CN202402076U - Drainage pump station for underground line intervals of rail traffic - Google Patents

Drainage pump station for underground line intervals of rail traffic Download PDF

Info

Publication number
CN202402076U
CN202402076U CN2011205111106U CN201120511110U CN202402076U CN 202402076 U CN202402076 U CN 202402076U CN 2011205111106 U CN2011205111106 U CN 2011205111106U CN 201120511110 U CN201120511110 U CN 201120511110U CN 202402076 U CN202402076 U CN 202402076U
Authority
CN
China
Prior art keywords
drainage
drainage pump
interval
pumping plant
sump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011205111106U
Other languages
Chinese (zh)
Inventor
马振海
程保青
刘学志
刘乃宗
张永利
李怀鉴
耿广晋
杨宝峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
Original Assignee
Third Railway Survey and Design Institute Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Railway Survey and Design Institute Group Corp filed Critical Third Railway Survey and Design Institute Group Corp
Priority to CN2011205111106U priority Critical patent/CN202402076U/en
Application granted granted Critical
Publication of CN202402076U publication Critical patent/CN202402076U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a drainage pump station for underground line intervals of rail traffic. The drainage pump station is arranged in the middle of an integrated ballast bed, namely at the lowest point of a shield interval, and comprises a drainage pump and a water pumping pipe, wherein a drainage pipe opening of the drainage pump is connected with the water pumping pipe; a drainage pump body is fixed to the bottom of a water collection pit by a fixed pipe clamp; and the water collection pit is formed in a central drainage ditch, and the depth of the water collection pit is 600 millimeters. The drainage pump station has the advantages that the drainage pump station is arranged at the lowest point of the shield interval, so the drainage requirement of running tunnels is met, the safety requirement on the strength of the ballast bed during the running of trains is met, and the requirement of sewage discharge under the daily and fire-fighting working conditions also can be met; and high risks and high investment of the construction of interval connection channels are avoided effectively.

Description

The interval drainage pumping plant of track traffic underground line
Technical field
The utility model relates to a kind of drainage pumping plant; Particularly relate to a kind of interval drainage pumping plant of track traffic underground line that is suitable for.
Background technology
City track traffic engineering underground line running tunnel generally is " V " font gradient; Middle minimum point must be provided with drainage pumping plant; To get rid of the ponding in the tunnel, existing drainaging scheme is that service channel is provided with jointly between the land, and sump is arranged at minimum point between the two threaded list roads.But there is following defective in the drainaging scheme of existing city rail engineering: the firstth, and the construction risk of interval service channel and pumping plant is big, and buried depth is bigger, the engineering construction difficulty; The secondth, the freezing hidden construction process construction of domestic most employing, expense is high; The 3rd is long in time limit, controls and influence total duration of engineering.More than 3 be the enforcement difficult point that city rail engineering is generally acknowledged, once had a plurality of engineerings to cause the landslide accident because of the construction service channel.
Summary of the invention
The utility model technical problem to be solved is to provide a kind of track traffic underground line interval of satisfying shield structure running tunnel drainage requirement to use drainage pumping plant.
The technical scheme that the utility model adopted is: the interval drainage pumping plant of a kind of track traffic underground line, drainage pumping plant are arranged on the interval minimum point of middle part-shield structure of solid concrete roabed, comprise drainage pump and lifting pipe; The draining mouth of pipe of said drainage pump is connected with lifting pipe, and the drainage pump body fastens the bottom at sump through stationary pipes; Said sump is arranged in the central row ditch, and the degree of depth of sump is 600mm.
Said drainage pump comprises first drainage pump and second drainage pump; Said central row ditch is provided with along the track circuit direction, and the degree of depth in central row ditch is 480mm; Bottom and sidewall spray epoxy water-repellent paint at said sump.
Top, said central row ditch is provided with double-edged fine-toothed comb.
The output of said lifting pipe 30 is connected with elastomer connector, gate valve and flap valve in regular turn.
Also comprise being arranged on the two-layer reinforcing bar that solid concrete roabed distributes up and down between sleeper, the transverse reinforcement spacing is 200mm, and said sump bottom is provided with longitudinal reinforcement, and rebar spacing is 120mm.
The beneficial effect of the utility model is: owing in the interval minimum point of shield structure drainage pumping plant is installed, satisfy the drainage requirement of running tunnel, to the Strength Safety requirement of railway roadbed, also can satisfy the discharge of wastewater demand under daily and the fire-fighting operating mode simultaneously when reaching train operation; Effectively avoided the excessive risk of interval service channel construction and with high investment.
Description of drawings
Fig. 1 is the floor map of drainage pumping plant;
Fig. 2 be among Fig. 1 A-A to sectional view.
Among the figure:
10. first drainage pump, 20. second drainage pumps, 30. lifting pipes
40. sump 50. central row ditches 60. are pipe clamp 70. carbon fiber reinforced concretes fixedly.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done further explain:
The interval drainage pumping plant of the utility model track traffic underground line, drainage pumping plant are arranged on the interval minimum point of middle part-shield structure of solid concrete roabed, and solid concrete roabed is a carbon fiber reinforced concrete 70, comprise first drainage pump 10, second drainage pump 20 and lifting pipe 30; Select for use drainage pump appearance and size can not exceed the gauge requirement; The lowest water level of water pump is low as far as possible; To increase the pumping plant available depth, can select good reliability, pump that the pump housing is little for use, the draining mouth of pipe of said first drainage pump 10 and second drainage pump 20 is connected with lifting pipe 30; Drainage pump is fixed on the bottom of sump 40 through fixing pipe clamp 60; Be 600mm apart from the rail level degree of depth at the bottom of the hole of sump; Smallest effective depth of water 140mm, sump consider 2 water pumps installations and space for maintenance, and length is 2~6 meters; Sump is in order to reduce the minimum height of water level that retains in central row ditch, makes full use of the central row ditch and is provided with; Said sump 40 is arranged in the central row ditch 50; Central row ditch 50 road along the line directions are provided with, and central row ditch bottom of trench is 480mm apart from the tread face, only needs 36-54 rice sump length to store the effective water capacity of pumping plant; Bottom and sidewall spray epoxy water-repellent paint at sump 40; Can prevent infiltration of sump bottom and deposition, the top in central row ditch 50 is provided with the steel double-edged fine-toothed comb; First drainage pump 10 is connected with elastomer connector 31, gate valve 32, flap valve 33 in regular turn through the output of lifting pipe 30; The output of second drainage pump 20 through lifting pipe 30 is connected with in regular turn and drains into station waste water pumping plant after waste water that elastomer connector 31, gate valve 32, flap valve 33 and reduced pipe 34, the first drainage pumps 10 and second drainage pump 20 discharge is collected to main lifting pipe.
The utility model is distributed with two-layer reinforcing bar on solid concrete roabed between sleeper; That is, top reinforcement and lower floor's reinforcing bar, upper and lower two-layer reinforcing bar is respectively arranged with transverse reinforcement and longitudinal reinforcement; Transverse reinforcement and longitudinal reinforcement are encrypted setting, and the transverse reinforcement spacing is 200mm; Upper strata transverse reinforcement 82 be placed on upper strata longitudinal reinforcement 81 above, lower floor's transverse reinforcement 83 be placed on lower floor's longitudinal reinforcement 84 below.

Claims (5)

1. the interval drainage pumping plant of track traffic underground line is characterized in that, drainage pumping plant is arranged on the interval minimum point of middle part-shield structure of solid concrete roabed, comprises drainage pump and lifting pipe (30); The draining mouth of pipe of said drainage pump is connected with lifting pipe (30), and the drainage pump body is fixed on the bottom of sump (40) through fixing pipe clamp (60); Said sump (40) is arranged in the central row ditch (50), and the degree of depth of sump (40) is 600mm.
2. the interval drainage pumping plant of track traffic underground line according to claim 1 is characterized in that said drainage pump comprises first drainage pump (10) and second drainage pump (20); Said central row ditch (50) is provided with along the track circuit direction, and the degree of depth of central row ditch (50) is 480mm; Bottom and sidewall spray epoxy water-repellent paint at said sump (40).
3. the interval drainage pumping plant of track traffic underground line according to claim 1 is characterized in that top, said central row ditch (50) is provided with double-edged fine-toothed comb.
4. the interval drainage pumping plant of track traffic underground line according to claim 1 is characterized in that the output of said lifting pipe (30) is connected with elastomer connector (31), gate valve (32) and flap valve (33) in regular turn.
5. the interval drainage pumping plant of track traffic underground line according to claim 1; It is characterized in that also comprise being arranged on the two-layer reinforcing bar that solid concrete roabed distributes up and down between sleeper, the transverse reinforcement spacing is 200mm; Said sump bottom is provided with longitudinal reinforcement, and rebar spacing is 120mm.
CN2011205111106U 2011-12-08 2011-12-08 Drainage pump station for underground line intervals of rail traffic Expired - Lifetime CN202402076U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205111106U CN202402076U (en) 2011-12-08 2011-12-08 Drainage pump station for underground line intervals of rail traffic

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205111106U CN202402076U (en) 2011-12-08 2011-12-08 Drainage pump station for underground line intervals of rail traffic

Publications (1)

Publication Number Publication Date
CN202402076U true CN202402076U (en) 2012-08-29

Family

ID=46699727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205111106U Expired - Lifetime CN202402076U (en) 2011-12-08 2011-12-08 Drainage pump station for underground line intervals of rail traffic

Country Status (1)

Country Link
CN (1) CN202402076U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781613A (en) * 2016-04-28 2016-07-20 中铁隧道勘测设计院有限公司 Local dynamic dry-type waste water pump house for large-scale shield tunnel
CN106245466A (en) * 2016-10-09 2016-12-21 北京交通大学 Combined elastic ballast bed structure
CN106283943A (en) * 2016-10-09 2017-01-04 北京交通大学 Elastic roadbed structure
CN107100670A (en) * 2017-05-22 2017-08-29 宁波大学 A kind of built-in pump room structure of shield tunnel
CN108223008A (en) * 2018-03-02 2018-06-29 中铁第六勘察设计院集团有限公司 A kind of buried Underwater Traffic Tunnel wastewater disposal basin dischargeable capacity optimization structure of Mining Method
CN113656969A (en) * 2021-08-18 2021-11-16 中铁二院华东勘察设计有限责任公司 Water pump model selection method suitable for track bed pump station in underground section of rail transit
CN115075875A (en) * 2022-07-21 2022-09-20 广州地铁设计研究院股份有限公司 Interval drainage pump station of track traffic

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781613A (en) * 2016-04-28 2016-07-20 中铁隧道勘测设计院有限公司 Local dynamic dry-type waste water pump house for large-scale shield tunnel
CN106245466A (en) * 2016-10-09 2016-12-21 北京交通大学 Combined elastic ballast bed structure
CN106283943A (en) * 2016-10-09 2017-01-04 北京交通大学 Elastic roadbed structure
CN107100670A (en) * 2017-05-22 2017-08-29 宁波大学 A kind of built-in pump room structure of shield tunnel
CN108223008A (en) * 2018-03-02 2018-06-29 中铁第六勘察设计院集团有限公司 A kind of buried Underwater Traffic Tunnel wastewater disposal basin dischargeable capacity optimization structure of Mining Method
CN113656969A (en) * 2021-08-18 2021-11-16 中铁二院华东勘察设计有限责任公司 Water pump model selection method suitable for track bed pump station in underground section of rail transit
CN113656969B (en) * 2021-08-18 2023-09-08 中铁二院华东勘察设计有限责任公司 Water pump type selection method suitable for track traffic underground section ballast bed pump station
CN115075875A (en) * 2022-07-21 2022-09-20 广州地铁设计研究院股份有限公司 Interval drainage pump station of track traffic

Similar Documents

Publication Publication Date Title
CN202402076U (en) Drainage pump station for underground line intervals of rail traffic
CN106968712B (en) Tunnel bottom drainage structure of water-rich stratum and construction method thereof
CN102661171B (en) Frost damage prevention drainage system for tunnel
CN102434175A (en) Tunnel lining self waterproof drainage system
CN202483588U (en) Self water-proof drainage system of tunnel lining
CN202560320U (en) Frost-damage preventing drainage system for tunnels
CN206386150U (en) A kind of Underground Subway Station draining and examination and repair system
CN106981855B (en) High-speed railway base cable trough system
CN206220972U (en) Frame branch arched tunnel lining structure
CN107401413A (en) Tunnel structure for expansive stratum
CN105888724B (en) A kind of reverse drainage system reducing tunnel bottom water pressure
CN107965327A (en) Arcuately tunnel bottom liner structure and its drainage system
CN103556672A (en) Rainwater harvesting and water storage system for field road and construction method thereof
CN208996764U (en) A kind of bored tunnel step automation water plug
CN207568626U (en) A kind of tunnel structure for expansive stratum
CN212927943U (en) Reverse slope drainage system in open cut tunnel construction process
CN108533317A (en) A kind of tunnel bottom discharge structure
CN112343654A (en) Maintainable drainage system for extremely water-rich stratum tunnel and tunnel
CN107761763A (en) A kind of pipe gallery and its application method
CN208168937U (en) A kind of tunnel bottom discharge structure
CN107905809B (en) Double-hole hollow rectangular section beam bearing cutting type arched tunnel lining structure
CN206903689U (en) A kind of and water delivery and the Railway Tunnel of communication function
CN207079625U (en) A kind of city emergency drainage system with rapid transit and underground pipe gallery function
CN212359860U (en) Urban tunnel sewage-cleaning shunting drainage system
CN211972919U (en) Based on tunnel portal half cutting section bed mud pumping renovation system that turns over

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 300142 Hebei District, Zhongshan Road, No. 10,

Patentee after: China Railway Design Group Limited

Address before: 300142 Hebei District, Zhongshan Road, No. 10,

Patentee before: China Railway Third Survey and Design Institute Group Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120829