CN205935883U - Slope high cable termination field that varies - Google Patents
Slope high cable termination field that varies Download PDFInfo
- Publication number
- CN205935883U CN205935883U CN201620482651.3U CN201620482651U CN205935883U CN 205935883 U CN205935883 U CN 205935883U CN 201620482651 U CN201620482651 U CN 201620482651U CN 205935883 U CN205935883 U CN 205935883U
- Authority
- CN
- China
- Prior art keywords
- slope
- herringbone
- cable termination
- varies
- termination field
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a slope high cable termination field that varies, including the hillside fields, the supreme herringbone post that varies highly that is equipped with in proper order under following in the slope has set up between per two herringbone capitals ends and has striden a crossbeam, still is equipped with the ground post at herringbone capital end. Compared with the prior art, the utility model discloses adopt the high herringbone post cable termination field structure that varies in the slope great slope, greatly reduced cubic metre of earth and stone excavation volume, protected natural environment betterly, simple structure has, the construction work volume is few, investment cost low grade advantage.
Description
Technical field
This utility model is related to a kind of not contour cable termination field in slope, belongs to cable termination field technology field.
Background technology
In technical field of electric power, carry out the long-distance sand transport of electric power by the way of power grid interlink, close on electric terminal
When, need to build cable termination field.At present, build cable termination field usual way be by ground dig flat, fill and lead up, then upper
Cable termination field is built in face.But for the larger hillside fields of the gradient, if making levelling of the land, the relatively low one end in position needs to build
The shelves cob wall of certain altitude, the higher side needs excavation formation side slope in position, and slope retaining to be made, quantities is larger.
Utility model content
The technical problems to be solved in the utility model is:There is provided a kind of slope not contour cable termination field, there is structure letter
Singly, the advantages of construction work amount is few, and construction cost is cheap, can overcome the deficiencies in the prior art.
The technical solution of the utility model is:A kind of not contour cable termination field in slope, including hillside fields, slope under
Supreme be sequentially provided with not contour herringbone column, between each two herringbone column top set up have across frame crossbeam, on herringbone column top
It is additionally provided with ground post.
Described across frame crossbeam is horizontally disposed.
The described herringbone column positioned at hillside fields low side supports herringbone column for band edge.
Described herringbone column is provided with cat ladder.
The beneficial effects of the utility model are:Compared with prior art, this utility model is adopted in the larger slope of the gradient
With not contour herringbone column's cable termination field structure, greatly reduce earthwork evacuation amount, preferably protect natural environment, have
Structure is simple, and construction work amount is few, the low advantage of cost of investment.
Brief description
Fig. 1 is structural representation of the present utility model.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment is described further to utility model:
The not contour cable termination field in this utility model slope, builds ground and is located on the city ring freeway side of Guiyang, and long 40
Rice, wide 16 meters, place is hillside fields 1, and the overall gradient is 20 degree about.Due to the needs in aerial line inlet wire direction, this terminal head
Side vertical equal pitch contour arrangement, 17 meters about of the two ends discrepancy in elevation.If making levelling of the land, the relatively low one end in position needs to build 9 meters about
Shelves cob wall, the higher side in position needs to excavate the side slope forming 10 meters about, and slope retaining to be made, and quantities is relatively
Greatly.On the premise of No. 1 terminal field of satisfaction uses and operation maintenance requires, this engineering is intended not carrying out levelling of the land, but near the mountain
Make use of momentum and frame design is carried out using not contour " people " word post, 3 not contour herringbone columns are sequentially arranged from bottom to up on hillside fields 1
3, set up across frame crossbeam 4 between each two herringbone column 3 top, be additionally provided with ground post 5 on each herringbone column 3 top, at everyone
It is also equipped with cat ladder, in order to overhaul on word post 3.
Described across frame crossbeam 4 is horizontally disposed, and the herringbone column 3 being installed on hillside fields low side adopts band edge to support herringbone column 2.
This utility model not only substantially reduces construction costs, and greatly reduces earthwork evacuation amount, preferably protects
Natural environment.
Above content be with reference to specific preferred implementation further detailed description of the utility model it is impossible to
Identification is of the present utility model to be embodied as being confined to these explanations.Ordinary skill for this utility model art
For personnel, without departing from the concept of the premise utility, some simple deduction or replace can also be made, all should regard
For belonging to protection domain of the present utility model.
Claims (2)
1. the not contour cable termination field in a kind of slope, including hillside fields(1)It is characterised in that:Set successively from bottom to up in slope
There is not contour herringbone column(3), in each two herringbone column(3)Setting up between top has across frame crossbeam(4), in herringbone column(3)Top
End is additionally provided with ground post(5), described across frame crossbeam(4)Horizontally disposed, the described herringbone column positioned at hillside fields low side supports herringbone for band edge
Post(2).
2. the not contour cable termination field in slope according to claim 1 it is characterised in that:In described herringbone column(3)On set
There is cat ladder.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620482651.3U CN205935883U (en) | 2016-05-25 | 2016-05-25 | Slope high cable termination field that varies |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620482651.3U CN205935883U (en) | 2016-05-25 | 2016-05-25 | Slope high cable termination field that varies |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205935883U true CN205935883U (en) | 2017-02-08 |
Family
ID=57935368
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620482651.3U Active CN205935883U (en) | 2016-05-25 | 2016-05-25 | Slope high cable termination field that varies |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205935883U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107269099A (en) * | 2017-05-24 | 2017-10-20 | 常熟风范电力设备股份有限公司 | A kind of inverted Y-shaped column framework of the high structural behaviour of substation framework |
-
2016
- 2016-05-25 CN CN201620482651.3U patent/CN205935883U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107269099A (en) * | 2017-05-24 | 2017-10-20 | 常熟风范电力设备股份有限公司 | A kind of inverted Y-shaped column framework of the high structural behaviour of substation framework |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102436548A (en) | Line wind load computing method for transmission tower in micro-morphogenetic region | |
CN103362343B (en) | A kind of with tower six circuit pole tower | |
CN204510985U (en) | Inner climbing type microfluidic platform communicates three pipe towers | |
CN205935883U (en) | Slope high cable termination field that varies | |
CN204475306U (en) | A kind of windbreak for the protection of trees vegetation | |
CN209924555U (en) | 220kV single-loop strain drill crossing tower | |
CN106284378A (en) | A kind of Canal in Loess Area side slope soil and water conservation method | |
CN202850038U (en) | Ecological composite slope protection plate and slope protective structure | |
CN206529782U (en) | A kind of ecological slope protection device | |
CN203247919U (en) | 220kV-electric transmission line double-return tangent tower used in wind area with air speed of 28 meters per second and altitude below 4000 meters | |
CN204849818U (en) | Assembled retaining wall | |
CN203684259U (en) | Flange type foundation for outgoing line framework of 500-kV transformer substation | |
CN205454734U (en) | Greening structure of gravity dam low reaches dam facing | |
CN100575646C (en) | The vertical construction method of slope substation in front of the mountains | |
CN210928905U (en) | Windproof fixing device for building roof greening | |
CN210143380U (en) | Slope ecological restoration vegetation planting device | |
CN207211085U (en) | Concrete gravity dam arrangement before rock | |
CN202064364U (en) | Earth-rock cofferdam structure capable of filling water in foundation pit | |
CN202012226U (en) | Narrow base tower | |
CN212002579U (en) | Ice zone narrow-base tangent tower in +/-500 kV direct current single loop | |
CN203339616U (en) | Aerial frame-type cable platform system | |
CN206052637U (en) | A kind of environmental height flood control barricade | |
CN204139193U (en) | Box-type substation and wind generator facility mutual foundation device | |
CN205776344U (en) | A kind of beam slab overhead type cable termination field | |
CN204609420U (en) | A kind of voltage levels rapid rush-repair tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: Building A6, Defu center, No. 357, qianlingshan Road, high tech Zone, Guiyang City, Guizhou Province 550002 Patentee after: POWERCHINA GUIZHOU ELECTRIC POWER DESIGN & RESEARCH INSTITUTE Co.,Ltd. Address before: 550002 No. 133, Zunyi Road, Nanming District, Guizhou, Guiyang Patentee before: GUIZHOU ELECTRIC POWER DESIGN INSTITUTE |