CN206015693U - A kind of upper side slope friction pile - Google Patents

A kind of upper side slope friction pile Download PDF

Info

Publication number
CN206015693U
CN206015693U CN201621066143.3U CN201621066143U CN206015693U CN 206015693 U CN206015693 U CN 206015693U CN 201621066143 U CN201621066143 U CN 201621066143U CN 206015693 U CN206015693 U CN 206015693U
Authority
CN
China
Prior art keywords
pile
friction pile
face
raised
pile body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621066143.3U
Other languages
Chinese (zh)
Inventor
闻国骄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Science and Engineering WUSE
Wuhan University of Science and Technology WHUST
Original Assignee
Wuhan University of Science and Engineering WUSE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Science and Engineering WUSE filed Critical Wuhan University of Science and Engineering WUSE
Priority to CN201621066143.3U priority Critical patent/CN206015693U/en
Application granted granted Critical
Publication of CN206015693U publication Critical patent/CN206015693U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

This utility model is related to Landslide Hazards Treatment process field, and in particular to a kind of upper side slope friction pile, it is characterised in that it includes friction pile pile body, square plastic draining board, steel wire drain pipe, treatment hole;The friction pile pile body is in vertically cylindric, it is raised that several are distributed with the outside curve wall of friction pile pile body, raised quantity is at least three, raised is in vertical rectangular-shape, each raised top end face is respectively concordant with the top end face and bottom face of friction pile pile body with bottom face, several projections are uniformly distributed in horizontal circumference along the outside curve wall of friction pile pile body, and the angle between two projections of arbitrary neighborhood is equal, square groove is offered along raised vertical extension direction on each raised outboard end perpendicular, the top end face of square groove and the insertion of bottom face difference are to raised top end face and bottom face.This utility model can effectively improve the anti-slide performance and shear behavior of upper side slope, strengthen the security and stability of upper side slope.

Description

A kind of upper side slope friction pile
【Technical field】
This utility model is related to Landslide Hazards Treatment process field, more particularly to a kind of upper side slope antiskid Stake.
【Background technology】
Friction pile is landslide disaster prevention and an important engineering measure in improvement.Friction pile is by a gear Rock And Soil Sliding force, reaches the effect for maintaining stability of slope.Friction pile has that excavated volume is little, is difficult to deteriorate landslide state, and anti-slide performance is strong, Applied widely, the advantages of construction safety is simple.Soil-slope friction pile is broadly divided into timber, piling bar, armored concrete at present Stake and group are attached together, and wherein reinforced concrete pile is most widely used.There is enough anti-slide performances for making friction pile, general meeting Increase its volume or add enough reinforcing bars, can so increase financial burden, and the non-deformability of large volume friction pile may Affected by explosion or geological process and weakened.Furthermore, the stability of soil-slope is largely by subsoil water and rainfall Affect, water often causes the principal element of landslide disaster to the attenuation of soil strength, therefore improves the draining of friction pile Ability and shear resistance are particularly important.
【Utility model content】
The technical problems to be solved in the utility model is to provide a kind of upper side slope friction pile, compared to traditional antiskid Stake, the application of the shape of this friction pile and anchor cable can effectively improve the anti-slide performance and shear behavior of upper side slope, in addition originally Friction pile can also be greatly enhanced the drainability of traditional friction pile, strengthen the security and stability of upper side slope.
In order to achieve the above object, the technical scheme of this utility model offer is:A kind of upper side slope friction pile, its feature It is that it includes friction pile pile body, square plastic draining board, steel wire drain pipe, treatment hole;The friction pile pile body is in vertical circle Column, is distributed with several raised, raised quantity at least three on the outside curve wall of friction pile pile body, raised in vertical Rectangular-shape, each raised top end face are respectively concordant with the top end face and bottom face of friction pile pile body with bottom face, some The individual raised outside curve wall along friction pile pile body is uniformly distributed in horizontal circumference, and the angle between two projections of arbitrary neighborhood is equal Equal, square groove is offered along raised vertical extension direction on each raised outboard end perpendicular, square groove , to raised top end face and bottom face, each fixation in each raised direction groove spreads for top end face and the insertion of bottom face difference It is provided with the square plastic draining board being adapted to square groove, the top end face center of friction pile pile body offers vertically communicated together To the cylindrical cavity of friction pile pile body bottom face, the center of cylindrical cavity is vertically provided with steel wire drain pipe, steel wire drain pipe Consolidated by the medial wall of reinforcing bar and cylindrical cavity, the vertical top end face and vertical bottom face of steel wire drain pipe respectively with anti- The vertical top end face of sliding pile pile body is concordant with vertical bottom face, if offering arterial highway level on the outside curve wall of friction pile pile body The treatment hole of insertion to friction pile pile body center cylindrical empty intracavity, if arterial highway treatment hole is along the outside curve of friction pile pile body Wall is helically dislocatedly distributed shape;Several projections on the friction pile pile body and friction pile pile body are by reinforced concrete cast-in-situ Form an entirety.
The beneficial effects of the utility model are:This utility model compared to traditional friction pile, the shape of this friction pile and The application of anchor cable can effectively improve the anti-slide performance and shear behavior of upper side slope, and this friction pile is also drastically increased in addition The drainability of traditional friction pile, enhances the security and stability of upper side slope.
【Description of the drawings】
With reference to the accompanying drawings and examples this utility model is further illustrated.
Fig. 1 is overlooking the structure diagram of the present utility model.
A-A cross section structure diagrams of the Fig. 2 for Fig. 1.
Fig. 3, Fig. 4 are view when this utility model is used.
Wherein, 1- friction piles pile body, 2- projections, 3- square plastic draining boards, 4- steel wire drain pipies, 5- treatment holes, 6- are broken Stone, 7- geotextiles, 8- upper side slopes, 9- sliding surfaces, 10- anchor cables, 11-- armored concrete end sockets, 12- anchored ends.
【Specific embodiment】
In example shown in the drawings, as shown in Figure 1 and Figure 2, a kind of upper side slope friction pile, it is characterised in that it includes Friction pile pile body, square plastic draining board, steel wire drain pipe, treatment hole;The friction pile pile body is in vertically cylindric, friction pile Several are distributed with the outside curve wall of pile body raised, raised quantity is at least three, raised is in vertical rectangular-shape, per Individual raised top end face is respectively concordant with the top end face and bottom face of friction pile pile body with bottom face, and several projections are along antiskid The outside curve wall of stake pile body is uniformly distributed in horizontal circumference, and the angle between two projections of arbitrary neighborhood is equal, and each is convex Square groove, the top end face of square groove and bottom are offered along raised vertical extension direction on the outboard end perpendicular for rising Insertion is distinguished to raised top end face and bottom face in face, and each fixation in each raised direction groove is equipped with recessed with square The square plastic draining board of groove adaptation, the top end face center of friction pile pile body offers vertically communicated to friction pile pile body together The cylindrical cavity of bottom face, the center of cylindrical cavity are vertically provided with steel wire drain pipe, and steel wire drain pipe is by reinforcing bar and circle The medial wall consolidation of cylindrical cavity, the vertical top end face and vertical bottom face of steel wire drain pipe are respectively perpendicular with friction pile pile body Concordant with vertical bottom face to top end face, if offering the horizontal insertion in arterial highway on the outside curve wall of friction pile pile body to friction pile The treatment hole of pile body center cylindrical empty intracavity, if arterial highway treatment hole helically misplaces along the outside curve wall of friction pile pile body Distribution shape;Several projections on the friction pile pile body and friction pile pile body are whole by reinforced concrete cast-in-situ formation one Body.
During using this utility model, construction operation personnel first should excavate on the upper side slope for needing do reinforcement and beat well Enter the pile sinking hole required for this friction pile, then this friction pile is squeezed in the pile sinking hole that has excavated using pile driving equipment.It is worth It is noted that construction operation personnel are before piling, the debris in all treatment holes on this friction pile lateral wall should be cleared up, be dredged Treatment hole, it is ensured that treatment hole is not blocked before piling, after treatment hole is cleaned out, construction operation personnel can be incited somebody to action with geotextiles Per pass treatment hole its be located at the opening at friction pile pile body lateral wall and wrap, prevent soil body impurity to be redirected back into by treatment hole In cylindrical cavity in friction pile pile body.After piling is finished, construction operation personnel can be in the cylinder in friction pile pile body Rubble being inserted in cavity and tamping tight (see Fig. 3), construction operation personnel can be in the way of with machine drilling in this antiskid afterwards Anchor cable is installed in stake, the anchor head of anchor cable stretches into the top of friction pile pile body, and the top armored concrete in friction pile pile body The anchor head of end socket sealing and reinforcing anchor cable, the anchored end of anchor cable are stretched in upper side slope, and be fixed on the sliding surface of upper side slope with Under (see Fig. 4).Compared to traditional friction pile, the application of the shape of this friction pile and anchor cable effectively increases traditional upper side slope The anti-slide performance and shear behavior of friction pile, square plastic draining board, steel wire drain pipe, and the setting for the treatment of hole, greatly The drainability of friction pile is improve, so that the hydrops in upper side slope fast and effectively can be discharged, upper side slope is enhanced Security and stability.

Claims (1)

1. a kind of upper side slope friction pile, it is characterised in that it includes friction pile pile body, square plastic draining board, steel wire draining Pipe, treatment hole;The friction pile pile body is distributed with several on the outside curve wall of friction pile pile body convex in vertically cylindric Rise, raised quantity is at least three, raised is in vertical rectangular-shape, each raised top end face and bottom face respectively with anti- The top end face of sliding pile pile body is concordant with bottom face, and several projections are in horizontal even circumferential along the outside curve wall of friction pile pile body Distribution, and the angle between two projections of arbitrary neighborhood is equal, along the vertical of projection on each raised outboard end perpendicular Length direction offers square groove, and the top end face of square groove and bottom face difference insertion are to raised top end face and bottom face On, each fixation in each raised direction groove is equipped with the square plastic draining board being adapted to square groove, friction pile stake The top end face center of body offers the vertically communicated cylindrical cavity to friction pile pile body bottom face together, cylindrical cavity Center is vertically provided with steel wire drain pipe, and medial wall of the steel wire drain pipe by reinforcing bar with cylindrical cavity consolidates, steel wire drain pipe Vertical top end face respectively concordant with the vertical top end face of friction pile pile body and vertical bottom face with vertical bottom face, friction pile If offering the horizontal insertion in arterial highway on the outside curve wall of pile body to the treatment hole of friction pile pile body center cylindrical empty intracavity, If arterial highway treatment hole is helically dislocatedly distributed shape along the outside curve wall of friction pile pile body;The friction pile pile body and friction pile stake Several projections with it form an entirety by reinforced concrete cast-in-situ.
CN201621066143.3U 2016-09-10 2016-09-10 A kind of upper side slope friction pile Expired - Fee Related CN206015693U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621066143.3U CN206015693U (en) 2016-09-10 2016-09-10 A kind of upper side slope friction pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621066143.3U CN206015693U (en) 2016-09-10 2016-09-10 A kind of upper side slope friction pile

Publications (1)

Publication Number Publication Date
CN206015693U true CN206015693U (en) 2017-03-15

Family

ID=58261132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621066143.3U Expired - Fee Related CN206015693U (en) 2016-09-10 2016-09-10 A kind of upper side slope friction pile

Country Status (1)

Country Link
CN (1) CN206015693U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284384A (en) * 2016-09-10 2017-01-04 武汉科技大学 A kind of upper side slope draining friction pile
CN109763485A (en) * 2019-02-18 2019-05-17 郑秀平 A kind of dewatering type prefabricated pile and its construction method convenient for construction
CN110080208A (en) * 2019-04-23 2019-08-02 东北大学 A kind of anti-liquefaction stake of hollow antiskid
CN112411583A (en) * 2020-12-10 2021-02-26 中国地质科学院探矿工艺研究所 Integrated form side slope drainage reinforcerment system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284384A (en) * 2016-09-10 2017-01-04 武汉科技大学 A kind of upper side slope draining friction pile
CN109763485A (en) * 2019-02-18 2019-05-17 郑秀平 A kind of dewatering type prefabricated pile and its construction method convenient for construction
CN109763485B (en) * 2019-02-18 2022-01-28 上海民航新时代机场设计研究院有限公司 Drainage type precast pile convenient to construct and construction method thereof
CN110080208A (en) * 2019-04-23 2019-08-02 东北大学 A kind of anti-liquefaction stake of hollow antiskid
CN112411583A (en) * 2020-12-10 2021-02-26 中国地质科学院探矿工艺研究所 Integrated form side slope drainage reinforcerment system

Similar Documents

Publication Publication Date Title
CN206015693U (en) A kind of upper side slope friction pile
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN104234055B (en) A kind of prefabricated pile post-grouting device and technique thereof
CN103835284A (en) Karst area drilling cast-in-place pile structure and construction method
CN104452784B (en) Composite bolt pile used for slope strengthening and construction technique of composite bolt pile
CN103774675A (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN106284384A (en) A kind of upper side slope draining friction pile
JP3789127B1 (en) Seismic structure
KR20110121043A (en) Pile foundation and method for constucting the same
KR100710867B1 (en) Method of upward type base reinforced a substitute for horizontal drainage and that of structure
KR102317138B1 (en) Construction method of cast in place concrete pile for retaining wall
JP4727718B2 (en) Retaining method for retaining wall
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
KR101078080B1 (en) Earth retaining wall and it's construction method using the precast pile and ground reinforcement
KR101008478B1 (en) Geogrid structure preventing bulging failure of stone column and method constructing the stone column by the geogrid structure
KR102490872B1 (en) Reinforced earth retaining wall and construction method using tensile force of steel rod piles
KR100823980B1 (en) Drain combination paker type pressurization grouting equipment and the upward method using the same
KR100910884B1 (en) Multistaged cone foundation
KR200381571Y1 (en) Structure of upward type base reinforced a substitute for horizontal drainage
CN206368375U (en) A kind of electric power pylon basis
CN212225231U (en) Protective structure for bias tunnel portal
KR100984040B1 (en) Method of reinforced earth retaining wall for cutting face through double reinforcing execution
CN204311463U (en) A kind of Composite Bolt stake for slope reinforcement
CN107630706A (en) A kind of tunnel bottom structure and construction method for eliminating highland nip tunnel inverted arch protuberance
CN1132980C (en) Method for preventing and treating landslide o earth slope

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170315

Termination date: 20170910

CF01 Termination of patent right due to non-payment of annual fee