CN206053999U - A kind of reverse discharge structure for reducing tunnel bottom water pressure - Google Patents
A kind of reverse discharge structure for reducing tunnel bottom water pressure Download PDFInfo
- Publication number
- CN206053999U CN206053999U CN201620313520.2U CN201620313520U CN206053999U CN 206053999 U CN206053999 U CN 206053999U CN 201620313520 U CN201620313520 U CN 201620313520U CN 206053999 U CN206053999 U CN 206053999U
- Authority
- CN
- China
- Prior art keywords
- inverted arch
- pipe
- longitudinal
- oblique
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 36
- 238000007689 inspection Methods 0.000 claims abstract description 15
- 238000004078 waterproofing Methods 0.000 claims abstract description 9
- 238000010276 construction Methods 0.000 claims abstract description 6
- 238000012423 maintenance Methods 0.000 claims description 4
- 206010047700 Vomiting Diseases 0.000 abstract description 2
- 230000008673 vomiting Effects 0.000 abstract description 2
- 239000002689 soil Substances 0.000 description 3
- 201000010099 disease Diseases 0.000 description 2
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000012634 fragment Substances 0.000 description 2
- 230000000630 rising effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000009440 infrastructure construction Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The utility model discloses a kind of reverse discharge structure for reducing tunnel bottom water pressure, laterally collecting system is arranged on the bottom position of inverted arch construction joint, longitudinal water guiding system is arranged on inverted arch bottom along longitudinal direction laying, and the oblique system of turning one's coat is arranged on the lower section of inspection shaft and oblique with longitudinal collector pipe connects;Laterally drainable waterproofing plate is laid between preliminary bracing and inverted arch lining cutting.Longitudinal water guiding system is made up of longitudinal drainage plate and pipe, and pipe is arranged on above preliminary bracing bottom centre line position.Laterally collecting system is used for the waterproof of tunnel bottom structure and leads water in longitudinal water guiding system, and discharges along longitudinal water guiding system;Oblique drainage system is for being discharged into tunnel bottom watery vomiting stream counter in inspection-pit and inverted arch Central drain.This utility model is avoided, while realizing safeguarding for tunnel bottom drainage system, meets life requirement, effectively reduces Tunnel Second Lining behind water pressure.
Description
Technical field
This utility model is related to a kind of reverse discharge structure for reducing tunnel bottom water pressure, belongs to underground engineering guarded drainage
Technical field.
Background technology
With developing rapidly for the infrastructure constructions such as China's traffic, the energy, water conservancy, the construction scale of Tunnel Engineering is more next
It is bigger.Only by taking railway tunnel as an example, by the end of in by the end of December, 2015, the railway tunnel that the own Jing of China builds up and puts into effect is existing
More than 13000, total length has exceeded 13000 kilometers;3700 are exceeded railway tunnel is built, it is public that total length has exceeded 8700
In, exceed the summation of other All Countries.In addition, vcehicular tunnel is open to traffic, total length also breaches 10000 kilometers.When China it is big
Putting into effect for amount Tunnel Engineering, has many tunnel bottom structures to occur in that drum on base plate, rise soil, and railway roadbed cracking etc.
Disease.Line quality is had a strong impact on, is increased line maintenance workload, is caused the significant wastage of labour force and material, Er Qieyou
In substrate softening and the hardened integral, flexible for making railway roadbed of ballast aggregate reduce, affect train safe operation.In addition tunnel bottom is sick
Evil regulation difficulty is big, particularly lays the Railway Tunnel of non-fragment orbit, during by train travel density height, treatment construction skylight
Between short, non-fragment orbit is not easy-maintaining etc. that harsh conditions are limited, eradicate and administer extremely difficult.Substantial amounts of engineering practice shows, underground
Water is one of principal element that is bulging on tunnel occurs and rising soil.Thus, how to eliminate impact of the subsoil water to tunnel structure
It is the key point for solving above-mentioned disease.And the problem solved by subsoil water, tunnel domestic demand has good drainage system, it is necessary to logical
Cross new technology to solve.
This utility model is longitudinally confluxed by laterally catchmenting, and is realized by the reverse draining under nature head pressure, and is had
There is modularity, maintainable high, drainage path is wide, designs the advantages of facilitating, with extremely wide application prospect.
Utility model content
For achieving the above object, the technical solution adopted in the utility model is a kind of the reverse of reduction tunnel bottom water pressure
Discharge structure, the system include horizontal collecting system, longitudinal water guiding system, oblique system of turning one's coat;Laterally collecting system is arranged on
The bottom position of inverted arch construction joint, longitudinal water guiding system are arranged on inverted arch bottom along longitudinal direction laying, and the oblique system of turning one's coat is arranged on
The lower section of inspection shaft simultaneously oblique with longitudinal collector pipe connects;
Laterally collecting system is made up of horizontal drainable waterproofing plate 2, and horizontal drainable waterproofing plate 2 is laid on preliminary bracing 1 and is served as a contrast with inverted arch
Build between 3.
Longitudinal water guiding system is made up of longitudinal drainage plate and pipe 4, and pipe 4 is arranged on 1 bottom centerline position of preliminary bracing
Top is put, longitudinal drainage plate is laid on below pipe 4 and both sides.
Oblique system of turning one's coat is made up of one-way cock group 5, oblique drain pipe 6, inspection shaft 7, inverted arch center draining 8;Check
Well 7 is equally spaced along the centrage of inverted arch lining cutting 3;Inspection shaft 7 is connected with 6 top of oblique drain pipe, pipe 4, oblique draining
Pipe 6, inverted arch central drainage pipe 8 are sequentially arranged from the bottom to top;One-way cock group 5 is arranged on oblique drain pipe 6 and inverted arch central row
8 junction of water pipe, one-way cock group 5 are arranged on the bottom of inspection shaft 7, facilitate maintenance and inspection.
The one-way cock group 5 is made up of check valve, filter, and check valve is connected with filter.
Inverted arch filling 9 is layed in 3 top of tunnel inverted arch lining cutting.
Laterally collecting system is used for the waterproof of tunnel bottom structure and leads water in longitudinal water guiding system, and along longitudinal direction
Water guiding system is discharged;Oblique drainage system is for being discharged into tunnel bottom watery vomiting stream counter in inspection-pit and inverted arch Central drain.
The beneficial effects of the utility model are:
1st, using the drainage arrangement for reducing tunnel bottom water pressure of the present utility model, imitate using the draining of drainable waterproofing plate
Fruit is discharged to water in inverted arch Central drain, then together drains into outside tunnel.Avoid railway bed from rising soil phenomenon, protect railway
Roadbed.
2nd, later maintenance can be carried out to the tunnel using tunnel waterproof and water drainage system provided by the utility model, it is to avoid again
It is secondary to dig tunnel bottom structure so as to affect tunnel normally to run.
3rd, safeguarding for tunnel bottom drainage system can be realized, meets life requirement.
4th, Tunnel Second Lining behind water pressure can effectively be reduced.
Description of the drawings
Fig. 1 is the drainage arrangement view in transverse section that this utility model reduces tunnel bottom water pressure.
Fig. 2 is the drainage arrangement fragmentary detail view that this utility model reduces tunnel bottom water pressure.
Fig. 3 is the drainage arrangement part sectioned view that this utility model reduces tunnel bottom water pressure.
In figure:1- preliminary bracings;The horizontal drainable waterproofing plates of 2-;3- inverted arch lining cutting;4- pipes;5- one-way cock groups;6- is oblique
Drain pipe;7- inspection shafts;8- inverted arch central drainage pipes;9- inverted arch is filled.
Specific embodiment
With reference to the accompanying drawings and detailed description this utility model is described in further detail.
As Figure 1-3, a kind of reverse discharge structure for reducing tunnel bottom water pressure, the implementing procedure of the step is such as
Under:
Step 1, the inverted arch construction joint position between bottom preliminary bracing 1 and inverted arch lining cutting 3 arrange horizontal drainable waterproofing plate
2, horizontal drainable waterproofing plate 2 is connected with tunnel bottom longitudinal direction collecting system, arranges diameter 150 in longitudinal collecting system middle upper portion
The pipe 4 of~200mm.
Step 2, oblique drain pipe 6 is set in inspection shaft position it is connected for oblique 30 ° along tunnel drainage longitudinal gradient with pipe 4, then
Inverted arch lining cutting 3 and filling 9 are poured, oblique drain pipe 6 is arranged on the centre position of inspection shaft 7.
Step 3, check valve is connected with oblique drain pipe 6 with the one-way cock group 5 that y-type filter is constituted.
Claims (3)
1. it is a kind of reduce tunnel bottom water pressure reverse discharge structure, it is characterised in that:The structure include horizontal collecting system,
Longitudinal water guiding system, oblique system of turning one's coat;Laterally collecting system is arranged on the bottom position of inverted arch construction joint, longitudinal water guiding system
Be arranged on inverted arch bottom along longitudinal direction laying, the oblique system of turning one's coat be arranged on the lower section of inspection shaft and with the oblique company of longitudinal collector pipe
It is logical;
Laterally collecting system is made up of horizontal drainable waterproofing plate (2), and horizontal drainable waterproofing plate (2) is laid on preliminary bracing (1) and inverted arch
Between lining cutting (3);
Longitudinal water guiding system is made up of longitudinal drainage plate and pipe (4), and pipe (4) is arranged on preliminary bracing (1) bottom centerline
Above position, longitudinal drainage plate is laid on below pipe (4) and both sides;
Oblique system of turning one's coat is by one-way cock group (5), oblique drain pipe (6), inspection shaft (7), inverted arch central drainage pipe (8) group
Into;Inspection shaft (7) is equally spaced along the centrage of inverted arch lining cutting (3);Inspection shaft (7) is connected with oblique drain pipe (6) top,
Pipe (4), oblique drain pipe (6), inverted arch central drainage pipe (8) are sequentially arranged from the bottom to top;One-way cock group (5) is arranged on tiltedly
To drain pipe (6) and inverted arch central drainage pipe (8) junction, one-way cock group (5) is installed in the bottom of inspection shaft (7), convenient
Maintenance and inspection.
2. it is according to claim 1 it is a kind of reduce tunnel bottom water pressure reverse discharge structure, it is characterised in that:It is described
One-way cock group (5) is made up of check valve, filter, and check valve is connected with filter.
3. it is according to claim 1 it is a kind of reduce tunnel bottom water pressure reverse discharge structure, it is characterised in that:Inverted arch
Filling (9) is layed in tunnel inverted arch lining cutting (3) top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620313520.2U CN206053999U (en) | 2016-04-14 | 2016-04-14 | A kind of reverse discharge structure for reducing tunnel bottom water pressure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620313520.2U CN206053999U (en) | 2016-04-14 | 2016-04-14 | A kind of reverse discharge structure for reducing tunnel bottom water pressure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206053999U true CN206053999U (en) | 2017-03-29 |
Family
ID=58371604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620313520.2U Expired - Fee Related CN206053999U (en) | 2016-04-14 | 2016-04-14 | A kind of reverse discharge structure for reducing tunnel bottom water pressure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206053999U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105888724A (en) * | 2016-04-14 | 2016-08-24 | 中国铁路经济规划研究院 | Reverse drainage system capable of reducing water pressure at bottom of tunnel |
CN113073684A (en) * | 2021-03-18 | 2021-07-06 | 上海建工四建集团有限公司 | Drainage construction method for basement bottom plate |
-
2016
- 2016-04-14 CN CN201620313520.2U patent/CN206053999U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105888724A (en) * | 2016-04-14 | 2016-08-24 | 中国铁路经济规划研究院 | Reverse drainage system capable of reducing water pressure at bottom of tunnel |
CN113073684A (en) * | 2021-03-18 | 2021-07-06 | 上海建工四建集团有限公司 | Drainage construction method for basement bottom plate |
CN113073684B (en) * | 2021-03-18 | 2023-02-10 | 上海建工四建集团有限公司 | Drainage construction method for basement bottom plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105888724B (en) | A kind of reverse drainage system reducing tunnel bottom water pressure | |
CN108547641B (en) | Substrate reinforcing system of heavy-duty railway tunnel in water-rich weak stratum and construction method thereof | |
CN106968712A (en) | Water rich strata tunnel bottom discharge structure and its construction method | |
CN107401413A (en) | Tunnel structure for expansive stratum | |
CN202117030U (en) | Sand-gravel dam with steel structure panel | |
CN107905811B (en) | Inverted arch-free lining of foundation hollow longitudinal beam bearing arch structure | |
CN202402076U (en) | Drainage pump station for underground line intervals of rail traffic | |
CN102155005B (en) | Steel structural panel sand gravel dam | |
CN206053999U (en) | A kind of reverse discharge structure for reducing tunnel bottom water pressure | |
CN206529653U (en) | A kind of underground railway track construction | |
CN214832389U (en) | Ecological bank protection in river course | |
CN107761763A (en) | A kind of pipe gallery and its application method | |
CN108361065B (en) | Tunnel inverted arch filling drainage structure | |
CN201972137U (en) | Steel-structure combined type interlayer steel plate rock-fill dam | |
CN102155004B (en) | Steel structure combined-type sandwich steel plate rock-fill dam | |
CN107905809B (en) | Double-hole hollow rectangular section beam bearing cutting type arched tunnel lining structure | |
CN111425250B (en) | Double-layer pressure-reducing water-proof and drainage system for karst water-rich tunnel and construction method of double-layer pressure-reducing water-proof and drainage system | |
CN211228363U (en) | Face river barricade | |
CN207672344U (en) | Railway bed karez location pin-connected panel foundation stabilization construction | |
CN206570767U (en) | The case base analysis on aqueduct structure being arranged in parallel suitable for double flute | |
CN206903689U (en) | A kind of and water delivery and the Railway Tunnel of communication function | |
CN205934974U (en) | Tunnel inspection shaft with anti function of floating sluices | |
CN107237255A (en) | A kind of bridge pier type road construction concentrates discharge structure with rainwater | |
CN208203350U (en) | A kind of full packet pressure release waterproof/drainage structure in tunnel | |
CN207760999U (en) | A kind of water draw-off with energy dissipating |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170329 Termination date: 20190414 |