CN206053999U - A kind of reverse discharge structure for reducing tunnel bottom water pressure - Google Patents

A kind of reverse discharge structure for reducing tunnel bottom water pressure Download PDF

Info

Publication number
CN206053999U
CN206053999U CN201620313520.2U CN201620313520U CN206053999U CN 206053999 U CN206053999 U CN 206053999U CN 201620313520 U CN201620313520 U CN 201620313520U CN 206053999 U CN206053999 U CN 206053999U
Authority
CN
China
Prior art keywords
inverted arch
pipe
longitudinal
oblique
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620313520.2U
Other languages
Chinese (zh)
Inventor
赵勇
倪光斌
李鹏飞
林传年
马伟斌
纪茜尧
杨云轩
唐国荣
田四明
王志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
China Academy of Railway Sciences Corp Ltd CARS
China Railway Economic and Planning Research Institute
Original Assignee
Beijing University of Technology
China Academy of Railway Sciences Corp Ltd CARS
China Railway Economic and Planning Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology, China Academy of Railway Sciences Corp Ltd CARS, China Railway Economic and Planning Research Institute filed Critical Beijing University of Technology
Priority to CN201620313520.2U priority Critical patent/CN206053999U/en
Application granted granted Critical
Publication of CN206053999U publication Critical patent/CN206053999U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of reverse discharge structure for reducing tunnel bottom water pressure, laterally collecting system is arranged on the bottom position of inverted arch construction joint, longitudinal water guiding system is arranged on inverted arch bottom along longitudinal direction laying, and the oblique system of turning one's coat is arranged on the lower section of inspection shaft and oblique with longitudinal collector pipe connects;Laterally drainable waterproofing plate is laid between preliminary bracing and inverted arch lining cutting.Longitudinal water guiding system is made up of longitudinal drainage plate and pipe, and pipe is arranged on above preliminary bracing bottom centre line position.Laterally collecting system is used for the waterproof of tunnel bottom structure and leads water in longitudinal water guiding system, and discharges along longitudinal water guiding system;Oblique drainage system is for being discharged into tunnel bottom watery vomiting stream counter in inspection-pit and inverted arch Central drain.This utility model is avoided, while realizing safeguarding for tunnel bottom drainage system, meets life requirement, effectively reduces Tunnel Second Lining behind water pressure.

Description

A kind of reverse discharge structure for reducing tunnel bottom water pressure
Technical field
This utility model is related to a kind of reverse discharge structure for reducing tunnel bottom water pressure, belongs to underground engineering guarded drainage Technical field.
Background technology
With developing rapidly for the infrastructure constructions such as China's traffic, the energy, water conservancy, the construction scale of Tunnel Engineering is more next It is bigger.Only by taking railway tunnel as an example, by the end of in by the end of December, 2015, the railway tunnel that the own Jing of China builds up and puts into effect is existing More than 13000, total length has exceeded 13000 kilometers;3700 are exceeded railway tunnel is built, it is public that total length has exceeded 8700 In, exceed the summation of other All Countries.In addition, vcehicular tunnel is open to traffic, total length also breaches 10000 kilometers.When China it is big Putting into effect for amount Tunnel Engineering, has many tunnel bottom structures to occur in that drum on base plate, rise soil, and railway roadbed cracking etc. Disease.Line quality is had a strong impact on, is increased line maintenance workload, is caused the significant wastage of labour force and material, Er Qieyou In substrate softening and the hardened integral, flexible for making railway roadbed of ballast aggregate reduce, affect train safe operation.In addition tunnel bottom is sick Evil regulation difficulty is big, particularly lays the Railway Tunnel of non-fragment orbit, during by train travel density height, treatment construction skylight Between short, non-fragment orbit is not easy-maintaining etc. that harsh conditions are limited, eradicate and administer extremely difficult.Substantial amounts of engineering practice shows, underground Water is one of principal element that is bulging on tunnel occurs and rising soil.Thus, how to eliminate impact of the subsoil water to tunnel structure It is the key point for solving above-mentioned disease.And the problem solved by subsoil water, tunnel domestic demand has good drainage system, it is necessary to logical Cross new technology to solve.
This utility model is longitudinally confluxed by laterally catchmenting, and is realized by the reverse draining under nature head pressure, and is had There is modularity, maintainable high, drainage path is wide, designs the advantages of facilitating, with extremely wide application prospect.
Utility model content
For achieving the above object, the technical solution adopted in the utility model is a kind of the reverse of reduction tunnel bottom water pressure Discharge structure, the system include horizontal collecting system, longitudinal water guiding system, oblique system of turning one's coat;Laterally collecting system is arranged on The bottom position of inverted arch construction joint, longitudinal water guiding system are arranged on inverted arch bottom along longitudinal direction laying, and the oblique system of turning one's coat is arranged on The lower section of inspection shaft simultaneously oblique with longitudinal collector pipe connects;
Laterally collecting system is made up of horizontal drainable waterproofing plate 2, and horizontal drainable waterproofing plate 2 is laid on preliminary bracing 1 and is served as a contrast with inverted arch Build between 3.
Longitudinal water guiding system is made up of longitudinal drainage plate and pipe 4, and pipe 4 is arranged on 1 bottom centerline position of preliminary bracing Top is put, longitudinal drainage plate is laid on below pipe 4 and both sides.
Oblique system of turning one's coat is made up of one-way cock group 5, oblique drain pipe 6, inspection shaft 7, inverted arch center draining 8;Check Well 7 is equally spaced along the centrage of inverted arch lining cutting 3;Inspection shaft 7 is connected with 6 top of oblique drain pipe, pipe 4, oblique draining Pipe 6, inverted arch central drainage pipe 8 are sequentially arranged from the bottom to top;One-way cock group 5 is arranged on oblique drain pipe 6 and inverted arch central row 8 junction of water pipe, one-way cock group 5 are arranged on the bottom of inspection shaft 7, facilitate maintenance and inspection.
The one-way cock group 5 is made up of check valve, filter, and check valve is connected with filter.
Inverted arch filling 9 is layed in 3 top of tunnel inverted arch lining cutting.
Laterally collecting system is used for the waterproof of tunnel bottom structure and leads water in longitudinal water guiding system, and along longitudinal direction Water guiding system is discharged;Oblique drainage system is for being discharged into tunnel bottom watery vomiting stream counter in inspection-pit and inverted arch Central drain.
The beneficial effects of the utility model are:
1st, using the drainage arrangement for reducing tunnel bottom water pressure of the present utility model, imitate using the draining of drainable waterproofing plate Fruit is discharged to water in inverted arch Central drain, then together drains into outside tunnel.Avoid railway bed from rising soil phenomenon, protect railway Roadbed.
2nd, later maintenance can be carried out to the tunnel using tunnel waterproof and water drainage system provided by the utility model, it is to avoid again It is secondary to dig tunnel bottom structure so as to affect tunnel normally to run.
3rd, safeguarding for tunnel bottom drainage system can be realized, meets life requirement.
4th, Tunnel Second Lining behind water pressure can effectively be reduced.
Description of the drawings
Fig. 1 is the drainage arrangement view in transverse section that this utility model reduces tunnel bottom water pressure.
Fig. 2 is the drainage arrangement fragmentary detail view that this utility model reduces tunnel bottom water pressure.
Fig. 3 is the drainage arrangement part sectioned view that this utility model reduces tunnel bottom water pressure.
In figure:1- preliminary bracings;The horizontal drainable waterproofing plates of 2-;3- inverted arch lining cutting;4- pipes;5- one-way cock groups;6- is oblique Drain pipe;7- inspection shafts;8- inverted arch central drainage pipes;9- inverted arch is filled.
Specific embodiment
With reference to the accompanying drawings and detailed description this utility model is described in further detail.
As Figure 1-3, a kind of reverse discharge structure for reducing tunnel bottom water pressure, the implementing procedure of the step is such as Under:
Step 1, the inverted arch construction joint position between bottom preliminary bracing 1 and inverted arch lining cutting 3 arrange horizontal drainable waterproofing plate 2, horizontal drainable waterproofing plate 2 is connected with tunnel bottom longitudinal direction collecting system, arranges diameter 150 in longitudinal collecting system middle upper portion The pipe 4 of~200mm.
Step 2, oblique drain pipe 6 is set in inspection shaft position it is connected for oblique 30 ° along tunnel drainage longitudinal gradient with pipe 4, then Inverted arch lining cutting 3 and filling 9 are poured, oblique drain pipe 6 is arranged on the centre position of inspection shaft 7.
Step 3, check valve is connected with oblique drain pipe 6 with the one-way cock group 5 that y-type filter is constituted.

Claims (3)

1. it is a kind of reduce tunnel bottom water pressure reverse discharge structure, it is characterised in that:The structure include horizontal collecting system, Longitudinal water guiding system, oblique system of turning one's coat;Laterally collecting system is arranged on the bottom position of inverted arch construction joint, longitudinal water guiding system Be arranged on inverted arch bottom along longitudinal direction laying, the oblique system of turning one's coat be arranged on the lower section of inspection shaft and with the oblique company of longitudinal collector pipe It is logical;
Laterally collecting system is made up of horizontal drainable waterproofing plate (2), and horizontal drainable waterproofing plate (2) is laid on preliminary bracing (1) and inverted arch Between lining cutting (3);
Longitudinal water guiding system is made up of longitudinal drainage plate and pipe (4), and pipe (4) is arranged on preliminary bracing (1) bottom centerline Above position, longitudinal drainage plate is laid on below pipe (4) and both sides;
Oblique system of turning one's coat is by one-way cock group (5), oblique drain pipe (6), inspection shaft (7), inverted arch central drainage pipe (8) group Into;Inspection shaft (7) is equally spaced along the centrage of inverted arch lining cutting (3);Inspection shaft (7) is connected with oblique drain pipe (6) top, Pipe (4), oblique drain pipe (6), inverted arch central drainage pipe (8) are sequentially arranged from the bottom to top;One-way cock group (5) is arranged on tiltedly To drain pipe (6) and inverted arch central drainage pipe (8) junction, one-way cock group (5) is installed in the bottom of inspection shaft (7), convenient Maintenance and inspection.
2. it is according to claim 1 it is a kind of reduce tunnel bottom water pressure reverse discharge structure, it is characterised in that:It is described One-way cock group (5) is made up of check valve, filter, and check valve is connected with filter.
3. it is according to claim 1 it is a kind of reduce tunnel bottom water pressure reverse discharge structure, it is characterised in that:Inverted arch Filling (9) is layed in tunnel inverted arch lining cutting (3) top.
CN201620313520.2U 2016-04-14 2016-04-14 A kind of reverse discharge structure for reducing tunnel bottom water pressure Expired - Fee Related CN206053999U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620313520.2U CN206053999U (en) 2016-04-14 2016-04-14 A kind of reverse discharge structure for reducing tunnel bottom water pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620313520.2U CN206053999U (en) 2016-04-14 2016-04-14 A kind of reverse discharge structure for reducing tunnel bottom water pressure

Publications (1)

Publication Number Publication Date
CN206053999U true CN206053999U (en) 2017-03-29

Family

ID=58371604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620313520.2U Expired - Fee Related CN206053999U (en) 2016-04-14 2016-04-14 A kind of reverse discharge structure for reducing tunnel bottom water pressure

Country Status (1)

Country Link
CN (1) CN206053999U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888724A (en) * 2016-04-14 2016-08-24 中国铁路经济规划研究院 Reverse drainage system capable of reducing water pressure at bottom of tunnel
CN113073684A (en) * 2021-03-18 2021-07-06 上海建工四建集团有限公司 Drainage construction method for basement bottom plate

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888724A (en) * 2016-04-14 2016-08-24 中国铁路经济规划研究院 Reverse drainage system capable of reducing water pressure at bottom of tunnel
CN113073684A (en) * 2021-03-18 2021-07-06 上海建工四建集团有限公司 Drainage construction method for basement bottom plate
CN113073684B (en) * 2021-03-18 2023-02-10 上海建工四建集团有限公司 Drainage construction method for basement bottom plate

Similar Documents

Publication Publication Date Title
CN105888724B (en) A kind of reverse drainage system reducing tunnel bottom water pressure
CN108547641B (en) Substrate reinforcing system of heavy-duty railway tunnel in water-rich weak stratum and construction method thereof
CN106968712A (en) Water rich strata tunnel bottom discharge structure and its construction method
CN107401413A (en) Tunnel structure for expansive stratum
CN202117030U (en) Sand-gravel dam with steel structure panel
CN107905811B (en) Inverted arch-free lining of foundation hollow longitudinal beam bearing arch structure
CN102155005B (en) Steel structural panel sand gravel dam
CN206053999U (en) A kind of reverse discharge structure for reducing tunnel bottom water pressure
CN202402076U (en) Drainage pump station for underground line intervals of rail traffic
CN108361065B (en) Tunnel inverted arch filling drainage structure
CN201972137U (en) Steel-structure combined type interlayer steel plate rock-fill dam
CN102155004B (en) Steel structure combined-type sandwich steel plate rock-fill dam
CN211228363U (en) Face river barricade
CN107761763A (en) A kind of pipe gallery and its application method
CN207672344U (en) Railway bed karez location pin-connected panel foundation stabilization construction
CN206903689U (en) A kind of and water delivery and the Railway Tunnel of communication function
CN214832389U (en) Ecological bank protection in river course
CN105064222B (en) Beam bridge i shaped steel composite reinforcement structure
CN205934974U (en) Tunnel inspection shaft with anti function of floating sluices
CN208203350U (en) A kind of full packet pressure release waterproof/drainage structure in tunnel
CN208184752U (en) The bottom stab ilization system in rich water soft stratum heavy haul railway tunnel
CN107905809B (en) Double-hole hollow rectangular section beam bearing cutting type arched tunnel lining structure
CN207194952U (en) A kind of flood mine working bottom plate is harnessed the river structure
CN113202557A (en) Tunnel inverted arch lower one-way drain pipe convenient for drainage and pressure relief
CN206570767U (en) The case base analysis on aqueduct structure being arranged in parallel suitable for double flute

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329