CN205973684U - Portable insulating operation device of ascending a height of distribution lines - Google Patents

Portable insulating operation device of ascending a height of distribution lines Download PDF

Info

Publication number
CN205973684U
CN205973684U CN201620894000.5U CN201620894000U CN205973684U CN 205973684 U CN205973684 U CN 205973684U CN 201620894000 U CN201620894000 U CN 201620894000U CN 205973684 U CN205973684 U CN 205973684U
Authority
CN
China
Prior art keywords
bar
frame
gear
crane
guide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620894000.5U
Other languages
Chinese (zh)
Inventor
邹德华
刘夏清
牛捷
刘定国
欧乃成
章健军
胡弘莽
刘拓晟
陈隆
徐溧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Taiping Changsheng Electric Appliances Co Ltd
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Live Working Center of State Grid Hunan Electric Power Co
Original Assignee
Hunan Taiping Changsheng Electric Appliances Co Ltd
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Live Working Center of State Grid Hunan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Taiping Changsheng Electric Appliances Co Ltd, State Grid Corp of China SGCC, State Grid Hunan Electric Power Co Ltd, Live Working Center of State Grid Hunan Electric Power Co filed Critical Hunan Taiping Changsheng Electric Appliances Co Ltd
Priority to CN201620894000.5U priority Critical patent/CN205973684U/en
Application granted granted Critical
Publication of CN205973684U publication Critical patent/CN205973684U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a portable insulating operation device of ascending a height of distribution lines, include the motion chassis and set up elevating gear and the telescopic leg on it, elevating gear's top is equipped with the operation fill, the motion chassis includes crawler -type running gear and is fixed in the support frame on it, the both sides of support frame all are equipped with the translation subassembly of control telescopic leg motion, the translation subassembly includes the guide rail, the reverse wheel, the power supply, drive mechanism and slide bar, the one end of slide bar links to each other with the guide rail, the other end links to each other with telescopic leg, power supply and drive mechanism are located the slide bar outside, the reverse wheel is located the slide bar inboard, elevating gear is including basis frame and from outer to interior a plurality of grades of cranes that cup joint in proper order in the frame of basis, traction assembly and control elevating gear that the bottom of basis frame is equipped with control crane liters at different levels, fall the motion upright or the level set up the power device on crawler -type running gear, the crane fastens with the locating pin after going up and down to target in place, the operation is fought including insulating substrate and side fence.

Description

Distribution line mobile insulation ascending operation apparatus
Technical field
This utility model is related to a kind of ascending operation apparatus for distribution line, and more particularly, to a kind of distribution line moves Formula insulation ascending operation apparatus.
Background technology
Develop rapidly with rural economy and the increasing year by year of resident's household electrical appliance, " one draws a line, and one stops for power grid enterprises A sheet of " maintenance way can not meet rural electricity consumption demand, livewire work starts progressively to extend to agriculture distribution.And agriculture distribution Shaft tower is fragile, and during conventional bypass operation, bypass operation personnel need to stand on the insulated platform being installed on shaft tower , there is the risk of falling bar in operation process in operation.The safety of operating personnel cannot be guaranteed, and working performance is low, is unfavorable for electricity The development of net.
Simultaneously again due to during work high above the ground operating personnel away from ground, necessary at the stability of crane and job platform Protective measure extremely important for job safety.Further, since the restriction of transport, the use region of existing crane is limited, Mostly it is suitable only for the place of Land leveling, be not suitable for the complicated working environment of agriculture distribution distribution line.
In order to solve the above problems, people have developed aerial lift device with insulated arm, although aerial lift device with insulated arm is also a kind of good High-altitude operations tool, but, aerial lift device with insulated arm expensive, be not easy to promote on a large scale it is impossible to be widely used in each agriculture Distribution distribution line.
Utility model content
The purpose of this utility model is to provide a kind of applied widely, reliable simultaneously cheap joining of security performance Electric line mobile insulation ascending operation apparatus and method.
The utility model discloses a kind of distribution line mobile insulation ascending operation apparatus, including motion chassis and set Lowering or hoisting gear placed on it and telescopic outrigger, the top of lowering or hoisting gear is provided with operation bucket, and described motion chassis includes crawler type Walking mechanism and the bracing frame being fixed thereon, the both sides of bracing frame are equipped with the translation group controlling described telescopic outrigger motion Part, translation assembly include guide rail, reverse wheel, power source, drive mechanism and can along the reciprocating slide bar of guide rail, the one of slide bar End is connected with guide rail, the other end is connected with telescopic outrigger, and power source and drive mechanism are located at the outside of slide bar, reverse wheel positioned at cunning The inner side of bar, control slide bar stretches out bevel between direction and guide rail;
Described lowering or hoisting gear includes foundation frame and is socketed on some class B insulation performances in foundation frame from outside to inside successively Good crane, the bottom of foundation frame is provided with the traction component controlling crane ascending, descending campaigns at different levels and controls lowering or hoisting gear Upright or be horizontally placed on power set on crawler type walking mechanism, pass through alignment pin after lifting puts in place between cranes at different levels Fastening;
Described operation bucket includes being installed on the insulating base on lifting frame body top and is removably connected to insulating base On gusset hurdle.
Preferably, described power source is reducing motor, the output shaft of reducing motor is provided with output gear;Described transmission Mechanism includes gear shaft and tooth bar, and one end of gear shaft is provided with and is matched with the helical gear of output gear, the other end is to be matched with tooth The spur gear of bar;Described guide rail is provided with the U-rail of rib for opening;Described slide bar is rectangular structure, its length direction One end be provided be matched with the pulley of guide rail, the other end is provided with telescopic outrigger connecting seat, tooth bar is along the length direction setting of slide bar Thereon;Guide rail is fixed on the outside of support frame as described above length direction with its cecum, and slide bar is connected on guide rail by pulley, leads to Cross telescopic outrigger connecting seat to be connected with telescopic outrigger, reducing motor, gear shaft and reverse wheel are located at same one end end of guide rail, tooth Spur gear on wheel shaft and described reverse wheel are respectively positioned at the both sides of slide bar;Reducing motor output powered belt movable gear shaft rotation, Move along the tangential direction of reverse wheel with moving slide-bar.
Preferably, described translation assembly has four groups, it is symmetricly set in the both sides of support frame as described above length direction two-by-two, with The translation assembly of side goes to upper and lower arrangement.
Preferably, the bottom of described lowering or hoisting gear is provided with roller, the top of support frame as described above is provided with corresponding slide rail, sliding The end of rail is provided with limited block, and lowering or hoisting gear coordinates slide rail to be connected on bracing frame by roller.
Preferably, described power set are connected to inclusion support bar on bracing frame, drawstring, elevator and elevator motor, Elevator and elevator motor have two groups, are arranged on the median plane of described foundation frame width, and the two ends of drawstring are around in volume respectively Yang Shang, the geometric center of the middle part of drawstring and foundation frame bottom surface is fixed, and one end of support bar is articulated with described crawler-type traveling machine On structure, the other end be connected on foundation frame, elevator motor drives elevator rotation, and drawstring pulls foundation frame to move along described slide rail and join Close support bar and complete the upright switching and horizontality between of described lowering or hoisting gear.
Preferably, described traction component includes pull rope, pulley, reel and traction electric machine, the output shaft of traction electric machine Be connected as a single entity with reel, traction electric machine drive spool turns control pull rope along the pulley motion described crane of traction rise or under Fall.
Preferably, described foundation frame and crane are the rectangle frame that longitudinal and transverse bar is spliced, crane is using insulation Material is made, and the bottom surface of foundation frame is provided with rectangular installing plate;In order to improve stability further, on the top of cranes at different levels Portion corner is all connected with lateral conductor by fixing head, and the other end of lateral conductor respectively can with the described telescopic outrigger of relative position Dismounting connects;Described pulley is fixed with the cross bar of basic top of the trellis, the top of each crane, bottom bar are respectively and fixedly provided with institute State pulley, one end of pull rope is fixed on described reel, the other end is connected to inner side crane after bypassing each pulley successively On the cross bar at middle part.
In order to improve the reliability of elevating movement, described pull rope, pulley and reel all there are two groups, two reels are coaxial It is arranged in described installing plate width center to centrage, two winding drum is connected with the output shaft of described traction electric machine respectively, two Group pull rope is arranged symmetrically with regard to described crane width median plane.
For the ease of the realization of elevating movement, reduce frictional force, be equipped with the end of described cross bar and be easy to inner side lifting The nylon wheel of frame ascending, descending campaign;The turnover of operating personnel for convenience, leaves operating personnel on the wall of described foundation frame side and enters Mouthful;In order to reduce the inhomogeneities of crane stress, reduce accident risk, foundation frame is adopted the longitudinal and transverse of aluminum alloy material Bar is spliced, and described crane is spliced using the longitudinal and transverse bar of fiberglass, modified PVC material.
This utility model by by walking mechanism be set to crawler type walking mechanism make it preferably to be applied to various multiple Miscellaneous working environment;Operation height be increased by the setting of translation assembly and telescopic outrigger, improve job stabilization, prevent Ascend a height and lateral deviation occurs in operation process, improve security performance;By lowering or hoisting gear is set to foundation frame, crane, draw groups Part and power set, while satisfaction ascends a height job requirements, improve safety guarantee and also reduce cost of manufacture;By power The setting of device, enables lowering or hoisting gear to lie low in transport and is placed on crawler type walking mechanism, be readily transported, can be upright during operation On crawler type walking mechanism, it is easy to operation;By operation bucket is set to the assembly of insulating base and gusset hurdle it is ensured that making Industry avoids safely improve the convenience of demolition, installation while falling object from high altitude.
Brief description
Fig. 1 is the schematic perspective view of one preferred embodiment of this utility model.(Lateral conductor is not drawn into).
Fig. 2 is the three-dimensional enlarged diagram of Fig. 1 power set and traction component.
Diagram sequence number:
1 motion chassis, 2 lowering or hoisting gears, 3 operation buckets, 11 crawler type walking mechanisms, 12 telescopic outriggers, 13 translation assemblies, 14 bracing frames, 15 slide rails, 16 limited blocks, 131 guide rails, 132 slide bars, 133 deceleration electricity Machine, 134 gear shafts, 135 reverse wheels, 136 pulleys, 137 telescopic outrigger connecting seats, 138 tooth bars, 21 rollers, 22 foundation frames, 23 cranes, 24 traction components, 25 power set, 26 nylon wheels, 241 pull ropes, 242 Pulley, 243 reels, 244 traction electric machines, 251 support bars, 252 drawstrings, 253 elevators, 254 elevator motors.
Specific embodiment
As shown in Figure 1 and Figure 2, this distribution line mobile insulation ascending operation apparatus disclosed in the present embodiment, including fortune Dynamic chassis 1 and the lowering or hoisting gear 2 being arranged on, the top of lowering or hoisting gear 2 is provided with operation bucket 3.Wherein motion chassis 1 includes carrying out Belt walking mechanism 11, bracing frame 14, telescopic outrigger 12 and the translation assembly 13 controlling telescopic outrigger 12 motion, translation assembly 13 There are four groups, be symmetricly set in the both sides of crawler type walking mechanism 11 length direction two-by-two, the translation assembly 13 of homonymy goes to upper and lower cloth Put;The bottom of lowering or hoisting gear 2 is provided with roller 21, and the top of bracing frame 14 is provided with corresponding slide rail 15, and the end of slide rail 15 is provided with Limited block 16, lowering or hoisting gear 2 coordinates slide rail 15 to be connected on crawler type walking mechanism 11 by roller 21.
Translation assembly 13 includes guide rail 131, slide bar 132, reducing motor 133, gear shaft 134 and reverse wheel 135;Guide rail 131 are provided with the U-rail of rib for opening;The output shaft of reducing motor 133 is provided with output gear, and the one of gear shaft 134 End is provided with and is matched with the helical gear 1341 of output gear 136, the other end is spur gear 1342;Slide bar 132 is rectangular structure, its One end of length direction is provided with and is matched with the pulley 136 of guide rail 131, the other end is provided with telescopic outrigger connecting seat 137, slide bar 132 Outside is provided with the tooth bar 138 being matched with spur gear 1342 along its length;Guide rail 131 is fixed on crawler-type traveling machine with its cecum The outside of structure 11 length direction, slide bar 132 is connected on guide rail 131 by pulley 137, reducing motor 133, gear shaft 134 and Reverse wheel 135 is located at same one end end of guide rail 131, and the spur gear 1342 on gear shaft 134 and reverse wheel 135 are located at respectively and slide The both sides of bar 132;Reducing motor 133 output powered belt movable gear shaft 134 rotate, with moving slide-bar 132 along reverse wheel 135 tangent line Move in direction.
Lowering or hoisting gear 2 includes foundation frame 22 and is socketed on some grades of cranes in foundation frame 22 from outside to inside successively 23, foundation frame 22 and crane 23 are the rectangle frame that longitudinal and transverse bar is spliced, and the end of cross bar is equipped with for reducing friction Power is provided with rectangular installing plate in order to the nylon wheel 26 of inner side crane 23 ascending, descending campaign, the bottom surface of foundation frame 22.Install Plate is provided with the traction component 24 controlling crane 23 at different levels ascending, descending campaign, and the bottom of foundation frame 22 controls lowering or hoisting gear 2 upright Or it is horizontally placed on power set 25 on crawler type walking mechanism 11, by positioning after lifting puts in place between cranes 23 at different levels Lock solid.
Traction component 24 includes pull rope 241, pulley 242, reel 243 and traction electric machine 244, the horizontal stroke at foundation frame 22 top Pulley 242 is fixed with bar, the top of each crane 23, bottom bar are respectively and fixedly provided with pulley 242, one end of pull rope 241 It is fixed on reel 243, the other end is connected to after bypassing each pulley 242 successively on the cross bar at inner side crane 23 middle part, leads Draw the output shaft of motor 244 and reel 243 is connected as a single entity, traction electric machine 244 band movable reel 243 rotates and controls pull rope 241 edge Pulley 242 motion traction crane 23 rises or falls;Pull rope 241, pulley 242 and reel 243 all have two groups, two reels 243 common longitudinal center lines are arranged in installing plate width center, the two winding drum 243 output shaft phase with traction electric machine 244 respectively Even, two groups of pull ropes 221 are arranged symmetrically with regard to crane 23 width median plane.
Power set 25 include support bar 251,252, two elevators 253 of drawstring and two elevator motors 254, elevator 253 On the median plane that elevator motor 254 is all arranged in foundation frame 22 width, the two ends of drawstring 252 are around in different volumes respectively Raise on 253, the middle part of drawstring 252 is connected with the geometric center of foundation frame 22 bottom surface, one end of support bar 251 is articulated with crawler type In walking mechanism 11, the other end be connected on foundation frame 22, elevator motor 254 drive elevator 253 rotate, drawstring 252 pull base Plinth frame 22 moves along slide rail 15 and coordinates support bar 251, roller 21 and slide rail 15 to complete lowering or hoisting gear 2 uprightly and horizontality between Switching.In addition to being easy to operating personnel to enter internal climbing, foundation frame 22 side wall leaves operating personnel's entrance;For Reduce the inhomogeneities of crane stress, reduce accident risk, foundation frame 22 adopts the longitudinal and transverse bar splicing of aluminum alloy material Form, crane 23 is spliced using the longitudinal and transverse bar of isolation material.In order to improve stability further, in cranes at different levels 23 top corner is all connected with lateral conductor, the other end telescopic outrigger with corresponding position respectively of lateral conductor by fixing head 12 are detachably connected.
In sum, the present embodiment makes it preferably to be applied to by walking mechanism is set to crawler type walking mechanism Various complicated working environments, improve job stabilization by the setting of telescopic outrigger, occur in the operation process that prevents from ascending a height Lateral deviation, improves security performance, is being met by lowering or hoisting gear is set to foundation frame, crane, traction component and power set While job requirements of ascending a height, improve safety guarantee and also reduce cost of manufacture, by operation bucket is set to insulating base With the assembly on gusset hurdle it is ensured that improve the convenience of demolition, installation while job safety.

Claims (9)

1. a kind of distribution line mobile insulation ascending operation apparatus, including chassis and the lowering or hoisting gear being arranged on of moving And telescopic outrigger, the top of lowering or hoisting gear be provided with operation bucket it is characterised in that:Described motion chassis includes crawler type walking mechanism With the bracing frame being fixed thereon, the both sides of bracing frame are equipped with the translation assembly controlling described telescopic outrigger motion, translation group Part includes guide rail, reverse wheel, power source, drive mechanism and can be along the reciprocating slide bar of guide rail, one end of slide bar and guide rail It is connected, the other end is connected with telescopic outrigger, power source and drive mechanism are located at the interior of slide bar positioned at the outside of slide bar, reverse wheel Side, control slide bar stretches out bevel between direction and guide rail;
Some class B insulation performances that described lowering or hoisting gear includes foundation frame and is socketed in foundation frame from outside to inside successively are good Crane, the bottom of foundation frame is provided with the traction component controlling crane ascending, descending campaigns at different levels and controls lowering or hoisting gear upright Or it is horizontally placed on power set on crawler type walking mechanism, lifting between cranes at different levels is locked by positioning after putting in place Gu;
Described operation bucket includes being installed on the insulating base on lifting frame body top and is removably connected on insulating base Gusset hurdle.
2. distribution line mobile insulation ascending operation apparatus according to claim 1 it is characterised in that:Described power source For reducing motor, the output shaft of reducing motor is provided with output gear;Described drive mechanism includes gear shaft and tooth bar, gear shaft One end be provided be matched with the helical gear of output gear, the other end is the spur gear being matched with tooth bar;Described guide rail is opening It is provided with the U-rail of rib;Described slide bar be rectangular structure, one end of its length direction be provided be matched with guide rail pulley, The other end is provided with telescopic outrigger connecting seat, and tooth bar is arranged on along the length direction of slide bar;Guide rail is fixed on institute with its cecum State the outside of bracing frame length direction, slide bar is connected on guide rail by pulley, by telescopic outrigger connecting seat and telescopic outrigger It is connected, reducing motor, gear shaft and reverse wheel are located at same one end end, the spur gear on gear shaft and the described reverse wheel of guide rail It is located at the both sides of slide bar respectively;Reducing motor output powered belt movable gear shaft rotation, with moving slide-bar along reverse wheel tangential direction Motion.
3. distribution line mobile insulation ascending operation apparatus according to claim 2 it is characterised in that:Described translation group Part has four groups, is symmetricly set in the both sides of support frame as described above length direction two-by-two, and the translation assembly of homonymy goes to upper and lower arrangement.
4. distribution line mobile insulation ascending operation apparatus according to claim 1 it is characterised in that:Described lifting dress The bottom put is provided with roller, and the top of support frame as described above is provided with corresponding slide rail, and the end of slide rail is provided with limited block, lowering or hoisting gear Slide rail is coordinated to be connected on bracing frame by roller.
5. distribution line mobile insulation ascending operation apparatus according to claim 4 it is characterised in that:Described power dress Put the inclusion support bar being connected on bracing frame, drawstring, elevator and elevator motor, elevator and elevator motor have two groups, are arranged in On the median plane of described foundation frame width, the two ends of drawstring are around on elevator respectively, the middle part of drawstring and foundation frame bottom surface Geometric center fix, one end of support bar is articulated with described crawler type walking mechanism, the other end is connected on foundation frame, volume Raise motor and drive elevator rotation, drawstring pull foundation frame to move along described slide rail to complete described lowering or hoisting gear upright for cooperation support bar Switching and horizontality between.
6. distribution line mobile insulation ascending operation apparatus according to claim 1 it is characterised in that:Described draw groups Part includes pull rope, pulley, reel and traction electric machine, and the output shaft of traction electric machine and reel are connected as a single entity, and traction electric machine drives Spool turns control pull rope to rise or fall along the pulley motion described crane of traction.
7. distribution line mobile insulation ascending operation apparatus according to claim 6 it is characterised in that:Described foundation frame It is the rectangle frame that longitudinal and transverse bar is spliced with crane, the bottom surface of foundation frame is provided with rectangular installing plate;Cranes at different levels Top corner all lateral conductor is connected with by fixing head, the other end described flexible with relative position respectively of lateral conductor Lower limb is detachably connected;Described pulley is fixed with the cross bar of basic top of the trellis, all fixing on the top of each crane, bottom bar There is described pulley, one end of pull rope is fixed on described reel, the other end is connected to inner side and rises after bypassing each pulley successively On cross bar in the middle part of fall frame.
8. distribution line mobile insulation ascending operation apparatus according to claim 7 it is characterised in that:Described traction Rope, pulley and reel all have two groups, and two reels are total to longitudinal center line and are arranged in described installing plate width center, two winding drum It is connected with the output shaft of described traction electric machine respectively, two groups of pull ropes are with regard to the symmetrical cloth of described crane width median plane Put.
9. distribution line mobile insulation ascending operation apparatus according to claim 8 it is characterised in that:Described cross bar End is equipped with the nylon wheel being easy to inner side crane ascending, descending campaign, and described foundation frame side wall leaves operating personnel's entrance, Foundation frame is spliced using the longitudinal and transverse bar of aluminum alloy material, described crane adopt fiberglass, modified PVC material longitudinal and transverse Bar is spliced.
CN201620894000.5U 2016-08-18 2016-08-18 Portable insulating operation device of ascending a height of distribution lines Withdrawn - After Issue CN205973684U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620894000.5U CN205973684U (en) 2016-08-18 2016-08-18 Portable insulating operation device of ascending a height of distribution lines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620894000.5U CN205973684U (en) 2016-08-18 2016-08-18 Portable insulating operation device of ascending a height of distribution lines

Publications (1)

Publication Number Publication Date
CN205973684U true CN205973684U (en) 2017-02-22

Family

ID=58030944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620894000.5U Withdrawn - After Issue CN205973684U (en) 2016-08-18 2016-08-18 Portable insulating operation device of ascending a height of distribution lines

Country Status (1)

Country Link
CN (1) CN205973684U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106430006A (en) * 2016-08-18 2017-02-22 国网湖南省电力公司带电作业中心 Power distribution line mobile insulation climbing operation device and method
CN107285250A (en) * 2017-06-13 2017-10-24 孙景玉 A kind of Combined type power maintenance lift
CN110294440A (en) * 2019-06-21 2019-10-01 国网山东省电力公司临沂供电公司 Insulated platform lifting device
CN115123875A (en) * 2022-05-27 2022-09-30 国网山东省电力公司齐河县供电公司 Electric power construction draw gear

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106430006A (en) * 2016-08-18 2017-02-22 国网湖南省电力公司带电作业中心 Power distribution line mobile insulation climbing operation device and method
CN107285250A (en) * 2017-06-13 2017-10-24 孙景玉 A kind of Combined type power maintenance lift
CN110294440A (en) * 2019-06-21 2019-10-01 国网山东省电力公司临沂供电公司 Insulated platform lifting device
CN115123875A (en) * 2022-05-27 2022-09-30 国网山东省电力公司齐河县供电公司 Electric power construction draw gear

Similar Documents

Publication Publication Date Title
CN106430006B (en) Distribution line mobile insulation ascending operation apparatus and method
CN205973684U (en) Portable insulating operation device of ascending a height of distribution lines
CN103306199B (en) Mounting method of bottom width overhaul hanging basket of bridge
CN103183297B (en) Mobile rescue elevator and rescue vehicle
CN206511849U (en) A kind of mobile tower crane
CN106437118A (en) Movable lifter
CN203699606U (en) Lifter and iron tower
CN106698208A (en) Hoisting equipment and hoisting method for external transportation of super high-rise building
CN109025234A (en) A kind of building high-altitude vacantly construct with can level, vertically the track crane ship that walk
CN103274315B (en) Installing and hoisting device for side plate and upright of gas chamber
CN103306218B (en) Bottom width overhaul hanging basket of bridge
CN207903864U (en) A kind of side slope protection material lifting device
CN109368520A (en) Rail type material elevator
CN206359150U (en) A kind of hanging basket system
CN209038990U (en) A kind of spliced EMU wiper upkeep operation platform
CN108590146B (en) Frame-type lifting construction platform
CN206827927U (en) The explosion-proof crane of hydraulic platform is carried in double OPSs
CN214939299U (en) Movable suspension operation platform
CN205275061U (en) Semi -portal crane
CN210885045U (en) Tower crane with vertical ladder anti-falling device
CN208532052U (en) A kind of material lift device of the building safety with anti-collision effect
CN209583505U (en) A kind of power construction convenient type transport vehicle
CN206110628U (en) Portable lift
CN206985557U (en) A kind of double girder crane for preventing object crooked
CN206915597U (en) The overhead explosion-proof crane of hanging object anti-rock is played with the flexible wire saws of stretching

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170222

Effective date of abandoning: 20180612

AV01 Patent right actively abandoned