CN205954637U - Ensure safe braced system of " X " type bias voltage grade separation ring road foundation ditch construction - Google Patents

Ensure safe braced system of " X " type bias voltage grade separation ring road foundation ditch construction Download PDF

Info

Publication number
CN205954637U
CN205954637U CN201620652679.7U CN201620652679U CN205954637U CN 205954637 U CN205954637 U CN 205954637U CN 201620652679 U CN201620652679 U CN 201620652679U CN 205954637 U CN205954637 U CN 205954637U
Authority
CN
China
Prior art keywords
foundation ditch
foundation
concrete
pit enclosure
bank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620652679.7U
Other languages
Chinese (zh)
Inventor
董小龙
彭再勇
何毅
王海龙
李志军
万超
杨国胜
卢柯良
周兆勇
欧阳丹
郭小龙
史勇
崔海龙
吴孔勇
邳仲强
蔡肖
彭炎锋
叶亮
李成娇
高昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201620652679.7U priority Critical patent/CN205954637U/en
Application granted granted Critical
Publication of CN205954637U publication Critical patent/CN205954637U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides an ensure the safe braced system of " X " type bias voltage grade separation ring road foundation ditch construction, include foundation pit retaining structure, interim end -blocking wall, on the bank foundation ditch guan liang and the first layer concrete supports, on the bank in the foundation ditch support of second floor concrete and waist rail, cantilever foundation ditch go along with sb. To guard him under middle part reinforced concrete waist rail, three -dimensional reinforced concrete bracing, reinforced concrete bracing, the bank foundation ditch guanliang and the first layer concrete supports, embedded bar or later stage bar planting in the envelope. The utility model discloses an ensure the braced system of " X " type grade separation ring road foundation ditch synchronous construction safety of interim end -blocking wall both sides place discrepancy in elevation 10.5m, realized immersed tube tunnel " X " type grade separation ring road foundation ditch synchronous construction, guaranteed deep foundation pit construction safety for whole construction progress, practiced thrift construction cost, provide the reference frame for later stage similar operating mode foundation ditch construction.

Description

One kind guarantees that " X " type biases the support system of interchange ramp security of foundation ditch construction
Technical field
This utility model belongs to engineering construction field open-cut foundation ditch engineering aspect, and be related to one kind guarantees to block wall both sides temporarily The support system of " X " type interchange ramp foundation ditch synchronous construction safety of place discrepancy in elevation 10.5m.
Background technology
Domestic inland river immersed tube tunnel is mainly used in urban district and crosses river passage, in order to realize immersed tube under water complete intercommunicating overpass and with Town road connects on the bank, sets cofferdam in Jiang Hai two sides, and structure built by opencut method of constructing in cofferdam.Immersed tube top surface is located at the river of rivers Below bed erosion line, in cofferdam, riverbed and the periphery town road discrepancy in elevation are big, and are affected by surrounding building next-door neighbour's town road, " X " type interchange ramp orthogonal points and the distance between structure built by opencut method termination in cofferdam lengthening, and then " X " type foundation ditch cannot be applied Workshop ground the gradient slow down construction to structure built by opencut method create conditions.Consider on the bank with the place discrepancy in elevation, surrounding building under bank With factors such as the distance between ring road orthogonal points, open-cut foundation ditch place limiting gradients, arrange at " X " type interchange ramp orthogonal points Interim end-blocking wall, is divided into two or more single foundation ditches whole ring road and is constructed, a part is constructed on the coast, Another part is constructed under bank, larger with the place discrepancy in elevation of foundation ditch under bank on the bank.
Nanchang City Hong Gu tunnel east bank is located at Ganjiang River east side old town, on the bank seven three enter everywhere open cut ring road with riverine in Main road, Zhongshan Road West and Chaoyang continent Road connect.Eastern bank periphery grade elevation is 25.6m, and under bank, riverbed absolute altitude in foundation ditch termination is 3m, discrepancy in elevation 22.6m.Two of which ring road grade separation forms " X-type " foundation ditch, by setting interim end-blocking wall, " X-type " foundation ditch is divided into Two foundation ditches under " herringbone " foundation ditch and bank on the bank, on the bank with foundation ditch site elevation difference 10.5m under bank, form on the bank The bias foundation ditch of " herringbone " foundation ditch one side foundation pit enclosure structure ground-connecting-wall cantilever 10.5m.According to conventional construction organization scheme, bank After the completion of under upper and bank, foundation ditch can not be constructed it is necessary to the foundation pit construction of interim end-blocking wall side is completed and backfilled simultaneously, side Can carry out the construction of opposite side foundation ditch, but this organization scheme can not meet construction period it is impossible on schedule to riverine above it Through street construction creates conditions, and has larger social influence.
Utility model content
The purpose of this utility model be for the interchange ramp orthogonal points both sides place discrepancy in elevation is big, surrounding building and ring road just The factor such as the distance between intersection point is short causes the open-cut foundation ditch biasing and prior art not enough, provides one kind to guarantee to block temporarily The support system of " X " type interchange ramp foundation ditch synchronous construction safety of wall both sides place discrepancy in elevation 10.5m.
Support system described in the utility model includes:Foundation pit enclosure structure, temporarily end-blocking wall, on the bank foundation ditch Guan Liang and first Layer concrete supports, on the bank reinforced concrete waist rail in the middle part of second layer concrete support and waist rail, cantilever foundation pit enclosure in foundation ditch, Pre- in foundation ditch Guan Liang and ground floor concrete support, building enclosure under three-dimensional armored concrete diagonal brace, armored concrete diagonal brace, bank Bury reinforcing bar or later stage bar planting.
Foundation pit enclosure structure (1) is located at the both sides of structure built by opencut method, as a part for the support system of open-cut foundation ditch construction.
Interim end-blocking wall (2) is located in structure built by opencut method, and a foundation ditch is divided into two or more open-cut foundation ditch, finally needs Interim end-blocking wall (2) in range of structures to be cut, the insertion docking of realization body structure.Interim end-blocking wall pass through wall apical cap beam and Middle part concrete breast beam and support with foundation pit enclosure structure formed common by Force system.
Foundation ditch Guan Liang and ground floor concrete support (3) are located at foundation pit enclosure structure top, foundation pit enclosure structure (1) on the bank Reinforcing bar anchors in Guan Liang, foundation pit enclosure structure top is connected as an entirety, and is collectively forming foundation ditch with foundation pit enclosure structure Support system.
In foundation ditch, second layer concrete support and waist rail (4) are located in foundation ditch on the bank, and pit earthwork is excavated to second layer waist Liang Chu, construction second layer waist rail and support.In foundation pit enclosure structure, embedded bar or later stage bar planting (8) anchor into concrete breast beam Interior, pour as an entirety with concrete after support and the colligation simultaneously of waist rail reinforcing bar simultaneously.
In the middle part of cantilever foundation pit enclosure, reinforced concrete waist rail (5) is located at outside foundation ditch, and same absolute altitude, base with waist rail in foundation ditch In pit enclosure structure, embedded bar or later stage bar planting (9) anchor in concrete breast beam, after support and the colligation simultaneously of waist rail reinforcing bar Pour as an entirety with concrete simultaneously.
In the middle part of three-dimensional armored concrete diagonal brace (6) and armored concrete diagonal brace (7) one end and cantilever foundation pit enclosure, reinforcing bar mixes Solidifying soil waist rail connects, and one end is connected with foundation ditch Guan Liang under bank, and connected mode is Bar Anchorage.
Under bank, foundation ditch Guan Liang and ground floor concrete support (8) are located at foundation pit enclosure structure top, foundation pit enclosure structure (1) Reinforcing bar anchors in Guan Liang, foundation pit enclosure structure top is connected as an entirety, and is collectively forming foundation ditch with foundation pit enclosure structure Support system.
The beneficial effects of the utility model are:By assuring that " X " type of end-blocking wall both sides place discrepancy in elevation 10.5m stands temporarily Hand over ring road foundation ditch synchronous construction safety support system it is achieved that immersed tube tunnel " X " type interchange ramp foundation ditch synchronous construction it is ensured that Safety Construction of Deep Foundation Pit, accelerates integral construction progress, has saved construction cost, and being similar to operating mode foundation pit construction for the later stage provides Reference frame.
Brief description
Fig. 1 is support system described in the utility model " X " type interchange ramp foundation ditch plane graph;
Fig. 2 is the A-A profile in Fig. 1;
In figure:1 foundation pit enclosure structure, 2 interim end-blocking walls, 3 foundation ditch Guan Liang and ground floor concrete supports, 4 on the bank on the bank Reinforced concrete waist rail, 6 three-dimensional armored concrete in the middle part of second layer concrete support and waist rail, 5 cantilever foundation pit enclosures in foundation ditch In foundation ditch Guan Liang and ground floor concrete support, 9 building enclosures under diagonal brace, 7 armored concrete diagonal braces, 8 banks embedded bar or after Phase bar planting.
Specific embodiment
Support system described in the utility model includes:Foundation pit enclosure structure, temporarily end-blocking wall, on the bank foundation ditch Guan Liang and first Layer concrete supports, on the bank reinforced concrete waist rail in the middle part of second layer concrete support and waist rail, cantilever foundation pit enclosure in foundation ditch, Pre- in foundation ditch Guan Liang and ground floor concrete support, building enclosure under three-dimensional armored concrete diagonal brace, armored concrete diagonal brace, bank Bury reinforcing bar or later stage bar planting.
Foundation pit enclosure structure (1) is located at the both sides of structure built by opencut method, as a part for the support system of open-cut foundation ditch construction.
Interim end-blocking wall (2) is located in structure built by opencut method, and a foundation ditch is divided into two or more open-cut foundation ditch, finally needs Interim end-blocking wall (2) in range of structures to be cut, the insertion docking of realization body structure.Interim end-blocking wall pass through wall apical cap beam and Middle part concrete breast beam and support with foundation pit enclosure structure formed common by Force system.
Foundation ditch Guan Liang and ground floor concrete support (3) are located at foundation pit enclosure structure top, foundation pit enclosure structure (1) on the bank Reinforcing bar anchors in Guan Liang, foundation pit enclosure structure top is connected as an entirety, and is collectively forming foundation ditch with foundation pit enclosure structure Support system.
In foundation ditch, second layer concrete support and waist rail (4) are located in foundation ditch on the bank, and pit earthwork is excavated to second layer waist Liang Chu, construction second layer waist rail and support.In foundation pit enclosure structure, embedded bar or later stage bar planting (8) anchor into concrete breast beam Interior, pour as an entirety with concrete after support and the colligation simultaneously of waist rail reinforcing bar simultaneously.
In the middle part of cantilever foundation pit enclosure, reinforced concrete waist rail (5) is located at outside foundation ditch, and same absolute altitude, base with waist rail in foundation ditch In pit enclosure structure, embedded bar or later stage bar planting (9) anchor in concrete breast beam, after support and the colligation simultaneously of waist rail reinforcing bar Pour as an entirety with concrete simultaneously.
In the middle part of three-dimensional armored concrete diagonal brace (6) and armored concrete diagonal brace (7) one end and cantilever foundation pit enclosure, reinforcing bar mixes Solidifying soil waist rail connects, and one end is connected with foundation ditch Guan Liang under bank, and connected mode is Bar Anchorage.
Under bank, foundation ditch Guan Liang and ground floor concrete support (8) are located at foundation pit enclosure structure top, foundation pit enclosure structure (1) Reinforcing bar anchors in Guan Liang, foundation pit enclosure structure top is connected as an entirety, and is collectively forming foundation ditch with foundation pit enclosure structure Support system.

Claims (1)

1. one kind guarantee " X " type bias interchange ramp security of foundation ditch construction support system it is characterised in that:Described support system Including:The second layer in foundation pit enclosure structure, temporarily end-blocking wall, on the bank foundation ditch Guan Liang and ground floor concrete support, on the bank foundation ditch Reinforced concrete waist rail, three-dimensional armored concrete diagonal brace, armored concrete in the middle part of concrete support and waist rail, cantilever foundation pit enclosure Embedded bar or later stage bar planting in foundation ditch Guan Liang and ground floor concrete support, building enclosure under diagonal brace, bank;
Foundation pit enclosure structure (1) is located at the both sides of structure built by opencut method, as a part for the support system of open-cut foundation ditch construction;
Interim end-blocking wall (2) is located in structure built by opencut method, and a foundation ditch is divided into two or more open-cut foundation ditch, finally needs to dig Except end-blocking wall (2) interim in range of structures, the insertion docking of realization body structure;Interim end-blocking wall passes through wall apical cap beam and middle part Concrete breast beam and support with foundation pit enclosure structure formed common by Force system;
Foundation ditch Guan Liang and ground floor concrete support (3) are located at foundation pit enclosure structure top, foundation pit enclosure structure (1) reinforcing bar on the bank Anchor in Guan Liang, foundation pit enclosure structure top is connected as an entirety, and be collectively forming propping up of foundation ditch with foundation pit enclosure structure Protecting system;
In foundation ditch, second layer concrete support and waist rail (4) are located in foundation ditch on the bank, and pit earthwork is excavated at second layer waist rail, Construction second layer waist rail and support;In foundation pit enclosure structure, embedded bar or later stage bar planting (8) anchor in concrete breast beam, Pour as an entirety with concrete after support and the colligation simultaneously of waist rail reinforcing bar simultaneously;
In the middle part of cantilever foundation pit enclosure, reinforced concrete waist rail (5) is located at outside foundation ditch, and the same absolute altitude with waist rail in foundation ditch, and foundation ditch encloses In protection structure, embedded bar or later stage bar planting (9) anchor in concrete breast beam, after support and the colligation simultaneously of waist rail reinforcing bar and mixed Solidifying soil pours as an entirety simultaneously;
Armored concrete in the middle part of three-dimensional armored concrete diagonal brace (6) and armored concrete diagonal brace (7) one end and cantilever foundation pit enclosure Waist rail connects, and one end is connected with foundation ditch Guan Liang under bank, and connected mode is Bar Anchorage;
Under bank, foundation ditch Guan Liang and ground floor concrete support (8) are located at foundation pit enclosure structure top, foundation pit enclosure structure (1) reinforcing bar Anchor in Guan Liang, foundation pit enclosure structure top is connected as an entirety, and be collectively forming propping up of foundation ditch with foundation pit enclosure structure Protecting system.
CN201620652679.7U 2016-06-28 2016-06-28 Ensure safe braced system of " X " type bias voltage grade separation ring road foundation ditch construction Withdrawn - After Issue CN205954637U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620652679.7U CN205954637U (en) 2016-06-28 2016-06-28 Ensure safe braced system of " X " type bias voltage grade separation ring road foundation ditch construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620652679.7U CN205954637U (en) 2016-06-28 2016-06-28 Ensure safe braced system of " X " type bias voltage grade separation ring road foundation ditch construction

Publications (1)

Publication Number Publication Date
CN205954637U true CN205954637U (en) 2017-02-15

Family

ID=57969890

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620652679.7U Withdrawn - After Issue CN205954637U (en) 2016-06-28 2016-06-28 Ensure safe braced system of " X " type bias voltage grade separation ring road foundation ditch construction

Country Status (1)

Country Link
CN (1) CN205954637U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926638A (en) * 2016-06-28 2016-09-07 中铁隧道集团二处有限公司 Supporting system for ensuring construction safety of foundation pits of X-shaped eccentric loaded interchange ramp

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926638A (en) * 2016-06-28 2016-09-07 中铁隧道集团二处有限公司 Supporting system for ensuring construction safety of foundation pits of X-shaped eccentric loaded interchange ramp

Similar Documents

Publication Publication Date Title
CN103981898B (en) A kind of inverse underground engineering construction method done of overall open cut node
CN104652443B (en) Construction method of the interim horizontal support of deep basal pit as permanent structure beam
CN102296961A (en) Karst tunnel large-scale cavern processing method
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN104563128A (en) Synchronous excavation supporting system for deep and large asymmetric pit in soft soil area and implementation method of supporting system
CN105587320B (en) Rich water sand-pebble layer abnormal shape deep shaft structural system and its construction method
CN109750681A (en) A kind of embankment side slope framework parts La Tuoding anchor slab supporting construction and its construction method a little
CN104652444A (en) Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation
CN109056810A (en) The transverse direction that open cut or lid dig underground main structure below existing building digs construction and its construction method
CN109898556A (en) A kind of underground pipe gallery structure and sunk type construction method
CN113235613B (en) Method for excavating and supporting newly-built foundation pit by utilizing adjacent existing guard piles
CN107489106A (en) A kind of rocky bed subaqueous bearing platform construction method
CN205954637U (en) Ensure safe braced system of " X " type bias voltage grade separation ring road foundation ditch construction
CN108457289A (en) A kind of open caisson construction method of complex condition
CN109487793A (en) Inner support of pile foundation pit permanent support structure is perfused in a kind of solid matter under complex environment
CN208815566U (en) The transverse direction that open cut or lid dig underground main structure below existing building digs construction
CN209722993U (en) A kind of embankment side slope framework parts La Tuoding anchor slab supporting construction a little
CN107165640A (en) Tunnels and underground engineering surely builds method certainly
CN208815560U (en) A kind of structure of Underground Subway Station construction period full station sealing
CN206768832U (en) Support, anchor cable post-tensioning H type component building enclosures before a kind of steel pipe
CN105926638B (en) One kind ensures that " X " type biases the support system of interchange ramp security of foundation ditch construction
CN210068175U (en) A protective structure for preventing tunnel slip casting reinforcement from arousing earth's surface uplift
CN210141142U (en) Underground structure is built in same direction as digging in hole stake secret
El-Nahhas Tunnelling and supported deep excavations in the Greater Cairo

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170215

Effective date of abandoning: 20170929

AV01 Patent right actively abandoned