CN206071048U - A kind of support bar top clamping device for building - Google Patents

A kind of support bar top clamping device for building Download PDF

Info

Publication number
CN206071048U
CN206071048U CN201620971302.8U CN201620971302U CN206071048U CN 206071048 U CN206071048 U CN 206071048U CN 201620971302 U CN201620971302 U CN 201620971302U CN 206071048 U CN206071048 U CN 206071048U
Authority
CN
China
Prior art keywords
clamping device
transverse slat
location hole
manhole
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620971302.8U
Other languages
Chinese (zh)
Inventor
张政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fan Li
Guizhou province Kaili Dongxin Construction Engineering Co.,Ltd.
Tang Shaoping
Tang Zhengdong
Xie Lianhui
Original Assignee
Huaian Huadu Architectural Design Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaian Huadu Architectural Design Ltd filed Critical Huaian Huadu Architectural Design Ltd
Priority to CN201620971302.8U priority Critical patent/CN206071048U/en
Application granted granted Critical
Publication of CN206071048U publication Critical patent/CN206071048U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

This utility model belongs to construction field of support structures, and in particular to a kind of support bar top clamping device for building, and in solving existing building construction, support bar top does not have constitutionally stable clamping device, the not high problem of stability.Support baseboard including horizontally set, the clamping plate on support baseboard, the plate upper surface two ends are provided with location hole, the location hole is through hole, the clamping plate is provided with two and is relatively arranged on support baseboard two ends, the clamping plate includes riser, transverse slat, the riser and transverse slat are one, circular groove is provided with the middle part of the transverse slat, the circular groove bottom is provided with manhole, fixing bolt is inserted with the manhole, the fixing bolt sequentially passes through manhole, location hole from top to bottom, and the fixing bolt lower end is cased with clamp nut.The technical program is simple and reasonable, conveniently operation, low manufacture cost are combined with mould and more consolidated.

Description

A kind of support bar top clamping device for building
Technical field
This utility model belongs to construction field of support structures, and in particular to a kind of support bar top clamping dress for building Put.
Background technology
In building construction process, positioning is needed to support for beams of concrete pours mould, existing supporting construction is universal It is supported using steel pipe or other support members, and the loading plate that steel plate is used as mould is set at the top of support member;It is this Although structure can be played a supporting role still, unstable in structure, gripper shoe easily offsets, furthermore no fixed knot in gripper shoe Structure, easily topples under collision, causes construction accident.
Utility model content
This utility model aims to provide a kind of simple and reasonable, convenient operation, low manufacture cost is combined with mould consolidates Support bar top clamping device for building.
To realize above-mentioned technical purpose, the technical solution adopted in the utility model is as follows:
A kind of support bar top clamping device for building, including horizontally set support baseboard, on support baseboard Clamping plate, the plate upper surface two ends are provided with location hole, and the location hole is through hole, and the clamping plate is provided with two and relative sets Support baseboard two ends are placed in, the clamping plate includes that riser, transverse slat, the riser and transverse slat are one, opens in the middle part of the transverse slat There is circular groove, the circular groove bottom is provided with manhole, in the manhole, be inserted with fixing bolt, the fixed spiral shell Bolt sequentially passes through manhole, location hole from top to bottom, and the fixing bolt lower end is cased with clamp nut.
Using the utility model of above-mentioned technical proposal, clamping plate is provided with two and fixed spiral shell is constituted and passed through by riser and transverse slat Bolt is connected with support baseboard two ends respectively, and clamping plate and support baseboard constitute a device that can clamp mould, and clamping plate can be with Fixing bolt rotates to form different angles to adapt to different die shapes as fulcrum;By rotation after predetermined angle is formed Tight clamp nut can be such that clamping plate fixes with support baseboard, form a constitutionally stable clamping device, and the device can be arranged Support member is supported to mould;Start circular groove on transverse slat and then manhole is opened up in circular groove bottom, make solid Determine the nut top surface of bolt at a stalemate with transverse slat surface flat or less than transverse slat surface, clamping device is more closely tied with mould Close, improve the stability of clamping device.
Further limit, the location hole is bar hole.
Location hole is bar hole, and clamping plate can slide in bar hole with fixing bolt, to meet the mould of different in width, Supporting construction is enable to be supported the mould of different in width, it is not necessary to the support knot not of uniform size to no Mold Making Structure, reduces consumptive material, reduces cost of manufacture.
Further limit, in the middle part of the support baseboard lower surface, be welded with sleeve.
Sleeve can be enclosed within post upper, and can easily install and dismantle, convenient to operate.
Further limit, the riser height is 10cm.
The technical program is simple and reasonable compared to existing technology, conveniently operation, low manufacture cost are combined more with mould It is firm.
Description of the drawings
This utility model can be further illustrated by the nonlimiting examples that accompanying drawing is given;
Fig. 1 is a kind of support bar top clamping device dimensional structure diagram for building of this utility model;
Fig. 2 is a kind of support bar top clamping device sectional view for building of this utility model;
Fig. 3 is the enlarged drawing of A in Fig. 2;
Main element symbol description is as follows:
It is support baseboard 1, clamping plate 2, location hole 3, riser 4, transverse slat 5, circular groove 6, manhole 7, fixing bolt 8, tight Gu nut 9, sleeve 10.
Specific embodiment
In order that those skilled in the art may be better understood this utility model, it is right with reference to the accompanying drawings and examples Technical solutions of the utility model are further illustrated.
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of support bar top clamping device for building, including the support baseboard of horizontally set 1st, the clamping plate 2 on support baseboard 1, plate upper surface two ends are provided with location hole 3, and location hole 3 is through hole, and clamping plate 2 is provided with Two and 1 two ends of support baseboard are relatively arranged on, clamping plate 2 includes riser 4, transverse slat 5, riser 4 and transverse slat 5 are one, transverse slat 5 Middle part is provided with circular groove 6, and 6 bottom of circular groove is provided with manhole 7, and fixing bolt 8, fixed spiral shell are inserted with manhole 7 Bolt 8 sequentially passes through manhole 7, location hole 3 from top to bottom, and 8 lower end of fixing bolt is cased with clamp nut 9.
Preferably, location hole 3 is bar hole.
Preferably, sleeve 10 is welded with the middle part of 1 lower surface of support baseboard.
Preferably, 4 height of riser is 10cm.
Above the support bar top clamping device a kind of for building that this utility model is provided is described in detail.Specifically The explanation of embodiment is only intended to help and understands method of the present utility model and its core concept.It should be pointed out that for this technology For the those of ordinary skill in field, on the premise of without departing from this utility model principle, this utility model can also be carried out Some improvement and modification, these improve and modification is also fallen in this utility model scope of the claims.

Claims (4)

1. a kind of support baseboard, the folder on support baseboard of support bar top clamping device for building, including horizontally set Plate, it is characterised in that:The plate upper surface two ends are provided with location hole, and the location hole is through hole, and the clamping plate is provided with two Individual and be relatively arranged on support baseboard two ends, the clamping plate includes that riser, transverse slat, the riser and transverse slat are one, described Circular groove is provided with the middle part of transverse slat, and the circular groove bottom is provided with manhole, fixing bolt is inserted with the manhole, The fixing bolt sequentially passes through manhole, location hole from top to bottom, and the fixing bolt lower end is cased with clamp nut.
2. a kind of support bar top clamping device for building according to claim 1, it is characterised in that:The location hole is Bar hole.
3. a kind of support bar top clamping device for building according to claim 2, it is characterised in that:The support baseboard Sleeve is welded with the middle part of lower surface.
4. a kind of support bar top clamping device for building according to claim 3, it is characterised in that:The riser height For 10cm.
CN201620971302.8U 2016-08-26 2016-08-26 A kind of support bar top clamping device for building Expired - Fee Related CN206071048U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620971302.8U CN206071048U (en) 2016-08-26 2016-08-26 A kind of support bar top clamping device for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620971302.8U CN206071048U (en) 2016-08-26 2016-08-26 A kind of support bar top clamping device for building

Publications (1)

Publication Number Publication Date
CN206071048U true CN206071048U (en) 2017-04-05

Family

ID=58433405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620971302.8U Expired - Fee Related CN206071048U (en) 2016-08-26 2016-08-26 A kind of support bar top clamping device for building

Country Status (1)

Country Link
CN (1) CN206071048U (en)

Similar Documents

Publication Publication Date Title
CN204298826U (en) Deep foundation ditch concrete bottom slab concreting branch elephant trunk structure
CN204311741U (en) Rack template system is watered behind a kind of portable tread air channel
CN203997995U (en) Welded tube finished conveying device
CN204738236U (en) Pier vertical reinforcement installation mould
CN202227590U (en) Column rib locator for reinforced concrete column
CN209261237U (en) A kind of prefabricated panel clamping device
CN209699487U (en) A kind of turnover type precast box beam steel bar colligation moulding bed
CN204644976U (en) A kind of easily mounting or dismounting pin-connected panel gutter
CN206071048U (en) A kind of support bar top clamping device for building
CN206128634U (en) Air conditioner shelf and window one -piece casting template support structure that wafts
CN206971725U (en) Hang the erecting device of mould
CN207727978U (en) Girderless floor bolumn cap template reinforcing device
CN206829610U (en) A kind of removable variable cross-section steel framework wooden model
CN205591554U (en) Template position control device
CN209407297U (en) Reinforcing bar mobile hydraulic binding clamping fixture
CN207128050U (en) A kind of stair forming machine
CN207564661U (en) A kind of prestressing force overlaps board assembly line partition apparatus
CN202767371U (en) Split head bar special for prestress
CN204590424U (en) Steel plate thickness supporting protection device
CN205444896U (en) Concrete upstand string template reinforcing apparatus
CN203394035U (en) Plugging reinforcing device for reserved hole formworks of concrete platforms
CN213477623U (en) Concatenation formula ultra high performance concrete form
CN207464037U (en) Stent producing device placed in the middle
CN203626140U (en) Protective layer cushion block of pillar reinforcing steel bar
CN203440840U (en) Cup-shaped formwork anti-floating device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180327

Address after: 556000 Qiandongnan, Qiandongnan Miao and Dong Autonomous Prefecture, Kaili City, Kaili City, No. 2, No. 1, No. 1, No. 1

Patentee after: Guizhou province Kaili Dongxin Construction Engineering Co.,Ltd.

Address before: 556000 Guizhou Province, Qiandongnan Miao and Dong Autonomous Prefecture of Kaili city Jinhu District Bonan terrace 3 6 floor A block

Co-patentee before: Fan Li

Patentee before: Tang Zhengdong

Co-patentee before: Xie Lianhui

Co-patentee before: Tang Shaoping

Effective date of registration: 20180327

Address after: 556000 Guizhou Province, Qiandongnan Miao and Dong Autonomous Prefecture of Kaili city Jinhu District Bonan terrace 3 6 floor A block

Co-patentee after: Fan Li

Patentee after: Tang Zhengdong

Co-patentee after: Xie Lianhui

Co-patentee after: Tang Shaoping

Address before: 223021 library building, 83 North Beijing Road, Qinghe District, Huaian, Jiangsu

Patentee before: HUAI'AN HUADU CONSTRUCTION PROGRAM DESIGN CO.,LTD.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170405

Termination date: 20180826

CF01 Termination of patent right due to non-payment of annual fee