CN206090576U - Recoverable foundation pit retaining structure - Google Patents

Recoverable foundation pit retaining structure Download PDF

Info

Publication number
CN206090576U
CN206090576U CN201620542593.9U CN201620542593U CN206090576U CN 206090576 U CN206090576 U CN 206090576U CN 201620542593 U CN201620542593 U CN 201620542593U CN 206090576 U CN206090576 U CN 206090576U
Authority
CN
China
Prior art keywords
plate body
screw
connecting plate
turning connecting
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620542593.9U
Other languages
Chinese (zh)
Inventor
胡奇超
许义冲
严熙
冯斌
许斌
张义平
陈浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Technology ZJUT
Original Assignee
Zhejiang University of Technology ZJUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Technology ZJUT filed Critical Zhejiang University of Technology ZJUT
Priority to CN201620542593.9U priority Critical patent/CN206090576U/en
Application granted granted Critical
Publication of CN206090576U publication Critical patent/CN206090576U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a recoverable foundation pit retaining structure, the inner chamber of first plate body and second plate body all has a perfect understanding along vertical orientation, inwards cave in and form first recess in the left and right sides of first plate body, the left and right sides of second plate body has outside convex first plush copper, and the connection can be dismantled through first recess and first plush copper to first plate body and second plate body, the left and right sides of first plate body is equipped with first screw, and the left and right sides of second plate body is equipped with the second screw, and first screw and second screw level have a perfect understanding, and the bolt passes first screw and tightens first plate body with the second plate body with the second screw and be in the same place, the top of first plate body and the top of second plate body all are equipped with the cornical, and the cornical level sets up in the cavity of first plate body and second plate body, and the both ends of cornical are fixed on the internal face in internal chamber in main board or the internal chamber in second board, the front and back coexistence face of coexistence face, second plate body all is equipped with the pull -out hole of having a perfect understanding around the first plate body.

Description

A kind of recyclable foundation pit enclosure structure
Technical field
This utility model is related to a kind of recyclable foundation pit enclosure structure.
Background technology
With the continuous development of the underground space, construct for convenience, the depth requirements of foundation ditch also more and more higher.Foundation ditch is opened Digging through often needs some building enclosures to improve the stability of foundation ditch entirety.
The Chinese patent of Publication No. CN202559363U discloses a kind of underground diaphragm wall with steel structure foundation pit supporting construction, Respectively by front-seat steel sheet pile, the connection of heel row steel sheet pile, front-seat steel plate between H profile steel between the stake be arranged parallel to by several Stake, between heel row steel sheet pile, two neighboring stake, between H profile steel, form inter-pile soil.Although it is whole that the utility model can increase support system The rigidity of body, but component itself is excessively complicated, and the junction rigidity of each component is relatively low, easily causes foundation ditch and locally breaks It is bad.
The Chinese patent of Publication No. CN202610806U discloses a kind of H profile steel building enclosure, the web of H profile steel one end Topping anvil has been respectively provided on two sides with, a word length hole has been provided with the wing plate of H profile steel one end vertically, between two adjacent H profile steels Linked together by connecting plate.It is high that though this steel building enclosure integrally goes along with sb. to guard him intensity, good stability, the waterproof of junction Energy Dipeptiven is poor, easily causes foundation ditch infiltration.
The content of the invention
To overcome existing the problems referred to above, this utility model provides one kind, quick construction, integral rigidity is big, component is recyclable, whole The recyclable foundation pit enclosure structure that body performance is excellent and infiltration energy is good.
The technical solution adopted in the utility model is:
A kind of recyclable foundation pit enclosure structure, including the first plate body and the second plate body that are vertically arranged, and the first plate body and The vertically insertion of the inner chamber of the second plate body;
The left and right sides of the first plate body caves inward to form the first groove, and the left and right sides of the second plate body has outwardly The first plush copper, the first plate body and the second plate body are detachably connected by the first groove and the first plush copper;
The left and right sides of the first plate body is provided with the first screw, and the left and right sides of the second plate body is provided with the second screw, the first spiral shell Hole and the horizontal insertion of the second screw, bolt pass through the first screw and the second screw that the first plate body and the second plate body are tightened in one Rise, with further by strong first plate body and the bonding strength of the second plate body;
Be equipped with cornical at the top of the top of the first plate body and the second plate body, the cornical be horizontally set on the first plate body and In the cavity of the second plate body, and the two ends of cornical are fixed on the internal face of the first plate body inner chamber or the second plate body inner chamber;
Before and after first plate body, two facades, two facades in front and back of the second plate body are equipped with rising for insertion and pull out hole.
Further, also pass through turning connecting plate in corner including turning connecting plate, first plate body and the second plate body It is connected, the front facade of the turning connecting plate is provided with the second plush copper with the first fit depressions, the side of the turning connecting plate Face is provided with the second groove being engaged with the first plush copper.
Or, also including turning connecting plate, first plate body and the second plate body pass through turning connecting plate phase in corner Even, the side of the turning connecting plate is provided with the second plush copper with the first fit depressions, the front facade of the turning connecting plate It is provided with the second groove being engaged with the first plush copper.
Further, the angle of the second plush copper and the second groove is 90 °.
Further, first screw is arranged vertically on the boss of the first groove both sides, second screw It is arranged vertically on the side of the first plush copper both sides.
Or, first screw is arranged vertically at the bottom land of the first groove, and second screw is along vertically side To being arranged on the convex surface of the first plush copper.
Further, on the turning connecting plate, the first screw of correspondence and the second screw are respectively equipped with the 3rd screw and the 4th spiral shell Hole.
Further, cornical also is provided with the top of the turning connecting plate, cornical is horizontally set on the cavity of turning connecting plate It is interior, and the two ends of cornical are fixed on the inwall of turning connecting plate inner chamber.
Further, two facades in front and back of the turning connecting plate also are provided with symmetrical rising and pull out hole.
Further, the two ends of the cornical are fixed on two facades in front and back of the first plate body, the second plate body or turning connecting plate The back side on.
The beneficial effects of the utility model are embodied in:
Adjacent plate body is, by concavo-convex fitting connection, and to be bolted and further reinforce, and goes along with sb. to guard him intensity high;And it is recessed The infiltration that convex fitting connection enables this utility model overall is strong, is not in obvious gap.
This utility model is low for the requirement in place, is applicable to most of base pit engineering, and the suitability is good, globality By force;The equal recoverable of plate body, greatly reduces the cost of foundation pit enclosure, low-carbon environment-friendly.
Description of the drawings
Fig. 1 is the structural representation of the first plate body and the second plate body.
Fig. 2 is the structural representation of turning connecting plate.
Fig. 3 is the structural representation that the first plate body and the second plate body are connected.
Fig. 4 is the structural representation that the first plate body, the second plate body are connected with turning connecting plate.
Specific embodiment
Referring to the drawings, a kind of recyclable foundation pit enclosure structure, including the first plate body 1 and the second plate body 2 that are vertically arranged, and The inner chamber of the first plate body 1 and the second plate body 2 vertically insertion, during the press-in soil body to make soil enter the The inner chamber of one plate body 1 and the second plate body 2;
The left and right sides of the first plate body 1 caves inward to form the first groove 11, and the left and right sides of the second plate body 2 outwards has First plush copper 21 of protrusion, the first plate body 1 and the second plate body 2 are realized detachably connecting by the first groove 11 and the first plush copper 21 Connect;
The left and right sides of the first plate body 1 is provided with the first screw 4, and the left and right sides of the second plate body 2 is provided with the second screw 5, the The 5 horizontal insertion of one screw 4 and the second screw, bolt pass through the first screw 4 and the second screw 5 by the first plate body 1 and the second plate body 2 It is screwed together, with further by strong first plate body 1 and the bonding strength of the second plate body 2;
The top of the top of the first plate body 1 and the second plate body 2 is equipped with cornical 3, and the cornical 3 is horizontally set on the first plate In the cavity of body 1 and the second plate body 2, and the two ends of cornical 3 are fixed on the inwall of 2 inner chamber of 1 inner chamber of the first plate body or the second plate body On face;
Before and after first plate body 1, two sides, the two sides in front and back of the second plate body 2 are equipped with rising for insertion and pull out hole 6.
This utility model also includes that turning connecting plate 7, first plate body 1 and the second plate body 2 pass through turning in corner Connecting plate 7 is connected, and the front facade of the turning connecting plate 7 is provided with the second plush copper 72 being engaged with the first groove 11, described to turn The side of angle connecting plate 7 is provided with the second groove 71 being engaged with the first plush copper 21;Or, the second plush copper 72 is arranged on turning company The side of fishplate bar 7, the second groove 71 are arranged on the front facade of turning connecting plate 7.
The angle of the second plush copper 72 and the second groove 71 is 90 °.
First screw 4 is arranged vertically on the boss of 11 both sides of the first groove, and second screw 5 is along perpendicular Nogata is to being arranged on the side of 21 both sides of the first plush copper.
Or, first screw 4 is arranged vertically at the bottom land of the first groove 11, and second screw 5 is along perpendicular Nogata is to being arranged on the convex surface of the first plush copper 21.
On the turning connecting plate 7, the first screw 4 of correspondence and the second screw 5 are respectively equipped with the 3rd screw 9 and the 4th screw 8。
The top of the turning connecting plate 7 also is provided with cornical 3, and cornical 3 is horizontally set in the cavity of turning connecting plate 7, And the two ends of cornical 7 are fixed on the inwall of turning connecting plate inner chamber;
Before and after the turning connecting plate 7, two facades also are provided with symmetrical rising and pull out hole 6.
The two ends of the cornical 3 are fixed on the back side of two facades before and after the first plate body 1, the second plate body 2 or turning connecting plate 7 On.And the optimal distance at the top of 3 distance the first plate body 1 of cornical, the second plate body 2 or turning connecting plate 7 is 0.5m.
On first plate body 1, the second plate body 2 and turning connecting plate 7 rise pull out hole 6 be easy to reclaim when, inserted to pull out and used equipment.
Cornical 3 is welded on the first plate body 1, the second plate body 2 and turning connecting plate 7, can both strengthen the first plate body 1, The intensity of two plate bodys 2 and turning connecting plate 7, reduces the first plate body 1, the second plate body 2 and turning connecting plate 7 and becomes in pressurized process Shape, when also allowing for reclaiming, has put to pull out and has used rope, be easy to pull out.
In Excavation Process, first several special first plate bodys 1 and the alternating of the second plate body 2 are pressed into needs and are opened The depth for digging the periphery of foundation ditch, the first plate body 1 and the press-in of 2 bottom of the second plate body exceedes foundation depth, adjacent 1 He of the first plate body Second plate body 2 is fitting to connection into an entirety by concavo-convex, and is bolted and further fixes.Around the corner, using turning Angle connecting plate 7 realizes the connection of turning round of the first plate body 1 and the second plate body 2.At the end for the treatment of base pit engineering, the first plate body 1, the second plate Body 2 and turning connecting plate 7 can be extracted and be recycled.
This utility model has simple structure, is easy to process the advantage with construction and installation, and the first plate body 1, the second plate body 2 Be pressed into after the soil body with turning connecting plate 7 and immediately can just play effect, stability is provided for foundation ditch.
Cornical 3 inside first plate body 1, the second plate body 2 and turning connecting plate 7 also improves the intensity of itself, reduces First plate body 1, the second plate body 2 and turning connecting plate 7 are being pushed and are acting the deformation during pulling out.
First plate body 1, the second plate body 2 and turning connecting plate 7 be by concavo-convex fitting connection, and be bolted into One step is reinforced, and goes along with sb. to guard him intensity high;And the infiltration that concavo-convex fitting connection enables this utility model overall is by force, is not in bright Aobvious gap.
This utility model is low for the requirement in place, is applicable to most of base pit engineering, and the suitability is good, globality By force;Special steel beam column and connector is recyclable reuses, greatly reduces the cost of foundation pit enclosure, low-carbon environment-friendly.
Construction method of installation of the present utility model is as follows:
1) static pressure construction:First plate body 1, the second plate body 2 and turning connecting plate 7 size and dimension is by practical situation and sets Meter requires design, the first special plate body 1 and the second plate body 2 is applied according to static pressure in the position for needing to arrange foundation pit enclosure structure Work method alternating is pressed in the soil body, and guarantees that the first plush copper 21 of the second plate body 2 is inserted into the first groove 11 of the first plate body 1 It is interior, together with adjacent second plate body 2 is inlayed with the first plate body 1, constitute an entirety;The static pressure of the first plate body 1 and the second plate body 2 Compression distance is determined according to specification and design.
2) bolt connection:Bolt is penetrated the second screw 5 on the first screw 4 and the second plate body 2 on the first plate body 1, The first adjacent plate body 1 and the second plate body 2 are screwed together by bolt, several first plate bodys 1 and the second plate body 2 are formed One more firm overall.
3) corner's connection:Static pressure is pressed into turning connecting plate 7 around the corner, to realize the first plate by turning connecting plate 7 The connection of turning round of body 1 and the second plate body 2, by the first groove 11 of 72 embedded first plate body 1 of the second plush copper of turning connecting plate 7 Interior, the first plush copper 21 of the second plate body 2 is embedded in the second groove 8 of turning connecting plate 7, because of the second plush copper 72 and the second groove 71 Angle be 90 °, the first plate body 1 and the second plate body 2 realize vertical connection;The connection of first plate body 1, the second plate body 2 and turning Plate 7 is fitting to connection and forms an entirety.
4) corner strengthens connection:Bolt is penetrated on the first screw 4 and the turning connecting plate 7 on the first plate body 1 Three screws 9, meanwhile, bolt is penetrated the 4th screw 8 on the second screw 5 and the turning connecting plate 7 on the second plate body 1, is passed through Bolt is screwed together the first plate body 1, turning connecting plate 7 and the second plate body 2, the first plate body 1, turning connecting plate 7 and second Plate body 2 further connects, and forms a more firm entirety.
5) whole Foundation Pit Support Engineering is completed according to aforementioned four step, form foundation pit system.
6), after Foundation Pit Support Engineering terminates, will rise and pull out rising of arranging that insertion is previously provided with and pull out in hole or rope is enclosed within into abdomen On pipe 3, the first plate body 1, turning connecting plate 7 and the second plate body 2 are extracted into recovery one by one.
Content described in this specification embodiment is only enumerating for the way of realization to utility model design, and this practicality is new The protection domain of type is not construed as being only limitted to the concrete form of embodiment statement, protection domain of the present utility model also and in Those skilled in the art according to this utility model design it is conceivable that equivalent technologies mean.

Claims (10)

1. a kind of recyclable foundation pit enclosure structure, it is characterised in that:Including the first plate body and the second plate body that are vertically arranged, and the The vertically insertion of the inner chamber of one plate body and the second plate body;
The left and right sides of the first plate body caves inward to form the first groove, and the left and right sides of the second plate body has outwardly One plush copper, the first plate body and the second plate body are detachably connected by the first groove and the first plush copper;
The left and right sides of the first plate body is provided with the first screw, and the left and right sides of the second plate body is provided with the second screw, the first screw and The horizontal insertion of second screw, bolt pass through the first screw and the second screw to be screwed together the first plate body and the second plate body, with Further by strong first plate body and the bonding strength of the second plate body;
Cornical is equipped with the top of the top of the first plate body and the second plate body, the cornical is horizontally set on the first plate body and second In the cavity of plate body, and the two ends of cornical are fixed on the internal face of the first plate body inner chamber or the second plate body inner chamber;
Before and after first plate body, two facades, two facades in front and back of the second plate body are equipped with rising for insertion and pull out hole.
2. a kind of recyclable foundation pit enclosure structure as claimed in claim 1, it is characterised in that:Also include turning connecting plate, institute State the first plate body and the second plate body to be connected by turning connecting plate in corner, the front facade of the turning connecting plate is provided with and the Second plush copper of one fit depressions, the side of the turning connecting plate are provided with the second groove being engaged with the first plush copper.
3. a kind of recyclable foundation pit enclosure structure as claimed in claim 1, it is characterised in that:Also include turning connecting plate, institute State the first plate body and the second plate body to be connected by turning connecting plate in corner, the side of the turning connecting plate is provided with and first Second plush copper of fit depressions, the front facade of the turning connecting plate are provided with the second groove being engaged with the first plush copper.
4. as claimed in claim 2 or claim 3 a kind of recyclable foundation pit enclosure structure, it is characterised in that:Second plush copper and second recessed The angle of groove is 90 °.
5. a kind of recyclable foundation pit enclosure structure as claimed in claim 4, it is characterised in that:First screw is along vertically side To being arranged on the boss of the first groove both sides, second screw is arranged vertically at the side of the first plush copper both sides On.
6. a kind of recyclable foundation pit enclosure structure as claimed in claim 5, it is characterised in that:First screw is along vertically side To the bottom land for being arranged on the first groove, second screw is arranged vertically on the convex surface of the first plush copper.
7. a kind of recyclable foundation pit enclosure structure as described in claim 5 or 6, it is characterised in that:On the turning connecting plate The first screw of correspondence and the second screw are respectively equipped with the 3rd screw and the 4th screw.
8. a kind of recyclable foundation pit enclosure structure as claimed in claim 7, it is characterised in that:The top of the turning connecting plate Cornical also is provided with, cornical is horizontally set in the cavity of turning connecting plate, and the two ends of cornical are fixed on turning connecting plate inner chamber Inwall on.
9. a kind of recyclable foundation pit enclosure structure as claimed in claim 8, it is characterised in that:Before and after the turning connecting plate Two facades also are provided with symmetrical rising and pull out hole.
10. a kind of recyclable foundation pit enclosure structure as claimed in claim 9, it is characterised in that:The two ends of the cornical are fixed Before and after the first plate body, the second plate body or turning connecting plate on the back side of two facades.
CN201620542593.9U 2016-06-06 2016-06-06 Recoverable foundation pit retaining structure Expired - Fee Related CN206090576U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620542593.9U CN206090576U (en) 2016-06-06 2016-06-06 Recoverable foundation pit retaining structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620542593.9U CN206090576U (en) 2016-06-06 2016-06-06 Recoverable foundation pit retaining structure

Publications (1)

Publication Number Publication Date
CN206090576U true CN206090576U (en) 2017-04-12

Family

ID=58471838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620542593.9U Expired - Fee Related CN206090576U (en) 2016-06-06 2016-06-06 Recoverable foundation pit retaining structure

Country Status (1)

Country Link
CN (1) CN206090576U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862882A (en) * 2016-06-06 2016-08-17 浙江工业大学 Recyclable foundation pit support structure
CN107740422A (en) * 2017-09-25 2018-02-27 谭增红 A kind of foundation ditch protective stent of high safety performance

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862882A (en) * 2016-06-06 2016-08-17 浙江工业大学 Recyclable foundation pit support structure
CN107740422A (en) * 2017-09-25 2018-02-27 谭增红 A kind of foundation ditch protective stent of high safety performance

Similar Documents

Publication Publication Date Title
CN100580195C (en) Large depth underground continuous wall water-stop joint device
CN203334322U (en) Seepage-prevention slurry blocking device of underground continuous wall
CN206090576U (en) Recoverable foundation pit retaining structure
CN213062029U (en) Energy-conserving pile roof beam erects anchor supporting construction based on excavation supporting
CN206090532U (en) Foundation pit retaining structure with cornical and bottom are pyramid
CN202559375U (en) H-shaped steel underground diaphragm wall base pit support structure
CN203593968U (en) Steel tube bamboo row frame for shallow hole blasting excavation bridge foundation bit construction
CN205975624U (en) Recoverable foundation pit retaining structure with pull -out hole
CN205975623U (en) Recoverable foundation pit retaining structure with screw
CN205975625U (en) Recoverable foundation pit retaining structure with cornical
CN202559363U (en) Foundation pit supporting structure for underground diaphragm wall with steel structure
CN206090575U (en) Bottom is foundation pit retaining structure of pyramid
CN205975581U (en) Foundation pit retaining structure with screw and bottom are pyramid
CN206090574U (en) Foundation pit enclosure structure
CN201125396Y (en) Underground continuous wall water stop joint device
CN105862880A (en) Recoverable foundation pit support structure with pull-out holes
CN208293573U (en) A kind of fixed frame can be used for different-diameter steel pile casting
CN105908758A (en) Foundation pit supporting structure with bottom in pyramid shape
CN105862881A (en) Recoverable foundation pit support structure with screw holes
CN105862882A (en) Recyclable foundation pit support structure
CN105839646A (en) Recoverable foundation pit support structure with web pipes
CN110258528B (en) Assembled and inserted self-clamping type prefabricated hollow underground continuous wall and construction method thereof
CN108661056B (en) Pile plate up-and-down combined supporting structure and construction process
CN206784451U (en) It is a kind of to be used to anti-gush blowout water installations in anchor pole pore forming process
CN218233504U (en) Ground supporting device for rock-soil construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170412

Termination date: 20200606