CN106284296B - A kind of supporting construction and its construction method of double steel sheet pile - Google Patents

A kind of supporting construction and its construction method of double steel sheet pile Download PDF

Info

Publication number
CN106284296B
CN106284296B CN201610877630.6A CN201610877630A CN106284296B CN 106284296 B CN106284296 B CN 106284296B CN 201610877630 A CN201610877630 A CN 201610877630A CN 106284296 B CN106284296 B CN 106284296B
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
card slot
linking beam
bolt hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610877630.6A
Other languages
Chinese (zh)
Other versions
CN106284296A (en
Inventor
刘加才
赵鹏飞
王旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CN201610877630.6A priority Critical patent/CN106284296B/en
Publication of CN106284296A publication Critical patent/CN106284296A/en
Application granted granted Critical
Publication of CN106284296B publication Critical patent/CN106284296B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/16Auxiliary devices rigidly or detachably arranged on sheet piles for facilitating assembly

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses the supporting construction and its construction method of a kind of double steel sheet pile, supporting construction includes front-seat steel sheet pile, heel row steel sheet pile, purlin, card slot, linking beam, bolt.The purlin is integral by the steel sheet pile connection of every row, and the card slot is caught in steel plate stake top, and the end of the linking beam is aligned with card slot, and steel sheet pile, card slot, linking beam are one-time fixed there are bolt hole and by bolt.Construction method are as follows: squeeze into front and rear row steel sheet pile first and set up purlin, be then caught in card slot, fixed linking beam, precipitation, last excavation of foundation pit and underground structure of constructing etc. are carried out between the soil body campshed and foundation pit later.Steel construction recoverable of the invention coordinates the deformation of front and rear row stake top mutually by fixed linking beam, passes through the precipitation between the soil body campshed, substantially reduce the horizontal force of front-seat steel sheet pile, percolation path is increased, the safety of excavation of foundation pit is increased, reduces construction cost.

Description

A kind of supporting construction and its construction method of double steel sheet pile
Technical field
The present invention relates to the technical fields of geotechnical engineering, are to be related to a kind of supporting knot of double steel sheet pile more specifically Structure and its construction method.
Background technique
With the development of China's skyscraper, traditional single supporting construction cannot better meet engine request, double Campshed building enclosure is widely applied in base pit engineering because it is with preferable implementation and achieves good economy, society It can benefit.General double-row pile mostly uses cast-in-situ bored pile, and cast-in-situ bored pile is with bearing capacity is big, stability is good, settling amount is small The advantages of, but there is also complex process, the problems such as mud rubbish is more, and cost is higher.A large amount of case history and theory The rigid connection of analytical proof, campshed stake top is more more reasonable than connectionless, at present there are many connection types of campshed stake top, but The less stake top connectivity problem for relating to double steel sheet pile.Sealing gear can be effectively played by setting steel sheet pile around foundation pit The effect of soil can extract steel sheet pile after foundation pit construction to reduce construction cost, however steel sheet pile supporting belong to it is soft Property supporting, when excavation of foundation pit is deeper, steel sheet-pile deformation can be larger, and setting double steel sheet pile although can reduce Support Deformation, but It is the percolation path of level of ground water still along front-seat steel sheet pile, the solution still not yet in effect of the seepage deformation problem of foundation pit.
Summary of the invention
The purpose of the present invention is in view of the above shortcomings of the prior art, provide a kind of supporting construction of double steel sheet pile and its Construction method is become with solving foundation pit seepage deformation caused by the stake top connectivity problem and excavation of foundation pit of double steel sheet pile and steel sheet pile The problem of shape.
To achieve the above object, the technical solution adopted by the present invention are as follows: a kind of supporting construction of double steel sheet pile, including it is preceding Arrange steel sheet pile, heel row steel sheet pile, purlin, card slot, linking beam, bolt, it is characterised in that: the purlin connects the steel sheet pile of every row It is connected into an entirety, the card slot is caught at front and rear row steel plate stake top straight panel, and the end of the linking beam is aligned with card slot, steel Sheet pile, card slot, linking beam are one-time fixed there are bolt hole and by bolt.
Preferably, the purlin using double Pin, is arranged in every row's steel sheet pile close to foundation pit side and slightly above ground.
Preferably, the card slot is U-shaped structure, two interplanar distance of front and back and thickness at the straight panel of institute steel-fastening sheet pile are identical simultaneously And front and back two sides is respectively arranged symmetrically four bolts hole.
Preferably, the front row steel sheet pile, heel row steel sheet pile are U-shaped Larsen steel sheet pile, it is disposed at stake top straight panel Four bolts hole, steel sheet pile basset 0.5m.
Preferably, the linking beam both ends are welded with one block of steel plate, there are four bolts hole for arrangement on steel plate.
Preferably, the bolt hole of the bolt hole of the steel plate stake top, card slot and the bolt hole hole location on linking beam It corresponds, and can be one-time fixed by the bolt hole that bolt passes through three.
A kind of construction method of supporting construction based on double steel sheet pile, comprising the following steps:
Step 1: the long model of front and rear row steel sheet pile, stake, array pitch, construction depth are determined according to place and design requirement, Select suitable purlin, card slot, linking beam model and position;
Step 2: squeezing into front and rear row steel sheet pile and setting up purlin;
Step 3: stake top card slot is caught in, so that card slot bolt hole is overlapped with steel sheet pile bolt hole;
Step 4: fixed linking beam, is directed at card slot bolt hole for linking beam bolt hole, by screw bolt by steel sheet pile, Card slot, linking beam are fixed;
Step 5: carrying out precipitation to front and rear row inter-pile soil body, inter-pile soil body water level is not less than hole bottom water position;
Step 6: carrying out precipitation to foundation pit, hole bottom water position meets design requirement;
Step 7: excavation of foundation pit and underground structure of constructing;
Step 8: Underground Construction goes out terrace, after the gap between structure and foundation pit crater wall is backfilling and compacted, recycling is enclosed Purlin, card slot, linking beam simultaneously extract steel sheet pile.
The beneficial effects of the present invention are:
1, stake top connection structure of the invention coordinates steel plate stake top deformation in front and back mutually.
2, between campshed of the invention the soil body precipitation, reduce the horizontal force of front-seat steel sheet pile, make percolation path by edge Front-seat steel sheet pile reach foundation pit bottom and increase then to pass through soil body arrival base between the steel sheet pile stake bottom of front and back via heel row steel sheet pile Bottom is cheated, thus reduces Support Deformation and seepage flow deformation, improves the safety of excavation of foundation pit.
3, a kind of supporting construction of double steel sheet pile of the invention can the factorial production, the construction period is short, low cost, safety Property it is high, structure is can be recycled.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the double steel sheet pile of the present invention.
Fig. 2 is the connection schematic diagram between structure of the invention.
Fig. 3 is the precipitation schematic diagram of the double steel sheet pile of the present invention.
In figure: 1, front-seat steel sheet pile, 2, heel row steel sheet pile, 3, purlin, 4, card slot, 5, linking beam, 6, bolt, 7, underground water Position, 8, inter-pile soil body water level, 9, hole bottom water position, 10, foundation pit bottom, 11, ground.
Specific embodiment
Embodiment is joined as shown in figure 1 to 3: a kind of supporting construction of double steel sheet pile, including front-seat steel sheet pile 1, heel row steel plate Stake 2, purlin 3, card slot 4, linking beam 5, bolt 6, it is characterised in that: the purlin 3 by the steel sheet pile of every row connect into one it is whole Body, the card slot 4 are respectively clamped into front-seat steel sheet pile 1, at 2 stake top straight panel of heel row steel sheet pile, the end of the linking beam 5 and card slot 4 alignment, front-seat steel sheet pile 1, heel row steel sheet pile 2, card slot 4, linking beam 5 are one-time fixed there are bolt hole and by bolt 6.
The purlin 3 is arranged in every row's steel sheet pile close to foundation pit side and slightly above ground 11 using double Pin.
The card slot 4 is U-shaped structure, and two interplanar distance of front and back and the thickness at the steel sheet pile straight panel of institute Ka Chu are identical and preceding Two sides is respectively arranged symmetrically four bolts hole afterwards.
The front row steel sheet pile 1, heel row steel sheet pile 2 are U-shaped Larsen steel sheet pile, and every campshed passes through lock with stake and mutually takes It connects, there are four bolts hole for arrangement at stake top straight panel.
5 both ends of linking beam are welded with one block of steel plate, and there are four bolts hole for arrangement on steel plate.
The front row steel sheet pile 1 or the bolt hole of 2 stake top of heel row steel sheet pile, card slot 4 bolt hole and linking beam 5 on Bolt hole hole location corresponds, and can be one-time fixed by the bolt hole that bolt 6 passes through three.
A kind of construction method of supporting construction based on double steel sheet pile, comprising the following steps:
Step 1: determining that front row steel sheet pile 1, the model of heel row steel sheet pile 2, stake is long, arranges according to place and design requirement Away from selecting suitable purlin 3, card slot 4,5 model of linking beam and position;
Step 2: squeezing into front-seat steel sheet pile 1, heel row steel sheet pile 2 respectively and setting up corresponding purlin 3, it is ensured that stake top compares Ground 11 is higher by 0.5m, and purlin 3 is disposed adjacent at ground 11, and guarantees two stake top of front and back in the same horizontal line;
Step 2: being caught in stake top card slot 4, two card slots 4 are respectively clamped into symmetrical front-seat steel sheet pile 1, heel row steel plate At 2 stake top straight panels of stake, so that the bolt hole of card slot 4 and the steel sheet pile bolt hole of institute card position coincide;
Step 3: fixed linking beam 5, is respectively aligned to front-seat steel sheet pile 1, heel row steel plate for the bolt hole at 5 both ends of linking beam The bolt hole of 2 stake top card slots 4 of stake, it is by screwing bolt 6 that front-seat steel sheet pile 1, heel row steel sheet pile 2, card slot 4, linking beam 5 is fixed It is integral;
Step 4: the level of ground water 7 of the soil body between campshed is reduced, so that inter-pile soil body water level 8 is not low by setting dewatering well In hole bottom water position 9;
Step 5: reducing the level of ground water 7 of foundation pit position by setting dewatering well, set so that hole bottom water position 9 meets Meter requires;
Step 6: excavation of foundation pit is to foundation pit bottom 10 and underground structure of constructing;
Step 7: Underground Construction goes out terrace, after the gap between structure and foundation pit crater wall is backfilling and compacted, purlin is recycled 3, card slot 4, linking beam 5 and front-seat steel sheet pile 1, heel row steel sheet pile 2 are extracted.
It should be pointed out that made by a specific embodiment of the invention detailed description can not be used to limit it is of the invention Protection scope, those skilled in the art's made any change under the inspiration of the present invention, when not departing from the present invention Principle and claim when, all belong to the scope of protection of the present invention.

Claims (2)

1. a kind of supporting construction of double steel sheet pile, including front-seat steel sheet pile, heel row steel sheet pile, purlin, card slot, linking beam, spiral shell Bolt, it is characterised in that: the steel sheet pile of every row is connected into an entirety by the purlin, and the card slot is caught in steel plate stake top straight panel Place, the end of the linking beam are aligned with card slot, and steel sheet pile, card slot, linking beam are there are bolt hole and disposably solid by bolt Fixed, the purlin is arranged in every row's steel sheet pile close to foundation pit side and slightly above ground, the card slot is U-shaped knot using double Pin Structure, two interplanar distance of front and back is identical as thickness at the straight panel of institute steel-fastening sheet pile and front and back two sides is respectively arranged symmetrically four bolts hole, The front row steel sheet pile, heel row steel sheet pile are U-shaped Larsen steel sheet pile, and there are four bolt hole, steel sheet piles for arrangement at stake top straight panel Basset 0.5m, and the linking beam both ends are welded with one block of steel plate, and there are four bolt hole, the steel sheet pile stakes for arrangement on steel plate Bolt hole hole location on the bolt hole on top, the bolt hole of card slot and linking beam corresponds, and can pass through three's by bolt Bolt hole one-time fixes;On the basis of gap between the front-seat steel sheet pile and heel row steel sheet pile, the front row steel sheet pile " protrusion " on the outside of the gap is all had with heel row steel sheet pile and to " recess " on the inside of the gap, wherein each " protrusion " each corresponding described heel row steel sheet pile of the front row steel sheet pile is corresponding " recess ", each described front-seat steel plate Each corresponding described heel row steel sheet pile of " recess " of stake is corresponding " protrusion ";" protrusion " of each front-seat steel sheet pile and " recess " of its each corresponding heel row steel sheet pile is connected by linking beam, each front-seat steel sheet pile " protrusion " of each corresponding described heel row steel sheet pile of " recess " is connected by linking beam, and described in adjacent two " protrusion " of the linking beam one connection front-seat steel sheet pile and the heel row steel sheet pile are corresponding " recess ", another connection institute " recess " and the heel row steel sheet pile for stating front-seat steel sheet pile are corresponding " protrusion ".
2. based on a kind of construction method of the supporting construction of double steel sheet pile described in claim 1, it is characterised in that: including with Lower step:
Step 1: determining the long model of front and rear row steel sheet pile, stake, array pitch, construction depth according to place and design requirement, select Suitable purlin, card slot, linking beam model and position;
Step 2: squeezing into front and rear row steel sheet pile and setting up purlin;
Step 3: stake top card slot is caught in, so that card slot bolt hole is overlapped with steel sheet pile bolt hole;
Step 4: fixed linking beam, is directed at card slot bolt hole for linking beam bolt hole, by screw bolt by steel sheet pile, card slot, Linking beam is fixed;
Step 5: carrying out precipitation to front and rear row inter-pile soil body, inter-pile soil body water level is not less than hole bottom water position;
Step 6: carrying out precipitation to foundation pit, hole bottom water position meets design requirement;
Step 7: excavation of foundation pit and underground structure of constructing;
Step 8: Underground Construction goes out terrace, and after the gap between structure and foundation pit crater wall is backfilling and compacted, recycling purlin, card Slot, linking beam simultaneously extract steel sheet pile.
CN201610877630.6A 2016-09-28 2016-09-28 A kind of supporting construction and its construction method of double steel sheet pile Active CN106284296B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610877630.6A CN106284296B (en) 2016-09-28 2016-09-28 A kind of supporting construction and its construction method of double steel sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610877630.6A CN106284296B (en) 2016-09-28 2016-09-28 A kind of supporting construction and its construction method of double steel sheet pile

Publications (2)

Publication Number Publication Date
CN106284296A CN106284296A (en) 2017-01-04
CN106284296B true CN106284296B (en) 2019-04-23

Family

ID=57717958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610877630.6A Active CN106284296B (en) 2016-09-28 2016-09-28 A kind of supporting construction and its construction method of double steel sheet pile

Country Status (1)

Country Link
CN (1) CN106284296B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489102B (en) * 2017-06-29 2019-07-02 山东鲁桥建设有限公司 Based on combined steel sheet-pile cofferdam high water level difference cushion cap and construction method
CN108166504A (en) * 2018-01-17 2018-06-15 广州地铁设计研究院有限公司 A kind of reinforced double steel sheet piling pit supporting construction and its construction method
CN108612081B (en) * 2018-05-18 2021-02-26 中铁二院昆明勘察设计研究院有限责任公司 Combined type multilayer Larsen steel sheet pile combined supporting system and construction method
CN109235421A (en) * 2018-10-16 2019-01-18 中铁第四勘察设计院集团有限公司 A kind of double steel sheet pile fabricated structure of steel purlin also serving as interim sidewalk
CN109235422A (en) * 2018-10-16 2019-01-18 中铁第四勘察设计院集团有限公司 A kind of double steel sheet pile fabricated structure of steel purlin
CN109183781B (en) * 2018-11-08 2024-02-09 大连大学 Z-shaped steel sheet pile enclosure structure with bent cap
CN109555108B (en) * 2018-12-25 2023-09-29 中铁十七局集团有限公司 Steel sheet pile enclosure construction structure
CN110424405A (en) * 2019-08-06 2019-11-08 中建一局集团建设发展有限公司 A kind of soft clay area phreatic high foundation pit supporting construction and its construction method
CN110487715B (en) * 2019-08-23 2022-05-27 淮阴工学院 High-ductility cement-based material single fiber pulling-out test device and test method
CN110512617B (en) * 2019-09-03 2024-03-15 东莞市莞城建筑工程有限公司 Supporting structure, supporting system and supporting method for connecting sections of foundation pits inside and outside existing building
CN113513026A (en) * 2021-04-22 2021-10-19 中建八局第二建设有限公司 Soft soil foundation deep foundation pit pile end rear anchoring combined steel sheet pile and construction method thereof
CN113136875B (en) * 2021-04-29 2022-03-08 江苏科技大学 Foundation pit supporting structure and construction method thereof
CN113216150A (en) * 2021-05-13 2021-08-06 苏州荣帆建设工程有限公司 Larsen steel sheet pile and construction method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201883438U (en) * 2010-12-23 2011-06-29 东南大学 Pit-in-foundation-pit steel sheet pile foundation pit supporting structure
JP5772658B2 (en) * 2012-02-27 2015-09-02 新日鐵住金株式会社 Hat-type steel sheet piles and structures using hat-type steel sheet piles
CN202559362U (en) * 2012-04-09 2012-11-28 东南大学 Double-row steel sheet pile and H-steel section combined foundation pit supporting structure
CN103669375A (en) * 2013-12-27 2014-03-26 张安政 Double-layer steel sheet pile soil core composite cofferdam structure without inner support and application thereof
CN103758134B (en) * 2014-01-24 2015-09-30 中国建筑股份有限公司 A kind of construction method combining Double-row Piles Support system
CN204311459U (en) * 2014-11-13 2015-05-06 常州大学 Oblique double soldier pile body structure before chair shape

Also Published As

Publication number Publication date
CN106284296A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106284296B (en) A kind of supporting construction and its construction method of double steel sheet pile
CN202559362U (en) Double-row steel sheet pile and H-steel section combined foundation pit supporting structure
CN203768912U (en) Double-row prestressing high-strength concrete rectangular pile foundation pit supporting structure
CN203684230U (en) Prefabricated double-row pile structure
CN104912082A (en) Inclined assembled double-row steel sheet pile foundation pit supporting structure and construction method thereof
CN102864780A (en) Supporting structure and supporting method of foundation pit
CN106088102A (en) Lattice combined steel plate pile cement-soil composite pile and construction method thereof
CN103061346A (en) Steel plate pile utilizing bolt connection and H-shaped combined foundation pit support structure
CN202559363U (en) Foundation pit supporting structure for underground diaphragm wall with steel structure
CN108118701A (en) A kind of double Larsen steel sheet pile rigit-frame beam and its installation method
CN207159990U (en) One kind combination steel construction support pile
CN202830936U (en) Supporting structure of foundation pit
CN103088831A (en) Overall assembly-type double-row steel pile foundation pit supporting structure
CN107326896A (en) One kind combination steel construction support pile and construction method
CN205088686U (en) Support structure of foundation pit
CN204023580U (en) The double steel sheet piling pit supporting construction of a kind of inclination assembling
CN110424370A (en) The linear type connecting node and L shape connecting node of prefabricated post and prefabricated panel
CN206971233U (en) A kind of supporting construction for deep basal pit
CN206279520U (en) A kind of prefabricated sheet pile and earth-retaining building structure
CN216713040U (en) Full-prefabricated pier type portal inclined support pile structure system
CN109056649A (en) A kind of sheet pile combination shore protection and its construction method
CN207934041U (en) A kind of double Larsen steel sheet pile rigit-frame beam
CN103046554B (en) Construction method for improving integrity and lateral rigidity of double-row supporting piles of foundation pit
CN207228126U (en) Deep foundation pit supporting structure
CN207812470U (en) A kind of plastic sheet pile with injected hole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant