CN206034458U - Structure of falling is prevented in steel shotcrete in SMW worker method stake envelope foundation ditch - Google Patents
Structure of falling is prevented in steel shotcrete in SMW worker method stake envelope foundation ditch Download PDFInfo
- Publication number
- CN206034458U CN206034458U CN201621006315.8U CN201621006315U CN206034458U CN 206034458 U CN206034458 U CN 206034458U CN 201621006315 U CN201621006315 U CN 201621006315U CN 206034458 U CN206034458 U CN 206034458U
- Authority
- CN
- China
- Prior art keywords
- bracing members
- foundation ditch
- wire rope
- steel
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model relates to a structure of falling is prevented in steel shotcrete in SMW worker method stake envelope foundation ditch connects installation wire rope between the tip of steel shotcrete is rather than the hole for hoist of adjacent H shaped steel. The utility model discloses utilize SMW to be good at method H stake shaped steel up -pull and insert the hole for hoist that shaped steel was used, adopt wire rope to bind the steel shotcrete and suspend in midair, ensure that the steel shotcrete changes perhaps equipment collision is followed has wire rope after the support position drops secondary protection at the atress, can guarantee the safety of steel shotcrete.
Description
Technical field
This utility model belongs to excavation field, is related to carry out fall arrest after foundation ditch support system bracing members are installed
Protection, especially bracing members Anti-falling structure in a kind of SMW engineering methods stake building enclosure foundation ditch.
Background technology
During Foundation Pit Construction, shallow excavation of foundation pit adopts the building enclosure of the stake of SMW engineering methods and high-pressure rotary jet grouting pile mostly
Form, foundation ditch support system adopt bracing members, and bracing members are erected on bearing by the built-in fitting in Guan Liang, are not had and Guan Liang
It is reliably connected.Due to the change or the collision of shoveling equipment of bracing members stress in Excavation Process, bracing members presence is fallen
Danger, bracing members fall and have a strong impact on the safety of site operation personnel, while the also safety to foundation ditch.
Utility model content
The purpose of this utility model be overcome current bracing members installation after, there is the danger fallen, there is provided a kind of
Bracing members second protection measure, by using the existing hole for hoist for lifting shaped steel on SMW engineering method stake Shaped Steels, using steel wire rope
Binding suspention is carried out to bracing members, it is ensured that bracing members change in stress or equipment is collided after coming off from support position and has steel wire rope
Second protection, it is ensured that the safety of bracing members.
This utility model solves the technical scheme that adopted of technical problem:
Bracing members Anti-falling structure in a kind of SMW engineering methods stake building enclosure foundation ditch, in the H that the end of bracing members is adjacent
Between the hole for hoist of shaped steel, steel wire rope is installed in connection.
And, described steel wire rope one ends wound is fixed by multiple rope cards in the end of bracing members;The other end bypasses H
The hole for hoist of shaped steel, is fixed by multiple rope cards.
And, the arrangement pitches of described multiple rope cards are 6~8 times of wirerope diameter.
And, multiple rope cards are equidirectional regularly arranged, and the U-loop part of card of restricting is stuck in the one side of fag end, the pressing plate of card of restricting
The one side of main rope is placed on, is tightened by bolt, make steel wire rope be crushed 1/3.
And, fix on the inside of end flanges in bracing members respectively and on the inside of the scalable position of bracing members segmented head, respectively wind a steel
One end of cord.
Advantage of the present utility model and good effect are:
This utility model is entered to bracing members using steel wire rope using the hole for hoist of plug shaped steel on SMW engineering method H pile-type steel
Row binding suspention, it is ensured that bracing members have the secondary guarantor of steel wire rope after stress change or equipment collision come off from support position
Shield, ensure that the safety of bracing members.
Description of the drawings
Fig. 1 is the connection longitudinal direction schematic diagram of bracing members and H profile steel;
Fig. 2 is the connection floor map of bracing members and H profile steel.
Mounting plane schematic diagrams of the Fig. 3 for bracing members.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings and by specific embodiment, and following examples are simply retouched
The property stated, be not determinate, it is impossible to limit protection domain of the present utility model with this.
Bracing members Anti-falling structure in a kind of SMW engineering methods stake building enclosure foundation ditch, is adjacent in the end of bracing members 1
Connecting steel wire ropes 2 between the hole for hoist 3 of H profile steel 4.Specific construction step is as follows:
(1) bracing members install the requirement according to design drawing, and the support position welded on the built-in fitting of Guan Liang position is installed,
And apply prestressing force according to design requirement, and it is solid with the Guan Liang top of both sides by prestressing force effect, form homeostatic system.
(2) after the completion of SMW engineering methods pile driving construction, shaped steel top board has a hole for hoist for lifting and pulling out shaped steel, checks
Whether breakage and crackle are had around hole for hoist, if flawless and breakage, connection of the hole for hoist as steel wire rope top
Point, and the length of steel wire rope is determined with this position to the distance of bracing members installation site.
(3) after bracing members installation, the installation of bracing members fall arrest steel wire rope is carried out, according to length and the weight of bracing members
Amount, scene select the steel wire rope of diameter 14mm as the lifting rope of bracing members fall arrest, and side is fixed on the inside of end flanges in bracing members
By card connection of restricting after winding bracing members, opposite side is after the scalable position wrapped inside of segmented head by card connection of restricting.
(4), when on steel wire rope and shaped steel, hole for hoist and bracing members connect, the arrangement pitches between rope card are generally steel wire rope
6~8 times of diameter or so, rope card want an in-line arrangement to arrange, and U-loop part should be stuck in the one side of fag end, and pressing plate is placed on the one of main rope
Face.U bolt is tightened, until steel wire rope is crushed till 1/3 or so.
(5) all bracing members, after fall arrest steel wire rope installation, then bracing members are installed and steel wire rope quality of connection
Checked, it is ensured that whole installation bracing members are installed and fall arrest works.
Above-described is only preferred implementation of the present utility model, it is noted that for the ordinary skill of this area
For personnel, on the premise of conceiving without departing from utility model, some deformations and improvement can also be made, these belong to this reality
With new protection domain.
Claims (5)
1. bracing members Anti-falling structure in a kind of SMW engineering methods stake building enclosure foundation ditch, it is characterised in that:The end of bracing members with
Between the hole for hoist of its adjacent H profile steel, steel wire rope is installed in connection.
2. bracing members Anti-falling structure in SMW engineering methods stake building enclosure foundation ditch according to claim 1, it is characterised in that:
Described steel wire rope one ends wound is fixed by multiple rope cards in the end of bracing members;The other end bypasses the hole for hoist of H profile steel,
Fixed by multiple rope cards.
3. bracing members Anti-falling structure in SMW engineering methods stake building enclosure foundation ditch according to claim 2, it is characterised in that:
6~8 times for wirerope diameter of the arrangement pitches of described multiple rope cards.
4. bracing members Anti-falling structure in SMW engineering methods stake building enclosure foundation ditch according to claim 2, it is characterised in that:
Multiple rope cards are equidirectional regularly arranged, and the U-loop part of card of restricting is stuck in the one side of fag end, and the pressing plate of card of restricting is placed on the one of main rope
Face, is tightened by bolt, makes steel wire rope be crushed 1/3.
5. bracing members Anti-falling structure in SMW engineering methods stake building enclosure foundation ditch according to claim 2, it is characterised in that:
Fix on the inside of end flanges in bracing members respectively and on the inside of the scalable position of bracing members segmented head, respectively wind a steel wire rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621006315.8U CN206034458U (en) | 2016-08-30 | 2016-08-30 | Structure of falling is prevented in steel shotcrete in SMW worker method stake envelope foundation ditch |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621006315.8U CN206034458U (en) | 2016-08-30 | 2016-08-30 | Structure of falling is prevented in steel shotcrete in SMW worker method stake envelope foundation ditch |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206034458U true CN206034458U (en) | 2017-03-22 |
Family
ID=58299611
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621006315.8U Expired - Fee Related CN206034458U (en) | 2016-08-30 | 2016-08-30 | Structure of falling is prevented in steel shotcrete in SMW worker method stake envelope foundation ditch |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206034458U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110761295A (en) * | 2019-10-28 | 2020-02-07 | 中铁第四勘察设计院集团有限公司 | Prefabricated assembled concrete pipe props structure |
-
2016
- 2016-08-30 CN CN201621006315.8U patent/CN206034458U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110761295A (en) * | 2019-10-28 | 2020-02-07 | 中铁第四勘察设计院集团有限公司 | Prefabricated assembled concrete pipe props structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103291076B (en) | Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame | |
CN102900021B (en) | Split mounting type bridge wet joint construction method | |
CN105275253A (en) | Equal-diameter rod erecting device and application method thereof | |
CN202530769U (en) | Large span steel structure high-altitude subsection hoisting support system | |
CN204402559U (en) | A kind of large jacking force shield machine air pushes through hole truss-like reaction support group | |
CN102486051B (en) | Manual demolishing method of large-area spherical net rack | |
CN206034458U (en) | Structure of falling is prevented in steel shotcrete in SMW worker method stake envelope foundation ditch | |
CN202945798U (en) | Overhanging type scaffold corner device | |
CN205532716U (en) | Block structure of ore bin bottom | |
CN206769931U (en) | A kind of bottom arch supporting construction of baseboard of coal mine roadway | |
CN107795133B (en) | Integral protective frame platform and construction method thereof | |
CN204343642U (en) | Builder's jack corner support frame | |
CN203398665U (en) | Unloading fixator used for tower crane cable vertical erecting | |
CN203359856U (en) | Support beam structure for external tower crane in high-rise core tube | |
CN107217912A (en) | It is a kind of to be used for the superelevation physical isolation construction method of neighbouring high ferro Business Line construction | |
CN204691212U (en) | A kind of nylon pin handsheet pedal of scaffold | |
CN206220461U (en) | A kind of packaged type I-steel hoistway operation platform | |
CN206034929U (en) | Hoisting frame of dress behind concrete square column capital | |
CN107780419A (en) | A kind of bracing members fall arrest method in SMW engineering methods stake building enclosure foundation ditch | |
CN210420898U (en) | Novel No. 0 block support of steel box girder | |
CN211283476U (en) | Be used for inclined roofing precast beam hoist device of assembled concrete structure | |
CN208548694U (en) | The system of power station lifting equipment lightning protection day network arrangements | |
CN203822340U (en) | Gate-type support frame equipment | |
CN202245789U (en) | Special typhoon prevention device for gantry crane | |
CN206987415U (en) | Folding is gone along with sb. to guard him temporarily |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170322 |
|
CF01 | Termination of patent right due to non-payment of annual fee |