CN212866860U - Plugging device is pour in entrance to a cave is reserved to floor - Google Patents

Plugging device is pour in entrance to a cave is reserved to floor Download PDF

Info

Publication number
CN212866860U
CN212866860U CN202021580322.5U CN202021580322U CN212866860U CN 212866860 U CN212866860 U CN 212866860U CN 202021580322 U CN202021580322 U CN 202021580322U CN 212866860 U CN212866860 U CN 212866860U
Authority
CN
China
Prior art keywords
bearing
steel pipes
support
pipes
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021580322.5U
Other languages
Chinese (zh)
Inventor
李瑞宇
牛宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202021580322.5U priority Critical patent/CN212866860U/en
Application granted granted Critical
Publication of CN212866860U publication Critical patent/CN212866860U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to the technical field of building construction, a floor reserved hole pouring and plugging device is disclosed, which comprises a top bearing module arranged on the upper surface of a floor, a bottom plugging module arranged on the lower surface of the floor and used for plugging the bottom of the reserved hole, and a counter-pulling screw rod used for connecting the top bearing module and the bottom plugging module; the top bearing module comprises two support steel pipes arranged in parallel and cushion support pipes arranged at the bottoms of the two ends of each support steel pipe, and the cushion support pipes are in contact with the surface of the floor slab and are arranged perpendicular to the support steel pipes; the bottom plugging module comprises a bearing frame and an aluminum alloy plate arranged on the bearing frame; the bearing frame comprises two bearing steel pipes which are arranged in parallel and a plurality of bearing beams which are uniformly distributed along the axial direction of the bearing steel pipes and are perpendicular to the bearing steel pipes, and the bearing steel pipes and the supporting steel pipes are arranged in parallel; the split screw is sleeved with a sleeve. The utility model discloses the efficiency of construction is high, and the time limit for a project is short to can effectively save artifical and measure nature material.

Description

Plugging device is pour in entrance to a cave is reserved to floor
Technical Field
The utility model relates to a construction technical field especially relates to a plugging device is pour to entrance to a cave is reserved to floor.
Background
As a novel template in the building industry, the aluminum alloy template has the advantages of good forming effect, high rigidity, difficulty in expanding the template, high construction efficiency and the like compared with the traditional wood template, and is more and more widely applied to house construction. Meanwhile, when the floor slab surface is used for building pouring, a hole for up-and-down material transmission is reserved on the slab surface, and the reserved hole needs to be plugged by concrete at the later stage. The traditional construction method for blocking the reserved hole on the board surface is to support a formwork on the lower layer of the hole and then pour concrete in the hole for blocking, and the method needs to support the formwork on the lower layer of the floor, so that time and labor are wasted, and material loss is large.
SUMMERY OF THE UTILITY MODEL
The utility model provides a simple structure, construction simple to operate and practice thrift construction material's a floor reservation entrance to a cave pouring plugging device.
The technical problem to be solved is that: the traditional construction method for blocking the reserved hole on the board surface is to support a formwork on the lower layer of the hole and then pour concrete in the hole for blocking, and the method needs to support the formwork on the lower layer of the floor, so that time and labor are wasted, and material loss is large.
In order to solve the technical problem, the utility model adopts the following technical scheme:
the utility model relates to a plugging device is pour in floor reservation entrance to a cave, including the top that sets up on the floor upper surface bears the weight of the module, set up in the floor lower surface and carry out the bottom shutoff module of shutoff to reserving entrance to a cave bottom and be used for connecting the top bears the weight of the module and the split screw of bottom shutoff module;
the top bearing module comprises two support steel pipes arranged in parallel and cushion support pipes arranged at the bottoms of the two ends of each support steel pipe, and the cushion support pipes are in contact with the surface of the floor slab and are arranged perpendicular to the support steel pipes;
the bottom plugging module comprises a bearing frame and an aluminum alloy plate arranged on the bearing frame horizontally; the bearing frame comprises two bearing steel pipes which are arranged in parallel and a plurality of bearing beams which are uniformly distributed along the axial direction of the bearing steel pipes and are perpendicular to the bearing steel pipes, and the bearing steel pipes and the supporting steel pipes are arranged in parallel;
the opposite-pulling screw rod is vertically arranged, two ends of the opposite-pulling screw rod respectively penetrate through the space between the two supporting steel pipes and the space between the two bearing steel pipes, and the opposite-pulling screw rod is respectively connected with the two supporting steel pipes and the two bearing steel pipes through the mountain-shaped clamp; and a sleeve is sleeved on the counter-pulling screw rod between the support steel pipe and the aluminum alloy plate.
Further, the middle part of the support cushion pipe is provided with a support cushion block, and the top of the support cushion block is provided with a mounting groove for placing the support steel pipe.
Further, the cushion bracing tube is a square tube.
Furthermore, the spandrel girder and the bearing steel pipe can be dismantled and be connected.
Furthermore, a connecting part is arranged in the bearing beam, a connecting groove connected with the bearing steel pipe is formed in the connecting part, and the connecting part is fixedly connected with the bearing steel pipe through a bolt.
The utility model relates to a plugging device is pour to entrance to a cave is reserved to floor compares with prior art, has following beneficial effect:
the utility model discloses a support steel pipe is shelved on upper portion, gives the support steel pipe through to drawing the screw rod with concrete gravity and reserves the entrance to a cave shutoff, has avoided the numerous and diverse process of concreting in lower part formwork, and this formwork system can carry out repetitious usage many times simultaneously, convenient and fast, resources are saved.
The utility model discloses the efficiency of construction is high, and the time limit for a project is short to can effectively save artifical and measure nature material.
The following description is further made by combining the drawings with the floor slab reserved hole pouring and plugging device of the utility model.
Drawings
Fig. 1 is a first schematic view of a construction structure of a floor slab reserved hole pouring and plugging device of the utility model;
fig. 2 is a schematic view of a construction structure of the floor slab reserved hole pouring and plugging device of the present invention;
fig. 3 is a schematic structural view of the floor slab reserved hole pouring and plugging device after the aluminum alloy plate is taken out;
fig. 4 is a schematic structural view of a cushion supporting tube of the floor slab reserved hole pouring and plugging device of the present invention;
fig. 5 is the utility model relates to a floor reserves entrance to a cave and pours plugging device's spandrel girder's schematic structure.
The support steel pipe 1, the cushion support pipe 2, the aluminum alloy plate 3, the bearing steel pipe 4, the bearing beam 5, the split screw 6, the mountain-shaped clamp 7, the sleeve 8, the cushion support block 9, the connecting part 11 and the connecting groove 12.
Detailed Description
As shown in fig. 1-5, the utility model relates to a plugging device is pour to entrance to a cave is reserved to floor, bear module, set up at the floor lower surface and carry out the bottom plugging module of shutoff and be used for connecting top and bear module and bottom plugging module to drawing screw rod 6 to reserving the entrance to a cave bottom including setting up the top on the floor upper surface.
The top bearing module comprises two parallel supporting steel pipes 1 and cushion supporting pipes 2 arranged at the bottoms of the two ends of each supporting steel pipe 1, the cushion supporting pipes 2 are in contact with the floor surface, and the support steel pipes 1 are perpendicular to the floor surface.
The bottom plugging module comprises an aluminum alloy plate 3 which is horizontally arranged on a bearing frame and arranged on the bearing frame, and the aluminum alloy plate 3 is tightly attached to the lower opening of the floor slab. The bearing frame comprises two bearing steel pipes 4 which are arranged in parallel and a plurality of bearing beams 5 which are evenly distributed along the axial direction of the bearing steel pipes 4 and are perpendicular to the bearing steel pipes 4, and the bearing steel pipes 4 and the supporting steel pipes 1 are arranged in parallel.
The number of the opposite-pulling screw rods 6 is at least two, the opposite-pulling screw rods are positioned at two ends of the support steel pipes 1 and are vertically arranged, two ends of the opposite-pulling screw rods respectively penetrate through the space between the two support steel pipes 1 and the space between the two bearing steel pipes 4, and the opposite-pulling screw rods are respectively connected with the two support steel pipes 1 and the two bearing steel pipes 4 through the mountain-shaped clamps 7; the sleeve 8 is sleeved on the opposite-pulling screw 6 between the supporting steel pipe 1 and the aluminum alloy plate 3, and the sleeve 8 is a PVC sleeve.
And after the installation is finished, pouring concrete into the reserved hole of the floor slab, sealing the reserved hole, and dismantling the template after the strength grade of the concrete meets the requirement of removing the template. Additional cover is equipped with the PVC sleeve pipe in the middle of the split screw 6, conveniently will pull out split screw 6, used repeatedly, resources are saved.
Further, for increasing the contact area with the floor face and reducing the pressure, the cushion support pipe 2 adopts a square pipe. The middle part of the support cushion pipe 2 is provided with a support cushion block 9, and the top of the support cushion block 9 is provided with a mounting groove for placing the support steel pipe 1. Directly will support steel pipe 1 and place at the mounting groove during the installation to play limiting displacement to supporting steel pipe 1, prevent to support steel pipe 1 and prop 2 endwise slip along the pad.
Furthermore, for facilitating the carrying of workers and reducing the storage space, the bearing beam 5 and the bearing steel pipe 4 are detachably connected. The connecting part 11 is arranged in the bearing beam 5, the connecting part 11 is provided with a connecting groove 12 connected with the bearing steel pipe 4, and the connecting part 11 is fixedly connected with the bearing steel pipe 4 through a bolt.
To sum up, the utility model discloses a support steel pipe is shelved on upper portion, reserves the entrance to a cave shutoff for supporting the steel pipe through to drawing the screw rod with concrete gravity transmission, has avoided the numerous and diverse process of concreting in lower part formwork, and this formwork system can carry out repetitious usage, convenient and fast, resources are saved simultaneously.
The utility model discloses the efficiency of construction is high, and the time limit for a project is short to can effectively save artifical and measure nature material.
The above-mentioned embodiments are only for describing the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art without departing from the design spirit of the present invention should fall into the protection scope defined by the claims of the present invention.

Claims (5)

1. The utility model provides a plugging device is pour to entrance to a cave is reserved to floor which characterized in that: the device comprises a top bearing module arranged on the upper surface of a floor slab, a bottom plugging module arranged on the lower surface of the floor slab and used for plugging the bottom of a reserved hole, and a counter-pulling screw (6) used for connecting the top bearing module and the bottom plugging module;
the top bearing module comprises two support steel pipes (1) arranged in parallel and cushion support pipes (2) arranged at the bottoms of the two ends of each support steel pipe (1), and the cushion support pipes (2) are in contact with the surface of the floor slab and are arranged perpendicular to the support steel pipes (1);
the bottom plugging module comprises a bearing frame and an aluminum alloy plate (3) arranged on the bearing frame horizontally; the bearing frame comprises two bearing steel pipes (4) which are arranged in parallel and a plurality of bearing beams (5) which are uniformly distributed along the axial direction of the bearing steel pipes (4) and are perpendicular to the bearing steel pipes (4), and the bearing steel pipes (4) are arranged in parallel with the supporting steel pipes (1);
the split screw (6) is vertically arranged, two ends of the split screw respectively penetrate through the space between the two supporting steel pipes (1) and the space between the two bearing steel pipes (4), and the split screw is respectively connected with the two supporting steel pipes (1) and the two bearing steel pipes (4) through the mountain-shaped clamp (7); and a sleeve (8) is sleeved on the counter-pulling screw rod (6) between the support steel pipe (1) and the aluminum alloy plate (3).
2. The floor slab reserved hole pouring and plugging device as claimed in claim 1, wherein: the middle part of the support cushion pipe (2) is provided with a support cushion block (9), and the top of the support cushion block (9) is provided with a mounting groove for placing the support steel pipe (1).
3. The floor slab reserved hole pouring and plugging device as claimed in claim 1, wherein: the cushion bracing tube (2) is a square tube.
4. The floor slab reserved hole pouring and plugging device as claimed in claim 1, wherein: the bearing beam (5) is detachably connected with the bearing steel pipe (4).
5. The floor slab reserved hole pouring and plugging device as claimed in claim 4, wherein: the bearing beam is characterized in that a connecting part (11) is arranged in the bearing beam (5), a connecting groove (12) connected with the bearing steel pipe (4) is formed in the connecting part (11), and the connecting part (11) is fixedly connected with the bearing steel pipe (4) through a bolt.
CN202021580322.5U 2020-08-03 2020-08-03 Plugging device is pour in entrance to a cave is reserved to floor Expired - Fee Related CN212866860U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021580322.5U CN212866860U (en) 2020-08-03 2020-08-03 Plugging device is pour in entrance to a cave is reserved to floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021580322.5U CN212866860U (en) 2020-08-03 2020-08-03 Plugging device is pour in entrance to a cave is reserved to floor

Publications (1)

Publication Number Publication Date
CN212866860U true CN212866860U (en) 2021-04-02

Family

ID=75219236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021580322.5U Expired - Fee Related CN212866860U (en) 2020-08-03 2020-08-03 Plugging device is pour in entrance to a cave is reserved to floor

Country Status (1)

Country Link
CN (1) CN212866860U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114718298A (en) * 2022-03-16 2022-07-08 中国十七冶集团有限公司 Installation structure and installation method of simple construction reserved hole plugging template

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114718298A (en) * 2022-03-16 2022-07-08 中国十七冶集团有限公司 Installation structure and installation method of simple construction reserved hole plugging template

Similar Documents

Publication Publication Date Title
CN212866860U (en) Plugging device is pour in entrance to a cave is reserved to floor
CN212053673U (en) Tower construction operation platform of dome
CN112982485A (en) Construction method for cast-in-situ pipe gallery bottom plate and top plate synchronous formwork pouring concrete
CN215631883U (en) Simple floor slab opening supporting and hanging die structure
CN208586937U (en) One kind can apply pre-jacking force concrete structure and return back to top device
CN214613475U (en) Formwork for road construction and mold for road construction
CN214401884U (en) Basement outer wall unilateral formwork stress system
CN212129218U (en) Basement outer wall single face formwork system
CN206000163U (en) Aluminum alloy building template splicing component
CN112854577A (en) Self-formwork-supporting cast-in-place floor and construction method thereof
CN216616848U (en) Beam plate post-cast strip supporting and mold sealing structure
CN207538461U (en) A kind of quick construction formwork system of beam
CN115075613B (en) Assembled building supporting system and construction method thereof
CN214402735U (en) Stable supporting device for shear wall
CN115045505A (en) Device for pouring concrete platform on steel structure frame and construction method
CN210396093U (en) Double-shear wall deformation joint steel formwork
CN211286623U (en) Secondary structure concrete inverted beam template reinforcing apparatus
CN210067425U (en) Standard universal olecranon drip aluminum template for building
CN220814891U (en) Drop board and hang mould structure
CN111236624A (en) Construction method of PCF structure cast-in-place node template reinforcing system
CN217106297U (en) Node structure of reinforcing construction unloading device
CN215291408U (en) Compound building aluminum mould and wheel buckle frame combined template supporting structure
CN113756497B (en) Concrete floor slab adopting hollow template and rapid construction method thereof
CN217028091U (en) Reserved hole hanging die reinforcing device
CN216949471U (en) Building floor height difference template support system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210402