CN207607490U - A kind of rail traffic vehicles section washing track takes turns line combination layout structure with Xuan - Google Patents

A kind of rail traffic vehicles section washing track takes turns line combination layout structure with Xuan Download PDF

Info

Publication number
CN207607490U
CN207607490U CN201721818274.7U CN201721818274U CN207607490U CN 207607490 U CN207607490 U CN 207607490U CN 201721818274 U CN201721818274 U CN 201721818274U CN 207607490 U CN207607490 U CN 207607490U
Authority
CN
China
Prior art keywords
track
xuan
line
track switch
library
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721818274.7U
Other languages
Chinese (zh)
Inventor
李重武
袁晓萍
蔡适
石鹏
刘铮
谷亮
王雄
徐源
周松
樊美斌
谭华刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201721818274.7U priority Critical patent/CN207607490U/en
Application granted granted Critical
Publication of CN207607490U publication Critical patent/CN207607490U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of rail traffic vehicles section washing track provided by the utility model takes turns line combination layout structure with Xuan, including:Line is taken turns with library, washing track and Xuan;Be arranged in parallel with into section line in the bottle-neck section with library and go out a section line, it is described enter section line with it is described go out section line between be connected by double crossover;One end of the washing track is connect with carwash library, and the other end of the washing track is connected into a section line;One end of the Xuan wheels line is connect with Xuan wheels library, and the other end of the Xuan wheels line is connected into a section line;And it is connected by first single branch-cut bridge or the first terraced line between the washing track and Xuan wheel lines.Rail traffic vehicles section washing track provided by the utility model takes turns line combination layout structure with Xuan, is connect using first single branch-cut bridge or the first terraced line by the way that washing track is taken turns line with Xuan, and Xuan wheels line use ratio can be improved, improve carwash efficiency and improve utilization of area rate.

Description

A kind of rail traffic vehicles section washing track takes turns line combination layout structure with Xuan
Technical field
The utility model is related to technical field of rail traffic, more particularly, to a kind of rail traffic vehicles section washing track Line combination layout structure is taken turns with Xuan.
Background technology
Urban rail transit vehicles section be City Rail Transit System vehicle parking, with reorganize and outfit, periodic inspection, daily dimension The place repaiied.According to《Metro design code》(GB50157-2013), mechanical vehicle-cleaning equipment, car inspection and repair should all be arranged in rolling stock section Facility should include periodical repair library, big un-wheeling repair library, face Xiu Ku, non-pulling wheel Xuan wheel library etc., i.e., under normal circumstances, rolling stock section, which should all be arranged, washes Fare takes turns line with Xuan.Due to the limitation of the factors such as orographic condition, land used range, rolling stock section's carwash library and Xuan take turns library frequently with most end The mode of formula arrangement, is placed side by side with library.Under normal circumstances, carwash library and Xuan wheel library may be arranged at library homonymy or The both sides with library are distributed in, as depicted in figs. 1 and 2.
In actual operations, all train cleanings can not be completed by entering section carwash when train returns the vehicle to the garage and knock off, it is most of Train need to enter parked with library after arrange to be put in storage carwash again, the case where continuous carwash operation, is very common.When using end to the greatest extent When formula washing track carwash, train needs, from bottle-neck section traveling to carwash library, washing track to be occupied again after carwash, through bottle-neck section Storage parking.Only after train sails out of washing track, next train can just pass through washing track traveling to carwash library.Carwash operation needs Washing track is occupied repeatedly, and carwash interval time is longer when leading to continuous carwash operation, and carwash is less efficient.
For Xuan take turns operation, train taken turns in prolonged driving process it is different to both sides abrasion condition or periodical repair, Xuan wheel operations need to be just carried out when un-wheeling repair.And according to the experience actually runed, Xuan takes turns library generally and can be used once every several talentes, greatly It is in idle condition when most, therefore the utilization rate of Xuan wheel lines is relatively low.
In summary it analyzes, at present using the rolling stock section for holding formula carwash library and Xuan wheel library arrangements to the greatest extent, washing track is continuous Carwash it is less efficient, while Xuan wheel line frequency of use it is relatively low.
Utility model content
For the above technical issues, a kind of rail traffic vehicles section washing track of the utility model offer is combined with Xuan wheel lines Arrangement.
In a first aspect, a kind of rail traffic vehicles section washing track of the utility model offer takes turns line combination layout structure with Xuan, Including:Line is taken turns with library, washing track and Xuan;Be arranged in parallel with into section line in the bottle-neck section with library and go out a section line, it is described enter section Line with it is described go out section line between be connected by double crossover;One end of the washing track is connect with carwash library, the washing track The other end enters section line described in being connected to;One end of the Xuan wheels line is connect with Xuan wheels library, and the other end of the Xuan wheels line is connected to It is described enter section line;And it is connected by first single branch-cut bridge or the first terraced line between the washing track and Xuan wheel lines;Wherein, carwash Library and Xuan wheels library are arranged at the side with library.
Wherein, it is connected by first single branch-cut bridge between the washing track and Xuan wheel lines, the washing track and described the The distance in the junction of one single branch-cut bridge to the carwash library is not shorter than the length of a section vehicle.
Wherein, it is connected by the first terraced line between the washing track and Xuan wheel lines, the washing track and described first The distance in the junction of terraced line to the carwash library is not shorter than a section Vehicle length.
Wherein, described first single branch-cut bridge includes that the 11st track switch, the tenth track switch and single branch-cut bridge, the 11st track switch are located at On the washing track, the tenth track switch be located at the Xuan wheel line on, the 11st track switch be left hand turnout, the described tenth Trouble is right hand turnout;And the distance between other end of the 11st track switch and the washing track and the tenth track switch The distance between the other end that line is taken turns with the Xuan is satisfied by the effectively long requirement of carwash;Wherein, carwash is effectively long requires packet Include Vehicle length and safe distance.
Wherein, the described first terraced line includes:11st track switch, the tenth track switch and terraced line;11st track switch is located at institute It states on washing track, the tenth track switch is located on Xuan wheel lines, and the 11st track switch is left hand turnout, the tenth track switch For right hand turnout;And the distance between the tenth track switch and the 11st track switch and the 11st track switch with it is described The distance between other end of washing track is satisfied by the effectively long requirement of carwash;Wherein, carwash effectively length requires to include Vehicle length And safe distance.
Wherein, the carwash library and Xuan wheels library are arranged at the homonymy with library, and Xuan wheels library is close It is described that lab setting, the carwash lab setting is used to take turns library far from the side with library in the Xuan.
Wherein, the double crossover includes third track switch, the 4th track switch, the 5th track switch, the 6th track switch and diamond crossing, The third track switch and the 6th track switch are located on section line, and the 4th track switch and the 5th track switch are located at a section line On.
Wherein, the rail traffic vehicles section washing track takes turns line combination layout structure with Xuan, further includes:It is arranged described Enter the 7th track switch on section line, the 7th track switch is arranged on the right side of the 6th track switch;And the washing track is another End with the Xuan wheel line the other end merge to be formed merge end, the mergings end be equipped with the 9th track switch, second ladder line connect described in 7th track switch and the 9th track switch.
Wherein, the rail traffic vehicles section washing track takes turns line combination layout structure with Xuan, further includes:It is arranged in parallel in It is described enter section line far from it is described go out section line side shunting neck, one end of the shunting neck passes through the 8th track switch and described second Terraced line is connected, and the second track switch is equipped on the shunting neck, and it is described enter section line on be equipped with the first track switch, and described the One track switch is arranged in the left side of the third track switch, and second single branch-cut bridge connects first track switch and second track switch.
Wherein, the sweep of the curved section of the washing track is not less than 150m.
A kind of rail traffic vehicles section washing track provided by the utility model and Xuan take turns line combination layout structure, and existing Washing track has the following advantages that compared with Xuan takes turns line arrangement:
First, the utility model is increased by increasing the first terraced line or first single branch-cut bridge between taking turns line in washing track and Xuan The route that Xuan wheel lines are connected with carwash library makes Xuan wheel lines while having the function of carwash storage, when Xuan wheels library does not have Xuan crop rotations When industry, carwash operation is carried out using Xuan wheel lines, Xuan is improved and takes turns line use ratio;
Second, the utility model connects Xuan and takes turns line and washing track by the first terraced line or first single branch-cut bridge, make Xuan wheel lines with Washing track all has carwash storage and function to be washed of stopping;After previous train carwash, latter train can directly pass through Another line to be washed enters carwash library and carries out carwash operation, therefore reduces the travel time that train passes in and out on washing track, from And the interval time of continuous carwash is shortened, improve carwash efficiency;
Third, the utility model increases by first single branch-cut bridge or the first terraced line using the place between washing track and Xuan wheel lines, In the case of no increase land area, the utilization rate in place is improved.
Description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is Some embodiments of the utility model, for those of ordinary skill in the art, without creative efforts, Other drawings may also be obtained based on these drawings.
Fig. 1 is that traditional rail traffic vehicles section washing track takes turns line combination layout structure figure with Xuan;
Fig. 2 is that another traditional rail traffic vehicles section washing track takes turns line combination layout structure figure with Xuan;
Fig. 3 is that the rail traffic vehicles section washing track that the utility model embodiment provides takes turns line combination layout structure with Xuan Figure;
Fig. 4 is that the rail traffic vehicles section washing track that another embodiment of the utility model provides takes turns line combined layout knot with Xuan Composition;
Fig. 5 is to take turns line combination layout structure with Xuan using rail traffic vehicles section washing track shown in Fig. 3 to carry out carwash work By running to the schematic diagram in carwash library with library when industry;
Fig. 6 is complete using rail traffic vehicles section washing track shown in Fig. 3 and Xuan wheel line combination layout structure carwash operations The schematic diagram with library is run to by carwash library after finishing;
Wherein, 1- goes out a section line;2- enters a section line;3- shunting necks;The single branch-cut bridges of 4- second;5- double crossovers;The terraced lines of 6- second;7- Washing track;8- Xuan take turns line;9- uses library;10- carwash library;11- Xuan take turns library;The single branch-cut bridges of 12- first;The terraced lines of 13- first;C1- One track switch;The second track switches of C2-;C3- third track switches;The 4th track switches of C4-;The 5th track switches of C5-;The 6th track switches of C6-;C7- the 7th Trouble;The 8th track switches of C8-;The 9th track switches of C9-;The tenth track switches of C10-;The 11st track switches of C11-.
Specific implementation mode
It is new below in conjunction with this practicality to keep the purpose, technical scheme and advantage of the utility model embodiment clearer Attached drawing in type embodiment, is explicitly described the technical scheme in the embodiment of the utility model, it is clear that described reality It is the utility model a part of the embodiment to apply example, instead of all the embodiments.Based on the embodiments of the present invention, ability It is new to belong to this practicality for the every other embodiment that domain those of ordinary skill is obtained without making creative work The range of type protection.
Fig. 3 is that the rail traffic vehicles section washing track that the utility model embodiment provides takes turns line combination layout structure with Xuan Figure, as shown in figure 3, the combination layout structure includes:Line 8 is taken turns with library 9, washing track 7 and Xuan;It is flat in the bottle-neck section with library 9 Row is provided with into section line 2 and goes out broken string 1, it is described enter section line 2 with it is described go out section line 1 between be connected by double crossover 5;It is described to wash One end of fare 7 is connect with carwash library 10, the other end of the washing track 7 be connected to it is described enter section line 2;The Xuan wheels line 8 One end is connect with Xuan wheels library 11;The other end of the Xuan wheels line 8 enters section line 2 described in being connected to;And the washing track 7 and Xuan It is connected by first single branch-cut bridge, 12 or first terraced line 13 between wheel line 8;Wherein, carwash library 10 and Xuan wheels library 11 are arranged at utilization The side in library 9.
Specifically, one end of washing track 7 is connected with carwash library 10, and the other end of washing track 7 is connected into section line 2;Xuan takes turns One end of line 8 is connected with Xuan wheels library 11, and the other end of Xuan wheel lines 8 is connected into section line 2;And between washing track 7 and Xuan wheel lines 8 It is connected by first single branch-cut bridge, 12 or first terraced line 13, as shown in Figure 3 and Figure 4.
For example, washing track 7 and Xuan wheel lines 8 are connected using first single branch-cut bridge 12 with shown in Fig. 3, then it is continuous in progress train When carwash operation, previous train is sailed out of by going out broken string 1 or entering section line 2 with library 9, then enters washing track through double crossover 5 7, when the train, which enters carwash library 10, carries out carwash operation, it is to be washed that latter train can run to Xuan wheel lines 8.When previous train After carwash, reverse end for end, across carwash library 10, to run in effective long range of 7 front end of washing track by washing track 7;At this point, Latter train takes turns line 8 by Xuan and first single branch-cut bridge 12 enters carwash library and carries out carwash operation.Carwash operation is carried out in latter train When, previous train can pass sequentially through washing track 7, double crossover 5, go out broken string 1 into library 9;Follow-up train can enter carwash Line 7 is to be washed, so repeats carwash and works continuously, until all train carwash operations finish.
In the utility model embodiment, singly crossed by the terraced line of increase by first between taking turns line in washing track and Xuan or first Line increases the route that Xuan wheel lines are connected with carwash library, makes Xuan wheel lines while having the function of carwash storage, when Xuan wheels library does not have When Xuan takes turns operation, carwash operation is carried out using Xuan wheel lines, Xuan is improved and takes turns line use ratio;Meanwhile keeping Xuan wheel lines and washing track equal Have the function of carwash storage and stop to be washed, after previous train carwash, latter train can be waited for directly by another It washes line and enters the progress carwash operation of carwash library, therefore reduce the travel time that train passes in and out on washing track, so as to shorten The interval time of continuous carwash, improve carwash efficiency;And in the case of no increase land area, improve the utilization in place Rate.
On the basis of the above embodiments, connected by first single branch-cut bridge 12 between the washing track 7 and Xuan wheel lines 8 It connects, the washing track 7 is not shorter than Vehicle length at a distance from the junction to the carwash library 10 of described first single branch-cut bridge 12.Institute It includes the 11st track switch C11, the tenth track switch C10 and single branch-cut bridge to state first single branch-cut bridge 12, and the 11st track switch C11 is located at described On washing track 7, the tenth track switch C10 is located on Xuan wheel lines 8, and the 11st track switch C11 is left hand turnout, and described the Ten track switch C10 are right hand turnout;And the distance between the other end of the 11st track switch C11 and the washing track 7, Yi Jisuo The distance between the other end for stating the tenth track switch C10 and Xuan wheel lines 8 is satisfied by the effectively long requirement of carwash;Wherein, carwash has Effect length requires to include Vehicle length and safe distance.
Wherein, branch-cut bridge, turn-out track section refer to the lengths of rail for connecting two parallel steel rails, make traveling Mr. Yu's route Train can switch tracks to an other route.Such track would generally be furnished with one group to multigroup railway switch.
Specifically, when the length of straigh line that washing track 7 connects the one end in carwash library 10 is not shorter than Vehicle length, that is, wash It is straight line in 10 previous, garage vehicle length range, then is connected using first single branch-cut bridge 12 between washing track 7 takes turns line 8 with Xuan, As shown in Figure 3.And on washing track 7 the distance between the 11st track switch C11 and the other end of washing track 7 meet carwash effectively length want It asks, that is, the distance between the 11st track switch C11 and the other end of washing track 7 are not less than the sum of overall length of the train degree and safe distance; And the distance between the other end of the tenth track switch C10 and Xuan wheel line 8 meets that carwash is effectively long to be required on Xuan wheel lines 8, i.e., the tenth The distance between the other end of track switch C10 and Xuan wheel lines 8 is not less than the sum of overall length of the train degree and safe distance, Generally Recognized as safe distance For 10m-20m.
When carrying out carwash operation, previous train is sailed out of by going out broken string 1 or entering section line 2 with library 9, is then crossed through intersecting Line 5 enters washing track 7, and when the train, which enters carwash library 10, carries out carwash operation, latter train can run to Xuan wheel lines 8 and wait for It washes, that is, latter train is to be washed on the line segment between the other end and the tenth track switch C10 that Xuan takes turns line 8.When previous train carwash is complete Bi Hou reverses end for end, across carwash library 10, to run in effective long range of 7 front end of washing track, that is, previous train by washing track 7 It runs on the line segment between the other end of washing track 7 and the 11st track switch C11;At this point, latter train takes turns line 8 and first by Xuan Single branch-cut bridge 12 enters carwash library and carries out carwash operation.When latter train carries out carwash operation, previous train can be passed sequentially through and be washed Fare 7, double crossover 5 go out broken string 1 into library 9;Follow-up train can enter the other end and the 11st track switch of washing track 7 It is to be washed on line segment between C11, so repeat carwash and work continuously, until all train carwash operations finish.
In the utility model embodiment, the length of straigh line in one end that washing track is connected with carwash library is not shorter than train When length, in the single branch-cut bridge of setting first between washing track and Xuan wheel lines so that the combination layout structure cost is relatively low.
On the basis of the various embodiments described above, connected by the first terraced line 13 between the washing track 7 and Xuan wheel lines 8, The washing track 7 is shorter than Vehicle length at a distance from the junction to the carwash library 10 of the described first terraced line 13.Described first Terraced line 13 includes:11st track switch C11, the tenth track switch C10 and terraced line;The 11st track switch C11 is located at the washing track 7 On, the tenth track switch C10 is located on Xuan wheel lines 8, and the 11st track switch C11 is left hand turnout, the tenth track switch C10 is right hand turnout;And the distance between the tenth track switch C10 and the 11st track switch C11 and the described 10th one The distance between the other end of trouble C11 and the washing track 7 is satisfied by the effectively long requirement of carwash;Wherein, carwash is effectively long requires Including Vehicle length and safe distance.
Wherein, as soon as terraced line refers to that several parallel lines are connected on a common wire, this common wire is terraced line.
Specifically, when the length of straigh line that washing track 7 connects the one end in carwash library 10 is shorter than Vehicle length, that is, carwash It is not straight line in the vehicle length range of 10 previous, library, then is connected using the first terraced line 13 between washing track 7 takes turns line 8 with Xuan, such as Shown in Fig. 4.And the 11st track switch C11 and Xuan takes turns the distance between the tenth track switch C10 on line 8 to meet carwash effective on washing track 7 It is long to require, that is, the distance between the 11st track switch C11 and the tenth track switch C10 is not less than the sum of overall length of the train degree and safe distance; And the other end and the distance between the 11st track switch C11 of washing track 7 meet that carwash is effectively long to be required, that is, washing track 7 it is another The distance between one end and the 11st track switch C11 are not less than the sum of overall length of the train degree and safe distance, and Generally Recognized as safe distance is 10m-20m。
When carrying out carwash operation, previous train is sailed out of by going out broken string 1 or entering section line 2 with library 9, is then crossed through intersecting Line 5 enters washing track 7, and when the train, which enters carwash library 10, carries out carwash operation, latter train can take turns line 8 through Xuan and run to First terraced line 13 is to be washed, that is, line segment of the latter train on the first terraced line 13 between the tenth track switch C10 and the 11st track switch C11 It is to be washed.After previous train carwash, reverse end for end, across carwash library 10, to run to the effective of 7 front end of washing track by washing track 7 In long range, that is, previous column vehicle is run on the line segment between the other end of washing track 7 and the 11st track switch C11;After at this point, One train enters carwash library by the first terraced line 13 and carries out carwash operation.When latter train carries out carwash operation, previous train can It passes sequentially through washing track 7, double crossover 5, enter section line 2 into library 9;Follow-up train can enter the other end of washing track 7 with It is to be washed on line segment between 11st track switch C11, so repeat carwash and work continuously, until all train carwash operations are complete Finish.
In the utility model embodiment, the straightway distance not enough setting in one end that washing track is connected with carwash library is single When branch-cut bridge, the terraced line of setting first between washing track and Xuan wheel lines so that the combination layout structure is flexible and changeable, adapts to a variety of The washing track and Xuan of different structure take turns line.
On the basis of the various embodiments described above, the carwash library 10 and Xuan wheels library 11 are arranged at the utilization library 9 Homonymy, and the wheel libraries 11 the Xuan are arranged close to described with library 9, and the carwash library 10 setting takes turns library 11 far from institute in the Xuan State the side with library 9.
Specifically, carwash library 10 and Xuan wheels library 11 are arranged in the homonymy with library 9, and the wheel libraries 11 Xuan are close to library 9 Setting, carwash library 10 are arranged in the wheel libraries 11 Xuan far from the side with library 9, can simplify first single branch-cut bridge, 12 or first terraced line 13 Structure so that entire combined layout meet combine carwash using washing track 7 and Xuan wheel lines 8 under conditions of, structure is simpler It is clean.
On the basis of the various embodiments described above, the double crossover 5 includes third track switch C3, the 4th track switch C4, the 5th Trouble C5, the 6th track switch C6 and diamond crossing, the third track switch C3 and the 6th track switch C6 are located on section line 2, described 4th track switch C4 and the 5th track switch C5 are located on section line 1.
Specifically, double crossover 5 connects out broken string 1 and enters section line 2, and 5 third track switch C3 of the double crossover, the 4th track switch C4, the 5th track switch C5, the 6th track switch C6 and diamond crossing, third track switch C3 and the 6th track switch C6 are located on section line 2, and the 4th Track switch C4 and the 5th track switch C5 are located on section line 1;Then it can realize that train is going out broken string 1 and entering using the double crossover 5 Conversion between section line 2, that is, sail out of train with library 9 by going out broken string 1, the third road in the double crossover 5 can be passed through Branch-cut bridge between trouble C3 and the 4th track switch C4 is travelled to section line 2 is entered, and is then travelled to washing track 7 and is washed into carwash library 10 Vehicle operation.After carwash operation, train reverses end for end, across carwash library 10, then to travel to entering section through washing track 7 by washing track 7 Line 2 travels to going out broken string 1 by the 6th track switch C6 in double crossover 5 and the branch-cut bridge between the 5th track switch C5, and drives into fortune With library 9.Straight line then is should be within the scope of a train length before and after carwash library 10, to meet the requirement of train carwash operation.
On the basis of the above embodiments, the rail traffic vehicles section washing track takes turns line combination layout structure with Xuan, Further include:Be arranged it is described enter section line 2 on the 7th track switch C7, the 7th track switch C7 is arranged on the right side of the 6th track switch C6 Side;And the other end of the washing track 7 takes turns the other end of line 8 with the Xuan and merges to be formed and merge end, the merging end is equipped with 9th track switch C9, the second terraced line 6 connect the 7th track switch C7 and the 9th track switch C9.
Specifically, the other end that the other end of washing track 7 is taken turns to line 8 with Xuan merges to form merging end, and is set merging end Set the 9th track switch C9;And the 7th track switch C7 is set on entering section line 2, it is used in combination the second terraced line 6 to connect the 7th track switch C7 and the 9th Track switch C9, then train from when entering the traveling of section line 2 and taking turns line 8 to washing track 7 or Xuan, first pass through the second terraced line 6 then traveling to washing Fare 7 or Xuan take turns line 8, then when carrying out carwash operation so that the driving process of train is more steady.Similarly, in train carwash Finish from the traveling of washing track 7 to when entering section line 2, first pass through the second terraced line 6 then traveling to entering section line 2 so that the row of train It is more steady to cross journey.
In the utility model embodiment, by being set in the 7th track switch of the right side of the 6th track switch setting, and merging end The 9th track switch is set, is then connected the 7th track switch with the 9th track switch by the second terraced line so that train is entering section line and washing track Between traveling back and forth it is more steady.
On the basis of the various embodiments described above, the rail traffic vehicles section washing track takes turns line combined layout knot with Xuan Structure further includes:Be arranged in parallel in it is described enter section line 2 far from it is described go out broken string 1 side shunting neck 3, the one of the shunting neck 3 End is connected by the 8th track switch C8 with the described second terraced line 6, and the shunting neck 3 is equipped with the second track switch C2, and described Enter section line 2 and be equipped with the first track switch C1, and the first track switch C1 is arranged in the left side of the third track switch C3, second single branch-cut bridge 4 Connect the first track switch C1 and the second track switch C2.
Specifically, shunting neck 3 is set in the side for going out broken string 1, then in carwash operation, as shown in figure 5, train is by going out Broken string 1 enters section line 2 and sails out of train with library 9, by double crossover 5 and second single traveling of branch-cut bridge 4 to shunting neck 3, and Turned on shunting neck 3, then the effective length of shunting neck 3 should be not less than overall length of the train, shunter length and safe distance it With.Then, washing track 7 is entered by the 8th track switch C8 and the 9th track switch C9, when train enters carwash by the 11st track switch C11 When library 10 carries out carwash operation, latter train can be by shunting neck 3 through the 8th track switch C8 and the 9th track switch C9, and line is taken turns in traveling to Xuan 8 progress are to be washed.
After previous train carwash, reversed end for end across carwash library 10, traveling to 7 front end of washing track by washing track 7 In effective long range, that is, run to the distance between the 9th track switch C9 and the 11st track switch C11 after train carwash.At this point, Latter train can enter carwash library 10 by first single branch-cut bridge, 12 or first terraced line 13 and carry out carwash operation.Previous train can lead to successively It crosses washing track 7, shunting neck 3, first single branch-cut bridge 4, double crossover 5 and enters section line 2 and enter with library 9, as shown in Figure 6.When next When train carwash, follow-up train can enter it is to be washed on washing track 7 or Xuan wheel lines 8, and so on, until all train carwash operations It finishes.The train of continuous carwash operation is more, and the carwash efficiency of the combination layout structure of the utility model embodiment is higher.
In addition, 50kg/m rail may be used in track switch C1-C11, wherein the 7th track switch C7 is simple turnout.
On the basis of the various embodiments described above, the sweep of the curved section of the washing track 7 is not less than 150m.
Specifically, set the sweep of the curved section of washing track 7 to being not less than 150m so that washing track 7 it is whole compared with Smoothly, then train can more smoothly pass through washing track 7 when entering the 10 progress carwash operation of carwash library by washing track 7.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model, rather than its limitations; Although the utility model is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: It still can be with technical scheme described in the above embodiments is modified, or is carried out to which part technical characteristic etc. With replacement;And these modifications or replacements, various embodiments of the utility model technology that it does not separate the essence of the corresponding technical solution The spirit and scope of scheme.

Claims (10)

1. a kind of rail traffic vehicles section washing track takes turns line combination layout structure with Xuan, which is characterized in that including:With library, wash Fare and Xuan take turns line;Be arranged in parallel with into section line in the bottle-neck section with library and go out a section line, it is described enter section line with it is described go out section line Between by double crossover be connected;
One end of the washing track is connect with carwash library, the other end of the washing track be connected to it is described enter section line;The Xuan wheels One end of line and Xuan wheel library connects, the other end of the Xuan wheels line be connected to described in enter section line;
And it is connected by first single branch-cut bridge or the first terraced line between the washing track and Xuan wheel lines;
Wherein, carwash library and Xuan wheels library are arranged at the side with library.
2. rail traffic vehicles section washing track according to claim 1 takes turns line combination layout structure with Xuan, which is characterized in that It is connected by first single branch-cut bridge between the washing track and Xuan wheel lines, the connection of the washing track and described first single branch-cut bridge Locate not being shorter than a section Vehicle length to the distance in the carwash library.
3. rail traffic vehicles section washing track according to claim 1 takes turns line combination layout structure with Xuan, which is characterized in that It is connected by the first terraced line between the washing track and Xuan wheel lines, the junction of the washing track and the described first terraced line is arrived The distance in the carwash library is not shorter than a section Vehicle length.
4. rail traffic vehicles section washing track according to claim 2 takes turns line combination layout structure with Xuan, which is characterized in that Described first single branch-cut bridge includes that the 11st track switch, the tenth track switch and single branch-cut bridge, the 11st track switch are located on the washing track, Tenth track switch is located on Xuan wheel lines, and the 11st track switch is left hand turnout, and the tenth track switch is right hand turnout; And the distance between the 11st track switch and the other end of the washing track and the tenth track switch take turns line with the Xuan The distance between other end is satisfied by the effectively long requirement of carwash;
Wherein, carwash effectively length requires to include Vehicle length and safe distance.
5. rail traffic vehicles section washing track according to claim 3 takes turns line combination layout structure with Xuan, which is characterized in that The first terraced line includes:11st track switch, the tenth track switch and terraced line;11st track switch is located on the washing track, institute It states the tenth track switch to be located on Xuan wheel lines, the 11st track switch is left hand turnout, and the tenth track switch is right hand turnout;And The other end of the distance between tenth track switch and the 11st track switch and the 11st track switch and the washing track The distance between be satisfied by that carwash is effectively long to be required;
Wherein, carwash effectively length requires to include Vehicle length and safe distance.
6. line combination layout structure is taken turns according to claim 1-5 any one of them rail traffic vehicles section washing track and Xuan, It is characterized in that, the carwash library and Xuan wheels library are arranged at the homonymy with library, and the wheel libraries the Xuan are close to described With lab setting, the carwash lab setting takes turns library far from the side with library in the Xuan.
7. rail traffic vehicles section washing track according to claim 1 takes turns line combination layout structure with Xuan, which is characterized in that The double crossover includes third track switch, the 4th track switch, the 5th track switch, the 6th track switch and diamond crossing, the third track switch It is located on section line with the 6th track switch, the 4th track switch and the 5th track switch are located on section line.
8. rail traffic vehicles section washing track according to claim 7 takes turns line combination layout structure with Xuan, which is characterized in that Further include:Be arranged it is described enter section line on the 7th track switch, the 7th track switch is arranged on the right side of the 6th track switch;And The other end that the other end of the washing track takes turns line with the Xuan merges to form merging end, and the merging end is equipped with the 9th track switch, Second terraced line connects the 7th track switch and the 9th track switch.
9. rail traffic vehicles section washing track according to claim 8 takes turns line combination layout structure with Xuan, which is characterized in that Further include:Be arranged in parallel in it is described enter section line far from it is described go out section line side side shunting neck, one end of the shunting neck passes through the Eight track switches are connected with the described second terraced line, and equipped with the second track switch on the shunting neck, and it is described enter section line on be equipped with First track switch, and first track switch is arranged in the left side of the third track switch, second single branch-cut bridge connect first track switch and Second track switch.
10. rail traffic vehicles section washing track according to claim 1 takes turns line combination layout structure with Xuan, feature exists In the sweep of the curved section of the washing track is not less than 150m.
CN201721818274.7U 2017-12-22 2017-12-22 A kind of rail traffic vehicles section washing track takes turns line combination layout structure with Xuan Active CN207607490U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721818274.7U CN207607490U (en) 2017-12-22 2017-12-22 A kind of rail traffic vehicles section washing track takes turns line combination layout structure with Xuan

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721818274.7U CN207607490U (en) 2017-12-22 2017-12-22 A kind of rail traffic vehicles section washing track takes turns line combination layout structure with Xuan

Publications (1)

Publication Number Publication Date
CN207607490U true CN207607490U (en) 2018-07-13

Family

ID=62799548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721818274.7U Active CN207607490U (en) 2017-12-22 2017-12-22 A kind of rail traffic vehicles section washing track takes turns line combination layout structure with Xuan

Country Status (1)

Country Link
CN (1) CN207607490U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107985320A (en) * 2017-12-22 2018-05-04 中铁第四勘察设计院集团有限公司 A kind of rail traffic vehicles section washing track and Xuan wheel line combination layout structures

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107985320A (en) * 2017-12-22 2018-05-04 中铁第四勘察设计院集团有限公司 A kind of rail traffic vehicles section washing track and Xuan wheel line combination layout structures
CN107985320B (en) * 2017-12-22 2024-03-08 中铁第四勘察设计院集团有限公司 Combined arrangement structure of car washing line and turning wheel line of rail transit vehicle section

Similar Documents

Publication Publication Date Title
CN107985320A (en) A kind of rail traffic vehicles section washing track and Xuan wheel line combination layout structures
CN110983874B (en) Wheel rail structure suspension type PRT elastic turnout switch structure and switching method
CN106114522B (en) Eight word formula washing track of urban track traffic, three curve shortens branch-cut bridge compact Layout structure
CN102529980A (en) Intensive structure for railcar-train parks
CN107804324A (en) Two-wire system washing track arrangement is held to the greatest extent in a kind of urban track traffic
CN107539322B (en) Urban rail transit parking area of putting in storage of pushing reversely goes in and out line and connects rail structure
CN105292249A (en) Track follow control method for rubber wheel low-floor intelligent rail train
CN101255674A (en) Method and road structure for run of road junction without block
CN207607490U (en) A kind of rail traffic vehicles section washing track takes turns line combination layout structure with Xuan
CN103498394A (en) Planar road network system for motor vehicles
CN108035573B (en) Motor car application station
CN201933378U (en) Urban road junction road structure and traffic route thereof
CN106087602B (en) Urban rail transit vehicles section washing track arrangement
CN106087603B (en) The word formula washing track hyperbola of urban track traffic eight shortens branch-cut bridge compact Layout structure
CN1328189A (en) One-way gallop bridge
CN207565583U (en) Two-wire system washing track arrangement is held to the greatest extent in a kind of urban track traffic
CN205893817U (en) Urban rail transit vehicles section carwash line arrangement structure
CN112176789A (en) Single-rail double-sliding opposite type six-direction rail
CN109249941B (en) The base structure and shunting method of an a kind of library line to two parking lines
CN109131361A (en) A kind of bulb-type intelligence rail is turned back cable architecture
CN210481908U (en) Combined turnout structure
CN207790686U (en) A kind of trapezoidal bottle-neck section track arrangement in rail traffic parking lot
Bonnafous et al. Transport energy and emissions: rail
CN207565609U (en) The maintenance library that tramcar rolling stock section car washer is collinearly set with lathe used for machining in-situ locomotive wheel
CN110422179A (en) The station arragement construction of tramcar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant