CN205944890U - 一种电力线缆支架 - Google Patents
一种电力线缆支架 Download PDFInfo
- Publication number
- CN205944890U CN205944890U CN201620870182.2U CN201620870182U CN205944890U CN 205944890 U CN205944890 U CN 205944890U CN 201620870182 U CN201620870182 U CN 201620870182U CN 205944890 U CN205944890 U CN 205944890U
- Authority
- CN
- China
- Prior art keywords
- base
- electric power
- battery
- device body
- power cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620870182.2U CN205944890U (zh) | 2016-08-12 | 2016-08-12 | 一种电力线缆支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620870182.2U CN205944890U (zh) | 2016-08-12 | 2016-08-12 | 一种电力线缆支架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205944890U true CN205944890U (zh) | 2017-02-08 |
Family
ID=57920729
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620870182.2U Expired - Fee Related CN205944890U (zh) | 2016-08-12 | 2016-08-12 | 一种电力线缆支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205944890U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109879109A (zh) * | 2018-12-29 | 2019-06-14 | 南通中远船务工程有限公司 | 一种轻便自升降线盘架 |
-
2016
- 2016-08-12 CN CN201620870182.2U patent/CN205944890U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109879109A (zh) * | 2018-12-29 | 2019-06-14 | 南通中远船务工程有限公司 | 一种轻便自升降线盘架 |
CN109879109B (zh) * | 2018-12-29 | 2020-12-29 | 南通中远海运船务工程有限公司 | 一种轻便自升降线盘架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209055620U (zh) | 输电线路监控系统 | |
CN104833894B (zh) | 一种电气设备的故障监测系统及故障监测方法 | |
CN205944890U (zh) | 一种电力线缆支架 | |
CN203788404U (zh) | 变电站室内巡视系统 | |
CN205092511U (zh) | 一种基于无人飞行器的高压线除异物装置 | |
CN105314492A (zh) | 一种用于建筑卸料平台的安全监控方法及装置 | |
CN103983875A (zh) | 一种电力检修现场保护系统 | |
CN207069443U (zh) | 输配电线路上的清理装置 | |
CN207194599U (zh) | 一种塔杆倾斜监测加固装置 | |
CN206564304U (zh) | 电池系统的安全防护系统和电池系统 | |
CN206654076U (zh) | 一种变电站运维一体化工具车 | |
CN203895840U (zh) | 导线异物处理专用绳锯 | |
CN206726894U (zh) | 一种户外电力变压器防护顶棚 | |
CN204613249U (zh) | 移动式继电保护试验台 | |
CN106952545A (zh) | 一种互感器体感实训系统 | |
CN206664313U (zh) | 电池系统的安全防护系统及电池系统 | |
CN203998501U (zh) | 一种用于建筑卸料平台的安全监控装置 | |
CN203030849U (zh) | 浇包应急控制装置 | |
CN207623420U (zh) | 一种换流站光ct通流检测平台 | |
CN107579467B (zh) | 变电站一次设备机构箱温度维持及监控系统 | |
CN111336404B (zh) | 一种六氟化硫充气速率稳控装置 | |
CN203859238U (zh) | 提高主接地线挂设时效的连接装置 | |
CN205692011U (zh) | 一种输变电站的安全监测控制系统 | |
CN204558999U (zh) | 输电线路检修平台 | |
CN204443897U (zh) | 一种冷冻精液提取助力提吊系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190220 Address after: 211304 No. 551 Wenxi Road, Gaochun Economic Development Zone, Nanjing City, Jiangsu Province Patentee after: Nanjing Zhuo Yi Yuan Electronic Technology Co.,Ltd. Address before: 21 006 Block E, 29th Floor, Riyue Building, No. 2 Taiping South Road, Qinhuai District, Nanjing City, Jiangsu Province Patentee before: NANJING YOUKESI NETWORK TECHNOLOGY Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Power cable bracket Effective date of registration: 20190918 Granted publication date: 20170208 Pledgee: Hongwu Branch of Nanjing Bank Co.,Ltd. Pledgor: Nanjing Zhuo Yi Yuan Electronic Technology Co.,Ltd. Registration number: Y2019980000174 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20210106 Granted publication date: 20170208 Pledgee: Hongwu Branch of Nanjing Bank Co.,Ltd. Pledgor: Nanjing Zhuo Yi Yuan Electronic Technology Co.,Ltd. Registration number: Y2019980000174 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A power cable bracket Effective date of registration: 20210107 Granted publication date: 20170208 Pledgee: Hongwu Branch of Nanjing Bank Co.,Ltd. Pledgor: Nanjing Zhuo Yi Yuan Electronic Technology Co.,Ltd. Registration number: Y2021980000135 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170208 Termination date: 20210812 |
|
CF01 | Termination of patent right due to non-payment of annual fee |