CN206011463U - A kind of marble drilling equipment for building - Google Patents

A kind of marble drilling equipment for building Download PDF

Info

Publication number
CN206011463U
CN206011463U CN201620858686.2U CN201620858686U CN206011463U CN 206011463 U CN206011463 U CN 206011463U CN 201620858686 U CN201620858686 U CN 201620858686U CN 206011463 U CN206011463 U CN 206011463U
Authority
CN
China
Prior art keywords
motor
slide rail
bracing frame
cutting ferrule
marble
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620858686.2U
Other languages
Chinese (zh)
Inventor
汪晶龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620858686.2U priority Critical patent/CN206011463U/en
Application granted granted Critical
Publication of CN206011463U publication Critical patent/CN206011463U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The utility model is related to a kind of marble drilling equipment, more particularly to a kind of marble drilling equipment for building.The technical problems to be solved in the utility model is to provide.A kind of drilling efficiency is high, save manpower, a kind of time saving marble drilling equipment for building.In order to solve above-mentioned technical problem, the utility model provides such a marble drilling equipment for building, include workbench, slide rail, bracing frame, slide block, first spring, first cutting ferrule, second cutting ferrule, first motor, first bearing seat, second bearing seat, screw mandrel, nut, second motor, cylinder, connecting plate, second spring, fixed plate, motorized cams and drill bit, workbench top is provided with slide rail and bracing frame, slide rail is located at the left of bracing frame, on slide rail, slidingtype is provided with slide block, the first spring is connected between slider bottom and slide rail inner top, the first cutting ferrule is provided with the right side of slide block.The utility model has reached high drilling efficiency, saving manpower, time saving effect.

Description

A kind of marble drilling equipment for building
Technical field
The utility model is related to a kind of marble drilling equipment, more particularly to a kind of marble drilling equipment for building.
Background technology
Also known as griotte, griotte original refers to the limestone for originating in the white of Dali of Yunnan with black decorative pattern to marble, Section can form a natural wash landscape painting, and ancient times are often chosen the marble of the decorative pattern with shaping and are used for making painted screen Or mosaic, later this title of marble be developing progressively address and one cut with shades of colour decorative pattern, for making building decoration The limestone of material.White marble is commonly referred to as white marble, but the white marble for translating west making statue is also referred to as Marble.
For building at present artificial be present that drilling efficiency is not high, need to expend a large amount of manpowers, need to expend to marble drilling The shortcoming of plenty of time, therefore needs a kind of high drilling efficiency of research and development, saving manpower, a kind of time saving marble for building badly Drilling equipment.
Utility model content
(1) technical problem to be solved
The utility model in order to overcome for building at present artificial to marble drilling efficiency not high, need to expend a large amount of people The shortcoming that power, needs take considerable time, the technical problems to be solved in the utility model are to provide.A kind of drilling efficiency is high, section About manpower, a kind of time saving marble drilling equipment for building.
(2) technical scheme
In order to solve above-mentioned technical problem, the utility model provides such a marble drilling equipment for building, bag Included workbench, slide rail, bracing frame, slide block, the first spring, the first cutting ferrule, the second cutting ferrule, the first motor, first bearing seat, Two bearing bracket, screw mandrel, nut, the second motor, cylinder, connecting plate, second spring, fixed plate, motorized cams and drill bit, workbench Top is provided with slide rail and bracing frame, and slide rail is located at the left of bracing frame, and on slide rail, slidingtype is provided with slide block, slider bottom and slide rail The first spring is connected between inner top, the first cutting ferrule is provided with the right side of slide block, and slide rail lower right side is provided with the second cutting ferrule, the first cutting ferrule Vertical with the second cutting ferrule corresponding, bracing frame upper left quarter is provided with the first motor, and bracing frame lower left quarter is provided with second bearing seat, bracing frame Left portion is provided with first bearing seat, is connected with screw mandrel between the first motor output shaft and second bearing seat, and screw mandrel passes through first axle Bearing, is combined with nut on screw mandrel, nut left part is provided with the second motor, and the second motor left part is connected with cylinder, and cylinder left part is stretched Contracting bar is provided with connecting plate, and connecting plate left part is arranged with second spring, and second spring left part is connected with fixed plate, and fixed plate is right Portion is provided with motorized cams, and motorized cams are located between two second springs, and motorized cams are contacted with connecting plate left part, and fixed plate is left Portion is provided with drill bit.
Preferably, the 3rd motor is also included, the 3rd motor is located at workbench upper left quarter, the 3rd motor output shaft and slide rail Bottom connects.
Preferably, guide post and fairlead are also included, and guide post is located between bracing frame upper and lower, on guide post Fairlead is provided with, fairlead left part is connected with nut.
Preferably, bracing frame material is Q235 steel.
Preferably, screw mandrel material is stainless steel.
Operation principle:When needing to drill to marble slab, it is possible to use the utility model.At this moment people holds the first cutting ferrule The first cutting ferrule and slide block is moved up on slide rail, the first spring is elongated, marble slab is placed on the second cutting ferrule, unclamp First cutting ferrule, the first spring contraction make the first cutting ferrule and the second cutting ferrule tightly block marble slab.At this moment start the first motor to turn Dynamic, the first motor drives screw mandrel to rotate, and nut is moved down on screw mandrel, and the second motor, cylinder, motorized cams and drill bit are therewith Move down, when drill bit moves on to the front-right that marble slab needs bore position, close the first motor.At this moment start cylinder to stretch Long, it is moved to the left motorized cams and drill bit etc., when drill bit is contacted with marble slab, stops cylinder elongation.At this moment start the Two motors and motorized cams are rotated, and the second motor rotarily drives cylinder, motorized cams and drill bit and rotates with, when motorized cams remote When end is contacted with connecting plate bottom, bit formula is moved to the left and drills to marble slab, when motorized cams near-end and connection When plate bottom contacts, bit formula returns to original position.Repeating above-mentioned action can repeatedly to marble slab punching.
Because also including the 3rd motor, the 3rd motor is located at workbench upper left quarter, the 3rd motor output shaft and slide rail bottom Portion connects, and when needing marble slab to be stuck on slide rail or remove marble slab, first starts the 3rd motor and rotates 180 °, make First cutting ferrule and the second cutting ferrule rotate with workbench left, and then people holds the first cutting ferrule and moves up, the first spring quilt Elongate, marble slab is placed on the second cutting ferrule, unclamp the first cutting ferrule, the first spring contraction makes the first cutting ferrule and the second cutting ferrule Marble slab is tightly blocked.
Because also including guide post and fairlead, guide post is located between bracing frame upper and lower, sets on guide post There are fairlead, fairlead left part to be connected with nut, during nut is mobile on screw mandrel, fairlead and guide post can rise To guide effect and make nut movement more steady.
Because bracing frame material is Q235 steel, the bearing capacity of Q235 steel is higher, can increase the service life of bracing frame.
Because screw mandrel material is stainless steel, the characteristics of stainless steel has wear-resistance and anti-corrosion.
(3) beneficial effect
The utility model has reached high drilling efficiency, saving manpower, time saving effect.
Description of the drawings
Fig. 1 is the first main structure diagram of the present utility model.
Fig. 2 is second main structure diagram of the present utility model.
Fig. 3 is the third main structure diagram of the present utility model.
Mark in accompanying drawing for:1- workbench, 2- slide rails, 3- bracing frames, 4- slide blocks, the first springs of 5-, the first cutting ferrules of 6-, The second cutting ferrules of 7-, 8- marble slabs, the first motors of 9-, 10- first bearing seats, 11- second bearing seats, 12- screw mandrels, 13- nuts, The second motors of 14-, 15- cylinders, 16- connecting plates, 17- second springs, 18- fixed plates, 19- motorized cams, 20- drill bits, 21- Three motors, 22- guide posts, 23- fairleads.
Specific embodiment
With reference to the accompanying drawings and examples the utility model is further described.
Embodiment 1
A kind of marble drilling equipment for building, as Figure 1-3, includes workbench 1, slide rail 2, bracing frame 3, slide block 4th, the first spring 5, the first cutting ferrule 6, the second cutting ferrule 7, the first motor 9, first bearing seat 10, second bearing seat 11, screw mandrel 12, spiral shell Female 13, second motor 14, cylinder 15, connecting plate 16, second spring 17, fixed plate 18, motorized cams 19 and drill bit 20, workbench 1 top is provided with slide rail 2 and bracing frame 3, and slide rail 2 is located at the left of bracing frame 3, and on slide rail 2, slidingtype is provided with slide block 4,4 bottom of slide block The first spring 5 is connected between 2 inner top of portion and slide rail, the first cutting ferrule 6 on the right side of slide block 4, is provided with, 2 lower right side of slide rail is provided with second Cutting ferrule 7, the first cutting ferrule 6 are vertical corresponding with the second cutting ferrule 7, and 3 upper left quarter of bracing frame is provided with the first motor 9, and 3 lower left quarter of bracing frame sets Have a second bearing seat 11,3 left portion of bracing frame is provided with first bearing seat 10,9 output shaft of the first motor and second bearing seat 11 it Between be connected with screw mandrel 12, screw mandrel 12 is combined with nut 13 through first bearing seat 10 on screw mandrel 12,13 left part of nut is provided with second Motor 14,14 left part of the second motor are connected with cylinder 15, and 15 left part expansion link of cylinder is provided with connecting plate 16,16 left part of connecting plate Second spring 17 is arranged with, 17 left part of second spring is connected with fixed plate 18, and 18 right part of fixed plate is provided with motorized cams 19, electricity Moving cam 19 is located between two second springs 17, and motorized cams 19 are contacted with 16 left part of connecting plate, and 18 left part of fixed plate is provided with Drill bit 20.
Threeth motor 21 is also included, and the 3rd motor 21 is located at 1 upper left quarter of workbench, 21 output shaft of the 3rd motor and slide rail 2 bottoms connect.
Guide post 22 and fairlead 23 are also included, and guide post 22 is located between 3 upper and lower of bracing frame, guide post 22 Fairlead 23 is provided with, 23 left part of fairlead is connected with nut 13.
3 material of bracing frame is Q235 steel.
12 material of screw mandrel is stainless steel.
Operation principle:When needing to drill to marble slab 8, it is possible to use the utility model.At this moment people holds first and blocks Set 6 makes the first cutting ferrule 6 and slide block 4 move up on slide rail 2, and the first spring 5 is elongated, and marble slab 8 is placed on the second card On set 7, the first cutting ferrule 6 is unclamped, the first spring 5 shrinks, and makes the first cutting ferrule 6 and the second cutting ferrule 7 tightly block marble slab 8.This The first motors of Shi Qidong 9 are rotated, and the first motor 9 drives screw mandrel 12 to rotate, and nut 13 is moved down on screw mandrel 12, the second motor 14th, cylinder 15, motorized cams 19 and drill bit 20 are moved down therewith, need bore position when drill bit 20 moves on to marble slab 8 During front-right, the first motor 9 is closed.At this moment start cylinder 15 to extend, be moved to the left motorized cams 19 and drill bit 20 etc., work as brill 20 when contacting with marble slab 8, stops cylinder 15 and extends.At this moment start the second motor 14 and motorized cams 19 are rotated, second Motor 14 rotarily drives cylinder 15, motorized cams 19 and drill bit 20 and rotates with, when 19 distal end of motorized cams and 16 bottom of connecting plate When portion contacts, drill bit 20 is rotary to be moved to the left and drills to marble slab 8, when 19 near-end of motorized cams and 16 bottom of connecting plate During contact, drill bit 20 is rotary to return to original position.Repeating above-mentioned action can repeatedly to 8 punching of marble slab.
Because also including the 3rd motor 21, the 3rd motor 21 is located at 1 upper left quarter of workbench, 21 output shaft of the 3rd motor with 2 bottom of slide rail connects, and when needing marble slab 8 to be stuck on slide rail 2 or remove marble slab 8, first starts the 3rd motor 21 rotation 180 °, make the first cutting ferrule 6 and the second cutting ferrule 7 rotate with 1 left of workbench, then people hold the first cutting ferrule 6 to Upper movement, the first spring 5 are elongated, and marble slab 8 is placed on the second cutting ferrule 7, unclamp the first cutting ferrule 6, and the first spring 5 is received Contracting, makes the first cutting ferrule 6 and the second cutting ferrule 7 tightly block marble slab 8.
Because also including guide post 22 and fairlead 23, guide post 22 is located between 3 upper and lower of bracing frame, is oriented to Bar 22 is provided with fairlead 23, and 23 left part of fairlead is connected with nut 13, during nut 13 is mobile on screw mandrel 12, leads Guide effect can be played to set 23 and guide post 22 and make the more steady of the movement of nut 13.
Because 3 material of bracing frame is Q235 steel, the bearing capacity of Q235 steel is higher, can increase the service life of bracing frame 3.
Because 12 material of screw mandrel is stainless steel, the characteristics of stainless steel has wear-resistance and anti-corrosion.
Embodiment described above only expresses preferred embodiment of the present utility model, and its description is more concrete and detailed, But therefore can not be interpreted as the restriction to the utility model the scope of the claims.It should be pointed out that common for this area For technical staff, without departing from the inventive concept of the premise, some deformations, improvement and replacement can also be made, these are all Belong to protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be defined by claims.

Claims (5)

1. a kind of marble drilling equipment for building, it is characterised in that include workbench (1), slide rail (2), bracing frame (3), Slide block (4), the first spring (5), the first cutting ferrule (6), the second cutting ferrule (7), the first motor (9), first bearing seat (10), the second axle Bearing (11), screw mandrel (12), nut (13), the second motor (14), cylinder (15), connecting plate (16), second spring (17), fixation Plate (18), motorized cams (19) and drill bit (20), workbench (1) top are provided with slide rail (2) and bracing frame (3), and slide rail (2) is located at The left of bracing frame (3), the upper slidingtype of slide rail (2) are provided with slide block (4), are connected between slide block (4) bottom and slide rail (2) inner top There is the first spring (5), on the right side of slide block (4), be provided with the first cutting ferrule (6), slide rail (2) lower right side is provided with the second cutting ferrule (7), the first card Set (6) is vertical corresponding with the second cutting ferrule (7), and bracing frame (3) upper left quarter is provided with the first motor (9), and bracing frame (3) lower left quarter is provided with Second bearing seat (11), the left portion of bracing frame (3) are provided with first bearing seat (10), the first motor (9) output shaft and second bearing Screw mandrel (12) is connected between seat (11), and screw mandrel (12) is combined with nut (13) through first bearing seat (10) on screw mandrel (12), Nut (13) left part is provided with the second motor (14), and the second motor (14) left part is connected with cylinder (15), and cylinder (15) left part stretches Bar is provided with connecting plate (16), and connecting plate (16) left part is arranged with second spring (17), and second spring (17) left part is connected with Fixed plate (18), fixed plate (18) right part are provided with motorized cams (19), motorized cams (19) be located at two second springs (17) it Between, motorized cams (19) are contacted with connecting plate (16) left part, and fixed plate (18) left part is provided with drill bit (20).
2. a kind of marble drilling equipment for building according to claim 1, it is characterised in that also include the 3rd motor (21), the 3rd motor (21) is located at workbench (1) upper left quarter, and the 3rd motor (21) output shaft is connected with slide rail (2) bottom.
3. a kind of marble drilling equipment for building according to claim 1, it is characterised in that also include guide post (22) and fairlead (23), guide post (22) is located between bracing frame (3) upper and lower, and guide post (22) is provided with fairlead (23), fairlead (23) left part is connected with nut (13).
4. a kind of marble drilling equipment for building according to claim 1, it is characterised in that bracing frame (3) material is Q235 steel.
5. a kind of marble drilling equipment for building according to claim 1, it is characterised in that screw mandrel (12) material is not for Rust steel.
CN201620858686.2U 2016-08-09 2016-08-09 A kind of marble drilling equipment for building Expired - Fee Related CN206011463U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620858686.2U CN206011463U (en) 2016-08-09 2016-08-09 A kind of marble drilling equipment for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620858686.2U CN206011463U (en) 2016-08-09 2016-08-09 A kind of marble drilling equipment for building

Publications (1)

Publication Number Publication Date
CN206011463U true CN206011463U (en) 2017-03-15

Family

ID=58248553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620858686.2U Expired - Fee Related CN206011463U (en) 2016-08-09 2016-08-09 A kind of marble drilling equipment for building

Country Status (1)

Country Link
CN (1) CN206011463U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107654048A (en) * 2017-09-01 2018-02-02 曾子强 A kind of efficient dabbing device of concrete wall surface
CN108312362A (en) * 2018-01-23 2018-07-24 黄朝仁 A kind of marble material cutting equipment
CN109732790A (en) * 2018-12-11 2019-05-10 中国二冶集团有限公司 It is a kind of to utilize spindle gear overhead horizontal drilling construction method
CN111037757A (en) * 2019-12-31 2020-04-21 重庆市耀城玻璃制品有限公司 Intelligent punching system for glass pot cover

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107654048A (en) * 2017-09-01 2018-02-02 曾子强 A kind of efficient dabbing device of concrete wall surface
CN108312362A (en) * 2018-01-23 2018-07-24 黄朝仁 A kind of marble material cutting equipment
CN109732790A (en) * 2018-12-11 2019-05-10 中国二冶集团有限公司 It is a kind of to utilize spindle gear overhead horizontal drilling construction method
CN111037757A (en) * 2019-12-31 2020-04-21 重庆市耀城玻璃制品有限公司 Intelligent punching system for glass pot cover
CN111037757B (en) * 2019-12-31 2021-09-07 重庆市耀城玻璃制品有限公司 Intelligent punching system for glass pot cover

Similar Documents

Publication Publication Date Title
CN206011463U (en) A kind of marble drilling equipment for building
CN108301794B (en) Petroleum workover robot
CN210908192U (en) Drilling device for urban rail transit pit external observation well
CN109048144A (en) Double-station thin-wall drilling welding machine
CN113976949A (en) Equidistant drilling device for new energy automobile parts
CN105620157A (en) Calabash bottom removing and core drawing machine
CN205949909U (en) Special rig of table bracket
CN215007906U (en) Large-scale three-dimensional transformer core of rolling up closed assembly roll-over table
CN107378046B (en) Inclined hole drilling device for numerical control machining center
CN112049585B (en) Drilling rod transfer frame for well drilling
CN207014990U (en) High-efficiency cleaning equipment is used in a kind of laser marking machine maintenance
CN212002116U (en) Civil engineering troweling device
CN107696297A (en) A kind of marble drilling equipment for building
CN210099010U (en) Drilling machine for machining
CN104879074A (en) Rail type iron roughneck spinning wrench
CN214373493U (en) Sampling device for pile foundation detection
CN205419062U (en) Fossil fragments feed mechanism
CN212372394U (en) Concrete pipe pile curing device
CN204868083U (en) Wallboard assembly device
CN207170997U (en) A kind of automatic drilling equipment
CN111633797A (en) Prefabricated plate napping device
CN205660191U (en) Light pole perforating device
CN206316399U (en) A kind of puncher automatic lifting stopping means
CN206013602U (en) A kind of lamp bar unloader
CN201471252U (en) Crystal polishing machine with four work positions

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170315

Termination date: 20170809