CN206000163U - Aluminum alloy building template splicing component - Google Patents

Aluminum alloy building template splicing component Download PDF

Info

Publication number
CN206000163U
CN206000163U CN201621003393.2U CN201621003393U CN206000163U CN 206000163 U CN206000163 U CN 206000163U CN 201621003393 U CN201621003393 U CN 201621003393U CN 206000163 U CN206000163 U CN 206000163U
Authority
CN
China
Prior art keywords
template
aluminum alloy
out against
link slot
splicing component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621003393.2U
Other languages
Chinese (zh)
Inventor
方建文
刘志强
韩新亭
曹淑涛
张岳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao No 1 Construction Group Co Ltd
Original Assignee
Qingdao No 1 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao No 1 Construction Group Co Ltd filed Critical Qingdao No 1 Construction Group Co Ltd
Priority to CN201621003393.2U priority Critical patent/CN206000163U/en
Application granted granted Critical
Publication of CN206000163U publication Critical patent/CN206000163U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of aluminum alloy building template splicing component, including the multigroup template laterally laid along floor to be poured, it is provided with the multigroup tool support beam jaggy being connected with template between described template, it is respectively equipped with a fixed block with gathering sill fixing with support beam in the intersection of adjacent two support beams, it is provided with one between described two fixed blocks to be adapted to breach, top surface act on link slot had on floor hold out against part, the described top surface holding out against part, template and support beam collectively constitute the slab form for pouring build floor, it is provided with the connector being fixedly connected with fixed block in described gathering sill and link slot, also include on ground and top with hold out against part grafting for by the Adjustable bracing bar of template and support beam jack-up.This utility model structure is simple, and splicing is convenient, efficiency high, and stability in the large is good, and scaffold quantity is few, economical and efficient.

Description

Aluminum alloy building template splicing component
Technical field
This utility model is related to construction engineering technical field, more particularly, to a kind of aluminum alloy building template splicing component.
Background technology
Building template is a kind of temporary supporting structure, makes by design requirement, makes xoncrete structure, component by regulation Position, physical dimension shape, and keep its tram, and bear building template deadweight and effect external loads thereon.Enter The purpose of row form work engineering, is to ensure that concrete engineering quality and construction safety, accelerating construction progress and reduction engineering cost.
The working architectural template structure of Cast-in-situ Concrete Structural Engineering, mainly by panel, supporting construction and connector three Part forms.Panel is the force bearing plate of directly contact newly-laid concrete;Supporting construction is then supporting faceplate, concrete and construction lotus Carry temporary structure it is ensured that architectural template structure combines securely, accomplish indeformable, do not destroy;Connector is by panel and to prop up Support structure connects integral accessory.
Existing building template mainly carries out installing of template using plywood, and the process that entirely installs is complex, bothersome Arduously, efficiency is low, and template is easy to damage and template easily loosens and affects the globality of template, leads to pouring quality poor, with When, scaffold usage quantity is many, increases expenditure, causes to waste.
Content of the invention
For solving above-mentioned problem, this utility model provides a kind of structure simple, and splicing is convenient, efficiency high, overall Good stability, scaffold quantity is few, the aluminum alloy building template splicing component of economical and efficient.
The technical scheme in the invention for solving the above technical problem is:Aluminum alloy building template splicing component, bag Include the multigroup template laterally laid along floor to be poured, be provided be connected with template multigroup between described template and there is breach Support beam, be respectively equipped with a fixed block with gathering sill fixing with support beam, institute in the intersection of adjacent two support beams State be provided between two fixed blocks one be adapted to breach, top surface act on link slot had on floor hold out against part, described hold out against The top surface of part, template and support beam collectively constitute the slab form for pouring build floor, are provided with described gathering sill and link slot The connector being fixedly connected with fixed block, also include on ground and top with hold out against part grafting for by template and support The Adjustable bracing bar that back rises.
Above-mentioned aluminum alloy building template splicing component, described template includes the template top board contacting with soffit, edge Template ceiling edge, to having connecting plate, described connecting plate offers connecting hole, is provided with ribs between connecting plate.
Above-mentioned aluminum alloy building template splicing component, described hold out against the top surface template that part includes an effect soffit, It is provided with connecting plate in top surface template both sides, described connecting plate is offered the breach repaired mouth being adapted with breach, described link slot It is respectively equipped with two connecting plates, be provided with fix with the top surface template and set with Adjustable bracing bar grafting between two connecting plates Pipe.
Above-mentioned aluminum alloy building template splicing component, described Adjustable bracing bar includes a connecting rod with fixing hole, with Connecting rod is plugged with the threaded support bar of a tool, offers the link slot equal with fixing hole aperture in the end of thread of support bar, Be plugged with a steady pin in fixing hole and link slot, also include one threaded with support bar for steady pin is locked in Locking device in fixing hole and link slot.
Above-mentioned aluminum alloy building template splicing component, described locking device includes the locking set threadeded with support bar And the regulation handle that for driving locking set along support bar vertically move hinged with locking set.
Above-mentioned aluminum alloy building template splicing component, the connection in the hole of described adjacent two templates is provided with bolt or lock Pin.
Above-mentioned aluminum alloy building template splicing component, described fixed block and connector offer installing hole respectively, It is plugged with installing hole for part will be held out against and connector is fixed on steady pin or fixing bolt on fixed block.
The beneficial effects of the utility model are:It is connected with template using support beam, and by holding out against part and adjustable supports , by the pouring area of floor to be poured to support beam and template overhead, stability in the large is good, and installs simple and convenient, efficiency for bar High;Template includes template top board, along template ceiling edge to having connecting plate, connecting plate offers connecting hole, connecting plate Between be provided with ribs, bulk strength is high, is easy to assembly, repeatable after dismounting utilizes;Hold out against part and include a top surface template, on top Face die plate both sides are provided with connecting plate, and described connecting plate is offered the breach repaired mouth being adapted with breach, and link slot is respectively equipped with On two connecting plates, between two connecting plates, it is provided with sleeve pipe, the top surface, template and the support beam that hold out against part collectively constitute for pouring building The slab form of plate, good integrity, coordinated with the breach in support beam using breach repaired mouth, be completely embedded, increased both Bonding strength;The pretightning force holding out against between part and floor can suitably be adjusted using Adjustable bracing bar, structure is simple and regulation side Just.
Brief description
Fig. 1 is overall structure diagram of the present utility model;
Fig. 2 is partial structural diagram of the present utility model;
Fig. 3 is the structural representation of support beam;
Fig. 4 is the structural representation of Adjustable bracing bar;
Fig. 5 is the structural representation holding out against part;
Fig. 6 is the front view holding out against part;
Fig. 7 is the structural representation of template.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment is described in further details to this utility model.
As shown in Figure 1, 2, 3, aluminum alloy building template splicing component is many including laterally lay along floor to be poured Group template 1, template 1 is adopted aluminum template, so that weight can be mitigated, is provided with the multigroup tool being connected with template 1 between described template 1 Jagged 2 support beam 3, is respectively equipped with one in the intersection of adjacent two support beams 3 and fixing with support beam 3 has gathering sill 4 Fixed block 5, be provided between described two fixed blocks 5 one be adapted to breach 2, top surface acts on has link slot 6 on floor Hold out against part 7, the described top surface 8 holding out against part 7, template 1 and support beam 3 collectively constitute the slab form for pouring build floor, described It is provided with the connector 9 being fixedly connected with fixed block 5 in gathering sill 4 and link slot 6, described fixed block 5 and connector 9 are opened respectively It is provided with installing hole 10,11, be plugged with installing hole 10,11 for part 7 will be held out against and connector 9 is fixed on fixed block 5 Steady pin 12 or fixing bolt, also include on ground and top with hold out against part 7 grafting for by template 1 and support beam 3 The Adjustable bracing bar 13 of jack-up.
As shown in fig. 7, described template 1 includes the template top board 14 contacting with soffit, along template top board 14 edge to Have connecting plate 15, described connecting plate 15 offers connecting hole 16, between connecting plate 15, be provided with ribs 17, described adjacent The connection in the hole of two templates 1 is provided with bolt or lock pin, splices and locked by lock pin between template and template.
As shown in Figure 5,6, described hold out against the top surface template 18 that part 7 includes an effect soffit, in 18 liang of top surface template Side is provided with connecting plate 19, and described connecting plate 19 is offered the breach repaired mouth 20 being adapted with breach 2, and described link slot 6 is respectively Be provided with two connecting plates 19, be provided between two connecting plates 19 fixing with top surface template 18 and with Adjustable bracing bar 13 grafting Sleeve pipe 21.
As shown in figure 4, described Adjustable bracing bar 13 includes a connecting rod 23 with fixing hole 22, it is plugged with one with connecting rod 23 Have threaded support bar 24, offer the link slot 25 equal with fixing hole 22 aperture in the end of thread of support bar 24, solid Determine to be plugged with a steady pin 26 in hole 22 and link slot 25, also include one threaded with support bar 24 for by steady pin 26 It is locked in the locking device 27 in fixing hole 22 and link slot 25, described locking device 27 includes threadeding with support bar 24 Locking set 28 and the regulation handle 29 that for driving locking set 28 along support bar 24 vertically move hinged with locking set 28, hinge It is connected in prior art, is well known to those skilled in the art, be provided with a connecting plate with fixing groove 30 in locking set 28 bottoms 31, after multiple support bars have installed, a connecting rod can be set up between two close support bars, connecting rod is provided with and fixing groove 30 The inserted sheet of grafting.
Although the above-mentioned accompanying drawing that combines is described to specific embodiment of the present utility model, not new to this practicality The restriction of type protection domain, one of ordinary skill in the art should be understood that on the basis of the technical solution of the utility model, ability Field technique personnel do not need to pay the various modifications that creative work can make or deformation still in protection model of the present utility model Within enclosing.

Claims (7)

1. aluminum alloy building template splicing component it is characterised in that:Including the multigroup mould laterally laid along floor to be poured Plate, is provided with the multigroup tool support beam jaggy being connected with template, in the intersecting punishment of adjacent two support beams between described template Be not provided with a fixed block with gathering sill fixing with support beam, be provided between described two fixed blocks one be adapted to breach, Top surface acts on the part that holds out against on floor with link slot, the described top surface holding out against part, template and support beam collectively constitute for Pour the slab form of build floor, in described gathering sill and link slot, be provided with the connector being fixedly connected with fixed block, also include setting On ground and top with hold out against part grafting for by the Adjustable bracing bar of template and support beam jack-up.
2. aluminum alloy building template splicing component according to claim 1 it is characterised in that:Described template includes and floor The template top board of bottom surface contact, along template ceiling edge to having connecting plate, described connecting plate offers connecting hole, connects It is provided with ribs between plate.
3. aluminum alloy building template splicing component according to claim 1 it is characterised in that:The described part that holds out against includes a work With the top surface template of soffit, it is provided with connecting plate in top surface template both sides, described connecting plate offers and is adapted with breach Breach repaired mouth, described link slot is respectively equipped with two connecting plates, be provided between two connecting plates fixing with top surface template and Sleeve pipe with Adjustable bracing bar grafting.
4. aluminum alloy building template splicing component according to claim 1 it is characterised in that:Described Adjustable bracing bar includes One connecting rod with fixing hole, is plugged with the threaded support bar of a tool with connecting rod, offers and solid in the end of thread of support bar Determine the equal link slot in hole aperture, be plugged with a steady pin in fixing hole and link slot, also include one with support bar screw thread even Connect for the locking device being locked in steady pin in fixing hole and link slot.
5. aluminum alloy building template splicing component according to claim 4 it is characterised in that:Described locking device include with The threaded locking set of support bar and the regulation that for driving locking set along support bar vertically move hinged with locking set Handle.
6. aluminum alloy building template splicing component according to claim 2 it is characterised in that:The company of described adjacent two templates Connect in the hole and bolt or lock pin are installed.
7. aluminum alloy building template splicing component according to claim 1 it is characterised in that:Described fixed block and connector Upper offer installing hole respectively, be plugged with installing hole for part will be held out against and connector is fixed on the steady pin on fixed block Or fixing bolt.
CN201621003393.2U 2016-08-31 2016-08-31 Aluminum alloy building template splicing component Expired - Fee Related CN206000163U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621003393.2U CN206000163U (en) 2016-08-31 2016-08-31 Aluminum alloy building template splicing component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621003393.2U CN206000163U (en) 2016-08-31 2016-08-31 Aluminum alloy building template splicing component

Publications (1)

Publication Number Publication Date
CN206000163U true CN206000163U (en) 2017-03-08

Family

ID=58195430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621003393.2U Expired - Fee Related CN206000163U (en) 2016-08-31 2016-08-31 Aluminum alloy building template splicing component

Country Status (1)

Country Link
CN (1) CN206000163U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193587A (en) * 2016-08-31 2016-12-07 青岛建集团有限公司 Aluminum alloy building template splicing component
CN109208894A (en) * 2018-10-09 2019-01-15 东莞市皓奇企业管理服务有限公司 Build the application method of removable floor template
CN109208896A (en) * 2018-10-09 2019-01-15 东莞市皓奇企业管理服务有限公司 Build the application method of removable template

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193587A (en) * 2016-08-31 2016-12-07 青岛建集团有限公司 Aluminum alloy building template splicing component
CN109208894A (en) * 2018-10-09 2019-01-15 东莞市皓奇企业管理服务有限公司 Build the application method of removable floor template
CN109208896A (en) * 2018-10-09 2019-01-15 东莞市皓奇企业管理服务有限公司 Build the application method of removable template
CN109208894B (en) * 2018-10-09 2021-03-09 中国矿业大学工程咨询研究院(江苏)有限公司 Use method of detachable floor formwork of building

Similar Documents

Publication Publication Date Title
CN104196222B (en) The suspension scaffold of tools type section steel builder's jack
CN206000163U (en) Aluminum alloy building template splicing component
CN105888236A (en) Frame formwork system
CN110005192A (en) Concrete floor aluminium, plank sheathing splicing construction and its installation method
CN105952154B (en) A kind of concrete-pouring template stent
CN105155836A (en) Aluminum alloy formwork for buildings and method for applying aluminum alloy formwork
CN113107199B (en) Beam wall fast-assembling early-dismantling beam structure convenient for beam bottom adjusting and positioning
CN206942138U (en) Cast template splices bridge plate
CN106193587A (en) Aluminum alloy building template splicing component
CN213927071U (en) Simple and easy angle steel lintel strutting arrangement
CN204781944U (en) A mode structure of infilled wall constructional column
CN102031869B (en) Horizontal template steel structure bracket
CN217711628U (en) Channel steel cantilever support template supporting device
CN218117337U (en) A plugging device for encorbelmenting I-steel and reserving entrance to a cave
CN210947661U (en) Installation device of socket type overhanging scaffold
CN214834735U (en) A fast-assembling support die carrier for face is early torn open
CN212866860U (en) Plugging device is pour in entrance to a cave is reserved to floor
CN211257810U (en) Novel shear wall template reinforcing system
CN111042519B (en) Early dismantling system for floor slab template beam-containing and plate-structure building
CN210622327U (en) Concrete pouring and tamping construction device for reinforced dense beam column joints
CN207332307U (en) The horizontal connection structure and system of a kind of shuttering supporting
CN211714558U (en) Hanging stirrup for nuclear power template
CN205875724U (en) Concrete placement formwork support
CN205894662U (en) Modular triangle steel truss template
CN205224571U (en) Anchor of builder's jack

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170308

Termination date: 20200831

CF01 Termination of patent right due to non-payment of annual fee