CN106193587A - Aluminum alloy building template splicing component - Google Patents

Aluminum alloy building template splicing component Download PDF

Info

Publication number
CN106193587A
CN106193587A CN201610775571.1A CN201610775571A CN106193587A CN 106193587 A CN106193587 A CN 106193587A CN 201610775571 A CN201610775571 A CN 201610775571A CN 106193587 A CN106193587 A CN 106193587A
Authority
CN
China
Prior art keywords
template
aluminum alloy
out against
link slot
splicing component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610775571.1A
Other languages
Chinese (zh)
Inventor
方建文
刘志强
韩新亭
曹淑涛
张岳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao No 1 Construction Group Co Ltd
Original Assignee
Qingdao No 1 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao No 1 Construction Group Co Ltd filed Critical Qingdao No 1 Construction Group Co Ltd
Priority to CN201610775571.1A priority Critical patent/CN106193587A/en
Publication of CN106193587A publication Critical patent/CN106193587A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/04Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements
    • E04G17/042Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements being tensioned by threaded elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements
    • E04G9/06Forming boards or similar elements the form surface being of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of aluminum alloy building template splicing component, including the many groups template laterally laid along floor to be poured, the many groups of tool support beams jaggy being connected with template it are provided with between described template, a fixed block with gathering sill fixing with support beam it is respectively equipped with in the intersection of adjacent two support beams, one it is provided with adaptive with breach between described two fixed blocks, end face act on there is on floor link slot hold out against part, the described end face holding out against part, template and support beam collectively constitute the slab form for watering build floor, it is provided with in described gathering sill and link slot and fixes the connector being connected with fixed block, also include being located on ground and top with hold out against part grafting for by template and the Adjustable bracing bar of support beam jack-up.Present configuration is simple, and splicing is convenient, and efficiency is high, and stability in the large is good, and scaffold quantity is few, economical and efficient.

Description

Aluminum alloy building template splicing component
Technical field
The present invention relates to construction engineering technical field, particularly relate to a kind of aluminum alloy building template splicing component.
Background technology
Building template is a kind of temporary supporting structure, makes by design requirement, makes xoncrete structure, component by regulation Position, physical dimension shape, and keep its tram, and bear building template deadweight and act on external loads thereon.Enter The purpose of row form work engineering, is to ensure that concrete engineering quality and construction safety, accelerating construction progress and reduction engineering cost.
The working architectural template structure of Cast-in-situ Concrete Structural Engineering, mainly by panel, supporting construction and connector three Part composition.Panel is the force bearing plate directly contacting newly-laid concrete;Supporting construction is then supporting faceplate, concrete and construction lotus Carry temporary structure, it is ensured that architectural template structure combines securely, accomplish indeformable, do not destroy;Connector is by panel and to prop up Support structure connects into the accessory of entirety.
Existing building template mainly uses plywood to carry out installing of template, and whole to install process complex, bothersome Arduously, efficiency is low, and the as easy as rolling off a log damage of template and template easily loosen and affect the globality of template, cause pouring quality poor, with Time, scaffold usage quantity is many, increases expenditure, causes waste.
Summary of the invention
For solving the problem of above-mentioned existence, the present invention provides a kind of simple in construction, and splicing is convenient, and efficiency is high, monolithic stability Property is good, and scaffold quantity is few, the aluminum alloy building template splicing component of economical and efficient.
The present invention solves the technical scheme of above-mentioned technical problem employing: aluminum alloy building template splicing component, including edge Many groups template that floor to be poured laterally is laid, is provided with many groups be connected with template and has jaggy between described template Support beam, is respectively equipped with a fixed block with gathering sill fixing with support beam in the intersection of adjacent two support beams, and described two Be provided with between fixed block one adaptive with breach, end face act on there is on floor link slot hold out against part, described in hold out against part End face, template and support beam collectively constitute the slab form for watering build floor, are provided with solid in described gathering sill and link slot Determine block and fix the connector of connection, also include being located on ground and top with hold out against part grafting for by template and support back The Adjustable bracing bar risen.
Above-mentioned aluminum alloy building template splicing component, described template includes the template top board contacted with soffit, edge Template ceiling edge, to having connecting plate, described connecting plate offers connecting hole, is provided with ribs between connecting plate.
Above-mentioned aluminum alloy building template splicing component, described in hold out against part and include the end face template of an effect soffit, It is provided with connecting plate in end face template both sides, described connecting plate offers the breach repaired mouth suitable with breach, described link slot It is respectively equipped with on two connecting plates, between two connecting plates, is provided with fixing and with Adjustable bracing bar grafting the set with end face template Pipe.
Above-mentioned aluminum alloy building template splicing component, described Adjustable bracing bar includes a connecting rod with fixing hole, with Connecting rod is plugged with a threaded support bar of tool, and the end of thread at support bar offers the link slot equal with fixing hole aperture, In fixing hole and link slot, be plugged with a steady pin, also include one threaded with support bar for steady pin is locked in Locking device in fixing hole and link slot.
Above-mentioned aluminum alloy building template splicing component, described locking device includes the locking set threadeded with support bar And the regulation handle that for drive locking overlap along support bar vertically move hinged with locking set.
Above-mentioned aluminum alloy building template splicing component, is provided with bolt or lock in the connecting hole of described adjacent two templates Pin.
Above-mentioned aluminum alloy building template splicing component, described fixed block and connector offer installing hole respectively, It is plugged with in installing hole for part will be held out against and steady pin that connector is fixed on fixed block or fixing bolt.
The beneficial effects of the present invention is: use support beam to be connected with template, and will by holding out against part and Adjustable bracing bar Support beam and the pouring area of template overhead floor to be poured, stability in the large is good, and installs simple and convenient, and efficiency is high;Mould Plate includes template top board, along template ceiling edge to having connecting plate, connecting plate offers connecting hole, sets between connecting plate Having ribs, bulk strength is high, it is simple to assembled, repeatable utilization after dismounting;Hold out against part and include an end face template, in end face template Both sides are provided with connecting plate, and described connecting plate offers the breach repaired mouth suitable with breach, and link slot is respectively equipped with two connections On plate, between two connecting plates, it is provided with sleeve pipe, holds out against the end face of part, template and support beam and collectively constitute the building for watering build floor Template die plate, good integrity, use breach repaired mouth to coordinate with the breach in support beam, be completely embedded, the connection adding both is strong Degree;Adjustable bracing bar is used can suitably to adjust the pretightning force holding out against between part and floor, simple in construction and easy to adjust.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of the present invention;
Fig. 2 is the partial structurtes schematic diagram of the present invention;
Fig. 3 is the structural representation of support beam;
Fig. 4 is the structural representation of Adjustable bracing bar;
Fig. 5 is the structural representation holding out against part;
Fig. 6 is the front view holding out against part;
Fig. 7 is the structural representation of template.
Detailed description of the invention
Below in conjunction with the accompanying drawings and the present invention is described in further details by specific embodiment.
As shown in Figure 1, 2, 3, aluminum alloy building template splicing component, including laterally laying many along floor to be poured Group template 1, template 1 uses aluminum matter template, in order to can alleviate weight, is provided with the many groups of tools being connected with template 1 between described template 1 The support beam 3 of jagged 2, is respectively equipped with one and fixing with support beam 3 has gathering sill 4 in the intersection of adjacent two support beams 3 Fixed block 5, be provided with between described two fixed blocks 5 one with breach 2 adaptation, end face acts on has link slot 6 on floor Hold out against part 7, described in hold out against the end face 8 of part 7, template 1 and support beam 3 and collectively constitute the slab form for watering build floor, described It is provided with the connector 9 that be connected fixing with fixed block 5 in gathering sill 4 and link slot 6, described fixed block 5 and connector 9 are opened respectively It is provided with installing hole 10,11, is plugged with in installing hole 10,11 for part 7 will be held out against and connector 9 is fixed on fixed block 5 Steady pin 12 or fixing bolt, also include being located on ground and top with hold out against part 7 grafting for by template 1 and support beam 3 The Adjustable bracing bar 13 of jack-up.
As it is shown in fig. 7, described template 1 includes the template top board 14 contacted with soffit, along template top board 14 edge to Have connecting plate 15, described connecting plate 15 offers connecting hole 16, between connecting plate 15, be provided with ribs 17, described adjacent In the connecting hole of two templates 1, bolt or lock pin are installed, splice between template and template and locked by lock pin.
As shown in Figure 5,6, hold out against part 7 described in and include the end face template 18 of an effect soffit, end face template 18 liang Side is provided with connecting plate 19, and described connecting plate 19 offers the breach repaired mouth 20 suitable with breach 2, and described link slot 6 is respectively Be provided with on two connecting plates 19, be provided with between two connecting plates 19 fixing with end face template 18 and with Adjustable bracing bar 13 grafting Sleeve pipe 21.
As shown in Figure 4, described Adjustable bracing bar 13 includes a connecting rod 23 with fixing hole 22, is plugged with one with connecting rod 23 Having threaded support bar 24, the end of thread at support bar 24 offers the link slot 25 equal with fixing hole 22 aperture, solid Be plugged with a steady pin 26 in determining hole 22 and link slot 25, also include one threaded with support bar 24 for by steady pin 26 Being locked in the locking device 27 in fixing hole 22 and link slot 25, described locking device 27 includes threadeding with support bar 24 Locking set 28 and the regulation handle 29 that be used for drive locking set 28 along support bar 24 vertically move hinged with locking set 28, hinge Connect as prior art, be well known to those skilled in the art, be provided with a connecting plate with fixing groove 30 in locking set 28 bottoms 31, after multiple support bars install, a connecting rod can be set up between two close support bars, connecting rod is provided with and fixes groove 30 The inserted sheet of grafting.
Although the detailed description of the invention of the present invention is described by the above-mentioned accompanying drawing that combines, but not the present invention is protected model The restriction enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme, and those skilled in the art are not Need to pay various amendments or deformation that creative work can make still within protection scope of the present invention.

Claims (7)

1. aluminum alloy building template splicing component, it is characterised in that: include the many groups mould laterally laid along floor to be poured Plate, is provided with the many groups of tool support beams jaggy being connected with template, in the crossing punishment of adjacent two support beams between described template Be not provided with a fixed block with gathering sill fixing with support beam, be provided with between described two fixed blocks one adaptive with breach, End face act on there is on floor link slot hold out against part, described in hold out against the end face of part, template and support beam collectively constitute for Water the slab form of build floor, be provided with in described gathering sill and link slot and fix the connector being connected with fixed block, also include setting On ground and top with hold out against part grafting for by template and the Adjustable bracing bar of support beam jack-up.
Aluminum alloy building template splicing component the most according to claim 1, it is characterised in that: described template includes and floor The template top board of bottom surface contact, along template ceiling edge to having connecting plate, described connecting plate offers connecting hole, connects Ribs it is provided with between plate.
Aluminum alloy building template splicing component the most according to claim 1, it is characterised in that hold out against part described in: and include a work By the end face template of soffit, it is provided with connecting plate in end face template both sides, described connecting plate offers suitable with breach Breach repaired mouth, described link slot is respectively equipped with on two connecting plates, be provided with between two connecting plates fixing with end face template and Sleeve pipe with Adjustable bracing bar grafting.
Aluminum alloy building template splicing component the most according to claim 1, it is characterised in that: described Adjustable bracing bar includes One connecting rod with fixing hole, is plugged with a threaded support bar of tool with connecting rod, and the end of thread at support bar offers with solid Determine the link slot that aperture, hole is equal, in fixing hole and link slot, be plugged with a steady pin, also include one with support bar screw thread even Connect for steady pin being locked in the locking device in fixing hole and link slot.
Aluminum alloy building template splicing component the most according to claim 4, it is characterised in that: described locking device include with Locking set that support bar is threaded and regulation for drive locking set along support bar vertically move hinged with locking set Handle.
Aluminum alloy building template splicing component the most according to claim 2, it is characterised in that: the company of described adjacent two templates Bolt or lock pin are installed in connecing hole.
Aluminum alloy building template splicing component the most according to claim 1, it is characterised in that: described fixed block and connector Upper offer installing hole respectively, in installing hole, be plugged with the steady pin for part will be held out against and connector is fixed on fixed block Or fixing bolt.
CN201610775571.1A 2016-08-31 2016-08-31 Aluminum alloy building template splicing component Pending CN106193587A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610775571.1A CN106193587A (en) 2016-08-31 2016-08-31 Aluminum alloy building template splicing component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610775571.1A CN106193587A (en) 2016-08-31 2016-08-31 Aluminum alloy building template splicing component

Publications (1)

Publication Number Publication Date
CN106193587A true CN106193587A (en) 2016-12-07

Family

ID=58089566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610775571.1A Pending CN106193587A (en) 2016-08-31 2016-08-31 Aluminum alloy building template splicing component

Country Status (1)

Country Link
CN (1) CN106193587A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110630006A (en) * 2019-09-06 2019-12-31 浙江华铁建筑安全科技股份有限公司 Aluminum template with high use efficiency and relatively material saving
CN112681720A (en) * 2020-12-22 2021-04-20 四汇建设集团有限公司 Aluminum template for building construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201221198Y (en) * 2008-06-02 2009-04-15 北京中建柏利工程技术发展有限公司 Aluminum alloy formwork system
CN103276891A (en) * 2013-06-08 2013-09-04 广东台澳特种铝材有限公司 Aluminum template system for building
CN104234411A (en) * 2013-06-21 2014-12-24 深圳市特辰科技股份有限公司 Aluminum alloy form structural system for fabrication of beams and slabs
CN204059954U (en) * 2014-08-27 2014-12-31 广东浩和绿色建筑研究有限公司 A kind of construction formwork shores structure
CN204418671U (en) * 2015-01-07 2015-06-24 福建工程学院 A kind of telescopic concrete blinding support bar system
CN206000163U (en) * 2016-08-31 2017-03-08 青岛一建集团有限公司 Aluminum alloy building template splicing component

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201221198Y (en) * 2008-06-02 2009-04-15 北京中建柏利工程技术发展有限公司 Aluminum alloy formwork system
CN103276891A (en) * 2013-06-08 2013-09-04 广东台澳特种铝材有限公司 Aluminum template system for building
CN104234411A (en) * 2013-06-21 2014-12-24 深圳市特辰科技股份有限公司 Aluminum alloy form structural system for fabrication of beams and slabs
CN204059954U (en) * 2014-08-27 2014-12-31 广东浩和绿色建筑研究有限公司 A kind of construction formwork shores structure
CN204418671U (en) * 2015-01-07 2015-06-24 福建工程学院 A kind of telescopic concrete blinding support bar system
CN206000163U (en) * 2016-08-31 2017-03-08 青岛一建集团有限公司 Aluminum alloy building template splicing component

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110630006A (en) * 2019-09-06 2019-12-31 浙江华铁建筑安全科技股份有限公司 Aluminum template with high use efficiency and relatively material saving
CN112681720A (en) * 2020-12-22 2021-04-20 四汇建设集团有限公司 Aluminum template for building construction

Similar Documents

Publication Publication Date Title
CN105888236B (en) frame template system
CN206000163U (en) Aluminum alloy building template splicing component
CN110778105A (en) Clear water formwork and construction process thereof
CN106193587A (en) Aluminum alloy building template splicing component
CN203878995U (en) Side wall stair formwork
CN111236620A (en) Anchor bolt sleeve and construction method for recoverable cantilever scaffold anchor bolt
CN102031869B (en) Horizontal template steel structure bracket
CN102587665B (en) Pouring method of coupled shear wall structure
CN218668525U (en) A assembled device that is used for steel construction building board of encorbelmenting to support
CN204781944U (en) A mode structure of infilled wall constructional column
CN109235871B (en) Construction method of variable cross-section structure aluminum alloy template
CN108222326B (en) Foam concrete light steel keel composite ultrahigh wall and construction method thereof
CN113107199B (en) Beam wall fast-assembling early-dismantling beam structure convenient for beam bottom adjusting and positioning
CN211691463U (en) Jacking for building
CN210622327U (en) Concrete pouring and tamping construction device for reinforced dense beam column joints
CN210947661U (en) Installation device of socket type overhanging scaffold
CN111042519B (en) Early dismantling system for floor slab template beam-containing and plate-structure building
CN211257810U (en) Novel shear wall template reinforcing system
CN207332307U (en) The horizontal connection structure and system of a kind of shuttering supporting
CN110616890A (en) Novel shear wall template reinforcing system and installation method
CN205875724U (en) Concrete placement formwork support
CN111155775A (en) Safety protection device for reserved hole and construction method thereof
CN203320917U (en) Square pipe channel supporting scaffold
CN217680504U (en) Bathroom balcony subsides template
CN205557343U (en) Only tower of curve pair all alone cable -stay bridge template for king -tower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207

RJ01 Rejection of invention patent application after publication