CN206047597U CN201621071932.6U CN201621071932U CN206047597U CN 206047597 U CN206047597 U CN 206047597U CN 201621071932 U CN201621071932 U CN 201621071932U CN 206047597 U CN206047597 U CN 206047597U
Authority
CN
China
Prior art keywords
station
milling center
workbench
gantry boring
manufacturing system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621071932.6U
Other languages
Chinese (zh)
Inventor
李绍萍
李波波
彭梁锋
赵建华
朱祥
王元伦
张文坤
刘啸
夏跃荣
尹亮
张楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Technology Group Kunming Machine Tool Co ltd
Original Assignee
Shenji Group Kunming Machine Tool Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenji Group Kunming Machine Tool Co Ltd filed Critical Shenji Group Kunming Machine Tool Co Ltd
Priority to CN201621071932.6U priority Critical patent/CN206047597U/en
Application granted granted Critical
Publication of CN206047597U publication Critical patent/CN206047597U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Boring (AREA)

Abstract

The application provides a kind of gantry boring-milling center flexible manufacturing system, including transmission trajectory;The logistics trolley that be arranged on the transmission trajectory and can move along which;It is arranged at least one gantry boring-milling center of the transmission trajectory side;The double switching station with the first station and the second station being arranged between the transmission trajectory and the gantry boring-milling center;The workbench that can be arranged on the logistics trolley, the double switching station and the gantry boring-milling center;The workbench is to swap along the width of itself between the logistics trolley, the double switching station and the gantry boring-milling center.The workbench of the flexible manufacturing system that the application is provided is exchanged along its width all the time, and double switching station realizes automatically feeding and caching for workbench.

Description

Gantry boring-milling center flexible manufacturing system
Technical field
This utility model is related to flexible manufacturing field, more particularly to a kind of gantry boring-milling center flexible manufacturing system.
Background technology
As flexible manufacturing system is stablized in actual production, efficiently run in recent years, which receives the favor in market. Rare with the flexible manufacturing system of gantry boring-milling center composition in the market, existing gantry boring-milling center is soft Property manufacture system is not equipped with double switching station.Workbench is exchanged to lathe, cache station or switching station by logistics transportation system, It is to swap along workbench length direction.The exchange distance of this exchanged form, required swap time is long, therefore leads Cause machine tooling, logistics transmission waiting time are long, and workbench exchange efficiency is low, and workbench can only be submitted in specified lathe Change use, workbench arbitrarily exchanges that precision is not high, and degree of flexibility is not high.
Utility model content
In view of problems of the prior art, this utility model offer gantry boring-milling center flexible manufacturing system, Including
Transmission trajectory;
The logistics trolley that be arranged on the transmission trajectory and can move along which;
It is arranged at least one gantry boring-milling center of the transmission trajectory side;
Be arranged at it is described transmission trajectory and the gantry boring-milling center between with the first station and the second work The double switching station of position;
The work that can be arranged on the logistics trolley, the double switching station and the gantry boring-milling center M Make platform;
The workbench is equal between the logistics trolley, the double switching station and the gantry boring-milling center It is to swap along the width of itself.
The gantry boring-milling center flexible manufacturing system that this utility model is provided, every gantry boring-milling center are equipped with Double switching station with the first station and the second station, with realize workbench and the processing workpiece that is carried on workbench to Gantry boring-milling center automatically feeds, workpiece is cached, and the double switching station potentially acts as gantry boring-milling center Interfacing conveyor between logistics system, so that logistics trolley can continue to perform ensuing action, the flexible manufacturing system Operation, it is easy to maintenance.
Additionally, the flexible manufacturing system is using " yi word pattern " linear array, flat layered planes distribution form.Double crossing over erect-position in The homonymy of gantry boring-milling center, workbench adopt monolayer switching fabric, it is simple and reliable for structure, and workbench from switching station to Gantry boring-milling center or logistics system only need to exchange (Y-direction) along workbench width, and which exchanges distance and swap time Shorten.Correspondingly, transmission line rail span is little, and supporting, kinetic stability are good, and reliability is high, and floor space is little, low cost.
In some embodiments of the present utility model, described gantry boring-milling center flexible manufacturing system also includes It is arranged at the feeding station along lineal layout, blanking station and the cache station of the transmission trajectory opposite side.Workbench (T) energy Enough it is arranged in the feeding station (UP), the blanking station (DN) and the cache station (TR), and the workbench (T) exists The logistics trolley (Tv), between the feeding station (UP), the blanking station (DN) and the cache station (TR) be along from The width of body is swapped.
In some embodiments of the present utility model, the workbench has multiple.
In some embodiments of the present utility model, the cache station has multiple and along lineal layout.
In some embodiments of the present utility model, first station and the second station of the double switching station, institute State logistics trolley, the cache station, the feeding station, the blanking station to be provided with for for the workbench along its width The guide rail of guiding.
In some embodiments of the present utility model, be provided with the logistics trolley for by the workbench to institute State the two-way transmission mechanism of transmission trajectory both sides motion.
In some embodiments of the present utility model, described gantry boring-milling center flexible manufacturing system also includes It is arranged at the switch board of the transmission trajectory side, midpoint of the switch board generally within the transmission trajectory.
Switch board is to processing and transmitting various automatic information collectings, process, feedback needed for transportation, and passes through to calculate Machine or other control systems (device such as light, mechanical, electrical, liquid, gas), carry out grading control to machining cell and logistics system, with reality Now to machining cell and logistics system automatically control and operation is coordinated.
Description of the drawings
The schematic layout pattern of the gantry boring-milling center flexible manufacturing system that Fig. 1 is provided for this utility model (is overlooked Figure);
Fig. 2 provides the guide rail of gantry boring-milling center flexible manufacturing system, positioner, position restrainer for this utility model The schematic diagram of structure;
Fig. 3 is one-way driving mechanism schematic diagram of the present utility model;
Fig. 4 is two-way transmission mechanism schematic diagram of the present utility model;
Fig. 5 is the schematic diagram of X/Y/Z three-dimensionals travelling gantry boring-milling center of the present utility model;
Fig. 6 is the schematic diagram of X/Y/Z/W four-ways travelling gantry boring-milling center of the present utility model.
Specific embodiment
In order that the purpose of utility model, technical scheme and advantage are clearer, below in conjunction with the accompanying drawings and specific embodiment Utility model is described in further detail.Although disclosure exemplary embodiment is shown in accompanying drawing, it being understood, however, that May be realized in various forms this utility model and should not be limited by embodiments set forth here.On the contrary, there is provided these enforcements Example is able to more thorough explanation this utility model, and scope of the present utility model complete can be conveyed to ability The technical staff in domain.
As shown in figure 1, this utility model provides a kind of gantry boring-milling center flexible manufacturing system, including logistics system System and machining cell.
Logistics system includes transmitting trajectory TL, logistics trolley Tv, workbench T, feeding station UP, blanking station DN and cache station TR.Logistics trolley Tv is arranged on transmission trajectory TL and can move along transmission trajectory TL.Feeding station UP, blanking station DN and Cache station TR is along the side for being point-blank arranged in transmission trajectory TL.
Machining cell includes gantry boring-milling center M and double switching station.Gantry boring-milling center M is arranged in biography The opposite side of defeated trajectory TL, double switching station are arranged between gantry boring-milling center M and transmission trajectory TL.Duplex Position switching station has the first station Ma and the second station Mb.First station Ma and the second station Mb to transmit trajectory TL away from From identical, the distance to gantry boring-milling center M is also identical, i.e., the two is arranged on same straight line.The machining cell can be with With multiple, and along being disposed linearly at the opposite side of above-mentioned feeding station UP, blanking station DN and cache station TR, now, Duo Ge One station Ma and multiple second station Mb are still within same straight line.
In some embodiments of the present utility model, workbench T can have it is multiple, which can be arranged at logistics trolley Tv, the first station Ma of double switching station and the second station Mb, gantry boring-milling center M, feeding station UP, blanking station DN and In cache station TR.Workbench T can be exchanged to double switching station, feeding station UP, blanking station DN by logistics trolley Tv and be eased up Deposit station TR, it is also possible to exchanged to gantry boring-milling center M by double switching station.Above-mentioned exchange campaign is along workbench The width of T is carried out.
In embodiment as shown in Figure 1, the gantry boring-milling center flexible manufacturing system includes gantry boring-mill work Center M1 and gantry boring-milling center M2.Gantry boring-milling center M1 has the first station M1a and the second station M1b.Dragon Door boring-milling center M2 has the first station M2a and the second station M2b.Cache station TR has four, respectively cache station TR01~cache station TR04.Above-mentioned each device adopts flat layered planes distribution form.Workbench T has 8 pieces, respectively workbench T1 ~workbench T8, which adopts monolayer switching fabric, and its exchange in logistics system (for example to be moved to by logistics trolley Tv slow Deposit station TR) it is to carry out along its width.Exchanges of the workbench T in machining cell is (such as by the first station Ma or second Station Mb moves to gantry boring-milling center M) it is to carry out along its width.Workbench T is in machining cell and logistics system Exchange (for example moving to the first station Ma or the second station Mb by logistics trolley Tv) between system is also along its width Carry out.The width is the Y-direction shown in Fig. 1.
Therefore, the exchange of workbench is specifically become shorter compared with prior art, and swap time is also shorter.Additionally, workbench T is equal It is the first station Ma or the second station Mb that switching station is first moved to by logistics trolley Tv, then moves to gantry boring-milling center M, which will not take logistics trolley Tv as prior art always, then logistics trolley Tv can exchange workbench T to the Transport after continuing to complete after one station Ma or the second station Mb, and then when causing the wait of whole flexible manufacturing system Between short, high working efficiency.
Those skilled in the art are it should be understood that the guide rail span of conveying track TL only need to be by workbench T widths Carrying carry out supporting layout, carrying for workbench T length directions only need to arrange multiple spot along the length direction (X to) of conveying track Support.According to instruction, transmit dolly Tv and workbench T is transported along transmission trajectory TL length directions (X to) to the of switching station The unit interface position of one station Ma or the second station Mb, cache station TR, feeding station UP or blanking station DN, then along Y-direction by work Platform T and its workpiece for being carried are exchanged to specified location.
As shown in Fig. 2 the first station Ma and the second station Mb, logistics trolley Tv, cache station TR in double switching station, Feeding station UP and blanking station DN are provided with a plurality of guide rail 1 of the width along workbench T, and the bottom of workbench T has can The shape coordinated with the guide rail, the guide rail are risen to workbench T and are oriented to and supporting role, to ensure that workbench can be by smoothly Exchange to specified location.
As shown in figure 3, one-way driving mechanism 4 is provided with the first station Ma and the second station Mb of double switching station, Which is used to the workpiece of workbench T and carried is exchanged to gantry boring-milling center M.
As shown in figure 4, logistics trolley Tv is provided with two-way transmission mechanism 5, to realize workbench T and the workpiece of carried Exchange to the both sides of transmission trajectory TL, that is, exchange to switching station or feeding station UP or blanking station DN or cache station TR.
Referring still to shown in Fig. 2, in some embodiments of the present utility model, the first station Ma of double switching station Second station Mb, logistics trolley Tv, cache station TR, feeding station UP, blanking station DN are provided with position-limit mechanism 2 and positioner 3, To ensure workbench T being accurately positioned in each unit, and which can be avoided from toppling.
As shown in figure 1, in some embodiments of the present utility model, gantry boring-milling center flexible manufacturing system is also Including operating mode pattern cabinet CM.Operating mode pattern cabinet CM is arranged on the whole centre positions of transmission trajectory TL, and is located at gantry boring Milling Machining center this side of M.In embodiment as above, when gantry boring-milling center M has two, the logistics Switch board CM is may be located between two gantry boring-milling center M.
As shown in Figure 5, Figure 6, the double switching station adopted by this utility model is particularly well-suited to move with X/Y/Z three-dimensionals Dynamic formula gantry boring-milling center and X/Y/Z/W four-way travelling gantry boring-milling centers.
Above various embodiments of the present utility model have been described in detail.It will be understood by those skilled in the art that can be In the case of without departing from this utility model scope (being limited by the accompanying claims), embodiment is carried out various modifications, Change and change.The widest range consistent with explanation should be explained and be met from overall to explaining for right, not limit Enforcement example in example or detailed description.

Claims (7)

1. gantry boring-milling center flexible manufacturing system, it is characterised in that include:
Transmission trajectory (TL);
The logistics trolley (Tv) that be arranged on transmission trajectory (TL) and can move along which;
It is arranged at least one gantry boring-milling center (M) of transmission trajectory (TL) side;
Be arranged between transmission trajectory (TL) and the gantry boring-milling center (M) with the first station (Ma) and The double switching station of the second station (Mb);
Can be arranged on the logistics trolley (Tv), the double switching station and the gantry boring-milling center (M) Workbench (T);
The workbench (T) is in the logistics trolley (Tv), the double switching station and the gantry boring-milling center (M) Between be to swap along the width of itself.
2. gantry boring-milling center flexible manufacturing system according to claim 1, it is characterised in that also include:
It is arranged at the feeding station (UP) along lineal layout, blanking station (DN) and the cache station of transmission trajectory (TL) opposite side (TR);
The workbench (T) can be arranged in the feeding station (UP), the blanking station (DN) and the cache station (TR), and The workbench (T) is in the logistics trolley (Tv), the feeding station (UP), the blanking station (DN) and the cache station (TR) swapped along the width of itself between.
3. gantry boring-milling center flexible manufacturing system according to claim 2, it is characterised in that:
The workbench (T) is with multiple.
4. gantry boring-milling center flexible manufacturing system according to claim 2, it is characterised in that:
The cache station (TR) is with multiple and along lineal layout.
5. gantry boring-milling center flexible manufacturing system according to claim 2, it is characterised in that:
First station (Ma) and the second station (Mb) of the double switching station, the logistics trolley (Tv), the cache station (TR), the feeding station (UP), the blanking station (DN) are provided with along its width and are oriented to for the workbench (T) Guide rail.
6. gantry boring-milling center flexible manufacturing system according to claim 2, it is characterised in that:
It is provided with making on the logistics trolley (Tv) workbench (T) to transmission trajectory (TL) two lateral movement Two-way transmission mechanism.
7. gantry boring-milling center flexible manufacturing system according to claim 2, it is characterised in that also include:
The switch board (CM) of transmission trajectory (TL) side is arranged at, the switch board (CM) is generally within the transmission line The midpoint of track (TL).
CN201621071932.6U 2016-09-22 2016-09-22 Gantry boring-milling center flexible manufacturing system Active CN206047597U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621071932.6U CN206047597U (en) 2016-09-22 2016-09-22 Gantry boring-milling center flexible manufacturing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621071932.6U CN206047597U (en) 2016-09-22 2016-09-22 Gantry boring-milling center flexible manufacturing system

Publications (1)

Publication Number Publication Date
CN206047597U true CN206047597U (en) 2017-03-29

Family

ID=58366113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621071932.6U Active CN206047597U (en) 2016-09-22 2016-09-22 Gantry boring-milling center flexible manufacturing system

Country Status (1)

Country Link
CN (1) CN206047597U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108190462A (en) * 2017-12-29 2018-06-22 江西衡源智能装备有限公司 Flexible workpiece transfer system with caching function
CN111098087A (en) * 2018-10-25 2020-05-05 重庆铁马工业集团有限公司 Flexible machining process for chassis gearbox shell of military heavy-duty vehicle
CN111993162A (en) * 2020-08-31 2020-11-27 珠海格力智能装备有限公司 Processing production line

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108190462A (en) * 2017-12-29 2018-06-22 江西衡源智能装备有限公司 Flexible workpiece transfer system with caching function
CN108190462B (en) * 2017-12-29 2020-08-04 江西衡源智能装备有限公司 Workpiece flexible transfer system with cache function
CN111098087A (en) * 2018-10-25 2020-05-05 重庆铁马工业集团有限公司 Flexible machining process for chassis gearbox shell of military heavy-duty vehicle
CN111993162A (en) * 2020-08-31 2020-11-27 珠海格力智能装备有限公司 Processing production line

Similar Documents

Publication Publication Date Title
CN206047597U (en) Gantry boring-milling center flexible manufacturing system
JP6082825B2 (en) Longitudinal sheet loading / unloading and cutting method and system
CN110092324B (en) Novel heavy-load RGV robot with reversing and lifting functions
CN103010648A (en) Three-dimensional warehousing method for automatic virtual storage bin and warehousing system
CN102689787B (en) Reversing shifting conveyer device and conveyer system
KR101359729B1 (en) Splitting Device
CN201524912U (en) Movable worktable comprising three rolling guide rails
CN201834515U (en) Conveying device for container general assembly production lines
CN107571009B (en) Assembly line
CN204508297U (en) The multiple Copper Foil former of multilayer
CN209814891U (en) Conveying device is transported to warehouse goods shelves
EP4230548A1 (en) Transportation system
US6612229B2 (en) Multistation press
CN208216509U (en) Battery storage frame and new-energy automobile electrical changing station
CN107472821A (en) A kind of logistics sorting equipment and its driving method
CN102672518B (en) Mobile platform
CN105197080A (en) Locating device
CN207329915U (en) From the shifting carrying platform for moving punch-out equipment
CN206898693U (en) A kind of car body welding producing line flexibility switching device
CN108068323B (en) System for additive manufacturing of three-dimensional objects
CN104670775A (en) Digital-bus-based bracket and tray assembly capable of supplying materials circularly
CN212100841U (en) Transmission device and PTH production line
CN207346560U (en) A kind of transport mechanism and battery production equipment
CN205098222U (en) Positioner
CN206732492U (en) Suitable for the automatic assembly equipment of workpiece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 650203 No. 23 Dam Road, Yunnan, Kunming

Patentee after: General technology Group Kunming Machine Tool Co.,Ltd.

Address before: 650203 No. 23 Dam Road, Yunnan, Kunming

Patentee before: SHENJI GROUP KUNMING MACHINE TOOL Co.,Ltd.

CP01 Change in the name or title of a patent holder