CN205973078U - Steel pipe truck -loading facilities - Google Patents
Steel pipe truck -loading facilities Download PDFInfo
- Publication number
- CN205973078U CN205973078U CN201621009915.XU CN201621009915U CN205973078U CN 205973078 U CN205973078 U CN 205973078U CN 201621009915 U CN201621009915 U CN 201621009915U CN 205973078 U CN205973078 U CN 205973078U
- Authority
- CN
- China
- Prior art keywords
- conveyer belt
- steel pipe
- loading facilities
- support body
- truck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Structure Of Belt Conveyors (AREA)
Abstract
The utility model discloses a steel pipe truck -loading facilities, including the equipment support body, a plurality of install in the conveyer belt gyro wheel of equipment support body, for drive and transmission take the gyro wheel the motor, be used for transmitting the conveyer belt of steel pipe, the conveyer belt is installed in the conveyer belt gyro wheel, the contained angle of conveyer belt and horizontal plane is for being lighter than 90 degrees. The utility model discloses in, the conveyer belt passes through the conveyer belt gyro wheel to be installed on the equipment support body, and the motor passes through drive and transmission and takes the gyro wheel to roll to it send the steel pipe to drive the transmission. And the contained angle of conveyer belt and horizontal plane is less than 90 degrees, be that the conveyer belt can be carried the steel pipe to the position that is higher than the horizontal plane, it carries the steel pipe to the trailer that is higher than ground on to be the conveyer belt, thereby make steel pipe truck -loading facilities to carry the steel pipe to the trailer on, similarly, when the steel pipe is unloaded down to needs, can place the steel pipe on the conveyer belt, steel pipe truck -loading facilities carries the steel pipe from the trailer, therefore, steel pipe truck -loading facilities uses manpower sparingly when the loading and unloading steel pipe, the efficiency of the steel pipe loading is improved.
Description
Technical field
This utility model is related to lorry handling art, in particular to a kind of steel pipe truck-loading facilities.
Background technology
Building steel tube is after generally at one, building site is finished, and can disassemble and be transported to another place building site it is also possible to fortune
Deliver to and be transported to another place building site again after storeroom is deposited at one, so steel pipe is frequently necessary to entrucking being transported.Existing
In technology, typically by manpower by steel pipe transporting to trailer, because there is difference in height on lorry and ground, so generally all comparing
Arduously, and the length of steel pipe is long, weight is heavier, thus steel pipe carrying during bad controlled, easily right
The personnel of periphery cause potential safety hazard, and by steel pipe transporting during trailer ground minimum need two people cooperate, on trailer
Steel pipe is connected by minimum two people's cooperations of needs.Equally, it is also required to multiple person cooperational when steel pipe is unloaded down from trailer.Institute
To compare waste of manpower when being loaded and unloaded trailer on steel pipe transporting, efficiency is not also high, also there is certain potential safety hazard.
Utility model content
In view of this, this utility model provides a kind of steel pipe truck-loading facilities, and face is loaded and unloaded into trailer in order to steel pipe
When upper more efficiently, safety when being on the other hand loaded and unloaded on trailer in order to steel pipe.
A kind of steel pipe truck-loading facilities, it includes equipment support body, multiple is installed on the conveyer belt roller of equipment support body, in order to drive
The motor of dynamic conveyer belt roller, the conveyer belt in order to transmit steel pipe, described conveyer belt is installed on described conveyer belt roller, described biography
Band is sent to be less than 90 degree with the angle of horizontal plane.
Further, described conveyor width is 1 to 2 meter, and described motor is at least connected with conveyer belt roller described in.
Further, described conveyer belt is provided with the groove in order to accommodating steel pipe, and described conveyer belt is additionally provided with baffle part.
Further, described equipment support body is provided with one group of first round group in order to support ground.
Further, described equipment support body is provided with one group of second wheel group in order to support ground.
Further, described equipment support body is provided with one in order to tow the car puller hook of described steel pipe truck-loading facilities.
Further, also include blowing part, described blowing part is installed on equipment support body and favours described conveyer belt
Initiating terminal.
Further, also include outlet member, described outlet member is installed on equipment support body direction extension along the horizontal plane,
Described outlet member connects conveyer belt along the end of transmission direction.
Further, described outlet member also includes bolster, and described bolster is installed on outlet member and deviates from conveyer belt
End.
Further, also include calculating the enumerator of steel pipe quantity, described enumerator is installed on described outlet member.
A kind of steel pipe truck-loading facilities of the present utility model, including equipment support body, multiple conveyer belt being installed on equipment support body
Roller, motor, the conveyer belt in order to transmit steel pipe in order to drive conveyer belt roller, conveyer belt is installed on conveyer belt roller, passes
Band is sent to be less than 90 degree with the angle of horizontal plane.This use new in, conveyer belt is installed on equipment frame by conveyer belt roller
On body, motor passes through to drive conveyer belt roller to roll, thus driving biography conveying steel pipe.And conveyer belt is less than with the angle of horizontal plane
90 degree, that is, conveyer belt can by steel pipe market to the position higher than horizontal plane, that is, conveyer belt by steel pipe market to being above the ground level
On trailer, so that steel pipe truck-loading facilities can be by steel pipe market to trailer, similarly, when needing to unload steel pipe down
When, steel pipe can be positioned on conveyer belt, steel pipe is conveyed from trailer by steel pipe truck-loading facilities, thus, steel pipe entrucking
Equipment not only can save manpower when loading and unloading steel pipe, improves the efficiency of steel pipe entrucking, but also can increase steel pipe in handling
During safety.
Brief description
In order to be illustrated more clearly that the technical scheme of this utility model embodiment, below will be to use required in embodiment
Accompanying drawing be briefly described it will be appreciated that the following drawings illustrate only some embodiments of the present utility model, therefore should be by
Regard the restriction to scope as, for those of ordinary skill in the art, on the premise of not paying creative work, also may be used
To obtain other related accompanying drawings according to these accompanying drawings.
Fig. 1 shows a kind of connection diagram of steel pipe truck-loading facilities that this utility model one embodiment is provided.
Fig. 2 shows a kind of structural representation of the conveyer belt of steel pipe truck-loading facilities that this utility model one embodiment is provided
Figure.
Main element symbol description:
1- equipment support body;2- conveyer belt roller;3- motor;4- conveyer belt;5- retaining piece;6- first round group;7- second takes turns
Group;8- car puller hook;9- blowing part;10- outlet member;11- bolster;12- enumerator.
Specific embodiment
For the ease of understanding this utility model, below with reference to relevant drawings, a kind of steel pipe truck-loading facilities is carried out more comprehensively
Description.A kind of first-selected embodiment of steel pipe truck-loading facilities is given in accompanying drawing.But, a kind of steel pipe truck-loading facilities can be to be permitted
How different forms is realizing however it is not limited to embodiment described herein.On the contrary, providing the purpose of these embodiments to be to make
More thoroughly comprehensive to a kind of disclosure of steel pipe truck-loading facilities.
Of the present utility model description in it is to be understood that term " longitudinal ", " horizontal ", " on ", D score, " front ",
" afterwards ", the orientation of instruction such as "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outward " or position relationship are based on attached
Orientation shown in figure or position relationship, are for only for ease of and describe this utility model and simplify description, rather than instruction or hint
The device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to this
The restriction of utility model.
In the description of this specification, reference term " embodiment ", " some embodiments ", " example ", " specifically show
The description of example " or " some examples " etc. means specific features, structure, material or the spy describing with reference to this embodiment or example
Point is contained at least one embodiment of the present utility model or example.In this manual, the schematic table to above-mentioned term
State and be not necessarily referring to identical embodiment or example.And, the specific features of description, structure, material or feature can be
Combine in an appropriate manner in any one or more embodiments or example.
In description of the present utility model, unless otherwise prescribed and limit, it should be noted that term " installation ", " phase
Even ", " connection " should be interpreted broadly, for example, it may be the company of mechanical connection or electrical connection or two element internals
Logical, can be to be joined directly together it is also possible to be indirectly connected to by intermediary, for the ordinary skill in the art, can
To understand the concrete meaning of above-mentioned term as the case may be.
A kind of steel pipe truck-loading facilities, it includes equipment support body 1, multiple conveyer belt roller 2 being installed on equipment support body 1, use
To drive motor 3, the conveyer belt 4 in order to transmit steel pipe of conveyer belt roller 2, conveyer belt 4 is installed on conveyer belt roller 2, transmission
Angle with 4 and horizontal plane is less than 90 degree.
Above-mentioned, a kind of steel pipe truck-loading facilities, including equipment support body 1, multiple conveyer belt roller 2 being installed on equipment support body 1,
In order to drive motor 3, the conveyer belt 4 in order to transmit steel pipe of conveyer belt roller 2, refer to that conveyer belt roller 2 is installed on equipment frame
On body 1, motor 3 drives conveyer belt roller 2 to roll, and conveyer belt 4 is installed on conveyer belt roller 2, thus motor 3 passes through to drive
Conveyer belt roller 2 drives conveyer belt 4 to transmit, in order to increase the frictional force between conveyer belt 4 and conveyer belt roller 2, conveyer belt 4 with
Friction micelle can be provided with the contact surface of conveyer belt roller 2 contact, and the outer surface of conveyer belt roller 2 can also pass through sandblasting
Process to increase the frictional force and conveyer belt 4 between.Drive the mode of conveyer belt roller 2 rolling as motor 3, can be hinge
Connect to drive and drive it is also possible to be connected by belt.
Conveyer belt 4 is less than 90 degree with the angle of horizontal plane, when referring to that conveyer belt 4 is installed on equipment support body 1, conveyer belt
4 is less than 90 degree with the angle of horizontal plane, that is to say, the two ends of conveyer belt 4 have difference in height compared to horizontal plane, thus transmitting
The steel pipe market of lower to higher position, for the ease of distinguishing, in the present embodiment, will can be compared in conveyer belt 4 with 4
In the other end closer to the initiating terminal of the referred to as conveyer belt 4 on ground, it is compared to initiating terminal from higher being referred to as in level ground
The end of conveyer belt 4.Certainly, by adjusting the rotation direction of motor 3, the transmission direction of conveyer belt 4 can be adjusted, i.e. conveyer belt
4 can from the initiating terminal from horizontal plane lower transmit to from conveyer belt 4 end of horizontal plane higher position it is also possible to from from level
The initiating terminal of the conveyer belt 4 extremely from horizontal plane lower for the tip transition of the conveyer belt 4 of face higher position.
Need it is further noted that in the present embodiment, the name of the end of the initiating terminal of conveyer belt 4 and conveyer belt 4
Only to facilitate distinguishing, it is not offered as limiting the direction of transfer of conveyer belt 4 reality.
The end of conveyer belt 4 can connect the trailer portion of lorry, so steel pipe can be transmitted by conveyer belt 4 from initiating terminal
To the end of the conveyer belt 4 of higher position, and steel pipe freely falls behind the end reaching conveyer belt 4 and falls in trailer, at this
During only need people that steel pipe is positioned over the initiating terminal of conveyer belt 4, and the initiating terminal of conveyer belt 4 is close from level ground, so
Steel pipe just can be positioned over the initiating terminal of conveyer belt 4 by the manpower that only need to consume very little, and steel pipe just can be conveyed by conveyer belt 4
To trailer.Similarly, when needing to unload steel pipe down to ground in trailer, adjust the transmission direction of conveyer belt 4, then only
Steel pipe is positioned over the end of conveyer belt 4 in trailer by the manpower that need to consume very little, and steel pipe just can evenly unload in trailer
To ground.Therefore, steel pipe truck-loading facilities not only can increase the efficiency that steel pipe is loaded and unloaded on trailer, can also save human cost,
Also add the safety in steel pipe cargo handling process.
In order to reach the difference in height of conveyer belt 4, equipment support body 1 can be height structure, support conveyer belt 4 initiating terminal part
Equipment support body 1 part shorter, support conveyer belt 4 end section equipment support body 1 part higher, this two parts equipment frame
Body 1 is connected by connecting rod.
Conveyer belt 4 width is 1 to 2 meter, and motor 3 is at least connected with conveyer belt roller 2 described in.
Above-mentioned, conveyer belt 4 width is 1 to 2 meter, is because conveyer belt 4 needs conveying steel pipe, and the width of steel pipe is generally big
In 5 meters, so, so that steel pipe can be stably placed on conveyer belt 4, the width of conveyer belt 4 is more than or equal to 1 meter.
And in order to steel pipe truck-loading facilities do not take too much local, and steel pipe truck-loading facilities may also can be regular movement, for example fill
Move to after unsnatching a car and by another car, steel pipe loaded and unloaded, in order to steel pipe truck-loading facilities in moving process not excessively
Heaviness, more convenient in movement also for steel pipe truck-loading facilities, the width of conveyer belt 4 is less than or equal to 2 meters.For example, conveyer belt 4
Width can be 1.3 meters, 1.5 meters, 1.8 meters etc..
Conveyer belt 4 is provided with the groove in order to accommodating steel pipe, and conveyer belt 4 is additionally provided with baffle part 5.
Above-mentioned, conveyer belt 4 is provided with the groove in order to accommodating steel pipe, when referring to that steel pipe is positioned on conveyer belt 4, conveyer belt 4
Steel pipe can be lifted certain level height, and the generally pylindrical structure of steel pipe, and tube quality is higher, so when steel pipe is put
It is placed on general conveyer belt 4 and during during hoisting depth or from the tip transition of conveyer belt 4 to the initiating terminal of conveyer belt 4, steel pipe
It is not easy firm being surely positioned on conveyer belt 4, so the groove opening up in order to accommodating steel pipe in conveyer belt 4 can make steel pipe consolidate
Be positioned on conveyer belt 4.Need it is further noted that groove can also in order to the steel tube fastener on accommodating steel pipe so that
Steel pipe and steel tube fastener can be stably placed on conveyer belt 4.Conveyer belt 4 is provided with baffle part 5, refers to that conveyer belt 4 can be defeated
Send the material related to steel pipe, and retaining piece can prevent the material related to steel pipe from transmission in conveyer belt 4 transmitting procedure
Slide on band 4, so that baffle part 5 is stably placed on conveyer belt 4.
Equipment support body 1 is provided with one group of first round group 6 in order to support ground.
Above-mentioned, equipment support body 1 is provided with one group of first round group 6 in order to support ground, refers to exist due to steel pipe truck-loading facilities
The mobile loading and unloading carrying out steel pipe to another place place is typically required after having loaded and unloaded the steel pipe at, so, in order to be more convenient for
The movement of steel pipe truck-loading facilities, in the support level that equipment support body 1 is contacted with ground, is provided with first round group 6.In the present embodiment
In, first round group 6 can support on equipment support body 1 foot of conveyer belt 4 end section located at equipment support body 1, thus in Mobile steel
Other support less touch with the ground of other equipment support body 1 during pipe truck-loading facilities, being made, being rolled with first round group 6, thus moving
Dynamic steel pipe truck-loading facilities.
Equipment support body 1 is provided with one group of second wheel group 7 in order to support ground.
Above-mentioned, equipment support body 1 is provided with one group of second wheel group 7 in order to support ground, refers to be mounted with equipment support body 1
In the case of one wheel group 6, further for convenience in movement for the equipment support body 1, equipment support body 1 sets one group second and takes turns
Group 7.In the present embodiment, the second wheel group 7 can support equipment support body 1 foot of conveyer belt 4 initiating terminal part located at equipment support body 1
On, thus during mobile steel pipe truck-loading facilities, can directly draw steel pipe truck-loading facilities.It should be noted that second
Wheel group 7 can be universal wheel, is easy to the direction that the adjustment of steel pipe truck-loading facilities is stowed;Second wheel group 7 can set a wheel group locking
Part, thus steel pipe truck-loading facilities will not shift when loading and unloading steel pipe.
Equipment support body 1 is provided with one in order to tow the car puller hook 8 of described steel pipe truck-loading facilities.
Above-mentioned, when steel pipe truck-loading facilities needs distance mobile, the car puller hook 8 on equipment support body 1 can be caught on one and drag
Car, thus drag to steel pipe truck-loading facilities.
In another embodiment, a kind of steel pipe truck-loading facilities, it includes equipment support body 1, multiple equipment support body 1 that is installed on
Conveyer belt roller 2, motor 3, the conveyer belt 4 in order to transmit steel pipe in order to drive conveyer belt roller 2, conveyer belt 4 is installed on biography
Send band roller 2, conveyer belt 4 is less than 90 degree with the angle of horizontal plane.
Above-mentioned, a kind of steel pipe truck-loading facilities, including equipment support body 1, multiple conveyer belt roller 2 being installed on equipment support body 1,
In order to drive motor 3, the conveyer belt 4 in order to transmit steel pipe of conveyer belt roller 2, refer to that conveyer belt roller 2 is installed on equipment frame
On body 1, motor 3 drives conveyer belt roller 2 to roll, and conveyer belt 4 is installed on conveyer belt roller 2, thus motor 3 passes through to drive
Conveyer belt roller 2 drives conveyer belt 4 to transmit, in order to increase the frictional force between conveyer belt 4 and roller, conveyer belt 4 and conveyer belt
Roller 2 contact contact surface on can be provided with friction micelle, and the outer surface of conveyer belt roller 2 can also by blasting treatment with
Increase the frictional force and conveyer belt 4 between.Drive the mode of conveyer belt roller 2 rolling as motor 3, can drive for chain connection
Move and drive it is also possible to be connected by belt.
Conveyer belt 4 is less than 90 degree with the angle of horizontal plane, when referring to that conveyer belt 4 is installed on equipment support body 1, conveyer belt
4 is less than 90 degree with the angle of horizontal plane, that is to say, the two ends of conveyer belt 4 have difference in height compared to horizontal plane, thus transmitting
The steel pipe market of lower to higher position, for the ease of distinguishing, in the present embodiment, will can be compared in conveyer belt 4 with 4
In the other end closer to the initiating terminal of the referred to as conveyer belt 4 on ground, it is compared to initiating terminal from higher being referred to as in level ground
The end of conveyer belt 4.Certainly, by adjusting the rotation direction of motor 3, the transmission direction of conveyer belt 4 can be adjusted, i.e. conveyer belt
4 can from the initiating terminal from horizontal plane lower transmit to from conveyer belt 4 end of horizontal plane higher position it is also possible to from from level
The initiating terminal of the conveyer belt 4 extremely from horizontal plane lower for the tip transition of the conveyer belt 4 of face higher position.
Need it is further noted that in the present embodiment, the name of the end of the initiating terminal of conveyer belt 4 and conveyer belt 4
Only to facilitate distinguishing, it is not offered as limiting the direction of transfer of conveyer belt 4 reality.
The end of conveyer belt 4 can connect the trailer portion of lorry, so steel pipe can be transmitted by conveyer belt 4 from initiating terminal
To the end of the conveyer belt 4 of higher position, and steel pipe freely falls behind the end reaching conveyer belt 4 and falls in trailer, at this
During only need people that steel pipe is positioned over the initiating terminal of conveyer belt 4, and the initiating terminal of conveyer belt 4 is close from level ground, so
Steel pipe just can be positioned over the initiating terminal of conveyer belt 4 by the manpower that only need to consume very little, and steel pipe just can be conveyed by conveyer belt 4
To trailer.Similarly, when needing to unload steel pipe down to ground in trailer, adjust the transmission direction of conveyer belt 4, then only
Steel pipe is positioned over the end of conveyer belt 4 in trailer by the manpower that need to consume very little, and steel pipe just can evenly unload in trailer
To ground.Therefore, steel pipe truck-loading facilities not only can increase the efficiency that steel pipe is loaded and unloaded on trailer, can also save human cost,
Also add the safety in steel pipe cargo handling process.
In order to reach the difference in height of conveyer belt 4, equipment support body 1 can be height structure, support conveyer belt 4 initiating terminal part
Equipment support body 1 part shorter, support conveyer belt 4 end section equipment support body 1 part higher, this two parts equipment frame
Body 1 is connected by connecting rod.
Conveyer belt 4 width is 1 to 2 meter, and motor 3 is at least connected with conveyer belt roller 2 described in.
Above-mentioned, conveyer belt 4 width is 1 to 2 meter, is because conveyer belt 4 needs conveying steel pipe, and the width of steel pipe is generally big
In 5 meters, so, so that steel pipe can be stably placed on conveyer belt 4, the width of conveyer belt 4 is more than or equal to 1 meter.
And in order to steel pipe truck-loading facilities do not take too much local, and steel pipe truck-loading facilities may also can be regular movement, for example fill
Move to after unsnatching a car and by another car, steel pipe loaded and unloaded, in order to steel pipe truck-loading facilities in moving process not excessively
Heaviness, more convenient in movement also for steel pipe truck-loading facilities, the width of conveyer belt 4 is less than or equal to 2 meters.For example, conveyer belt 4
Width can be 1.3 meters, 1.5 meters, 1.8 meters etc..
Conveyer belt 4 is provided with the groove in order to accommodating steel pipe, and conveyer belt 4 is additionally provided with baffle part 5.
Above-mentioned, conveyer belt 4 is provided with the groove in order to accommodating steel pipe, when referring to that steel pipe is positioned on conveyer belt 4, conveyer belt 4
Steel pipe can be lifted certain level height, and the generally pylindrical structure of steel pipe, and tube quality is higher, so when steel pipe is put
It is placed on general conveyer belt 4 and during during hoisting depth or from the tip transition of conveyer belt 4 to the initiating terminal of conveyer belt 4, steel pipe
It is not easy firm being surely positioned on conveyer belt 4, so the groove opening up in order to accommodating steel pipe in conveyer belt 4 can make steel pipe consolidate
Be positioned on conveyer belt 4.Conveyer belt 4 is provided with baffle part 5, refers to that conveyer belt 4 can convey the material related to steel pipe, and every
Block piece can prevent the material related to steel pipe from sliding from conveyer belt 4 in conveyer belt 4 transmitting procedure, so that baffle part 5 is consolidated
Be positioned on conveyer belt 4.
Equipment support body 1 is provided with one group of first round group 6 in order to support ground.
Above-mentioned, equipment support body 1 is provided with one group of first round group 6 in order to support ground, refers to exist due to steel pipe truck-loading facilities
The mobile loading and unloading carrying out steel pipe to another place place is typically required after having loaded and unloaded the steel pipe at, so, in order to be more convenient for
The movement of steel pipe truck-loading facilities, in the support level that equipment support body 1 is contacted with ground, is provided with first round group 6.In the present embodiment
In, first round group 6 can support on equipment support body 1 foot of conveyer belt 4 end section located at equipment support body 1, thus in Mobile steel
Other support less touch with the ground of other equipment support body 1 during pipe truck-loading facilities, being made, being rolled with first round group 6, thus moving
Dynamic steel pipe truck-loading facilities.
Equipment support body 1 is provided with one group of second wheel group 7 in order to support ground.
Above-mentioned, equipment support body 1 is provided with one group of second wheel group 7 in order to support ground, refers to be mounted with equipment support body 1
In the case of one wheel group 6, further for convenience in movement for the equipment support body 1, equipment support body 1 sets one group second and takes turns
Group 7.In the present embodiment, the second wheel group 7 can support equipment support body 1 foot of conveyer belt 4 initiating terminal part located at equipment support body 1
On, thus during mobile steel pipe truck-loading facilities, can directly draw steel pipe truck-loading facilities.It should be noted that second
Wheel group 7 can be universal wheel, is easy to the direction that the adjustment of steel pipe truck-loading facilities is stowed;Second wheel group 7 can set a wheel group locking
Part, thus steel pipe truck-loading facilities will not shift when loading and unloading steel pipe.
Equipment support body 1 is provided with one in order to tow the car puller hook 8 of described steel pipe truck-loading facilities.
Above-mentioned, when steel pipe truck-loading facilities needs distance mobile, the car puller hook 8 on equipment support body 1 can be caught on one and drag
Car, thus drag to steel pipe truck-loading facilities.
Steel pipe truck-loading facilities also includes blowing part 9, and blowing part 9 is installed on equipment support body 1 and favours conveyer belt 4
Initiating terminal.
Above-mentioned, blowing part 9 is installed on equipment support body 1 and favours the initiating terminal of conveyer belt 4, refers to that blowing part 9 is pacified
It is loaded on equipment support body 1, and blowing part 9 favours the initiating terminal of conveyer belt 4, blowing part 9 can be a pair of iron, should
Iron is installed on the equipment support body 1 of the initiating terminal of conveyer belt 4, this is had angle with conveyer belt 4 shape to iron, so that
In when steel pipe be positioned over this to iron on when, steel pipe can be rolled on conveyer belt 4 along this to iron.Certainly, when conveyer belt 4 is from end
Hold toward during initiating terminal transmission, steel pipe market can be blocked by blowing part 9 to during blowing part 9, thus resting on blowing part 9
In.Certainly, blowing part 9 can also be made up of materials such as copper bar, aluminium bars, also can also be other forms, e.g. iron plate,
Copper coin etc., no longer illustrates in the present embodiment one by one.
Steel pipe truck-loading facilities also includes outlet member 10, and outlet member 10 is installed on equipment support body 1 and extends along the horizontal plane,
Outlet member 10 connects conveyer belt 4 along the end of transmission direction.
Above-mentioned, outlet member 10 is installed on equipment support body 1 and extends along the horizontal plane, and outlet member 10 connects conveyer belt 4 edge
The end of transmission direction, refers to that outlet member 10 is installed on the equipment support body 1 of conveyer belt 4 end, outlet member 10 edge
Horizontal plane direction simultaneously extends toward the direction deviating from conveyer belt 4.This outlet member 10 can be for a pair of iron naturally it is also possible to be one
To copper bar, aluminium bar etc., also can also be other forms, e.g. iron plate, copper coin etc..This outlet member 10 and conveyer belt 4 are formed
One angle, so that when conveyer belt 4 transmits toward initiating terminal from end, steel pipe is positioned over this outlet member 10 and near transmission
When carrying 4, conveyer belt 4 can be sent to the initiating terminal of conveyer belt 4 with steel pipe.Certainly, when steel pipe transmits to end from initiating terminal, steel
Pipe drops to outlet member 10 from conveyer belt 4, then is dropped to trailer from outlet member 10 by inertia.
Outlet member 10 also includes bolster 11, and bolster 11 is installed on the end that outlet member 10 deviates from conveyer belt 4.
Above-mentioned, outlet member 10 is also equipped with bolster 11, is, when steel pipe drops to discharging portion from conveyer belt 4
On part 10, then again when outlet member 10 drops to trailer, bolster 11 can play the effect of buffering steel pipe so that steel
Pipe is more steady during dropping on trailer.In the present embodiment, bolster 11 can include two and is connected to discharging portion
The buffer body of part 10 body, wherein one buffer body is fixedly connected outlet member 10 body, and another buffer body is movably connected on discharging
Part 10 body, fixing buffer body passes through a spring and connects loose buffer body.
Steel pipe truck-loading facilities also includes the enumerator 12 calculating steel pipe quantity, and enumerator 12 is installed on outlet member
10.
Above-mentioned, steel pipe truck-loading facilities also includes the enumerator 12 calculating steel pipe quantity, refers to that enumerator 12 is installed on
On outlet member 10, specifically, the one side that outlet member 10 is not contacted can be installed on steel pipe.Enumerator 12 can basis
The vibrations number of times that outlet member 10 is subject to is counted, and that is to say, enumerator 12 is by shaking that collection outlet member 10 is subject to
Data, and this vibration data is read.Specifically, enumerator can be shaken by a kind of counting assembly and a shaking sensor
Sensor is received often to collect a vibration data and just send this vibration data and is counted to counting assembly.
In all examples being illustrated and described herein, any occurrence should be construed as merely exemplary, and not
It is as restriction, therefore, other examples of exemplary embodiment can have different values.
Embodiment described above only have expressed several embodiments of the present utility model, and its description is more concrete and detailed,
But therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that it is common for this area
For technical staff, without departing from the concept of the premise utility, some deformation can also be made and improve, these all belong to
In protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be defined by claims.
Claims (10)
1. a kind of steel pipe truck-loading facilities is it is characterised in that include equipment support body, multiple conveyer belt rolling being installed on equipment support body
Wheel, motor, the conveyer belt in order to transmit steel pipe in order to drive conveyer belt roller, described conveyer belt is installed on described conveyer belt rolling
Wheel, described conveyer belt is less than 90 degree with the angle of horizontal plane.
2. a kind of steel pipe truck-loading facilities according to claim 1 it is characterised in that described conveyor width be 1 to 2 meter,
Described motor is at least connected with conveyer belt roller described in.
3. a kind of steel pipe truck-loading facilities according to claim 1 is it is characterised in that described conveyer belt is provided with order to house steel
The groove of pipe, described conveyer belt is additionally provided with baffle part.
4. a kind of steel pipe truck-loading facilities according to claim 1 it is characterised in that described equipment support body be provided with one group in order to
Support the first round group on ground.
5. a kind of steel pipe truck-loading facilities according to claim 4 it is characterised in that described equipment support body be provided with one group in order to
Support the second wheel group on ground.
6. a kind of steel pipe truck-loading facilities according to claim 4 is it is characterised in that described equipment support body is provided with one in order to drag
The car puller hook of the described steel pipe truck-loading facilities of row.
7. a kind of steel pipe truck-loading facilities according to claim 1 is it is characterised in that also include blowing part, described blowing
Part is installed on equipment support body and favours the initiating terminal of described conveyer belt.
8. a kind of steel pipe truck-loading facilities according to claim 1 is it is characterised in that also include outlet member, described discharging
Part is installed on equipment support body direction extension along the horizontal plane, and described outlet member connects conveyer belt along the end of transmission direction.
9. a kind of steel pipe truck-loading facilities according to claim 8 is it is characterised in that described outlet member also includes buffering
Part, described bolster is installed on the end that outlet member deviates from conveyer belt.
10. a kind of steel pipe truck-loading facilities according to claim 8 is it is characterised in that also include calculating steel pipe quantity
Enumerator, described enumerator is installed on described outlet member.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621009915.XU CN205973078U (en) | 2016-08-30 | 2016-08-30 | Steel pipe truck -loading facilities |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621009915.XU CN205973078U (en) | 2016-08-30 | 2016-08-30 | Steel pipe truck -loading facilities |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205973078U true CN205973078U (en) | 2017-02-22 |
Family
ID=58039266
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621009915.XU Expired - Fee Related CN205973078U (en) | 2016-08-30 | 2016-08-30 | Steel pipe truck -loading facilities |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205973078U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110626826A (en) * | 2019-10-08 | 2019-12-31 | 杭州筱趣贸易有限公司 | Steel pipe quick loading device that construction was used |
CN112846054A (en) * | 2020-12-31 | 2021-05-28 | 山东建桥机械股份有限公司 | But forging heating furnace that length is long in automatic control forging heating |
CN117657658A (en) * | 2023-12-29 | 2024-03-08 | 湖南工学院 | Logistics box delivery equipment |
-
2016
- 2016-08-30 CN CN201621009915.XU patent/CN205973078U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110626826A (en) * | 2019-10-08 | 2019-12-31 | 杭州筱趣贸易有限公司 | Steel pipe quick loading device that construction was used |
CN110626826B (en) * | 2019-10-08 | 2020-09-18 | 安徽华鑫建筑工程有限公司 | Steel pipe quick loading device that construction was used |
CN112846054A (en) * | 2020-12-31 | 2021-05-28 | 山东建桥机械股份有限公司 | But forging heating furnace that length is long in automatic control forging heating |
CN117657658A (en) * | 2023-12-29 | 2024-03-08 | 湖南工学院 | Logistics box delivery equipment |
CN117657658B (en) * | 2023-12-29 | 2024-06-25 | 湖南工学院 | Logistics box delivery equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205973078U (en) | Steel pipe truck -loading facilities | |
WO2022007447A1 (en) | Automatic precise loading system and loading method | |
US11192724B2 (en) | Inclined shaft continuous feeding system for solid filling materials | |
CN106199107A (en) | A kind of liftable agriculture row's ammeter box | |
CN206968681U (en) | A kind of grid stroller drawn | |
CN205952922U (en) | A high efficiency dregs conveying system for interim switching is used | |
CN109205174A (en) | A kind of logistics delivery machine for object transmission | |
CN111891935A (en) | On-line sliding trolley | |
CN205151021U (en) | Machine people is carried to indoor goods | |
CN109625873A (en) | A kind of overturning conveying device | |
CN105173787B (en) | A kind of material tip discharger of open top container | |
CN207535899U (en) | A kind of heavy grade inclined shaft rail flat car | |
CN205500313U (en) | Stores pylon conveyor | |
CN206551936U (en) | Goods unloader and transport lorry | |
CN110451293A (en) | Unloading transportation system | |
CN206782646U (en) | A kind of conveying arrangement for ore | |
CN208856370U (en) | Cold mineral aggregate conveying device | |
CN106853788A (en) | Goods unloader and transport lorry | |
CN109229173B (en) | Shaped reinforcing bar goods conveyer for building | |
US11278936B2 (en) | Mail sorting installation with a shuttle robot for injecting trays onto a conveyor | |
CN209582797U (en) | Self-feeding shelf with rotation and elevating function | |
CN208746928U (en) | The Auxiliary Track of cartridge clip is sent for hand-rail type | |
CN206447183U (en) | A kind of Coal Transportation device | |
CN216188450U (en) | Novel band conveyer with prevent off tracking mechanism | |
CN210339400U (en) | Spout export rotating device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170222 Termination date: 20190830 |
|
CF01 | Termination of patent right due to non-payment of annual fee |