CN205956307U - Sea worker drilling platform tow chain device - Google Patents
Sea worker drilling platform tow chain device Download PDFInfo
- Publication number
- CN205956307U CN205956307U CN201620872424.1U CN201620872424U CN205956307U CN 205956307 U CN205956307 U CN 205956307U CN 201620872424 U CN201620872424 U CN 201620872424U CN 205956307 U CN205956307 U CN 205956307U
- Authority
- CN
- China
- Prior art keywords
- cable
- support channel
- tow chain
- channel
- section steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a sea worker drilling platform tow chain device, including the tow chain body, this internal installation of cable district and hose installation district of being equipped with of tow chain, this internally is equipped with removable vertical partition round bar the tow chain, removable vertical partition round bar includes two vertical round bars, two support channel steel and two L shape locking baffles, and two support channel steel bottoms all are equipped with the through -hole, the through -hole that two vertical round bars are located between two support channel steel and the support channel steel bottom is all passed at both ends about it, two L shape locking baffles are located two support channel steel respectively, wherein, one side L shape locking baffle pass through the bolt fastening on the side of channel -section steel, the another side is located the support channel steel bottom and blocks the upper and lower both ends of two vertical round bars. Interior dismouting heavy -calibre hose of tow chain and cable can be realized to this tow chain device, need not to preassemble the hose, and it is convenient to dismantle, be convenient for maintain, change hose and cable.
Description
Technical field
The utility model is related to a kind of sea work drilling platforms towing chain device.
Background technology
When on extra large work drilling platforms, the effect of towing chain device is that rig floor and cantilever beam are mobile with respect to main deck, drive is contained in
Its internal flexible pipe moves together with cable and protects them, has ensured water on rig floor and cantilever beam, electricity, oil, mud etc.
Continuous effective is supplied, and general maritime platform design at present and the drag chain installed are arranged, mainly have the disadvantage that:1. big in drag chain
External diameter is big using by appointing or bump joint, installing for bore hose, and in the limited grating space of drag chain, installation difficulty is big;Drag chain
Inner cable part adopts armouring, and bending radius is big, installation difficulty.2. drag chain adopts non-disconnectable form, and internal is non-disconnectable vertical
Round bar, increases the installation difficulty of flexible pipe and cable, particularly large-caliber hose further.3. can only be adopted based on above feature
In drag chain work preassembly in factory flexible pipe, if desired for safeguarding or changing during subsequent production, operate and its difficult, the duration affects
Greatly, cost is high.
Utility model content
For solving above-mentioned technical problem, the utility model provides a kind of sea work drilling platforms towing chain device, achievable drag chain
Interior dismounting large-caliber hose and cable, need not pre-install flexible pipe, convenient disassembly, are easy to safeguard, change flexible pipe and cable.
The utility model employs the following technical solutions:A kind of sea work drilling platforms towing chain device, including drag chain body, described
Drag chain is originally provided with cable installing zone and flexible pipe installing zone in vivo, and described drag chain is originally provided with removable vertical separation round bar in vivo and incites somebody to action
The intrinsic space of drag chain is divided into multiple difference in functionality cable installing zones and different bore hose installing zone, described removable perpendicular
Include two vertical round bars, two support channel-section steels and two L-shaped stop baffle plates to separating round bar, two support channel-section steel bottoms to be all provided with
There is through hole, described two vertical round bars are located between two support channel-section steels and its upper and lower ends both passes through and supports the logical of channel-section steel bottom
Hole, described two L-shaped stop baffle plates are located at two respectively and support in channel-section steels, and wherein, the bolt that passes through of L-shaped stop baffle plate is consolidated
On the side of channel-section steel, another side is located at the upper and lower ends supporting channel-section steel bottom and blocking two vertical round bars.
Described cable installing zone adopts the less cable of bending radius, and the hose coupling of described flexible pipe installing zone is pacified for clip
The HUB form of dress or the joint of threaded removable form.
The utility model has the advantages that:1st, towing chain device is designed to partly removable, but ensures not affecting drag chain simultaneously
Integrated carrying ability, will not fall apart.2nd, flexible pipe need not be pre-installed, large-caliber hose can also be pacified at the scene in the platform construction stage
Dress.3rd, it is also possible to convenient pass through only to dismantle drag chain interior part non-bearing bar during platform operation at sea, safeguard and change flexible pipe
And cable, it is greatly saved the time, provide guarantee for higher production efficiency.4. solve original installation difficulty and maintenance
Difficult puzzlement.
Brief description
Fig. 1 is drilling platforms towing chain device functional schematic;
Fig. 2 is the utility model drilling platforms towing chain device internal structure schematic diagram;
Fig. 3 is the A-A profile of Fig. 2;
Fig. 4 is the B of Fig. 2 to enlarged drawing;
Fig. 5 is the C of Fig. 4 to enlarged drawing;
Fig. 6 is the drilling platforms towing chain device internal structure schematic diagram after removing removable vertical separation round bar;
In figure, 1, drag chain body, 2, vertical round bar, 3, support channel-section steel, 4, L-shaped stop baffle plate, 5, cable installing zone, 6, soft
Pipe installing zone, 7, bolt, 8, flexible pipe, 9, hose coupling, 10, cable, 11, main deck, 12, drag chain slide rail.
Specific embodiment
In order to deepen, to understanding of the present utility model, to make into one to of the present utility model below in conjunction with embodiment and accompanying drawing
Step describes in detail, does not constitute the restriction to protection domain of the present utility model.
As shown in figure 1, the effect of towing chain device is mainly rig floor and cantilever beam with respect to main deck on extra large work drilling platforms
11 mobile when, towing chain device passes through to slide on drag chain slide rail 12, drives and is contained in its internal flexible pipe 8 and moves together with cable 10
And protect them, ensure water on rig floor and cantilever beam, electricity, oil, the continuous effective supply of mud etc..
The utility model changes drag chain structure first, and the vertical round bar that separates is designed to removable mode, simultaneously because perpendicular
It is not primary load bearing structure to round bar, during dismounting, whole drag chain structure does not fall apart.After vertical round bar is removed, flexible pipe is fitted inside,
Hose coupling 9 makes the HUB form of clip installation or threaded removable form into by non-disconnectable welding point simultaneously, so
The clear space that flexible pipe is fit into drag chain requires to substantially reduce, and only be can achieve with less grating space.Cable installing zone is to the greatest extent
Amount adopts the less cable of bending radius 10, makes to draw cable more smooth.
Concrete structure is as follows:As Figure 2-Figure 5, a kind of sea work drilling platforms towing chain device, including drag chain body 1, drags
It is provided with cable installing zone 5 and flexible pipe installing zone 6 in chain body 1, be provided with removable vertical separation round bar in drag chain body 1 and will drag
The intrinsic space of chain is divided into multiple difference in functionality cable installing zones and different bore hose installing zone, removable vertical separation
Round bar includes two vertical 2, two support channel-section steels 3 of round bar and two L-shaped stop baffle plates 4, and two support channel-section steel 3 bottoms to be equipped with
Through hole, vertical round bar 2 be located at two support channel-section steels 3 between and its upper and lower ends both pass through support channel-section steel 3 bottom through hole, two
L-shaped stop baffle plate 4 respectively be located at two support channel-section steels 3 in, wherein, L-shaped stop baffle plate support is fixed on by bolt 7
On the side of channel-section steel 3, another side is located at the upper and lower ends supporting channel-section steel 3 bottom and blocking two vertical round bars 2.
When using, turn on bolt and nut first, take the L-shaped stop baffle plate at vertical round bar two ends apart, then pull out vertical
Round bar, which increases the space of grid areas(As shown in Figure 6), dismantle after vertical round bar, installing space is three-in-one, be easy to
Flexible pipe and cable are installed.Then by flexible pipe(After HUB head or removable joint of dismantling)Pass through from grid, give necessary simultaneously
Chain block auxiliary is installed, and cable needs to install after flexible pipe installs again, because part flexible pipe is heavy caliber, to erection clearance
Between require higher, cable installing space demand is less, can after install.After installing by shown position successively, you can reinstall perpendicular
To round bar and L-shaped stop baffle plate.
As during operation at sea, needed to safeguard and remove flexible pipe and cable, same unclamps stop baffle plate, takes out and vertically justifies
Bar, is then assisted with chain block and takes out flexible pipe and cable.
Claims (2)
1. a kind of sea work drilling platforms towing chain device, including drag chain body, described drag chain is originally provided with cable installing zone and soft in vivo
Pipe installing zone is it is characterised in that described drag chain is originally provided with removable vertical separation round bar and in vivo by intrinsic for drag chain space
It is divided into multiple difference in functionality cable installing zones and different bore hose installing zone, described removable vertical separation round bar includes erecting
To two round bars, two support channel-section steels and two L-shaped stop baffle plates, two support channel-section steel bottoms to be equipped with through hole, described two
Vertical round bar is located between two support channel-section steels and its upper and lower ends both passes through the through hole supporting channel-section steel bottom, described two L-shaped
Stop baffle plate is located at two respectively and supports in channel-section steel, wherein, the side being secured by bolts in channel-section steel of L-shaped stop baffle plate
On, another side is located at the upper and lower ends supporting channel-section steel bottom and blocking two vertical round bars.
2. a kind of sea according to claim 1 work drilling platforms towing chain device is it is characterised in that described cable installing zone is adopted
With the less cable of bending radius, HUB form that the hose coupling of described flexible pipe installing zone is installed for clip or threaded
The joint of removable form.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620872424.1U CN205956307U (en) | 2016-08-12 | 2016-08-12 | Sea worker drilling platform tow chain device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620872424.1U CN205956307U (en) | 2016-08-12 | 2016-08-12 | Sea worker drilling platform tow chain device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205956307U true CN205956307U (en) | 2017-02-15 |
Family
ID=57976139
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620872424.1U Active CN205956307U (en) | 2016-08-12 | 2016-08-12 | Sea worker drilling platform tow chain device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205956307U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108539689A (en) * | 2018-05-08 | 2018-09-14 | 广东电网有限责任公司 | A kind of secondary cable grid facilitating closure |
CN111075804A (en) * | 2019-12-31 | 2020-04-28 | 上海建工四建集团有限公司 | Connecting piece for positioning connection of equipment and use method |
-
2016
- 2016-08-12 CN CN201620872424.1U patent/CN205956307U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108539689A (en) * | 2018-05-08 | 2018-09-14 | 广东电网有限责任公司 | A kind of secondary cable grid facilitating closure |
CN111075804A (en) * | 2019-12-31 | 2020-04-28 | 上海建工四建集团有限公司 | Connecting piece for positioning connection of equipment and use method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2759673C (en) | Structural duct bearing system | |
CN205956307U (en) | Sea worker drilling platform tow chain device | |
CN110306658A (en) | Steel construction for assembled architecture assembles system and construction method | |
CN103397782B (en) | Frame type steel work is installed construction method and the construction equipment of tie-beam | |
CN104005569A (en) | Construction method for supporting beam and removing columns | |
CN206987854U (en) | A kind of aligning recoverable anchor rod for increasing anchoring strength | |
CN106499201A (en) | A kind of dismountable safety rope tool-type holding clamp and its using method | |
CN103896165B (en) | The outer climbing tower crane supporting system of a kind of suspension type and turnover using method thereof | |
CN201569609U (en) | Cast iron pipe hydraulic testing machine | |
CN104746895A (en) | Building structure single-pipe supporting device | |
CN203878979U (en) | Bolt opposite-pulling type track sliding formwork | |
KR100944458B1 (en) | Apparatus preventing separation of cage for construction | |
CN208748645U (en) | A kind of prefabricated ground-connecting-wall leads wall | |
CN203782858U (en) | Inspection well capable of smoothly draining sewage | |
CN206376517U (en) | A kind of scaffold wall connecting piece | |
CN204238443U (en) | A kind of detachable suspension column fastening devices | |
CN202273240U (en) | Light single-wall steel hanging box cofferdam for deepwater bridge foundation construction | |
CN111877390A (en) | Large-scale tower crane basis fixing device | |
CN104358355A (en) | Detachable column base fixing device and construction method thereof | |
CN109555131A (en) | A kind of Construction of Civil Engineering foundation pit side-wall covering protection device | |
CN104895116B (en) | A kind of dropproof well lid mounting structure of inspection shaft | |
CN204199327U (en) | The safety device of municipal administration manhole | |
CN204456169U (en) | A kind of transformer track settlement formula mounting structure | |
CN202706511U (en) | Fixing device for hanging scaffold used in dismantling high structures | |
CN204023622U (en) | A kind of anti-noise inspection well lid |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |