CN205935551U - Terrazzo floor system - Google Patents
Terrazzo floor system Download PDFInfo
- Publication number
- CN205935551U CN205935551U CN201620829679.XU CN201620829679U CN205935551U CN 205935551 U CN205935551 U CN 205935551U CN 201620829679 U CN201620829679 U CN 201620829679U CN 205935551 U CN205935551 U CN 205935551U
- Authority
- CN
- China
- Prior art keywords
- floor system
- layer
- terrazzo floor
- pea gravel
- gravel concreten
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Floor Finish (AREA)
- Road Paving Structures (AREA)
Abstract
The utility model discloses a terrazzo floor system, this terrazzo floor system have set gradually broom -finish treatment layer, pea gravel concreten bed course, interface agent layer, cement base grindstone layer, surface course from inside to outside, still are provided with the copper bar that is used for the filleting above the pea gravel concreten bed course. The utility model discloses a terrazzo floor system has construction convenience, the quality is reliable, decorative effect good, economical and practical advantage, not only realized the stone material feel and aesthetic feeling but also greatly reduced construction cost.
Description
Technical field
The utility model is related to the ground pavement system of the realm of building construction, particularly to a kind of terrazzo floor system.
Background technology
In building trade field, flooring material and the way mated formation have multiple.The material of every kind of ground pavement and
Way has its different use function and drawback.Wherein, tile floor, stone floor etc., ceramic tile and stone floor are in construction
During be also easy to produce hollowing, many hidden danger of quality such as flatness is irregular, spillage of material is big, material construction is high and cost control are asked
Topic.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of terrazzo floor system, thus overcoming prior art
Drawbacks described above, there is easy construction, reliable in quality, good decorating effect, economical and practical.
Technical problem to be solved in the utility model is achieved through the following technical solutions:
A kind of terrazzo floor system, be followed successively by from inside to outside wharf's pavement quality layer, pea gravel concreten bed course, interface agent layer,
Cement base grinding stone layer, surface layer, are additionally provided with the copper bar for filleting above described pea gravel concreten bed course.
Preferably, in technique scheme, described pea gravel concreten bed course comprises coarse aggregate and fine aggregate, wherein, thick bone
Material clay content≤1%, fine aggregate clay content≤2%.
Preferably, in technique scheme, described pea gravel concreten bed course adopts medium coarse sand, and sand factor is 35%-40%,
Cement-sand ratio is 1:2-1:2.5.
Preferably, in technique scheme, the particle diameter of described medium coarse sand is 0.3-0.5mm.
Preferably, in technique scheme, the concrete strength of described pea gravel concreten bed course is not less than C20, every cube
Rice concrete cement consumption >=330kg, the ratio of mud≤0.55.
Preferably, in technique scheme, described water is running water or drinkable natural water.
Preferably, in technique scheme, the thickness of described pea gravel concreten bed course is 30mm.
Preferably, in technique scheme, the thickness of described copper bar is 3mm.
Preferably, in technique scheme, described cement base grinding stone is with granite grain as aggregate.
Preferably, in technique scheme, described facing surface has glossy film.
The utility model technique scheme, has the advantages that:
Compared with prior art, terrazzo floor system of the present utility model, has easy construction, reliable in quality, decoration
Good, the economical and practical advantage of effect, had not only achieved the texture of stone material and aesthetic feeling but also had greatly reduced construction cost.
Brief description
Fig. 1 is terrazzo floor system partial schematic diagram of the present utility model.
Wherein:1- wharf's pavement quality layer, 2- pea gravel concreten bed course, 3- interface agent layer, 4- copper bar, 5- cement base grinding stone layer,
6- surface layer.
Specific embodiment
Below specific embodiment of the present utility model is described in detail, new in order to further understand this practicality
Type.
As shown in figure 1, a kind of terrazzo floor system, it is followed successively by from inside to outside:Wharf's pavement quality layer 1, pea gravel concreten bed course
2nd, interface agent layer 3, the copper bar 4 of filleting, cement base grinding stone layer 5, surface layer 6.Specifically:
The wharf's pavement quality 1 plucking fine uniform on original building ground.
The thickness of pea gravel concreten bed course 2 is 25-35mm, preferably 30mm.Pea gravel concreten bed course 2 must not use volcano
Grey matter cement, sand adopts the medium coarse sand of particle diameter 0.3-0.5mm, and coarse aggregate clay content not should be greater than 1%, and fine aggregate clay content should not
More than 2%, water adopts running water or drinkable natural water, and concrete strength is not lower than C20, every cubic meter of concrete cement
Consumption is no less than 330KG, and the ratio of mud not should be greater than 0.55, and sand factor is preferably 35%-40%, and cement-sand ratio is preferably 1:2-1:2.5.Pad
Can not be eager to carry out further work after the completion of layer, band mould should be taken to wrap up, water, spraying the measures such as watering and carry out moisturizing, tide
Wet curing it is ensured that at form joint will not desiccation, curing time more than 5 days.
Copper bar 4 is the copper bar filleting of 2-4mm, preferably 3mm copper bar filleting.The bed course in production, maintenance being completed carries out thorough
Bottom is cleared up, and brush interfacial agents carry out typesetting unwrapping wire according to site dimension, and arrangement copper bar cut size is 1000mm*1000mm.Copper bar
Bonding also should carry out maintenance process.
The higher granite grain of the selected hardness of cement base grinding stone 5, wearability is aggregate, is taken using stone material primary colors and cement
Join construction natural granite texture.
Surface layer 6 adopts crystallization treatment, using the adjustable polishing and burnishing machine of import high speed, grinder, special-purpose polishing block to terrazzo face
It is polished, through surface physical reaction, make terrazzo surface form one layer of glossy film having with lithotome.First corase grind is beaten
It is milled to 50 mesh.Then middle mill is polishing to 800 mesh.Add import curing sealing agent after middle mill, infiltrate through concrete through pore deep
Layer, by chemical reaction, it is possible to increase concrete hardness and packing, prevents ground from playing ash, running sand, increases ground wearability,
Give curing agent sufficient time of penetration, more than or equal to 12 hours, temperature control, at 5 DEG C -35 DEG C, was finally finely ground to 2000 mesh.
Terrazzo surface, through specialty crystallization polishing, has reached as bright as a sixpence, glittering and translucent effect.
The preparation process of above-mentioned terrazzo floor system and method are as follows:
1st, original building ground surface roughening is processed:Require plucking fine uniform and clear up ground in time, be that next step operation is carried out
Prepare;
2nd, 30mm thickness pea gravel concreten bed course:Pea gravel concreten must not use volcano grey matter cement;Sand adopts particle diameter 0.3-
The medium coarse sand of 0.5mm, coarse aggregate clay content not should be greater than 1%;Fine aggregate clay content not should be greater than 2%;Water adopt running water or
Drinkable natural water;Concrete strength is not lower than C20, and every cubic meter of concrete cement consumption is no less than 330kg, the ratio of mud
Not should be greater than 0.55;Sand factor is preferably 35%-40%;Cement-sand ratio is preferably 1: 2-1: 2.5.
Can not be eager after the completion of bed course to carry out next step operation, band mould should be taken to wrap up, water, spraying the measures such as watering and enter
Row moisturizing, moist maintenance it is ensured that at form joint will not desiccation, curing time more than 5 days.
3rd, brush interfacial agents, 3mm copper bar filleting:The bed course that maintenance is completed carries out thorough cleaning, and brush interfacial agents, according to scene
Size carries out typesetting unwrapping wire, and arrangement copper bar cut size is 1000mm*1000mm, and copper bar bonding also should carry out maintenance process.
4th, cement base grinding stone:The higher granite grain of selected hardness, wearability is aggregate, using stone material primary colors and cement
Natural granite texture is built in collocation.
5th, surface layer crystallization treatment:Using the adjustable polishing and burnishing machine of import high speed, grinder, special-purpose polishing block, terrazzo face is carried out
Polishing, through surface physical reaction, makes terrazzo surface form one layer of glossy film having with lithotome.First corase grind is polishing to
50 mesh.Then middle mill is polishing to 800 mesh.Add import curing sealing agent after middle mill, infiltrate through concrete deep layer through pore, lead to
Cross chemical reaction, it is possible to increase concrete hardness and packing, prevent ground from playing ash, running sand, increase ground wearability, give solid
The sufficient time of penetration of agent, more than or equal to 12 hours, temperature control, at 5 DEG C -35 DEG C, was finally finely ground to 2000 mesh.Terrazzo
Surface, through specialty crystallization polishing, has reached as bright as a sixpence, glittering and translucent effect.
Terrazzo floor system of the present utility model, has easy construction, reliable in quality, good decorating effect, economical and practical
Advantage, not only achieved the texture of stone material and aesthetic feeling but also greatly reduced construction cost.
Although the utility model is open as above with embodiment, so it is not intended to limit the utility model, any ability
Field technique personnel, without departing from spirit and scope of the present utility model, all can make various different selections and modification, therefore originally
The protection domain of utility model is limited by claims and its equivalents.
Claims (4)
1. a kind of terrazzo floor system is it is characterised in that described terrazzo floor system is followed successively by wharf's pavement quality from inside to outside
Layer (1), pea gravel concreten bed course (2), interface agent layer (3), cement base grinding stone layer (5), surface layer (6), described pea gravel concreten pad
Layer (2) is additionally provided with the copper bar (4) for filleting above.
2. terrazzo floor system according to claim 1 is it is characterised in that the thickness of described pea gravel concreten bed course (2)
Spend for 30mm.
3. terrazzo floor system according to claim 1 is it is characterised in that the thickness of described copper bar (4) is 3mm.
4. terrazzo floor system according to claim 1 is it is characterised in that described surface layer (6) surface has glossy film.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620829679.XU CN205935551U (en) | 2016-08-02 | 2016-08-02 | Terrazzo floor system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620829679.XU CN205935551U (en) | 2016-08-02 | 2016-08-02 | Terrazzo floor system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205935551U true CN205935551U (en) | 2017-02-08 |
Family
ID=57924204
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620829679.XU Active CN205935551U (en) | 2016-08-02 | 2016-08-02 | Terrazzo floor system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205935551U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109356358A (en) * | 2018-10-10 | 2019-02-19 | 常州新城万盛商业管理有限公司 | A kind of construction method of garage terrazzo terrace |
CN110206270A (en) * | 2019-05-15 | 2019-09-06 | 上海建工七建集团有限公司 | A kind of floor structure and its construction method |
CN113738063A (en) * | 2021-09-26 | 2021-12-03 | 苏州美瑞德建筑装饰有限公司 | Impervious design concrete-based terrazzo ground construction process |
-
2016
- 2016-08-02 CN CN201620829679.XU patent/CN205935551U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109356358A (en) * | 2018-10-10 | 2019-02-19 | 常州新城万盛商业管理有限公司 | A kind of construction method of garage terrazzo terrace |
CN110206270A (en) * | 2019-05-15 | 2019-09-06 | 上海建工七建集团有限公司 | A kind of floor structure and its construction method |
CN113738063A (en) * | 2021-09-26 | 2021-12-03 | 苏州美瑞德建筑装饰有限公司 | Impervious design concrete-based terrazzo ground construction process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9486891B2 (en) | Method for polishing special-shaped face of marble | |
US4748788A (en) | Surface seeded exposed aggregate concrete and method of producing same | |
CN205935551U (en) | Terrazzo floor system | |
AU2007278700B2 (en) | Preparation method of a tile with solid pores as decoration and its product | |
WO2014008723A1 (en) | Automatic cutting equipment for processing stone floor tile | |
CN101913806A (en) | Cement-based artificial stone and production process thereof | |
CN102416648A (en) | Method for manufacturing artificial marble by using fly ash and waste glass | |
CN103467002A (en) | Method for producing resin type artificial stones by using tile polishing residues | |
CN1070173A (en) | Organic artificial rain flower stone decorative block and manufacture method thereof | |
CN105000850A (en) | Glass artistic floor | |
CN107419858A (en) | A kind of inner wall render smears construction method | |
CN201195936Y (en) | Seamless epoxy-quartz terrace | |
CN1982252A (en) | Production of artificial glauconite sandstone decorative board | |
JP2794468B2 (en) | Surface finishing method for concrete-based artificial stone products | |
CN105669110A (en) | Cement-base stone with composite-membrane surface and preparation method thereof | |
CN107839074A (en) | Stone archaizing surface structure and manufacturing method thereof | |
CN203684596U (en) | Epoxy resin gold millstone ground | |
CN201802032U (en) | Tile simulating man-made granite | |
CN202826090U (en) | Automatic cutting equipment for processing stone floor chunks | |
CN103980002A (en) | Sandstone highlight treating process | |
CN219773444U (en) | Stone-like leather pattern brick convenient to clean | |
TWM283017U (en) | Pre-cast stone board | |
EP1524089A2 (en) | Procedure for generating a special surface of the palladium-type covering on concrete panels | |
CN1872515B (en) | Technique of prefabricated decorative board from handstones | |
CN209851248U (en) | Novel artificial stripe stone plate production device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 200122 Pudong New Area Dongfang Road, Pudong New Area, Pudong New Area, Shanghai, 21 layers Patentee after: Built in East Decoration Co. Ltd. Address before: 200122 Pudong New Area Dongfang Road, Pudong New Area, Pudong New Area, Shanghai, 21 layers Patentee before: Dongfang Decoration Design Engineering Co., Ltd. of China Construction Third Engineering Bureau |