CN205975625U - Recoverable foundation pit retaining structure with cornical - Google Patents
Recoverable foundation pit retaining structure with cornical Download PDFInfo
- Publication number
- CN205975625U CN205975625U CN201620548465.5U CN201620548465U CN205975625U CN 205975625 U CN205975625 U CN 205975625U CN 201620548465 U CN201620548465 U CN 201620548465U CN 205975625 U CN205975625 U CN 205975625U
- Authority
- CN
- China
- Prior art keywords
- plate body
- cornical
- plate
- connecting plate
- turning connecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides a recoverable foundation pit retaining structure with cornical, the inner chamber of first plate body and second plate body all has a perfect understanding along vertical orientation, inwards cave in and form first recess in the left and right sides of first plate body, the left and right sides of second plate body has outside convex first plush copper, and the connection can be dismantled through first recess and first plush copper to first plate body and second plate body, the top of first plate body and the top of second plate body all are equipped with the cornical, and the cornical level sets up in the cavity of first plate body and second plate body, and the both ends of cornical are fixed on the internal face in internal chamber in main board or the internal chamber in second board, adjacent plate body is connected through concave -convex embedded, and concave -convex embedded connects to make the utility model discloses holisticly preventing that waterproof performance is strong, obvious gap can appearing, the cornical has improved the intensity of self, reduced first plate body, second plate body and corner connecting board push down with the deformation of pull -out in -process.
Description
Technical field
The utility model is related to a kind of recyclable foundation pit enclosure structure with cornical.
Background technology
With the continuous development of the underground space, construct for convenience, the depth requirements also more and more higher of foundation ditch.The opening of foundation ditch
Dig and typically require some building enclosures stability overall to improve foundation ditch.
The Chinese patent of Publication No. CN202559363U discloses a kind of underground diaphragm wall with steel structure foundation pit supporting construction,
Pass through front-seat steel sheet pile respectively between H profile steel, heel row steel sheet pile connects, front-seat steel plate between the stake being arranged parallel to by several
Form inter-pile soil between H profile steel between stake, heel row steel sheet pile, two neighboring stake.Although it is whole that this utility model can increase support system
The rigidity of body, but component itself is excessively complicated, and the junction rigidity of each component is relatively low, easily causes foundation ditch and locally breaks
Bad.
The Chinese patent of Publication No. CN202610806U discloses a kind of H profile steel building enclosure, the web of H profile steel one end
It has been respectively provided on two sides with topping anvil, the wing plate of H profile steel one end has been provided with a word length hole vertically, between two adjacent H profile steel
Linked together by connecting plate.Though it is high that this steel building enclosure integrally goes along with sb. to guard him intensity, good stability, the waterproof of junction
Ability is too poor, easily causes foundation ditch infiltration.
Content of the invention
For overcoming existing the problems referred to above, the utility model provides one kind, quick construction, integral rigidity is big, component is recyclable, whole
The recyclable foundation pit enclosure structure with cornical that body performance is excellent and water-impervious performance is good.
The technical solution adopted in the utility model is:
A kind of recyclable foundation pit enclosure structure with cornical, including the first plate body being vertically arranged and the second plate body, and
The all vertically insertions of the inner chamber of the first plate body and the second plate body;
The left and right sides of the first plate body caves inward formation the first groove, and the left and right sides of the second plate body has outwardly
The first plush copper, the first plate body and the second plate body are detachably connected by the first groove and the first plush copper;
The top of the top of the first plate body and the second plate body is equipped with cornical, described cornical be horizontally set on the first plate body and
In the cavity of the second plate body, and the two ends of cornical are fixed on the first plate body inner chamber or the internal face of the second plate body inner chamber.
Further, also include turning connecting plate, described first plate body and the second plate body pass through turning connecting plate in corner
It is connected, the front facade of described turning connecting plate is provided with the second plush copper with the first fit depressions, the side of described turning connecting plate
Face is provided with the second groove matching with the first plush copper.
Or, also include turning connecting plate, described first plate body and the second plate body pass through turning connecting plate phase in corner
Even, the side of described turning connecting plate is provided with the second plush copper with the first fit depressions, the front facade of described turning connecting plate
It is provided with the second groove matching with the first plush copper.
Further, the angle of the second plush copper and the second groove is 90 °.
Further, the top of described turning connecting plate also is provided with cornical, and cornical is horizontally set on the cavity of turning connecting plate
Interior, and the two ends of cornical are fixed on the inwall of turning connecting plate inner chamber.
Further, the two ends of described cornical are fixed on two facades in front and back of the first plate body, the second plate body or turning connecting plate
The back side on.
The beneficial effects of the utility model are embodied in:
Adjacent plate body is all by concavo-convex fitting connection, and concavo-convex fitting connection makes the overall infiltration of the utility model
Can be strong, be not in obvious gap.
The utility model is low for the requirement in place, is applicable to most of base pit engineering, and applicability is good, globality
By force;The equal recoverable of plate body, greatly reduces the cost of foundation pit enclosure, low-carbon environment-friendly.
Cornical improves the intensity of itself, decreases the first plate body, the second plate body and turning connecting plate and pulls out pushing and rise
During deformation.
Brief description
Fig. 1 is the first plate body and the structural representation of the second plate body.
Fig. 2 is the structural representation of turning connecting plate.
Fig. 3 is the structural representation that the first plate body and the second plate body are connected.
Fig. 4 is the structural representation that the first plate body, the second plate body are connected with turning connecting plate.
Specific embodiment
Referring to the drawings, a kind of recyclable foundation pit enclosure structure with cornical, including the first plate body 1 being vertically arranged and
Two plate bodys 2, and all vertically insertions of the inner chamber of the first plate body 1 and the second plate body 2, to make during the press-in soil body
Soil enters the inner chamber of the first plate body 1 and the second plate body 2;
The left and right sides of the first plate body 1 caves inward and forms the first groove 11, and the left and right sides of the second plate body 2 has outwards
The first plush copper 21 protruded, the first plate body 1 and the second plate body 2 are realized detachably connecting by the first groove 11 and the first plush copper 21
Connect;
The left and right sides of the first plate body 1 is provided with the first screw 4, and the left and right sides of the second plate body 2 is provided with the second screw 5, the
One screw 4 and the horizontal insertion of the second screw 5, bolt passes through the first screw 4 and the second screw 5 by the first plate body 1 and the second plate body 2
It is screwed together, with further by the bonding strength of strong first plate body 1 and the second plate body 2;
The top of the top of the first plate body 1 and the second plate body 2 is equipped with cornical 3, and described cornical 3 is horizontally set on the first plate
In the cavity of body 1 and the second plate body 2, and the two ends of cornical 3 are fixed on the first plate body 1 inner chamber or the inwall of the second plate body 2 inner chamber
On face;
Before and after first plate body 1, two sides, the two sides in front and back of the second plate body 2 are equipped with rising of insertion and pull out hole 6.
The utility model also includes turning connecting plate 7, and described first plate body 1 and the second plate body 2 pass through turning in corner
Connecting plate 7 is connected, and the front facade of described turning connecting plate 7 is provided with the second plush copper 72 matching with the first groove 11, described turns
The side of angle connecting plate 7 is provided with the second groove 71 matching with the first plush copper 21;Or, the second plush copper 72 is arranged on turning even
The side of fishplate bar 7, the second groove 71 is arranged on the front facade of turning connecting plate 7.
The angle of the second plush copper 72 and the second groove 71 is 90 °.
Described first screw 4 is arranged vertically on the boss of the first groove 11 both sides, and described second screw 5 is along perpendicular
Nogata is on the side being arranged on the first plush copper 21 both sides.
Or, described first screw 4 is arranged vertically at the bottom land of the first groove 11, and described second screw 5 is along perpendicular
Nogata is on the convex surface being arranged on the first plush copper 21.
On described turning connecting plate 7, corresponding first screw 4 and the second screw 5 are respectively equipped with the 3rd screw 9 and the 4th screw
8.
The top of described turning connecting plate 7 also is provided with cornical 3, and cornical 3 is horizontally set in the cavity of turning connecting plate 7,
And the two ends of cornical 7 are fixed on the inwall of turning connecting plate inner chamber;
Before and after described turning connecting plate 7, two facades also are provided with symmetrical rising and pull out hole 6.
The two ends of described cornical 3 are fixed on the back side of two facades before and after the first plate body 1, the second plate body 2 or turning connecting plate 7
On.And the optimal distance at cornical 3 distance the first plate body 1, the second plate body 2 or turning connecting plate 7 top is 0.5m.
On first plate body 1, the second plate body 2 and turning connecting plate 7 rise pull out hole 6 be easy to reclaim when, inserted to pull out and used equipment.
Cornical 3 is welded on the first plate body 1, the second plate body 2 and turning connecting plate 7, both can strengthen the first plate body 1,
Two plate bodys 2 and the intensity of turning connecting plate 7, reduce the first plate body 1, the second plate body 2 and turning connecting plate 7 and become in pressurized process
Shape, when also allowing for reclaiming, has put to pull out and has used rope, be easy to pull out.
In Excavation Process, first several special first plate bodys 1 and the second plate body 2 are alternately pressed into needs and open
Dig the periphery of foundation ditch, the depth of the first plate body 1 and the press-in of the second plate body 2 bottom exceedes foundation depth, adjacent the first plate body 1 He
Second plate body 2 is fitting to connection into an entirety by concavo-convex, and is bolted and fixes further.Around the corner, using turning
Angle connecting plate 7 realizes the connection of turning round of the first plate body 1 and the second plate body 2.At the end for the treatment of base pit engineering, the first plate body 1, the second plate
Body 2 and turning connecting plate 7 all can be extracted and recycle.
The utility model has the advantage that structure is simple, is easy to processing and construction and installation, and the first plate body 1, the second plate body 2
It is pressed into after the soil body with turning connecting plate 7 and immediately just can play effect, provide stability for foundation ditch.
First plate body 1, the second plate body 2 and the cornical 3 within turning connecting plate 7 also improve the intensity of itself, decrease
First plate body 1, the second plate body 2 and turning connecting plate 7 are pushing and are acting the deformation during pulling out.
First plate body 1, the second plate body 2 and turning connecting plate 7 are all by concavo-convex fitting connection, and be bolted into
One step is reinforced, and goes along with sb. to guard him intensity high;And concavo-convex fitting connection makes the overall water-impervious performance of the utility model strong, is not in bright
Aobvious gap.
The utility model is low for the requirement in place, is applicable to most of base pit engineering, and applicability is good, globality
By force;Special steel beam column and connector is recyclable reuses, greatly reduces the cost of foundation pit enclosure, low-carbon environment-friendly.
Construction method of installation of the present utility model is as follows:
1) static pressure construction:The size and dimension of the first plate body 1, the second plate body 2 and turning connecting plate 7 by actual conditions and sets
Meter requires design, applies the first special plate body 1 and the second plate body 2 according to static pressure in the position needing to arrange foundation pit enclosure structure
Work method is alternately pressed in the soil body, and guarantees that the first plush copper 21 of the second plate body 2 is inserted into the first groove 11 of the first plate body 1
Interior, together with adjacent second plate body 2 is inlayed with the first plate body 1, constitute an entirety;First plate body 1 and the static pressure of the second plate body 2
Compression distance determines according to specification and design.
2) bolt connection:Bolt is penetrated the second screw 5 on the first screw 4 and the second plate body 2 on the first plate body 1,
By bolt, the first adjacent plate body 1 and the second plate body 2 are screwed together, several first plate bodys 1 and the second plate body 2 are formed
One more overall.
3) corner connects:Static pressure press-in turning connecting plate 7 around the corner, to realize the first plate by turning connecting plate 7
Body 1 and the connection of turning round of the second plate body 2, by the first groove 11 of embedded first plate body 1 of the second plush copper 72 of turning connecting plate 7
Interior, the first plush copper 21 of the second plate body 2 embeds in the second groove 8 of turning connecting plate 7, because of the second plush copper 72 and the second groove 71
Angle be 90 °, the first plate body 1 and the second plate body 2 achieve vertical connection;First plate body 1, the second plate body 2 and turning connect
Plate 7 is fitting to connection and forms an entirety.
4) corner strengthens connecting:Bolt is penetrated on the first screw 4 and the turning connecting plate 7 on the first plate body 1
Three screws 9, meanwhile, bolt are penetrated the 4th screw 8 on the second screw 5 and the turning connecting plate 7 on the second plate body 1, pass through
Bolt is screwed together the first plate body 1, turning connecting plate 7 and the second plate body 2, the first plate body 1, turning connecting plate 7 and second
Plate body 2 connects further, forms a more firmly entirety.
4) complete whole Foundation Pit Support Engineering according to aforementioned four step, form foundation pit system.
5), after Foundation Pit Support Engineering terminates, pull out acting rising of pulling out that setting insertion is previously provided with hole or rope is enclosed within abdomen
On pipe 3, the first plate body 1, turning connecting plate 7 and the second plate body 2 are extracted recovery one by one.
Content described in this specification embodiment is only enumerating of the way of realization to utility model design, and this practicality is new
The protection domain of type is not construed as being only limitted to the concrete form of embodiment statement, protection domain of the present utility model also and in
Those skilled in the art according to the utility model design it is conceivable that equivalent technologies mean.
Claims (6)
1. a kind of recyclable foundation pit enclosure structure with cornical it is characterised in that:Including the first plate body being vertically arranged and
Two plate bodys, and all vertically insertions of the inner chamber of the first plate body and the second plate body;
The left and right sides of the first plate body caves inward formation the first groove, and the left and right sides of the second plate body has outwardly the
One plush copper, the first plate body and the second plate body are detachably connected by the first groove and the first plush copper;
The top of the top of the first plate body and the second plate body is equipped with cornical, and described cornical is horizontally set on the first plate body and second
In the cavity of plate body, and the two ends of cornical are fixed on the first plate body inner chamber or the internal face of the second plate body inner chamber.
2. as claimed in claim 1 a kind of recyclable foundation pit enclosure structure with cornical it is characterised in that:Also include turning
Connecting plate, described first plate body and the second plate body pass through turning connecting plate in corner and are connected, and the front of described turning connecting plate stands
Face is provided with the second plush copper with the first fit depressions, and the side of described turning connecting plate is provided with matching with the first plush copper
Two grooves.
3. as claimed in claim 1 a kind of recyclable foundation pit enclosure structure with cornical it is characterised in that:Also include turning
Connecting plate, described first plate body and the second plate body pass through turning connecting plate in corner and are connected, the side of described turning connecting plate
It is provided with the second plush copper with the first fit depressions, the front facade of described turning connecting plate is provided with matching with the first plush copper
Two grooves.
4. as claimed in claim 2 or claim 3 a kind of recyclable foundation pit enclosure structure with cornical it is characterised in that:Second is convex
The angle of head and the second groove is 90 °.
5. as claimed in claim 4 a kind of recyclable foundation pit enclosure structure with cornical it is characterised in that:Described turning is even
The top of fishplate bar also is provided with cornical, and cornical is horizontally set in the cavity of turning connecting plate, and the two ends of cornical are fixed on turning
On the inwall of connecting plate inner chamber.
6. as claimed in claim 5 a kind of recyclable foundation pit enclosure structure with cornical it is characterised in that:Described cornical
Two ends are fixed on the back side of two facades in front and back of the first plate body, the second plate body or turning connecting plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620548465.5U CN205975625U (en) | 2016-06-06 | 2016-06-06 | Recoverable foundation pit retaining structure with cornical |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620548465.5U CN205975625U (en) | 2016-06-06 | 2016-06-06 | Recoverable foundation pit retaining structure with cornical |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205975625U true CN205975625U (en) | 2017-02-22 |
Family
ID=58021774
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620548465.5U Expired - Fee Related CN205975625U (en) | 2016-06-06 | 2016-06-06 | Recoverable foundation pit retaining structure with cornical |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205975625U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105839646A (en) * | 2016-06-06 | 2016-08-10 | 浙江工业大学 | Recoverable foundation pit support structure with web pipes |
-
2016
- 2016-06-06 CN CN201620548465.5U patent/CN205975625U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105839646A (en) * | 2016-06-06 | 2016-08-10 | 浙江工业大学 | Recoverable foundation pit support structure with web pipes |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106284296B (en) | A kind of supporting construction and its construction method of double steel sheet pile | |
CN203334322U (en) | Seepage-prevention slurry blocking device of underground continuous wall | |
CN213062029U (en) | Energy-conserving pile roof beam erects anchor supporting construction based on excavation supporting | |
CN206090532U (en) | Foundation pit retaining structure with cornical and bottom are pyramid | |
CN206090576U (en) | Recoverable foundation pit retaining structure | |
CN205975625U (en) | Recoverable foundation pit retaining structure with cornical | |
CN205975623U (en) | Recoverable foundation pit retaining structure with screw | |
CN109296010A (en) | The joint structure and construction method vertically connected for coercion underground continuous wall | |
CN205975624U (en) | Recoverable foundation pit retaining structure with pull -out hole | |
CN203593968U (en) | Steel tube bamboo row frame for shallow hole blasting excavation bridge foundation bit construction | |
CN202559363U (en) | Foundation pit supporting structure for underground diaphragm wall with steel structure | |
CN206090575U (en) | Bottom is foundation pit retaining structure of pyramid | |
CN205975581U (en) | Foundation pit retaining structure with screw and bottom are pyramid | |
CN203475439U (en) | Special precast underground wall in precast underground wall based foundation pit support structure construction method | |
CN105862880A (en) | Recoverable foundation pit support structure with pull-out holes | |
CN206090574U (en) | Foundation pit enclosure structure | |
CN218508431U (en) | Auxiliary leveling device in suction pile penetration process and suction pile | |
CN105862882A (en) | Recyclable foundation pit support structure | |
CN105839646A (en) | Recoverable foundation pit support structure with web pipes | |
CN105862881A (en) | Recoverable foundation pit support structure with screw holes | |
CN110258528B (en) | Assembled and inserted self-clamping type prefabricated hollow underground continuous wall and construction method thereof | |
CN108661056B (en) | Pile plate up-and-down combined supporting structure and construction process | |
CN214463220U (en) | Waterproof fence | |
CN105908758A (en) | Foundation pit supporting structure with bottom in pyramid shape | |
CN105887802A (en) | Foundation pit support structure with screw holes and pyramid-shaped bottom |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170222 Termination date: 20190606 |
|