CN206782646U - A kind of conveying arrangement for ore - Google Patents
A kind of conveying arrangement for ore Download PDFInfo
- Publication number
- CN206782646U CN206782646U CN201720593199.2U CN201720593199U CN206782646U CN 206782646 U CN206782646 U CN 206782646U CN 201720593199 U CN201720593199 U CN 201720593199U CN 206782646 U CN206782646 U CN 206782646U
- Authority
- CN
- China
- Prior art keywords
- basket
- ore
- steel pipe
- steel
- transmission belt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Discharge Of Articles From Conveyors (AREA)
Abstract
The utility model provides a kind of conveying arrangement for ore, including two drives and the transmission belt being arranged on two drives, multiple baskets for being used to load ore are interval with transmission belt, basket is cube, the bottom centre position of basket is provided with the first steel pipe, first steel pipe and the traffic direction of transmission belt are vertically arranged, the first steel shaft is worn in first steel pipe, the both ends of first steel shaft are fixedly connected with transmission belt, basket upper end is provided with basket lid, basket upper end is provided with the second steel pipe away from the side of transmission direction, the second steel shaft is worn in second steel pipe, second steel shaft both ends are connected by connector with basket lid.Conveying arrangement provided by the utility model for ore, the problem of ore existing for prior art slides is overcome, avoids the pollution to tunnel, and realize the continuative transport and automatic discharging of ore, and it is simple in construction, it is easy to use.
Description
Technical field
It the utility model is related to a kind of conveying arrangement, more particularly to a kind of conveying arrangement for ore.
Background technology
At present, in ore extraction, the Ore Transportation in generally use belt transport processing mine is to outside mine.Belt is transported
During ore, the phenomenon that ore slides often occurs, ore slides and not only air in tunnel can be polluted, Er Qieyou
Operating personnel may be injured by a crashing object, serious potential safety hazard be present.
Utility model content
The purpose of this utility model is to provide a kind of conveying arrangement for ore solve ore existing for prior art
The problem of landing.
The technical solution of the utility model is as follows:A kind of conveying arrangement for ore, including two drives and set
The transmission belt on two drives to be put, multiple baskets for being used to load ore are interval with transmission belt, basket is cube,
The bottom centre position of basket is provided with the first steel pipe, and the traffic direction of the first steel pipe and transmission belt is vertically arranged, in the first steel pipe
The first steel shaft is worn, the both ends of the first steel shaft are fixedly connected with transmission belt, and basket upper end is provided with basket lid, and basket upper end is away from transmission
The side in direction is provided with the second steel pipe, and the second steel pipe be arranged in parallel with the first steel pipe, wears the second steel shaft in the second steel pipe, and second
Steel shaft is connected by connector with basket lid.
Preferably, above-mentioned transmission belt is steel wire belt.
Preferably, the vertical direction of the both ends of above-mentioned first steel shaft vertically is provided with through hole, the first steel shaft and transmission band logical
Cross the fixation with steel wire connection being located in through hole.
Preferably, the both ends of above-mentioned second steel shaft are circumferentially arranged with groove, and above-mentioned connector includes angle bar, angle bar side with
Basket lid connection, opposite side are provided with ring-shaped hook, and ring-shaped hook set is hung in the groove.
Preferably, above-mentioned basket is irony, and the first steel pipe and the second steel pipe weld with basket.
The utility model has the advantages that:Conveying arrangement provided by the utility model for ore, transmission belt
On be interval with it is multiple be used to load the baskets of ore, bottom and the transmission belt of basket are rotatablely connected by the first steel shaft, basket
Basket lid be rotatablely connected by the second steel shaft and basket, basket is loaded after ore with transmission belt after mine is reached outside mine, after
Continuous to be run with transmission belt, because bottom and the transmission belt of basket are rotatablely connected by the first steel shaft, therefore, basket is around the first steel shaft
Upset, meanwhile, basket lid rotates around the second steel shaft, opens basket lid, and the ore in basket falls under gravity, completes automatic
Discharging.Basket continues to run until in mine that ore is loaded into basket by operating personnel by hopper or other instruments, covers basket
Lid, continue transport, discharge process next time.Conveying arrangement provided by the utility model for ore, because basket is provided with
Basket lid, therefore, the problem of ore existing for prior art slides is overcome, the pollution to tunnel is it also avoid, realizes simultaneously
Ore continuative transport and automatic discharging, and it is simple in construction, it is easy to use.
Brief description of the drawings
Fig. 1 is the conveying arrangement structural representation for ore that the utility model embodiment provides;
Fig. 2 is the basket structural representation that the utility model embodiment provides;
Fig. 3 is Fig. 2 A-A sectional views.
In figure, 1. drives, 2. transmission belts, 3. baskets, 3-1. basket lids, 4. first steel shafts, the steel pipes of 4-1. first, 5. second
Steel shaft, the steel pipes of 5-1. second.
Embodiment
Specific embodiment of the present utility model is described in further detail below in conjunction with the accompanying drawings.
Embodiment
A kind of conveying arrangement for ore, referring to Fig. 1, Fig. 2 and Fig. 3, including two drives 1 and it is arranged on two biographies
Transmission belt 2 on driving wheel 1, is interval with multiple baskets 3 for being used to load ore in transmission belt 2, and basket 3 is cube, basket 3
Bottom centre position be provided with the first steel pipe 4-1, the first steel pipe 4-1 perpendicular to the traffic direction of transmission belt 2, the first steel pipe 4-1
The first steel shaft 4 is inside worn, the both ends of the first steel shaft 4 are fixedly connected with transmission belt 2, and the upper end of basket 3 is provided with basket lid 3-1, on basket 3
End is provided with the second steel pipe 5-1 away from the side of the traffic direction of transmission belt 2, and the second steel pipe 5-1 be arranged in parallel with the first steel pipe 4-1,
The second steel shaft 5 is worn in second steel pipe 5-1, the second steel shaft 5 is connected by connector with basket lid 3-1.
Transport ore when, in mine the basket 3 of one end load onto ore, cover basket lid 3-1, basket 3 is with transmission belt 2
After reaching the other end outside mine, continue to run with transmission belt 2, because bottom and the transmission belt 2 of basket 3 pass through the first steel shaft 4
Rotation connection, therefore, basket 3 is overturn around the first steel shaft 4, meanwhile, basket lid 3-1 rotates around the second steel shaft 5, opens basket lid 3-1,
Ore in basket 3 falls under gravity, completes automatic discharging.Basket 3 after discharging is continued to run until one in mine
End, ore is loaded into basket 3 by operating personnel by hopper or other instruments, covers basket lid 3-1, continue transport next time,
Discharge process.
For sound construction, 2 preferred steel wire belt of transmission belt.
For Stability Analysis of Structures, the vertical direction of the both ends of the first steel shaft 4 vertically is provided with through hole, the first steel shaft 4 and transmission
Fixation with steel wire with 2 by being located in the through hole connects;The both ends of second steel shaft 5 include circumferentially arranged with groove, connector
Angle bar, angle bar side are connected with basket lid 3-1, and opposite side is provided with ring-shaped hook, and ring-shaped hook set is hung in groove.
In order to further improve structural stability, basket 3 is preferably ferrous material, the first steel pipe 4-1 and the second steel pipe 5-1
Welded with basket 3.
The utility model is used for the conveying arrangement of ore, realizes continuative transport and automatic discharging;Simultaneously as on basket
Provided with basket lid, therefore, the problem of ore existing for prior art slides is overcome, it also avoid the pollution to tunnel, and structure
Simply, it is easy to use.
Claims (4)
- A kind of 1. conveying arrangement for ore, it is characterised in that:Including two drives (1) and it is arranged on two drives (1) transmission belt (2) on, multiple baskets (3) for being used to load ore, the basket (3) are interval with the transmission belt (2) For cube, the bottom centre position of basket (3) is provided with the first steel pipe (4-1), first steel pipe (4-1) and transmission belt (2) Traffic direction be vertically arranged, is equipped with the first steel shaft (4), the both ends of first steel shaft (4) in first steel pipe (4-1) It is fixedly connected with transmission belt (2), basket (3) upper end is provided with basket lid (3-1), and basket (3) upper end deviates from transmission belt (2) The side of traffic direction is provided with the second steel pipe (5-1), and the second steel pipe (5-1) be arranged in parallel with the first steel pipe (4-1), and described second The second steel shaft (5) is equipped with steel pipe (5-1), the second steel shaft (5) both ends are connected by connector with basket lid (3-1).
- 2. it is used for the conveying arrangement of ore as claimed in claim 1, it is characterised in that:The transmission belt (2) is steel wire belt.
- 3. it is used for the conveying arrangement of ore as claimed in claim 1, it is characterised in that:The both ends edge of first steel shaft (4) The vertical direction of axial direction is provided with through hole, and the first steel shaft (4) is connected with transmission belt (2) by the fixation with steel wire being located in the through hole Connect;Circumferentially arranged with groove, the connector includes angle bar, the angle bar side and basket lid at the both ends of second steel shaft (5) (3-1) is connected, and opposite side is provided with ring-shaped hook, and the ring-shaped hook set is hung in the groove.
- 4. it is used for the conveying arrangement of ore as claimed in claim 1, it is characterised in that:The basket (3) is irony, described One steel pipe (4-1) and the second steel pipe (5-1) weld with basket (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720593199.2U CN206782646U (en) | 2017-05-25 | 2017-05-25 | A kind of conveying arrangement for ore |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720593199.2U CN206782646U (en) | 2017-05-25 | 2017-05-25 | A kind of conveying arrangement for ore |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206782646U true CN206782646U (en) | 2017-12-22 |
Family
ID=60712949
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720593199.2U Expired - Fee Related CN206782646U (en) | 2017-05-25 | 2017-05-25 | A kind of conveying arrangement for ore |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206782646U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108639674A (en) * | 2018-06-27 | 2018-10-12 | 衡阳泰源商砼有限公司 | A kind of powder material conveyer belt |
CN112298907A (en) * | 2020-10-29 | 2021-02-02 | 奚尹莉 | Accessory conveying device for manufacturing mechanical accessories |
-
2017
- 2017-05-25 CN CN201720593199.2U patent/CN206782646U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108639674A (en) * | 2018-06-27 | 2018-10-12 | 衡阳泰源商砼有限公司 | A kind of powder material conveyer belt |
CN112298907A (en) * | 2020-10-29 | 2021-02-02 | 奚尹莉 | Accessory conveying device for manufacturing mechanical accessories |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107902115A (en) | A kind of Chinese medicine crushes packaging system | |
CN206782646U (en) | A kind of conveying arrangement for ore | |
CN106179994A (en) | A kind of taper roll bearing automatic charging recognizes face machine | |
CN108014989A (en) | A kind of sandstone-screening machine | |
CN108043699A (en) | A kind of screening plant of sandstone-screening machine | |
CN106629501A (en) | Unloading assisting device of liquefied natural gas | |
CN206606402U (en) | Turn-over mechanism for the buckled shell packing machine of raw material | |
CN209536259U (en) | A kind of roller of conveyer | |
CN104590909B (en) | Bucket-wheel material piling and taking machine | |
CN208306699U (en) | A kind of building waste small handcart | |
CN206634694U (en) | A kind of dust protected para-ester production feed device | |
CN205701102U (en) | A kind of automatic centrifugal oil remover | |
CN205114287U (en) | Machine is carried to belt fill | |
CN210083815U (en) | Supporting device and transportation production line comprising same | |
CN107628423A (en) | A kind of transporting equipment of automatic crushing and its transportation resources | |
CN208265347U (en) | A kind of tunnel inner belt transport establishment and bucket elevator automated transport system | |
CN210392437U (en) | Ore conveyer | |
CN206492609U (en) | A kind of magnetic separator | |
CN206842417U (en) | A kind of leaking material of belt conveyor device | |
CN107776629A (en) | A kind of rubber grain dump car | |
CN208666589U (en) | A kind of sludge conveyer | |
CN206351943U (en) | A kind of ribbon conveyer transfers the high efficiency buffer cylinder between material | |
CN206121402U (en) | Handle recovery unit of dust | |
CN206218640U (en) | A kind of conveyer belt stands up uses drive device | |
CN206871929U (en) | Activation feed spoon structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171222 Termination date: 20180525 |