CN110080208A - A kind of anti-liquefaction stake of hollow antiskid - Google Patents
A kind of anti-liquefaction stake of hollow antiskid Download PDFInfo
- Publication number
- CN110080208A CN110080208A CN201910328708.2A CN201910328708A CN110080208A CN 110080208 A CN110080208 A CN 110080208A CN 201910328708 A CN201910328708 A CN 201910328708A CN 110080208 A CN110080208 A CN 110080208A
- Authority
- CN
- China
- Prior art keywords
- pile body
- liquefaction
- stake
- several
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/30—Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/165—Shapes polygonal
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Foundations (AREA)
Abstract
The invention belongs to soil body stability studying technological domains, disclose a kind of anti-liquefaction stake of hollow antiskid, including pile body, cuboid protrusion, catch basin, suction eye, water-guiding hole, several cuboid protrusions are evenly equipped with along the pile body periphery, catch basin is offered respectively on the outside of several cuboid protrusions, filter screen is respectively arranged on the outside of several catch basins, pile body center offers suction eye, several catch basins pass through water-guiding hole respectively and are connected to suction eye, pile body is internally provided with the duct of several perforations, pile body bottom is fixed with pile crown, the cuboid protrusion, catch basin, suction eye is arranged in parallel with the axis of pile body;The present invention has the characteristics that the anti-liquefaction of draining, catch basin is set on the outside of the cuboid protrusion of pile body periphery, it is covered outside catch basin using double-layer stainless steel filter screen, with prevent due to partial size block big in the soil body passes through when cause filter screen to block, it is unified after the water in catch basin being directed in drinking-water pipe by the way that water-guiding hole is arranged in pile body to be extracted out by suction pump.
Description
Technical field
The invention belongs to soil body stability studying technological domains, and in particular to a kind of hollow anti-liquefaction stake of antiskid.
Background technique
Ordinary reinforced concrete prefabricated pile is divided into two class of solid pile body and hollow pile body, although wherein solid pile intensity is high,
Hardness is big, but can usually have the problems such as cost height not convenient for transportation and constructing operation;Though and hollow pile is light easily applies
Work but there can be intensity unstability easy to damage not up to standard.Being often used in construction at present only has the hollow pre- of a circular hole road
Reinforced concrete pile processed, but since engineering is actually limited, when encountering the excessive situation of requirement pile body cross-sectional area, only have
The problems such as long period project amount that the pile body of one stake holes will appear that difficulty of construction is big in the construction process is more, sometimes can also be because
For due to the excessive problem no longer up to standard so as to cause pile body integral strength of single hole area, and in the soil body caused by soil liquefaction
Sediment failure phenomenon is also the problem of should improving emphatically in engineering.
Summary of the invention
Of the existing technology in order to solve the problems, such as, the present invention provides a kind of anti-liquefaction stake of hollow antiskid, and technical solution is such as
Under:
A kind of anti-liquefaction stake of hollow antiskid, including pile body, cuboid protrusion, catch basin, suction eye, water-guiding hole, along described
Pile body periphery is evenly equipped with several cuboid protrusions, offers catch basin respectively on the outside of several cuboid protrusions, several catch basins
Outside is respectively arranged with filter screen, and pile body center offers suction eye, several catch basins pass through water-guiding hole and suction eye respectively
Connection, pile body are internally provided with the duct of several perforations, and pile body bottom is fixed with pile crown, the cuboid protrusion, catch basin, pumping
Water hole is arranged in parallel with the axis of pile body.
There are three the cuboid protrusion is specifically arranged, arrangement in equilateral triangle between three cuboid protrusions.
There are three the duct is specifically arranged, arrangement in equilateral triangle between three ducts, and three ducts and three
It is staggered between cuboid protrusion.
Suction pump is provided in the suction eye.
The pile body is the reinforced concrete pile body prepared in prefabrication practice.
The pile crown is solid pile crown.
The filter screen is double-layer stainless steel filter screen.
The length of the pile body is two times of soil property slider bed.
Several longitudinal reinforcements are axially evenly arranged in the pile body along pile body, the end insertion pile foundation of longitudinal reinforcement is held
In platform.
The distance between any two duct is all larger than the radius in duct itself.
Compared with prior art, the beneficial effects of the present invention are:
The present invention has the characteristics that the anti-liquefaction of draining, and catch basin, water storage is arranged on the outside of the cuboid protrusion of pile body periphery
Covered using double-layer stainless steel filter screen outside slot, with prevent due to partial size block big in the soil body passes through when cause filter screen to block up
Plug is unified after the water in catch basin being directed in drinking-water pipe by the way that water-guiding hole is arranged in pile body to be extracted out by suction pump.
Meanwhile perforation duct is set to save material, reduce weight in pile body, it is high inconvenient to eliminate pile body cost
The problem of transport, solves the problems, such as easy sliding pile in the antiskid cuboid protrusion of pile body periphery setting, to guarantee reinforcing side slope,
The effects of anti-skidding.
The advantages that present invention has structure simple, convenient for construction, saves material, and transport is convenient, overcomes common pile foundation and exists
Many disadvantages during prefabricated construction.
Detailed description of the invention
Fig. 1 is cross section structure schematic diagram of the invention;
Fig. 2 is the schematic cross-section in Fig. 1 at A-A;
Fig. 3 is the schematic cross-section in Fig. 1 at B-B;
Fig. 4 is the schematic cross-section in Fig. 1 at C-C;
Wherein: pile body 1;Cuboid protrusion 2;Catch basin 3;Suction eye 4;Water-guiding hole 5;Filter screen 6;Duct 7;Pile crown 8;It takes out
Water pump 9.
Specific embodiment
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute is only used in the embodiment of the present invention
In explaining in relative positional relationship, the motion conditions etc. under a certain particular pose (as shown in the picture) between each component, if should
When particular pose changes, then directionality instruction also correspondingly changes correspondingly.
As shown in Figures 1 to 4, the present invention provides a kind of hollow anti-liquefaction stakes of antiskid, including pile body 1, cuboid protrusion
2, catch basin 3, suction eye 4, water-guiding hole 5 are evenly equipped with several cuboid protrusions 2 along 1 periphery of pile body and are mentioned with playing AsA -GSH cycle
The anti-slide performance of high soil-slope and shearing resistance are horizontal, and several 2 outsides of cuboid protrusions offer catch basin 3 respectively, several
Filter screen 6 is respectively arranged on the outside of catch basin 3,1 center of pile body offers suction eye 4, several catch basins 3 pass through water guide respectively
Hole 5 is connected to suction eye 4, it is preferred that water-guiding hole 5 is disposed proximate to the position of 1 lower end of pile body, and water is come together in middle part suction eye
It is unified after in 4 to be extracted out by suction pump 9, play the role of resisting the soil body liquefied, pile body 1 is internally provided with the hole of several perforations
Road 7, for reducing 1 quality heavy of pile body, 1 bottom of pile body is fixed with pile crown 8, and cuboid protrusion 2, catch basin 3, suction eye 4 are equal
It is arranged in parallel with the axis of pile body 1.
There are three cuboid protrusion 2 is specifically arranged, arrangement in equilateral triangle between three cuboid protrusions 2.
Duct 7 is specifically there are three settings, arrangement in equilateral triangle between three ducts 7, and three ducts 7 and three long
It is staggered between cube protrusion 2, water-guiding hole 5 is on the one hand made to be staggered with duct 7, on the other hand improve the whole stabilization of pile body 1
Property.
Suction pump 9 is provided in suction eye 4.
Pile body 1 is the reinforced concrete pile body 1 prepared in prefabrication practice.
Pile crown 8 is solid pile crown 8, the intensity of pile crown 8 when guaranteeing to squeeze into pile body 1, while being prevented under drilled pile during stake
Due to the destruction unstability of pile crown 8 or even pile body 1 caused by soil body resistance.
Filter screen 6 is double-layer stainless steel filter screen.
The length of pile body 1 is two times of soil property slider bed.
Several longitudinal reinforcements are axially evenly arranged with along pile body 1 in pile body 1, pile foundation cushion cap is inserted into the end of longitudinal reinforcement
In.
The distance between any two duct 7 is all larger than the radius in duct 7 itself.
In use, hollow anchorage depth of sliding resistant piles uses 2~5 times of 1 diameter of pile body when soil layer is slided along bedrock surface,
Meanwhile the stake spacing of the anti-liquefaction stake of the hollow antiskid of the present invention generally takes 3~5 times of 1 diameter of pile body, to guarantee that sliding soil mass does not exist
It is skidded off between stake.
In addition, the present invention need to use the construction method (drilling construction method) of drilled pile when constructing, to prevent the destruction of pile body 1, and
The disturbance of surrounding soil reduces intensity.
The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, although referring to above-described embodiment pair
The present invention is described in detail, and the those of ordinary skill in field is it is understood that still can be to specific embodiment party of the invention
Formula is modified or replaced equivalently, and without departing from any modification of spirit and scope of the invention or equivalent replacement, it should all
Cover in present claims range.
Claims (10)
1. a kind of anti-liquefaction stake of hollow antiskid, which is characterized in that including pile body, cuboid protrusion, catch basin, suction eye, water guide
Hole is evenly equipped with several cuboid protrusions along the pile body periphery, offers catch basin respectively on the outside of several cuboid protrusions, several
It is respectively arranged with filter screen on the outside of a catch basin, pile body center offers suction eye, several catch basins pass through water-guiding hole respectively
It being connected to suction eye, pile body is internally provided with the duct of several perforations, and pile body bottom is fixed with pile crown, the cuboid protrusion,
Catch basin, suction eye are arranged in parallel with the axis of pile body.
2. a kind of hollow anti-liquefaction stake of antiskid according to claim 1, which is characterized in that the cuboid protrusion is specifically set
There are three setting, arrangement in equilateral triangle between three cuboid protrusions.
3. a kind of hollow anti-liquefaction stake of antiskid according to claim 2, which is characterized in that the duct is specifically provided with three
It is a, arrangement in equilateral triangle between three ducts, and be staggered between three ducts and three cuboid protrusions.
4. a kind of hollow anti-liquefaction stake of antiskid according to claim 1, which is characterized in that be provided with pumping in the suction eye
Water pump.
5. a kind of hollow anti-liquefaction stake of antiskid according to claim 1, which is characterized in that the pile body is to use prefabricated side
The reinforced concrete pile body of method preparation.
6. a kind of hollow anti-liquefaction stake of antiskid according to claim 1, which is characterized in that the pile crown is solid pile crown.
7. a kind of hollow anti-liquefaction stake of antiskid according to claim 1, which is characterized in that the filter screen is double-deck stainless
Steel filter screen.
8. a kind of hollow anti-liquefaction stake of antiskid according to claim 1, which is characterized in that the length of the pile body is soil property
Two times of slider bed.
9. a kind of hollow anti-liquefaction stake of antiskid according to claim 1, which is characterized in that along pile body axial direction in the pile body
Several longitudinal reinforcements are evenly arranged with, the end of longitudinal reinforcement is inserted into pile foundation cushion cap.
10. a kind of hollow anti-liquefaction stake of antiskid according to claim 1, which is characterized in that between any two duct
Distance is all larger than the radius in duct itself.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910328708.2A CN110080208A (en) | 2019-04-23 | 2019-04-23 | A kind of anti-liquefaction stake of hollow antiskid |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910328708.2A CN110080208A (en) | 2019-04-23 | 2019-04-23 | A kind of anti-liquefaction stake of hollow antiskid |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110080208A true CN110080208A (en) | 2019-08-02 |
Family
ID=67416271
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910328708.2A Pending CN110080208A (en) | 2019-04-23 | 2019-04-23 | A kind of anti-liquefaction stake of hollow antiskid |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110080208A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113216217A (en) * | 2021-03-25 | 2021-08-06 | 三峡大学 | Exhibition arm type slide-resistant pile |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202913416U (en) * | 2012-11-07 | 2013-05-01 | 宁波大学 | Drainage slide-resistant pile |
CN203639900U (en) * | 2013-11-21 | 2014-06-11 | 上海理工大学 | Hollow pile |
CN104762980A (en) * | 2015-04-07 | 2015-07-08 | 兰州理工大学 | Energy dissipation, shock absorption and anti-liquefaction rigid and flexible slide-resistant pile and construction method |
CN206015693U (en) * | 2016-09-10 | 2017-03-15 | 武汉科技大学 | A kind of upper side slope friction pile |
CN107604929A (en) * | 2017-09-20 | 2018-01-19 | 兰州理工大学 | The anti-liquefaction friction pile of integrate draining and construction method |
-
2019
- 2019-04-23 CN CN201910328708.2A patent/CN110080208A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202913416U (en) * | 2012-11-07 | 2013-05-01 | 宁波大学 | Drainage slide-resistant pile |
CN203639900U (en) * | 2013-11-21 | 2014-06-11 | 上海理工大学 | Hollow pile |
CN104762980A (en) * | 2015-04-07 | 2015-07-08 | 兰州理工大学 | Energy dissipation, shock absorption and anti-liquefaction rigid and flexible slide-resistant pile and construction method |
CN206015693U (en) * | 2016-09-10 | 2017-03-15 | 武汉科技大学 | A kind of upper side slope friction pile |
CN107604929A (en) * | 2017-09-20 | 2018-01-19 | 兰州理工大学 | The anti-liquefaction friction pile of integrate draining and construction method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113216217A (en) * | 2021-03-25 | 2021-08-06 | 三峡大学 | Exhibition arm type slide-resistant pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1288122A2 (en) | Floating support for a construction extending above the water surface | |
CN209620061U (en) | Latch steel-pipe pile and I-shaped sheet pile combined cofferdam structure | |
CN205776180U (en) | A kind of reinforced hollow bamboo joint pile of concrete | |
CN110080208A (en) | A kind of anti-liquefaction stake of hollow antiskid | |
CN105113539A (en) | Combined multifunctional underground continuous wall core tube in top-down method and construction method thereof | |
CN204000840U (en) | Concrete floral tube slip casting uplift pile | |
JP6190111B2 (en) | Steel pipe concrete pile construction method and steel pipe pile | |
CN209457162U (en) | A kind of assembled wallboard connecting joint structure | |
CN107034876A (en) | Stanchion connecting node and its construction method in one pile for one column construction | |
CN209412846U (en) | A kind of drainage mechanism of basement bottom board | |
CN203569700U (en) | Transition node from concrete filled steel tube combination column to reinforced concrete column | |
CN206635793U (en) | A kind of good building lot of anti seismic efficiency | |
CN206941572U (en) | Stanchion connecting node in one pile for one column construction | |
JP6915186B1 (en) | Soil removal jig, soil removal device, and soil removal method | |
CN205907690U (en) | Drilling bored concrete pile steel reinforcement cage hangs muscle | |
CN109537586B (en) | Pile with large head | |
CN108360746A (en) | A kind of column pilework and its construction method | |
JP2019203314A (en) | Suction foundation structure | |
JPH0941399A (en) | Foundation pile enabling prevention of liquefaction of sandy ground and liquefaction preventive method of sandy ground by foundation pile enabling prevention of liquefaction of sandy ground and manufacture of foundation pile enabling prevention of liquefaction of sandy ground | |
CN209538189U (en) | A kind of foundation ditch strengthening structure based on high-pressure rotary jet grouting pile | |
CN208039625U (en) | A kind of column pilework | |
CN209179025U (en) | A kind of brace type Steep Slope Embankment ruggedized construction | |
CN209353333U (en) | A kind of Strengthening of Bridge Pile Foundation structure | |
CN202117569U (en) | Drill | |
CN205000361U (en) | Multi -functional underground continuous wall core section of thick bamboo of combination among reverse construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190802 |
|
RJ01 | Rejection of invention patent application after publication |