CN105862882A - Recyclable foundation pit support structure - Google Patents
Recyclable foundation pit support structure Download PDFInfo
- Publication number
- CN105862882A CN105862882A CN201610398191.0A CN201610398191A CN105862882A CN 105862882 A CN105862882 A CN 105862882A CN 201610398191 A CN201610398191 A CN 201610398191A CN 105862882 A CN105862882 A CN 105862882A
- Authority
- CN
- China
- Prior art keywords
- plate body
- screw
- plate
- connecting plate
- board body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
Abstract
The invention discloses a recyclable foundation pit support structure. An inner cavity of a first board body and an inner cavity of a second board body penetrate through the first board body and the second board body in the vertical direction respectively; the left side and the right side of the first board body are concaved inwards to form first grooves, the left side and the right side of the second board body are provided with first convex heads which are convex outwards, and the first board body and the second board body are detachably connected through the first grooves and the first convex heads; the left side and the right side of the first board body are provided with first threaded holes, the left side and the right side of the second board body are provided with second threaded holes, the first threaded holes and the second threaded holes are horizontally communicated, and bolts penetrate through the first threaded holes and the second threaded holes to tightly screw the first board body and the second board body together; the top of the first board body and the top of the second board body are each provided with a web pipe, the web pipes are horizontally arranged in the cavity of the first board body and the cavity of the second board body, and the two ends of each web pipe are fixed to the inner wall face of the inner cavity of the first board body or the second board body; the front vertical face and the back vertical face of the first board body and the front vertical face and the back vertical face of the second board body are all provided with pulling through holes.
Description
Technical field
The present invention relates to a kind of recyclable foundation pit enclosure structure.
Background technology
Along with the development of the underground space, constructing for convenience, the depth requirements of foundation ditch is also got over
Come the highest.The excavation of foundation ditch typically requires some building enclosures to improve overall the stablizing of foundation ditch
Property.
The Chinese patent of Publication No. CN202559363U discloses a kind of Underground Steel even
Continuous wall base pit supporting construction, several between the stake being arranged parallel between H profile steel respectively
Connected by front-seat steel sheet pile, heel row steel sheet pile, front-seat steel sheet pile, heel row steel sheet pile, adjacent
Inter-pile soil is formed between H profile steel between two stakes.Although it is overall that this invention can increase support system
Rigidity, but component itself is the most complicated, the junction rigidity of each component is relatively low, easily
Foundation ditch is caused locally to destroy.
The Chinese patent of Publication No. CN202610806U discloses a kind of H profile steel and goes along with sb. to guard him knot
Structure, the web of H profile steel one end has been respectively provided on two sides with topping anvil, the wing plate of H profile steel one end
On be provided with a word length hole vertically, be connected to by connecting plate between two adjacent H profile steel
Together.Though it is high that this steel building enclosure entirety goes along with sb. to guard him intensity, good stability, but junction
Waterproof ability is the poorest, easily causes foundation ditch infiltration.
Summary of the invention
For overcoming existing the problems referred to above, the present invention provide one, quick construction, integral rigidity big,
The recyclable foundation pit enclosure structure that component is recyclable, overall performance is excellent and water-impervious performance is good.
The technical solution used in the present invention is:
A kind of recyclable foundation pit enclosure structure, including the first plate body being vertically arranged and the second plate
Body, and the inner chamber of the first plate body and the second plate body is the most through;
The left and right sides of the first plate body caves inward and forms the first groove, the left and right two of the second plate body
Side has the first outwardly plush copper, the first plate body and the second plate body by the first groove and the
One plush copper removably connects;
The left and right sides of the first plate body is provided with the first screw, and the left and right sides of the second plate body is provided with
Two screws, the first screw and the second screw level are through, and bolt passes the first screw and the second spiral shell
First plate body and the second plate body are screwed together by hole, with further by strong first plate body and second
The bonding strength of plate body;
The top of the first plate body and the top of the second plate body are equipped with cornical, and described cornical level sets
Put in the cavity of the first plate body and the second plate body, and the two ends of cornical are fixed in the first plate body
On the internal face of chamber or the second plate body inner chamber;
Before and after first plate body, before and after two facades, the second plate body, two facades are equipped with through rising
Pull out hole.
Further, also including turning connecting plate, described first plate body and the second plate body are in corner
Being connected by turning connecting plate, the front facade of described turning connecting plate is provided with and the first recess
The second plush copper closed, the side of described turning connecting plate is provided with second matched with the first plush copper
Groove.
Or, also including turning connecting plate, described first plate body and the second plate body are logical in corner
Crossing turning connecting plate to be connected, the side of described turning connecting plate is provided with and the first fit depressions
Second plush copper, it is recessed that the front facade of described turning connecting plate is provided with second matched with the first plush copper
Groove.
Further, the angle of the second plush copper and the second groove is 90 °.
Further, described first screw is arranged vertically at the boss of the first groove both sides
On, described second screw is arranged vertically on the side of the first plush copper both sides.
Or, described first screw is arranged vertically at the bottom land of the first groove, and described
Two screws are arranged vertically on the convex surface of the first plush copper.
Further, on the connecting plate of described turning, corresponding first screw and the second screw are respectively equipped with
Three screws and the 4th screw.
Further, the top of described turning connecting plate also is provided with cornical, and cornical is horizontally set on and turns
In the cavity of angle connecting plate, and the two ends of cornical are fixed on the inwall of turning connecting plate inner chamber.
Further, before and after the connecting plate of described turning, two facades also are provided with rising of symmetry and pull out hole.
Further, the two ends of described cornical are fixed on the first plate body, the second plate body or turning connection
Before and after plate on the back side of two facades.
Beneficial effects of the present invention is embodied in:
Adjacent plate body is all by concavo-convex fitting connection, and is bolted reinforcing further,
Go along with sb. to guard him intensity high;And water-impervious performance that concavo-convex fitting connection makes the present invention overall is strong, will not
Obvious gap occurs.
The present invention is low for the requirement in place, is applicable to most of base pit engineering, is suitable for
Property is good, and globality is strong;The equal recoverable of plate body, greatly reduces the cost of foundation pit enclosure,
Low-carbon environment-friendly.
Accompanying drawing explanation
Fig. 1 is the first plate body and the structural representation of the second plate body.
Fig. 2 is the structural representation of turning connecting plate.
The structural representation that Fig. 3 is the first plate body and the second plate body is connected.
Fig. 4 is the structural representation that the first plate body, the second plate body are connected with turning connecting plate.
Detailed description of the invention
Referring to the drawings, a kind of recyclable foundation pit enclosure structure, including the first plate body being vertically arranged
1 and second plate body 2, and the inner chamber of the first plate body 1 and the second plate body 2 the most vertically passes through
Logical, in order to make earth enter the first plate body 1 and the second plate body 2 during the press-in soil body
Inner chamber;
The left and right sides of the first plate body 1 caves inward and forms the first groove 11, the second plate body 2
The left and right sides there is the first outwardly plush copper 21, the first plate body 1 and the second plate body 2
Realize removably connecting by the first groove 11 and the first plush copper 21;
The left and right sides of the first plate body 1 is provided with the first screw 4, the left and right sides of the second plate body 2
Being provided with the second screw 5, the first screw 4 and the second screw 5 level are through, and bolt passes first
First plate body 1 and the second plate body 2 are screwed together, to enter one by screw 4 and the second screw 5
Step is by strong first plate body 1 and the bonding strength of the second plate body 2;
The top of the first plate body 1 and the top of the second plate body 2 are equipped with cornical 3, described cornical
In 3 cavitys being horizontally set on the first plate body 1 and the second plate body 2, and the two ends of cornical 3 are solid
It is scheduled on the internal face of the first plate body 1 inner chamber or the second plate body 2 inner chamber;
Before and after first plate body 1, before and after two sides, the second plate body 2, two sides is equipped with through rising
Pull out hole 6.
Present invention additionally comprises turning connecting plate 7, described first plate body 1 and the second plate body 2 are turning
Crook is connected by turning connecting plate 7, and the front facade of described turning connecting plate 7 is provided with and first
The second plush copper 72 that groove 11 matches, the side of described turning connecting plate 7 is provided with and first
The second groove 71 that plush copper 21 matches;Or, the second plush copper 72 is arranged on turning and connects
The side of plate 7, the second groove 71 is arranged on the front facade of turning connecting plate 7.
The angle of the second plush copper 72 and the second groove 71 is 90 °.
Described first screw 4 is arranged vertically on the boss of the first groove 11 both sides,
Described second screw 5 is arranged vertically on the side of the first plush copper 21 both sides.
Or, described first screw 4 is arranged vertically at the bottom land of the first groove 11,
Described second screw 5 is arranged vertically on the convex surface of the first plush copper 21.
On described turning connecting plate 7, corresponding first screw 4 and the second screw 5 are respectively equipped with the 3rd
Screw 9 and the 4th screw 8.
The top of described turning connecting plate 7 also is provided with cornical 3, and cornical 3 is horizontally set on turning
In the cavity of connecting plate 7, and the two ends of cornical 7 are fixed on the inwall of turning connecting plate inner chamber;
Before and after described turning connecting plate 7, two facades also are provided with rising of symmetry and pull out hole 6.
The two ends of described cornical 3 are fixed on the first plate body the 1, second plate body 2 or turning connecting plate
Before and after 7 on the back side of two facades.And cornical 3 distance the first plate body the 1, second plate body 2 or turn
The optimal distance at angle connecting plate 7 top is 0.5m.
On first plate body the 1, second plate body 2 and turning connecting plate 7 rise pull out hole 6 be easy to reclaim
Time, insert to pull out and used equipment.
Cornical 3 is welded on first plate body the 1, second plate body 2 and turning connecting plate 7, both may be used
To strengthen the first plate body the 1, second plate body 2 and intensity of turning connecting plate 7, reduce by the first plate
Body the 1, second plate body 2 and turning connecting plate 7 deform in pressurized process, when also allowing for reclaiming,
Put and pulled out with rope, it is simple to risen and pull out.
In Excavation Process, first by special several the first plate body 1 and second plate bodys 2
Alternately it is pressed into the periphery needing excavation pit, the first plate body 1 and the press-in of the second plate body 2 bottom
The degree of depth exceed foundation depth, the first adjacent plate body 1 and the second plate body 2 are by concavo-convex chimeric
Connect into an entirety, and be bolted the most fixing.Around the corner, turning is used
Connecting plate 7 realizes the first plate body 1 and the connection of turning round of the second plate body 2.Treat that base pit engineering terminates
Time, first plate body the 1, second plate body 2 and turning connecting plate 7 all can be extracted and recycle.
The present invention has simple in construction, it is simple to processing and the advantage of construction and installation, and the first plate
Body the 1, second plate body 2 and turning connecting plate 7 immediately just can play effect after being pressed into the soil body,
Stability is provided for foundation ditch.
Cornical 3 within first plate body the 1, second plate body 2 and turning connecting plate 7 also improves
The intensity of self, decrease first plate body the 1, second plate body 2 and turning connecting plate 7 under press
With the deformation risen during pulling out.
First plate body the 1, second plate body 2 and turning connecting plate 7 are all by concavo-convex fitting connection,
And it is bolted reinforcing further, go along with sb. to guard him intensity high;And concavo-convex fitting connection makes this
The water-impervious performance of bright entirety is strong, does not haves obvious gap.
The present invention is low for the requirement in place, is applicable to most of base pit engineering, is suitable for
Property is good, and globality is strong;Special steel beam column and connector is recyclable reuses, greatly reduces
The cost of foundation pit enclosure, low-carbon environment-friendly.
The construction method of installation of the present invention is as follows:
1) static pressure construction: the first plate body the 1, second plate body 2 and size of turning connecting plate 7
With shape by practical situation and design requirement design, needing to arrange the position of foundation pit enclosure structure
The first special plate body 1 and the second plate body 2 are alternately pressed into according to static-pressure construction method the soil body
In, and guarantee that the first plush copper 21 of the second plate body 2 is inserted into the first groove of the first plate body 1
In 11, together with adjacent second plate body 2 is embedded in the first plate body 1, constitute an entirety;
The static pressure compression distance of the first plate body 1 and the second plate body 2 determines according to specification and design.
2) bolt connects: bolt penetrates the first screw 4 and the second plate on the first plate body 1
The second screw 5 on body 2, is twisted the first adjacent plate body 1 and the second plate body 2 by bolt
The most together, several first plate bodys 1 and the second plate body 2 form a more firm entirety.
3) corner connects: static pressure press-in turning connecting plate 7 around the corner, to pass through turning
Connecting plate 7 realizes the first plate body 1 and the connection of turning round of the second plate body 2, by turning connecting plate 7
The second plush copper 72 embed in the first groove 11 of the first plate body 1, the first of the second plate body 2
Plush copper 21 embeds in the second groove 8 of turning connecting plate 7, because the second plush copper 72 and second is recessed
The angle of groove 71 is 90 °, and the first plate body 1 and the second plate body 2 achieve vertical connection;First
Plate body the 1, second plate body 2 and turning connecting plate 7 are fitting to connection and form an entirety.
4) corner adds strong ties: the first screw 4 He being penetrated by bolt on the first plate body 1
The 3rd screw 9 on turning connecting plate 7, meanwhile, penetrates on the second plate body 1 by bolt
The 4th screw 8 on two screws 5 and turning connecting plate 7, by bolt the first plate body 1,
Turning connecting plate 7 and the second plate body 2 are screwed together, the first plate body 1, turning connecting plate 7
Connect further with the second plate body 2, form a more firm entirety.
5) complete whole Foundation Pit Support Engineering according to aforementioned four step, form foundation pit enclosure body
System.
6) after Foundation Pit Support Engineering terminates, by rise pull out arrange insert be previously provided with rise pull out in hole
Or rope is enclosed within cornical 3, by the first plate body 1, turning connecting plate 7 and the second plate body
2 extract recovery one by one.
Content described in this specification embodiment is only the example of the way of realization to inventive concept
Lifting, protection scope of the present invention is not construed as being only limitted to the concrete form of embodiment statement,
Protection scope of the present invention also and can be thought according to present inventive concept in those skilled in the art
The equivalent technologies means arrived.
Claims (10)
1. a recyclable foundation pit enclosure structure, it is characterised in that: include be vertically arranged
One plate body and the second plate body, and the inner chamber of the first plate body and the second plate body the most vertically passes through
Logical;
The left and right sides of the first plate body caves inward and forms the first groove, the left and right two of the second plate body
Side has the first outwardly plush copper, the first plate body and the second plate body by the first groove and the
One plush copper removably connects;
The left and right sides of the first plate body is provided with the first screw, and the left and right sides of the second plate body is provided with
Two screws, the first screw and the second screw level are through, and bolt passes the first screw and the second spiral shell
First plate body and the second plate body are screwed together by hole, with further by strong first plate body and second
The bonding strength of plate body;
The top of the first plate body and the top of the second plate body are equipped with cornical, and described cornical level sets
Put in the cavity of the first plate body and the second plate body, and the two ends of cornical are fixed in the first plate body
On the internal face of chamber or the second plate body inner chamber;
Before and after first plate body, before and after two facades, the second plate body, two facades are equipped with through rising
Pull out hole.
A kind of recyclable foundation pit enclosure structure the most as claimed in claim 1, it is characterised in that:
Also include that turning connecting plate, described first plate body and the second plate body are connected by turning in corner
Plate is connected, and the front facade of described turning connecting plate is provided with convex with the second of the first fit depressions
Head, the side of described turning connecting plate is provided with the second groove matched with the first plush copper.
A kind of recyclable foundation pit enclosure structure the most as claimed in claim 1, it is characterised in that:
Also include that turning connecting plate, described first plate body and the second plate body are connected by turning in corner
Plate is connected, and the side of described turning connecting plate is provided with the second plush copper with the first fit depressions,
The front facade of described turning connecting plate is provided with the second groove matched with the first plush copper.
A kind of recyclable foundation pit enclosure structure the most as claimed in claim 2 or claim 3, its feature
It is: the angle of the second plush copper and the second groove is 90 °.
A kind of recyclable foundation pit enclosure structure the most as claimed in claim 4, it is characterised in that:
Described first screw is arranged vertically on the boss of the first groove both sides, described second spiral shell
Hole is arranged vertically on the side of the first plush copper both sides.
A kind of recyclable foundation pit enclosure structure the most as claimed in claim 5, it is characterised in that:
Described first screw is arranged vertically at the bottom land of the first groove, and described second screw is along perpendicular
Nogata is on the convex surface being arranged on the first plush copper.
7. the recyclable foundation pit enclosure structure of one as described in claim 5 or 6, its feature
It is: on the connecting plate of described turning, corresponding first screw and the second screw are respectively equipped with the 3rd screw
With the 4th screw.
A kind of recyclable foundation pit enclosure structure the most as claimed in claim 7, it is characterised in that:
The top of described turning connecting plate also is provided with cornical, and cornical is horizontally set on the sky of turning connecting plate
Intracavity, and the two ends of cornical are fixed on the inwall of turning connecting plate inner chamber.
A kind of recyclable foundation pit enclosure structure the most as claimed in claim 8, it is characterised in that:
Before and after the connecting plate of described turning, two facades also are provided with rising of symmetry and pull out hole.
A kind of recyclable foundation pit enclosure structure the most as claimed in claim 9, it is characterised in that:
The two ends of described cornical are fixed on before and after the first plate body, the second plate body or turning connecting plate two and stand
On the back side in face.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610398191.0A CN105862882A (en) | 2016-06-06 | 2016-06-06 | Recyclable foundation pit support structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610398191.0A CN105862882A (en) | 2016-06-06 | 2016-06-06 | Recyclable foundation pit support structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105862882A true CN105862882A (en) | 2016-08-17 |
Family
ID=56675956
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610398191.0A Pending CN105862882A (en) | 2016-06-06 | 2016-06-06 | Recyclable foundation pit support structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105862882A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2260103Y (en) * | 1996-08-05 | 1997-08-20 | 郭同元 | Pile |
KR100743474B1 (en) * | 2007-05-21 | 2007-07-30 | (주)한터인종합건축사사무소 | Earth of building land-side protection wall structure |
CN101956454A (en) * | 2010-10-16 | 2011-01-26 | 徐秀良 | Hollow filled plastic-steel building template and composite structure |
CN103938614A (en) * | 2014-05-05 | 2014-07-23 | 张武 | Strengthening type prestressed concrete corrugated plate pile |
CN204401626U (en) * | 2014-11-11 | 2015-06-17 | 江苏鼎达建筑新技术有限公司 | A kind of П type assembling sheet pile supporting and protection structure |
CN206090576U (en) * | 2016-06-06 | 2017-04-12 | 浙江工业大学 | Recoverable foundation pit retaining structure |
-
2016
- 2016-06-06 CN CN201610398191.0A patent/CN105862882A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2260103Y (en) * | 1996-08-05 | 1997-08-20 | 郭同元 | Pile |
KR100743474B1 (en) * | 2007-05-21 | 2007-07-30 | (주)한터인종합건축사사무소 | Earth of building land-side protection wall structure |
CN101956454A (en) * | 2010-10-16 | 2011-01-26 | 徐秀良 | Hollow filled plastic-steel building template and composite structure |
CN103938614A (en) * | 2014-05-05 | 2014-07-23 | 张武 | Strengthening type prestressed concrete corrugated plate pile |
CN204401626U (en) * | 2014-11-11 | 2015-06-17 | 江苏鼎达建筑新技术有限公司 | A kind of П type assembling sheet pile supporting and protection structure |
CN206090576U (en) * | 2016-06-06 | 2017-04-12 | 浙江工业大学 | Recoverable foundation pit retaining structure |
Non-Patent Citations (1)
Title |
---|
刘昌辉等: "《基础工程学》", 30 March 2005 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112095620B (en) | Foundation pit supporting structure and construction method thereof | |
CN110529151A (en) | A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method | |
CN206090532U (en) | Foundation pit retaining structure with cornical and bottom are pyramid | |
CN206090576U (en) | Recoverable foundation pit retaining structure | |
CN202559363U (en) | Foundation pit supporting structure for underground diaphragm wall with steel structure | |
CN205975623U (en) | Recoverable foundation pit retaining structure with screw | |
CN205975625U (en) | Recoverable foundation pit retaining structure with cornical | |
CN105862880A (en) | Recoverable foundation pit support structure with pull-out holes | |
CN105862882A (en) | Recyclable foundation pit support structure | |
CN205975624U (en) | Recoverable foundation pit retaining structure with pull -out hole | |
CN206090575U (en) | Bottom is foundation pit retaining structure of pyramid | |
CN105839646A (en) | Recoverable foundation pit support structure with web pipes | |
CN105862881A (en) | Recoverable foundation pit support structure with screw holes | |
CN205975581U (en) | Foundation pit retaining structure with screw and bottom are pyramid | |
CN104131570A (en) | Steel box enclosure device for foundation pit construction and construction method thereof | |
CN105908758A (en) | Foundation pit supporting structure with bottom in pyramid shape | |
CN204252119U (en) | The special-shaped supporting pile structure of X | |
CN207244672U (en) | A kind of dewatering well well lid assembly that can be born large-tonnage vehicle and roll | |
CN103132531A (en) | Foundation pit supporting system construction method | |
CN201125396Y (en) | Underground continuous wall water stop joint device | |
CN206090574U (en) | Foundation pit enclosure structure | |
CN105887802A (en) | Foundation pit support structure with screw holes and pyramid-shaped bottom | |
CN105887803A (en) | Foundation pit support structure with web pipes and pyramid-shaped bottom | |
CN105887894A (en) | Pit support structure | |
CN212026280U (en) | Vertical stock supporting construction of double row pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160817 |