of city rail traffic station, the two sides difference of an island platform It is provided with the first main track and the second main track, the first curve connects first main track and double crossover, described in the connection of the second curve Second main track and double crossover, first interval main track and second interval main track are connected by the double crossover.
Wherein, the distance between the first interval main track and the second interval main track L1≥4.6m。
Wherein, the distance between first main track and second main track L2≥12m。
Wherein, the radius R of first curve1≥200m;The radius R of second curve2≥200m。
Wherein, one end that first main track is connect with first curve is set as the first superelevation runoff straightway;Institute It states one end that the second main track is connect with second curve and is set as the second superelevation runoff straightway.
Wherein, the track switch at the double crossover includes the first track switch, the second track switch, third track switch and the 4th track switch; Wherein, first track switch, second track switch, the third track switch and the 4th track switch are simple turnout.
Wherein, the width of an island platform is more than or equal to 9m.
Wherein, further includes: the first safety line and the second safety line;Wherein, first main track is in an island platform It is connect by first safety line with route terminal after standing;Second main track is behind the station of an island platform by described Second safety line is connect with route terminal.
Wherein, the train on the first interval main track successively passes through the 4th track switch and first track switch, then by First curve leaves for first main track, so that the train reaches an island platform;The train is by described One main track leaves for first curve, then successively diverges to up to the second interval just by first track switch and the second Line is to complete operation of turning back.
Wherein, the train on the first interval main track successively passes through the 4th track switch and the third track switch, then by Second curve leaves for second main track, so that the train reaches an island platform;The train is by described Two main tracks leave for second curve, then successively diverge to up to the second interval just by the third track switch and the second Line is to complete operation of turning back.
To sum up, it turns back before a kind of city rail traffic station provided by the invention island station arragement construction, it is bent to pass through first Line connects the first main track and double crossover, and the second curve connects the second main track and double crossover, effectively shorten station total length, Reduce project scale;It is distance travelled to shorten train operation of turning back, improves train and turns back operating efficiency;Applicability is wide, flexibility ratio is high, The station arragement construction that overhead station, underground station can be met, the island station arragement construction suitable for a variety of platform widths.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of island station arragement construction of turning back before city rail traffic station in the prior art;
Fig. 2 is the structure according to island station arragement construction of turning back before a kind of city rail traffic station of the embodiment of the present invention Schematic diagram.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing, to the embodiment of the present invention In technical solution be explicitly described, it is clear that described embodiments are some of the embodiments of the present invention, rather than all Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art institute without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
Fig. 2 is the structure according to island station arragement construction of turning back before a kind of city rail traffic station of the embodiment of the present invention Schematic diagram, as shown in Fig. 2, the two sides of an island platform 3 are respectively arranged with the first main track 1 and the second main track 2, the connection of the first curve 4 First main track 1 and double crossover 6, the second curve 5 connect second main track 2 and double crossover 6, first interval main track 7 It is connected with second interval main track 8 by the double crossover 6.
Wherein, the first main track 1 and the second main track 2 are disposed in parallel relation to one another.
Wherein, first interval main track 7 and second interval main track 8 are disposed in parallel relation to one another.
Wherein, the first curve 4 and the second curve 5 are circular arc line of the opening towards an island platform 3.
Island station arragement construction of turning back before a kind of city rail traffic station is present embodiments provided, passes through the first curve and connects The first main track and double crossover are connect, the second curve connects the second main track and double crossover, effectively shortens station total length, reduces Project scale;It is distance travelled to shorten train operation of turning back, improves train and turns back operating efficiency;Applicability is wide, flexibility ratio is high, can expire Sufficient overhead station, underground station station arragement construction, the island station arragement construction suitable for a variety of platform widths.
In another embodiment of the present invention, on the basis of the above embodiments, the first interval main track 7 and described The distance between second interval main track 8 L1≥4.6m。
Preferably, the distance between first interval main track 7 and second interval main track 8 L1≥5m。
Preferably, the distance between first interval main track 7 and second interval main track 8 L1For 5m.
Present embodiments provide island station arragement construction of turning back before a kind of city rail traffic station, first interval main track and The distance between second interval main track L1For 5m, the scale at station is reduced.
In yet another embodiment of the present invention, on the basis of the above embodiments, first main track 1 and described second The distance between main track 2 L2≥12m。
Preferably, the distance between the first main track 1 and the second main track 2 L2For 15m.
Present embodiments provide island station arragement construction of turning back before a kind of city rail traffic station, the first main track and second The distance between main track L2For 15m, the scale at station is reduced.
In another embodiment of the invention, on the basis of the above embodiments, the radius R of first curve 41≥ 200m;
The radius R of second curve 52≥200m。
Preferably, the radius R of the first curve 41For 200m, the radius R of the second curve 52For 200m.
Present embodiments provide island station arragement construction of turning back before a kind of city rail traffic station, the radius of the first curve R1For 200m, the radius R of the second curve2For 200m, effectively shortens station total length, reduces project scale;Shorten train to turn back Operation is distance travelled, improves train and turns back operating efficiency;Applicability is wide, flexibility ratio is high, can meet overhead station, underground station Station arragement construction, the island station arragement construction suitable for a variety of platform widths.
In another embodiment of the invention, on the basis of the above embodiments, first main track 1 and first song One end that line 4 connects is set as the first superelevation runoff straightway;One end that second main track 2 is connect with second curve 5 It is set as the second superelevation runoff straightway.
Specifically, the first main track 1 is set as the first surpassing from the end of an island platform 3 to connecting this section with the first curve 4 High gradual change straightway;
To be set as the second superelevation runoff straight from the end of an island platform 3 to this section is connect with the second curve 5 for second main track 2 Line segment.
In another embodiment of the invention, on the basis of the above embodiments, the track switch at the double crossover includes First track switch C1, the second track switch C2, third track switch C3And the 4th track switch C4;Wherein,
The first track switch C1, the second track switch C2, the third track switch C3And the 4th track switch C4It is singly to open Track switch.
In another embodiment of the invention, on the basis of the above embodiments, the width of an island platform is greater than etc. In 9m.
Preferably, the width of an island platform 3 is 12m.
Present embodiments provide island station arragement construction of turning back before a kind of city rail traffic station, the width of an island platform For 12m, effectively shortens station total length, reduces project scale.
In another embodiment of the invention, on the basis of the above embodiments, further includes: the first safety line and the second peace Completely;Wherein,
First main track 1 is connect by first safety line with route terminal behind the station of an island platform 3;
Second main track 2 is connect by second safety line with route terminal behind the station of an island platform 3.
In another embodiment of the invention, on the basis of the above embodiments, the train on the first interval main track 7 Successively pass through the 4th track switch C4With the first track switch C1, then first main track 1 left for by first curve 4, so that It obtains the train and reaches an island platform 3;
The train leaves for first curve 4 by first main track 1, then successively passes through the first track switch C1And institute State the second track switch C2The second interval main track 8 is reached to complete operation of turning back.
Island station arragement construction of turning back before a kind of city rail traffic station is present embodiments provided, on first interval main track Train successively pass through the 4th track switch and the first track switch, then the first main track is left for by the first curve, so that train reaches island Platform;Train leaves for the first curve by the first main track, then successively diverges to by the first track switch and second up to second interval main track To complete to turn back operation, it is distance travelled to shorten train operation of turning back, and improves train and turns back operating efficiency;Applicability is wide, flexibility ratio Height can meet the station arragement construction of overhead station, underground station, and the island station suitable for a variety of platform widths arranges knot Structure.
In another embodiment of the invention, on the basis of the above embodiments, the train on the first interval main track 7 Successively pass through the 4th track switch C4With the third track switch C3, then second main track 2 left for by second curve 5, so that It obtains the train and reaches an island platform 3;
The train leaves for second curve 5 by second main track 2, then successively passes through the third track switch C3And institute State the second track switch C2The second interval main track 8 is reached to complete operation of turning back.
Island station arragement construction of turning back before a kind of city rail traffic station is present embodiments provided, on first interval main track Train successively pass through the 4th track switch and third track switch, then the second main track is left for by the second curve, so that train reaches island Platform;Train leaves for the second curve by the second main track, then successively diverges to by third track switch and second up to second interval main track To complete to turn back operation, it is distance travelled to shorten train operation of turning back, and improves train and turns back operating efficiency;Applicability is wide, flexibility ratio Height can meet the station arragement construction of overhead station, underground station, and the island station suitable for a variety of platform widths arranges knot Structure.
Although the embodiments of the invention are described in conjunction with the attached drawings, but those skilled in the art can not depart from this hair Various modifications and variations are made in the case where bright spirit and scope, such modifications and variations are each fallen within by appended claims Within limited range.

Claims (8)

1. island station arragement construction of turning back before a kind of city rail traffic station, which is characterized in that distinguish the two sides of an island platform It is provided with the first main track and the second main track, the first curve connects first main track and double crossover, described in the connection of the second curve Second main track and double crossover, first interval main track and second interval main track are connected by the double crossover;First main track and Second main track is disposed in parallel relation to one another, and first interval main track and second interval main track are disposed in parallel relation to one another, the first curve and the second song Line is circular arc line of the opening towards an island platform;
The radius R of first curve1≥200m;The radius R of second curve2≥200m;
One end that first main track is connect with first curve is set as the first superelevation runoff straightway;Second main track The one end connecting with second curve is set as the second superelevation runoff straightway;
First curve and second curve are respectively positioned on outside effective platform range of an island platform.
2. island station arragement construction of turning back before city rail traffic station according to claim 1, which is characterized in that described The distance between first interval main track and the second interval main track L1≥4.6m。
3. island station arragement construction of turning back before city rail traffic station according to claim 1, which is characterized in that described The distance between first main track and second main track L2≥12m。
4. island station arragement construction of turning back before city rail traffic station according to claim 1, which is characterized in that described Track switch at double crossover includes the first track switch, the second track switch, third track switch and the 4th track switch;Wherein,
First track switch, second track switch, the third track switch and the 4th track switch are simple turnout.
5. island station arragement construction of turning back before city rail traffic station according to claim 1, which is characterized in that described The width of an island platform is more than or equal to 9m.
6. island station arragement construction of turning back before city rail traffic station according to claim 1, which is characterized in that also wrap It includes: the first safety line and the second safety line;Wherein,
First main track is connect by first safety line with route terminal behind the station of an island platform;
Second main track is connect by second safety line with route terminal behind the station of an island platform.
7. island station arragement construction of turning back before city rail traffic station according to claim 4, which is characterized in that described Train on first interval main track successively passes through the 4th track switch and first track switch, then leaves for institute by first curve The first main track is stated, so that the train reaches an island platform;
The train leaves for first curve by first main track, then successively passes through first track switch and the second It diverges to up to the second interval main track to complete operation of turning back.
8. island station arragement construction of turning back before city rail traffic station according to claim 4, which is characterized in that described Train on first interval main track successively passes through the 4th track switch and the third track switch, then leaves for institute by second curve The second main track is stated, so that the train reaches an island platform;
The train leaves for second curve by second main track, then successively passes through the third track switch and the second It diverges to up to the second interval main track to complete operation of turning back.
CN201711236921.8A 2017-11-30 2017-11-30 It turns back before a kind of city rail traffic station island station arragement construction Active CN108016450B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711236921.8A CN108016450B (en) 2017-11-30 2017-11-30 It turns back before a kind of city rail traffic station island station arragement construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711236921.8A CN108016450B (en) 2017-11-30 2017-11-30 It turns back before a kind of city rail traffic station island station arragement construction

Publications (2)

Publication Number Publication Date
CN108016450A CN108016450A (en) 2018-05-11
CN108016450B true CN108016450B (en) 2019-09-13

Family

ID=62077760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711236921.8A Active CN108016450B (en) 2017-11-30 2017-11-30 It turns back before a kind of city rail traffic station island station arragement construction

Country Status (1)

Country Link
CN (1) CN108016450B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109131363B (en) * 2018-09-14 2024-01-16 中铁第四勘察设计院集团有限公司 Intelligent rail train parking system
CN109131364B (en) * 2018-09-21 2023-09-26 中铁第四勘察设计院集团有限公司 Intelligent track line structure system
CN110281957A (en) * 2019-06-28 2019-09-27 梁紫玥 The station and block design scheme that a kind of rail line is turned back based on revolution
CN112417557A (en) * 2020-11-18 2021-02-26 中国铁路设计集团有限公司 Method for calculating Yunba island type station end bell mouth and related parameters thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102501852A (en) * 2011-11-21 2012-06-20 铁道第三勘察设计院集团有限公司 Layout structure for integration of train depot and junction station of urban rail
CN104401329A (en) * 2014-10-30 2015-03-11 北京交控科技有限公司 Station-front double-track automatic turning-back control method and device
CN104742913A (en) * 2013-12-27 2015-07-01 王冠军 System and method for realizing station-front turning-back of urban rail transit
CN106087603A (en) * 2016-08-03 2016-11-09 中铁第四勘察设计院集团有限公司 Urban track traffic eight word formula washing track hyperbola shortens branch-cut bridge compact Layout structure
CN106143501A (en) * 2016-07-22 2016-11-23 中铁第四勘察设计院集团有限公司 The arrangement at formula station is held to the greatest extent in urban track traffic

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102501852A (en) * 2011-11-21 2012-06-20 铁道第三勘察设计院集团有限公司 Layout structure for integration of train depot and junction station of urban rail
CN104742913A (en) * 2013-12-27 2015-07-01 王冠军 System and method for realizing station-front turning-back of urban rail transit
CN104401329A (en) * 2014-10-30 2015-03-11 北京交控科技有限公司 Station-front double-track automatic turning-back control method and device
CN106143501A (en) * 2016-07-22 2016-11-23 中铁第四勘察设计院集团有限公司 The arrangement at formula station is held to the greatest extent in urban track traffic
CN106087603A (en) * 2016-08-03 2016-11-09 中铁第四勘察设计院集团有限公司 Urban track traffic eight word formula washing track hyperbola shortens branch-cut bridge compact Layout structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
轨道交通折返线路相关问题的分析探讨;刘波等;《铁路通信信号工程技术》;20160625;第13卷(第3期);第80-84页 *

Also Published As

Publication number Publication date
CN108016450A (en) 2018-05-11

Similar Documents

Publication Publication Date Title
CN108016450B (en) It turns back before a kind of city rail traffic station island station arragement construction
CN104742913B (en) Realize the system and method turned back before city rail traffic station
CN107974917B (en) A kind of bending node, curve continuous steel girder bridge and its design method
CN106143501A (en) The arrangement at formula station is held to the greatest extent in urban track traffic
CN101215816B (en) Traffic flow multiplication method for traffic light crossing
CN106114522B (en) Eight word formula washing track of urban track traffic, three curve shortens branch-cut bridge compact Layout structure
CN107585166A (en) A kind of track traffic turn back line arrangement
CN104816728B (en) Underground station structure of the city track traffic engineering with stop line
CN108550257A (en) A kind of control method for coordinating that multi-line railroad vehicle in intersection crosses and system
CN107663815A (en) A kind of double crossover single-track turnout of lifting type
CN104401329A (en) Station-front double-track automatic turning-back control method and device
CN206086719U (en) Urban rail transit holds arrangement structure at formula station to greatest extent
CN209683680U (en) It turns back before a kind of rail traffic terminal wedge shape island station the line arrangement structure at station
CN205203003U (en) System for turn back before realizing urban rail transit station
CN204139000U (en) Be applicable to the prefabricated switch structure of modern tram bottle-neck section
CN207537825U (en) A kind of double crossover single-track turnout of lifting type
CN106087603B (en) The word formula washing track hyperbola of urban track traffic eight shortens branch-cut bridge compact Layout structure
CN107364447A (en) A kind of track traffic parking lot bottle-neck section arrangement
CN207809379U (en) A kind of rail traffic is turned back trajectory arrangement
CN101864710A (en) Annular flyover for straight movement and large-radius turning at crossroad
CN110550051A (en) Track line structure with reserved long-term splitting condition and construction method thereof
CN108639066B (en) Semi-curve side platform and track structure for track traffic
CN104573067A (en) Tramcar and BRT cable network comprehensive arrangement method
CN202298397U (en) Road facility capable of keeping vehicles on urban cross road smooth
CN207607490U (en) A kind of rail traffic vehicles section washing track takes turns line combination layout structure with Xuan

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant