CN206769931U - A kind of bottom arch supporting construction of baseboard of coal mine roadway - Google Patents
A kind of bottom arch supporting construction of baseboard of coal mine roadway Download PDFInfo
- Publication number
- CN206769931U CN206769931U CN201720246191.9U CN201720246191U CN206769931U CN 206769931 U CN206769931 U CN 206769931U CN 201720246191 U CN201720246191 U CN 201720246191U CN 206769931 U CN206769931 U CN 206769931U
- Authority
- CN
- China
- Prior art keywords
- coal mine
- baseboard
- supporting construction
- steel band
- mine roadway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The utility model belongs to underground coal mine support technology field, encircle supporting construction more particularly to a kind of bottom of baseboard of coal mine roadway, including the multiple anchor poles being arranged on the arch of bottom, also include the upper bar-mat reinforcement for being covered in bottom arch inner concave, the steel band beam for fixed steel bars net is provided with above the bar-mat reinforcement, the steel band beam is the arc-shaped to be matched with bottom arch concave surface;Perforation is evenly arranged with the steel band beam, the anchor pole is inserted in the arch of bottom through perforation;The bottom arch supporting construction of the baseboard of coal mine roadway, is not only simple in structure, and can provide the stability of bottom arch, reduces the situation for pucking occur, and improves bottom plate compression strength, enhances the stability of bottom plate.
Description
Technical field
The utility model belongs to underground coal mine support technology field, and in particular to a kind of bottom arch supporting of baseboard of coal mine roadway
Structure.
Background technology
It is that colliery, metal mine, subway, civil air defense constructions and installations and underground space engineering etc. are frequent that the bottom plate of tunnel or chamber, which is heaved,
The problem of running into.Especially coal mining when by mining pressure or pick lane when influenceed by secondary supercoated stress, tunnel or chamber
Surrounding convergent deformation is serious, and the amount of heaving of bottom plate reaches more than half of roof to floor convergence, and even up to 90%.Tunnel or cave
Every 2~3 months quantities with regard to needing to reprocess the quantities once, reprocessed or even exceed new pick tunnel in room.Excessive pucking amount
The useful area of tunnel or chamber is severely impacted, it is normally raw to threaten ventilation safety, drawing-off gas, transport of materials of mine etc.
Production system and related link, and be all severely impacted using the stability of roadway's sides and top plate after acting as a planted agent repeatedly, in horse
Head door nearby even the serious threat borehole wall stabilization, cause the borehole wall to slide.
In order to prevent pucking phenomenon, strengthen the supporting to bottom arch and be particularly important, the most frequently used method is to adopt in colliery
With totally enclosed shed shoring.But shed ding support belongs to passive protecting, support does not have initial Support Resistance after setting up, can only lean on bottom
Deformation when small drum for marking time rises provides reaction for it, if subjected to the influence of unbalance loading load, shed is difficult to play effective control bottom work
With.Substantial amounts of engineering practice shows that this set support system effectively plays a role when being difficult to long, and new pucking still will be by reprocessing
Solve.Except planted agent when reprocessing, it is necessary to set up again after the shed of erection is all removed, the input of this quantities is very
It is huge, and work efficiency is extremely low.
Utility model content
The purpose of this utility model is to overcome existing bottom arch guard technology existence and stability poor, and tunnel, which is pressurized easily, to be occurred instead
Multiple pucking is, it is necessary to which roadway floor carries out regular the problem of handling repeatedly.
Therefore, the utility model provides a kind of bottom arch supporting construction of baseboard of coal mine roadway, including it is arranged on the arch of bottom
Multiple anchor poles, in addition to be covered in the upper bar-mat reinforcement of bottom arch inner concave, be provided with above the bar-mat reinforcement for fixing steel
The steel band beam of muscle net, the steel band beam are the arc-shaped to be matched with bottom arch concave surface;Perforation, institute are evenly arranged with the steel band beam
Anchor pole is stated to insert in the arch of bottom through perforation.
Iron pallet is provided between the steel band beam and the anchor pole.
The steel band beam is provided with multiple rows of, and I-shaped cable wire rope beam is vertically installed with steel band beam.
Anchor cable is provided with the I-shaped cable wire rope beam.
The I-shaped cable wire rope beam length 1.2m.
A diameter of 16mm of the anchor cable, length 7.3m.
The size of the iron pallet is 120mm × 120mm.
The length of the steel band beam × a width of 5.1m × 13mm.
The beneficial effects of the utility model:The bottom arch supporting construction of this baseboard of coal mine roadway provided by the utility model,
It is not only simple in structure, and the stability of bottom arch can be provided, reduces the situation for pucking occur, and improve bottom plate pressure resistance
Degree, enhance the stability of bottom plate.
The utility model is described in further details below with reference to accompanying drawing.
Brief description of the drawings
Fig. 1 is the bottom arch supporting construction top view of baseboard of coal mine roadway.
Fig. 2 is the bottom arch supporting overall structure top view of baseboard of coal mine roadway.
The bottom arch schematic diagram of Fig. 3 baseboard of coal mine roadway.
In figure:1st, bar-mat reinforcement;2nd, steel band beam;3rd, anchor pole;4th, iron pallet;5th, I-shaped cable wire rope beam;6th, anchor cable.
Embodiment
For the technological means and effect that the utility model is reached predetermined purpose and taken is expanded on further, below in conjunction with accompanying drawing
And embodiment describes in detail as follows to specific embodiment of the present utility model, architectural feature and its effect.
In order to overcome existing bottom arch guard technology existence and stability poor, tunnel, which is pressurized easily, there is repeatedly pucking, it is necessary to lane
Road bottom plate is carried out regular the problem of handling repeatedly, and the utility model provides a kind of described coal mine roadway bottom as shown in Figure 1, Figure 2
The bottom arch supporting construction of plate, including the multiple anchor poles 3 being arranged on the arch of bottom, anchor pole 3 is mainly used in piercing in the arch of bottom, such as Fig. 3 institutes
Show, bottom can be encircleed to all directions and be fixed with rock, play a part of preventing pucking phenomenon to a certain extent, but this
The appearance of phenomenon can not be entirely prevented underestimating, in order to preferably prevent the appearance of pucking phenomenon, the bottom of the baseboard of coal mine roadway
Arch supporting construction also includes the upper bar-mat reinforcement 1 for being covered in bottom arch inner concave, and the top of bar-mat reinforcement 1 is provided with for fixed steel bars net
1 steel band beam 2, the steel band beam 2 are the arc-shaped to be matched with bottom arch concave surface;Perforation, anchor pole 3 are evenly arranged with steel band beam 2
Through in the arch of perforation insertion bottom.Bar-mat reinforcement 1 covers bottom arch surface, from steel band beam 2 with being fixed with anchor pole 3, in order to increase
The lifting surface area of anchor pole 3 is provided with iron pallet 4 between steel band beam 2 and the anchor pole 3, and teel band beam 2 is matched somebody with somebody with anchor pole 3
Close, the effect of fixed steel wire 1.
When practice of construction, steel band beam 2 is provided with multiple rows of, and I-shaped cable wire rope beam is vertically installed with steel band beam 2
5;Anchor cable 6 is provided with I-shaped cable wire rope beam 5;So steel band beam 2 just forms cross in I-shaped cable wire rope beam 5 and fixed, and
Multiple rows of steel band beam 2 is connected integral, share the extruding force from some direction jointly, avoid the occurrence of pucking phenomenon;Add
Anchor cable 6, pulling force can be formed towards the direction inserted with anchor pole 3, preferably steel wire 1 is fixed.
Encircle supporting construction at the bottom of above-mentioned baseboard of coal mine roadway, when carrying out practical application, the length of I-shaped cable wire rope beam 5
Spend for 1.2m, a diameter of 16mm of anchor cable 6, length 7.3m, the size of iron pallet 4 is 120mm × 120mm;Steel band beam 2
Long × a width of 5.1m × 13mm.It should be noted that these sizes are not the single size actually applied, various compositions
Main bottom arch size, the order of severity of pucking phenomenon and the construction needs for considering practice of construction of the change of the size of part reach
Effect.
Above content is to combine specific preferred embodiment further detailed description of the utility model, it is impossible to
Assert that specific implementation of the present utility model is confined to these explanations.For the ordinary skill of the utility model art
For personnel, without departing from the concept of the premise utility, some simple deduction or replace can also be made, should all be regarded
To belong to the scope of protection of the utility model.
Claims (8)
1. a kind of bottom arch supporting construction of baseboard of coal mine roadway, including the multiple anchor poles being arranged on the arch of bottom(3), its feature exists
In:Also include the upper bar-mat reinforcement for being covered in bottom arch inner concave(1), the bar-mat reinforcement(1)Top is provided with for fixed steel bars
Net(1)Steel band beam(2), the steel band beam(2)For the arc-shaped to be matched with bottom arch concave surface;The steel band beam(2)On uniformly set
It is equipped with perforation, the anchor pole(3)Through in the arch of perforation insertion bottom.
A kind of 2. bottom arch supporting construction of baseboard of coal mine roadway as claimed in claim 1, it is characterised in that:The steel band beam
(2)With the anchor pole(3)Between be provided with iron pallet(4).
A kind of 3. bottom arch supporting construction of baseboard of coal mine roadway as claimed in claim 1, it is characterised in that:The steel band beam
(2)It is provided with multiple rows of, and steel band beam(2)On be vertically installed with I-shaped cable wire rope beam(5).
A kind of 4. bottom arch supporting construction of baseboard of coal mine roadway as claimed in claim 3, it is characterised in that:The I-steel anchor
Suo Liang(5)On be provided with anchor cable(6).
A kind of 5. bottom arch supporting construction of baseboard of coal mine roadway as claimed in claim 3, it is characterised in that:The I-steel anchor
Suo Liang(5)Long 1.2m.
A kind of 6. bottom arch supporting construction of baseboard of coal mine roadway as claimed in claim 4, it is characterised in that:The anchor cable
(6)A diameter of 16mm, length 7.3m.
A kind of 7. bottom arch supporting construction of baseboard of coal mine roadway as claimed in claim 2, it is characterised in that:The iron pallet
(4)Size be 120mm × 120mm.
A kind of 8. bottom arch supporting construction of baseboard of coal mine roadway as described in claim 1 or 2 or 3, it is characterised in that:The steel
Band beam(2)Length × a width of 5.1m × 13mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720246191.9U CN206769931U (en) | 2017-03-14 | 2017-03-14 | A kind of bottom arch supporting construction of baseboard of coal mine roadway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720246191.9U CN206769931U (en) | 2017-03-14 | 2017-03-14 | A kind of bottom arch supporting construction of baseboard of coal mine roadway |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206769931U true CN206769931U (en) | 2017-12-19 |
Family
ID=60632113
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720246191.9U Active CN206769931U (en) | 2017-03-14 | 2017-03-14 | A kind of bottom arch supporting construction of baseboard of coal mine roadway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206769931U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108561159A (en) * | 2018-04-10 | 2018-09-21 | 淮南矿业(集团)有限责任公司 | A kind of anti-wall caving suspension device of the high side in coal seam and method for protecting support |
CN109281687A (en) * | 2018-10-23 | 2019-01-29 | 河南理工大学 | A method of about the quick tuning construction of coal mine development machine |
CN109630050A (en) * | 2018-11-27 | 2019-04-16 | 陕西陕煤铜川矿业有限公司下石节煤矿 | A kind of Novel work face recovery approach support process |
-
2017
- 2017-03-14 CN CN201720246191.9U patent/CN206769931U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108561159A (en) * | 2018-04-10 | 2018-09-21 | 淮南矿业(集团)有限责任公司 | A kind of anti-wall caving suspension device of the high side in coal seam and method for protecting support |
CN109281687A (en) * | 2018-10-23 | 2019-01-29 | 河南理工大学 | A method of about the quick tuning construction of coal mine development machine |
CN109630050A (en) * | 2018-11-27 | 2019-04-16 | 陕西陕煤铜川矿业有限公司下石节煤矿 | A kind of Novel work face recovery approach support process |
CN109630050B (en) * | 2018-11-27 | 2021-08-17 | 陕西陕煤铜川矿业有限公司下石节煤矿 | Novel working face recovery channel supporting process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3489459B1 (en) | Non-uniform support structure for gob-side entry driving under deep unstable overburden rock and construction method | |
CN206769931U (en) | A kind of bottom arch supporting construction of baseboard of coal mine roadway | |
CN109268027B (en) | Tunnel top angle curved surface surrounding rock reinforcement control method | |
CN102852528A (en) | Method for controlling floor heave through inverted arch anchoring beam | |
US8966846B1 (en) | Steel anchored reinforced mine seal | |
CN109026024B (en) | Roadway roof deformation control method under high-level stress action | |
CN103742171A (en) | Mining roadway coal pillar reinforcing method | |
CN111485947A (en) | Method for quickly closing goaf by roof cutting, pressure relief and gob-side entry retaining | |
CN101614130A (en) | Method for preventing rock-burst of roadway support | |
CN210948737U (en) | Efficient and rapid tunneling roadway support facility for inclined small-section half-coal-rock roadway with thin coal seam | |
CN111022050B (en) | Fully-closed blasting pressure relief and self-retained roadway method for grouting reconstruction of composite roof | |
CN105626095B (en) | Coal mine goaf surrounding rock supporting method under the conditions of coal seam group mining tight roof | |
CN105937400A (en) | One-time tunneling two-roadway-retained excavating operation production line | |
CN107859525B (en) | A kind of large deformation stope drift active workings replace canopy surrounding rock control method except the lane Mao Kuo | |
CN105937401B (en) | The method for protecting support in Liu Sheshuan lanes is once tunneled in a kind of U-shaped ventilation | |
Hutchison et al. | Steep wall mining: engineered structures used in the management of rockfall hazards at Kanmantoo copper mine | |
CN111236968B (en) | Rock burst roadway advanced support anti-impact method | |
CN103742177B (en) | A kind of strong ore deposit pressure roadway support design method | |
US20180245468A1 (en) | Cable bolts | |
CN204253079U (en) | A kind of anchor plate for mining | |
CN112483134A (en) | Method for treating roof fall of roadway | |
CN105823389A (en) | Detonation protection device for shear wall | |
CN206034458U (en) | Structure of falling is prevented in steel shotcrete in SMW worker method stake envelope foundation ditch | |
CN108825282B (en) | Supporting structure for roadway crossing point cattle nose | |
Guo et al. | Instability Mechanism and Control Technology for Deep-Buried Large-Span Complex Roof Coal Roadway for the Prevention of Coal Pollution. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |