CN205973520U - Jack -up portal frame - Google Patents

Jack -up portal frame Download PDF

Info

Publication number
CN205973520U
CN205973520U CN201620964732.7U CN201620964732U CN205973520U CN 205973520 U CN205973520 U CN 205973520U CN 201620964732 U CN201620964732 U CN 201620964732U CN 205973520 U CN205973520 U CN 205973520U
Authority
CN
China
Prior art keywords
support
lifting
crane
portal frame
weight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620964732.7U
Other languages
Chinese (zh)
Inventor
刘程
刘俊峡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guoneng Daduhe maintenance and installation Co.,Ltd.
Original Assignee
MAINTENANCE AND INSTALLATION BRANCH OF GUODIAN DADU RIVER HYDROPOWER DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MAINTENANCE AND INSTALLATION BRANCH OF GUODIAN DADU RIVER HYDROPOWER DEVELOPMENT Co Ltd filed Critical MAINTENANCE AND INSTALLATION BRANCH OF GUODIAN DADU RIVER HYDROPOWER DEVELOPMENT Co Ltd
Priority to CN201620964732.7U priority Critical patent/CN205973520U/en
Application granted granted Critical
Publication of CN205973520U publication Critical patent/CN205973520U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)

Abstract

The utility model discloses a jack -up portal frame, include and lift by crane the field and arrange the support body that lifts by crane in lifting by crane the field, lift by crane the support body mainly by first support, second support, and connect and constitute at the spandrel girder on first support top and second support top, slide on the spandrel girder and be equipped with the lifting machine structure, its characterized in that: lift by crane heavy object mounting surface and heavy object transport road surface that the field has the halfpace structure, and heavy object mounting surface carries upwards arch of road surface for the heavy object, on the first support and the second support that lift by crane the support body are located heavy object mounting surface and the heavy object transport road surface in lifting by crane respectively, can make and lift by crane the support body and belong to the lifting machine structure horizontal slip on the spandrel girder, the heavy object that the portal frame lifted by crane is located the region that covers between first support and the second support. The utility model discloses the place of lifting by crane to halfpace structure, narrow space has fine adaptability, not only lifts by crane safety, lifts by crane the space moreover and occupies fewly.

Description

A kind of hoisting portal frame
Technical field
This utility model is related to crane gear, specifically a kind of hoisting portal frame.
Background technology
Crane gear refers to the electromechanical equipment for referring to carrying or moving heavy object, and hoisting portal frame is as common lifting Equipment, is widely applied to noon lifting carrying.
When the ground surface platform that weight mounting plane is higher than lifting Factory Building, no lifting suspension centre above weight, weight before lifting Can not move horizontally, for this situation, typically lifting carrying be carried out using hoisting portal frame.But, when hoisting portal frame peace When being contained on the weight both sides Factory Building bottom surface platform of lifting, extremely take the space of lifting Factory Building;When hoisting portal frame is arranged on When in the ground surface platform of lifting Factory Building side, the spandrel girder in lifting handling process will extend one section of load-bearing to outside hoisting portal frame Beam portion is divided, and when derricking gear is located on the spandrel girder of extension, force unbalance balances, and lifts by crane poor stability.
Content of the invention
The purpose of this utility model is:For above-mentioned the deficiencies in the prior art, provide a kind of lifting safety, lifting support body Space hold is few, a kind of hoisting portal frame of Fast Installation.
The technical solution adopted in the utility model is, a kind of hoisting portal frame, including lifting field and be arranged in lifting field Interior lifting support body, described lifting support body is mainly by first support, second support and be connected to first support top and second The spandrel girder composition on frame top, on described spandrel girder, slidable fit has derricking gear, and described lifting field has the weight of halfpace structure Thing mounting plane and weight carry road surface, and weight mounting plane raises up with respect to weight transport road face;Described upending frame The first support of body and second support are respectively seated on the weight mounting plane and weight carrying road surface in lifting field, can make Derricking gear level on the spandrel girder of lifting support body place is slided;The weight of described portal frame lifting is located at first support and second The region covering between support.
The height of described first support and weight mounting plane carry the height sum on road surface equal to second support from weight Height.
Further, it is equipped with many crossbeams between described first support and second support.
Further, it is connected with crossbeam by flange assembly between described first support and second support.
First support top and second support top are connected with corresponding spandrel girder by flange assembly respectively.
Further, described spandrel girder is in " work " font.
Mainly by pulling, list executes car to described derricking gear and chain block forms.
The bottom of described first support and second support is provided with the governor motion adjusting height.
The beneficial effects of the utility model are:
1. this utility model is directed to halfpace structure, the lifting place of narrow space has good adaptability, not only lifts by crane Safety, and it is few to lift by crane space hold.
2. it is attached using flange assembly, realize the Fast Installation of hoisting portal frame.
Brief description
Below in conjunction with the accompanying drawings this utility model is further described.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of first support in Fig. 1.
Fig. 3 is the structure of second support in Fig. 1 is to have figure.
Fig. 4 is the structural representation of Fig. 1 middle cross beam.
Fig. 5 is the structural representation of spandrel girder in Fig. 1.
In figure code name implication:1 first support;2 second supports;3 spandrel girders;4 pull single execution car;5 handss Draw calabash;6 weight mounting planes;7 weight carrying road surfaces;8 crossbeams;9 face-flanges;10 rim of the mouth flanges;11— Box flange;12 adjusting nuts;13 weights;14 lifting Factory Buildings.
Specific embodiment
Referring to shown in Fig. 1 to Fig. 5:This utility model is a kind of hoisting portal frame, including lifting field and be arranged in lifting In lifting support body, described lifting support body mainly by first support 1, second support 2 and be connected to first support 1 top and The spandrel girder 3 on second support 2 top forms, and this spandrel girder 3 is in " work " font.Between described first support 1 and second support 2 It is equipped with many horizontal strokes, 8, to increase stationarity and structural strength.
On above-mentioned spandrel girder 3, slidable fit has derricking gear, and the derricking gear in the present embodiment executes car 4 He by pulling list Chain block 5 forms.By pulling in derricking gear, level on spandrel girder 3 for single execution car 4 is slided and chain block 5 is upper The vertical lifting in lower direction is realizing the carrying of weight 13, to park.
Above-mentioned lifting field has weight mounting plane 6 and the weight carrying road surface 7 of halfpace structure, and weight mounting plane 6 Carry road surface 7 with respect to weight to raise up, raised weight mounting plane 6 is renovated for cement and formed in the present embodiment(Convex The weight mounting plane 6 rising can also be raised frame structure, raised column structure, also or, raised plastics block of wood, Raised wooden platform, or even hanging raised platforms);The first support 1 of described lifting support body and second support 2 are located respectively On the weight mounting plane 6 in lifting field and weight carrying road surface 7.Preferentially ensure the height of of described first support 1 itself The height sum carrying road surface 7 from weight with weight mounting plane 6 is equal to second support 2 height of itself, so can be more preferable The derricking gear level making on lifting support body place spandrel girder 3 slide;First support 1 and second support 2 are separately mounted to institute Need on the region of carrying heavy goods 13, weight mounting plane 6 and weight carry road surface 7, and the weight of described portal frame lifting is located at The region covering between first support 1 and second support 2, fully saves carrying space, is not in situations below:1). lifting The first support 1 of portal frame and second support 2 are arranged on this weight mounting plane 6 both sides with halfpace structure protrusions, Extremely take lifting Factory Building 14 space;2). the first support 1 of hoisting portal frame and second support 2 are arranged on this has halfpace Weight mounting plane 6 side of structure protrusions, lifting carrying is in two supports(First support 1 and second support 2)Outside It is impossible to reach a balance during spandrel girder 3 part, lift by crane poor stability;3). during weight 13 carrying, directly in lifting Factory Building 14 On back timber, derricking gear is installed, its very flexible, poor stability, carrying are limited in scope, and limited load bearing capacities.
In addition, for the set-up time shortening hoisting portal frame, passing through method between above-mentioned first support 1 and second support 2 Blue assembly is connected with crossbeam 8, and first support 1 top in the present embodiment and second support 2 adopt rim of the mouth flange 10 to dock crossbeam 8 On box flange 11.Above-mentioned first support 1 top and second support 2 top pass through flange assembly and corresponding spandrel girder 3 respectively Connect, its flange assembly adopts face-flange 9, and this face-flange 9 is respectively assembled at first support 1 top and second support 2 is pushed up The middle part at end.Guarantee Fast Installation, dismounting;In order to ensure the easy motion of derricking gear and the shadow installing bottom surface Ring, the bottom of first support 1 and second support 2 is provided with the governor motion adjusting height, using regulation spiral shell in the present embodiment Female 12;Repeatedly lift by crane to prevent from accurately lifting by crane in carrying, horizontal scale mark is provided with spandrel girder 3 length direction.
Above concrete technical scheme only in order to this utility model to be described, is not intended to limit.Although with reference to above-mentioned concrete skill Art scheme has been described in detail to this utility model, it will be understood by those within the art that:It still can be right Above-mentioned concrete technical scheme is modified, or carries out equivalent to wherein some technical characteristics;And these are changed or replace Change, do not make the essence of appropriate technical solution depart from spirit and scope of the present utility model.

Claims (8)

1. a kind of hoisting portal frame, including lifting by crane field and being arranged in the lifting support body lifting by crane in field, described lifting support body is main By first support, second support and be connected to first support top and the spandrel girder on second support top forms, described spandrel girder Upper slidable fit have derricking gear it is characterised in that:Described lifting field has the weight mounting plane of halfpace structure and weight is removed Transport road surface, and weight mounting plane raises up with respect to weight transport road face;The first support and second of described lifting support body Support is respectively seated on the weight mounting plane and weight carrying road surface in lifting field, can make lifting support body place spandrel girder On derricking gear level slide;The weight of described portal frame lifting is located at the area cover between first support and second support Domain.
2. according to claim 1 hoisting portal frame it is characterised in that:The height of described first support and weight mounting plane The height sum carrying road surface from weight is equal to the height of second support.
3. hoisting portal frame according to claim 1 or claim 2 it is characterised in that:Fill between described first support and second support It is furnished with many crossbeams.
4. according to claim 3 hoisting portal frame it is characterised in that:Pass through method between described first support and second support Blue assembly is connected with crossbeam.
5. according to claim 1 hoisting portal frame it is characterised in that:First support top and second support top lead to respectively Cross flange assembly to connect with corresponding spandrel girder.
6. according to claim 1 or 5 hoisting portal frame it is characterised in that:Described spandrel girder is in " work " font.
7. according to claim 1 hoisting portal frame it is characterised in that:Described derricking gear mainly by pull single execution car and Chain block forms.
8. according to claim 1 hoisting portal frame it is characterised in that:The bottom setting of described first support and second support There is the governor motion adjusting height.
CN201620964732.7U 2016-08-29 2016-08-29 Jack -up portal frame Active CN205973520U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620964732.7U CN205973520U (en) 2016-08-29 2016-08-29 Jack -up portal frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620964732.7U CN205973520U (en) 2016-08-29 2016-08-29 Jack -up portal frame

Publications (1)

Publication Number Publication Date
CN205973520U true CN205973520U (en) 2017-02-22

Family

ID=58036795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620964732.7U Active CN205973520U (en) 2016-08-29 2016-08-29 Jack -up portal frame

Country Status (1)

Country Link
CN (1) CN205973520U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110790132A (en) * 2019-11-22 2020-02-14 上海市建筑装饰工程集团有限公司 Device capable of simultaneously solving vertical and horizontal transportation of materials
CN110835049A (en) * 2019-11-22 2020-02-25 上海市建筑装饰工程集团有限公司 Using method of device capable of simultaneously solving vertical and horizontal material transportation
CN110862019A (en) * 2019-11-22 2020-03-06 上海市建筑装饰工程集团有限公司 Installation method of device capable of simultaneously solving vertical and horizontal material transportation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110790132A (en) * 2019-11-22 2020-02-14 上海市建筑装饰工程集团有限公司 Device capable of simultaneously solving vertical and horizontal transportation of materials
CN110835049A (en) * 2019-11-22 2020-02-25 上海市建筑装饰工程集团有限公司 Using method of device capable of simultaneously solving vertical and horizontal material transportation
CN110862019A (en) * 2019-11-22 2020-03-06 上海市建筑装饰工程集团有限公司 Installation method of device capable of simultaneously solving vertical and horizontal material transportation

Similar Documents

Publication Publication Date Title
EP2490973B1 (en) Method in the manufacture of an elevator
CN100522793C (en) Installing method of portal crane
CN205973520U (en) Jack -up portal frame
CN206624553U (en) Lifting component system
CN201587805U (en) Structure for hoisting rigid legs, flexible legs and main beam of gantry crane hoisted by utilizing large-scale floating crane
CN104989111B (en) Steel construction high level construction method for hanging
CN205575428U (en) Component hoisting system
CN206126599U (en) Steel band elevator car bottom structure
CN203269405U (en) Hoisting device for mounting side plates and upright columns of gas cabinet
CN110984611B (en) Narrow space steel column installation method
CN110409803B (en) Hoisting method for disassembling central drum ring of hydraulic mold lifting device
CN206736726U (en) The device of the prefabricated arch ring of nose girder auxiliary erection
CN202046786U (en) Integral boom for over-length reinforcement cage of pile foundation
CN206844620U (en) It is elevated from steady support equipment plateform system in the elevator hoistways of shear wall structure
CN205892406U (en) Elevator well structure
CN107487724A (en) A kind of the large-scale floating crane arm support erecting device and installation method of non-loop wheel machine auxiliary
CN210369846U (en) Operating platform capable of being clamped on elevator shaft shear wall surface and lifted layer by layer
CN105970988A (en) Construction method for installing elevator shaft side wall rebars in raft foundation
CN207748705U (en) Elevator compensating device
CN206033090U (en) Group hoist device
CN205575336U (en) Upward movement rope steel band hangs home use elevator
CN103318817A (en) Underwater rolling-over method of reversing chassis
CN211419276U (en) Construction platform assembly for construction elevator
CN201694766U (en) Building top end large-tonnage movable crane
JPH10279227A (en) Hydraulic elevator equipped with balance weight

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 614900 central control building, Hekou Road, Shawan Town, Shawan District, Leshan City, Sichuan Province

Patentee after: Guoneng Daduhe maintenance and installation Co.,Ltd.

Address before: 614900 central control building, Hekou Road, Shawan Town, Shawan District, Leshan City, Sichuan Province

Patentee before: GUODIAN DADUHE MAINTENANCE & INSTALLATION Co.,Ltd.