CN205931424U - Brick mechanism is folded to polishing brick and production line thereof - Google Patents

Brick mechanism is folded to polishing brick and production line thereof Download PDF

Info

Publication number
CN205931424U
CN205931424U CN201620798699.5U CN201620798699U CN205931424U CN 205931424 U CN205931424 U CN 205931424U CN 201620798699 U CN201620798699 U CN 201620798699U CN 205931424 U CN205931424 U CN 205931424U
Authority
CN
China
Prior art keywords
brick
polished bricks
clamping
lift
lift brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620798699.5U
Other languages
Chinese (zh)
Inventor
王伟
程峰
张波
刘建
熊辉煌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sankyo Precision Huizhou Co Ltd
Original Assignee
Sankyo Precision Huizhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sankyo Precision Huizhou Co Ltd filed Critical Sankyo Precision Huizhou Co Ltd
Priority to CN201620798699.5U priority Critical patent/CN205931424U/en
Application granted granted Critical
Publication of CN205931424U publication Critical patent/CN205931424U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The utility model discloses a brick mechanism is folded to the polishing brick for fold the brick conveying to the polishing brick, include: the frame, be used for to the polishing brick presss from both sides tight conveying the tight conveyer of clamp, lifting the brick device, locating and press from both sides tight conveyer and lift folding brick buffer, be used for installing and glue gluing piece installation device and being used for carrying out the unloading conveyer that the unloading conveyed to accomplishing superimposed brick that polishes of piece between the brick device to the polishing brick of the polishing brick that presss from both sides on the tight conveyer be used for laying. The utility model discloses a polishing brick packaging production line folds brick mechanism including foretell polishing brick, polishes brick packaging production line and still carries the mechanism including polishing brick transport mechanism, polishing brick tilting mechanism, carton installation mechanism, strap installation mechanism and the unloading of polishing brick, and the polishing brick is folded brick mechanism and is located between polishing brick tilting mechanism and the carton installation mechanism. The utility model discloses a polishing brick is folded brick mechanism and has not only been guaranteed production quality, through ingenious reasonable design also great improvement production efficiency.

Description

A kind of polished bricks Die Zhuan mechanism and its production line
Technical field
This utility model is related to a kind of Die Zhuan mechanism, more particularly to a kind of polished bricks Die Zhuan mechanism and its production line.
Background technology
With the continuous progress of social continuous development and science and technology, mechanization, automated production have been increasingly becoming development Trend.In the past, the booming of Chinese manufacturing has relied on a large amount of cheap labours.But time shift border is moved, with recent years Newly-increased labouring population reduce, the raising of people's living standard, and labour force is no longer low-cost resource, and a work difficulty is asked and become increasingly Generally, in order to meet the demand of production, automated production is gradually paid attention to by enterprise.And the development of mechanical automation will with realization Machinery production leads to a new field, by automatic control system, has been really achieved big commercial production and has reduced work Intensity, improves labor efficiency so that commercial production levels have stepped a new step.Therefore, traditional manual production side Formula has not more and more adapted to the demand for development in epoch.
In the production of ceramic tile is packed, usually polylith ceramic brick stacking is placed and put, then carry out packed in cases again.In tradition Superposition equipment in, major part is all to stack into piled bricks using directly being left toward on brick receiving machine structure from conveyer belt, this side of stacking Formula makes ceramic tile it is easy to there is the situation that tile corner is damaged or ftractures during stacking, and between ceramic tile and ceramic tile Also certain friction can occur so that ceramic tile surface easily scratches, so greatly have impact on that ceramic tile is attractive in appearance and quality.Due to porcelain Brick body amass larger and easily because collision leads to damage, so transmission to stack speed slower, must be by slowly particularly when stacking Carrying out stack, this makes production efficiency not high, thus leading to, in large-scale production, need to spend more manpowers, thing Power is produced so that production cost increases, and is unfavorable for the long term growth of enterprise.
Utility model content
The purpose of this utility model is to overcome weak point of the prior art, provides a kind of polished bricks Die Zhuan mechanism, Ensure also to substantially increase production efficiency while the quality of production.
The purpose of this utility model is achieved through the following technical solutions:
A kind of polished bricks Die Zhuan mechanism, for polished bricks are carried out with folded brick transmission, including:Frame, for entering to polished bricks Row clamps the gripper feeder of transmission, for laying the lift brick device of polished bricks on described gripper feeder, located at institute State the folded brick buffer unit between gripper feeder and described lift brick device, the blob of viscose for polished bricks are carried out with installation blob of viscose Erecting device and the blanking conveyer for the polished bricks completing to be superimposed are carried out with blanking transmission;
Described gripper feeder includes:Clamping brace frame, the first clamping located at described clamping brace frame both sides for the slip Transport unit and the second clamping transport unit, described first clamping transport unit is identical and mutually right with the described second clamping transport unit structure Claim setting;
Described first clamping transport unit includes:Clamping driving cylinder and the clamping of described clamping driving cylinder drive connection Transfer plate, the clamping conveyer belt being arranged on described clamping transfer plate and the clamping transmission being connected with described clamping belt-driven Motor, described clamping transfer plate is driven by described clamping driving cylinder and slides on described clamping brace frame.
As a kind of preferred scheme of this utility model, described clamping brace sets up clamping sliding rail, described clamping Transfer plate is slidably mounted on described clamping sliding rail.
As a kind of preferred scheme of this utility model, described lift brick device includes the first lift brick portion and lifts with described first The second lift brick portion that brick portion is symmetrically set.
As a kind of preferred scheme of this utility model, described first lift brick portion includes:Lift brick bracing frame and described lift brick The lift brick lifting assembly of bracing frame drive connection, slide located at described lift brick bracing frame on polished bricks mounting sheet and with described polishing The mounting sheet driving cylinder of brick mounting sheet drive connection.
As a kind of preferred scheme of this utility model, described lift brick lifting assembly includes:First lead, the second guiding Post, the elevating screw between described first lead and described second lead and with described elevating screw drive connection liter Fall motor, described first lead and described second lead are arranged on described lift brick bracing frame, described elevating screw and institute State lift brick bracing frame drive connection.
As a kind of preferred scheme of this utility model, described lift brick bracing frame is provided with lift brick sliding rail, described polishing Brick mounting sheet is slidably mounted on described lift brick sliding rail.
As a kind of preferred scheme of this utility model, described first lift brick portion is identical with the described second lift brick portion structure.
As a kind of preferred scheme of this utility model, described blanking conveyer located at the described first lift brick portion with described Between second lift brick portion.
As a kind of preferred scheme of this utility model, described blanking conveyer is blanking conveyer belt.
A kind of polished bricks packaging production line, including above-mentioned polished bricks Die Zhuan mechanism, described polished bricks packaging production line is also Including polished bricks connecting gear, polished bricks switching mechanism, carton installing mechanism, strap installing mechanism and polished bricks blanking carrying Mechanism, described polished bricks Die Zhuan mechanism is between described polished bricks switching mechanism and described carton installing mechanism.
Compared with prior art, this utility model has advantages below:
Polished bricks Die Zhuan mechanism of the present utility model passes through the folded brick buffer unit of setting so that during folded brick between ceramic tile Distance reduce, thus playing the effect of buffering, it is to avoid because too big potential energy is broken suitable with collision between ceramic tile, pass through to set simultaneously Put blob of viscose erecting device, blob of viscose is cleverly installed between the tiles, it is to avoid directly come in contact so that ceramic tile will not between ceramic tile Scratch.Polished bricks Die Zhuan mechanism of the present utility model not only ensure that the quality of production, by ingenious rational design also greatly Improve production efficiency.
Brief description
Fig. 1 is the structure chart of the polished bricks packaging production line of this utility model one embodiment
Fig. 2 is the structure chart of the polished bricks Die Zhuan mechanism of polished bricks packaging production line in Fig. 1;
Fig. 3 is the structure chart of the gripper feeder of polished bricks Die Zhuan mechanism in Fig. 2;
Fig. 4 is the structure chart of the lift brick device of the polished bricks Die Zhuan mechanism in Fig. 2;
Fig. 5 is the structure chart of the folded brick buffer unit of polished bricks Die Zhuan mechanism in Fig. 2;
Fig. 6 is the structure chart of the blob of viscose erecting device of polished bricks Die Zhuan mechanism in Fig. 2.
Specific embodiment
For the ease of understanding this utility model, below with reference to relevant drawings, this utility model is more fully retouched State.Better embodiment of the present utility model is given in accompanying drawing.But, this utility model can come in many different forms Realize however it is not limited to embodiments described herein.On the contrary, providing the purpose of these embodiments to be to make to this practicality newly It is more thoroughly comprehensive that the disclosure of type understands.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly on another element Or can also there is element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or may be simultaneously present centering elements.Term as used herein " vertical ", " level ", " left ", For illustrative purposes only, being not offered as is unique embodiment for " right " and similar statement.
Unless otherwise defined, all of technology used herein and scientific terminology are led with belonging to technology of the present utility model The implication that the technical staff in domain is generally understood that is identical.In term used in the description of the present utility model it is simply herein The purpose of description specific embodiment is it is not intended that in limiting this utility model.Term as used herein " and/or " bag Include the arbitrary and all of combination of the Listed Items of one or more correlations.
As shown in figure 1, the structure chart of the polished bricks packaging production line 10 for this utility model one embodiment.
A kind of polished bricks packaging production line 10, including polished bricks Die Zhuan mechanism 20, polished bricks packaging production line 10 also includes Polished bricks connecting gear 30, polished bricks switching mechanism 40, carton installing mechanism 50, strap installing mechanism 60 and polished bricks blanking Carrying mechanism 70, polished bricks Die Zhuan mechanism 20 is between polished bricks switching mechanism 40 and carton installing mechanism 50.
As shown in Fig. 2 the structure chart of the polished bricks Die Zhuan mechanism 20 for this utility model one embodiment.
A kind of polished bricks Die Zhuan mechanism 20, for polished bricks 80 are carried out with folded brick transmission, including:Frame 100, for throwing Light brick 80 is clamped gripper feeder 200, the lift brick for laying the polished bricks 80 on gripper feeder 200 transmitting Device 300, the folded brick buffer unit 400 between gripper feeder 200 and lift brick device 300, for polished bricks 80 Carry out the blob of viscose erecting device 500 of blob of viscose and the blanking transmission for the polished bricks 80 completing to be superimposed are carried out with blanking transmission are installed Device 600.
As shown in figure 3, gripper feeder 200 includes:Clamping brace frame 210, slip are located at clamping brace frame 210 both sides The first clamping transport unit 220 and the second clamping transport unit 230, the first clamping transport unit 210 clamps transport unit 230 with second and ties Structure is identical and is symmetrically set.
Further, the first clamping transport unit 220 includes:Clamping driving cylinder 221 is driven with clamping driving cylinder 221 Connect is clamped transfer plate 222, is arranged on the clamping conveyer belt 223 clamping on transfer plate 222 and is driven with clamping conveyer belt 223 The clamping transmission motor 224 connecting, clamping transfer plate 222 is driven by clamping driving cylinder 221 and slides located at clamping brace frame On 210.
In this utility model one embodiment, clamping brace frame 210 is provided with clamping sliding rail 211, clamps transfer plate 222 It is slidably mounted on clamping sliding rail 221.Clamping transfer plate 222 can be made by clamping sliding rail 211 on bracing frame 210 Slide more stable, position will not be occurred to offset.
When first piece of polished bricks 80 is sent to gripper feeder 200 by polished bricks connecting gear 30, clamping transmission Plate 222 passes through clamping driving cylinder 221 driving and is moved, from by the first clamping transport unit 220 and the second clamping transport unit 230 pairs of polished bricks 80 transmit.Due on clamping transfer plate 222, clamping conveyer belt 223 is installed, therefore in polished bricks 80 quilt Also begin to while clamping be transmitted.The position of polished bricks 80 can preferably be carried out solid by the motion mode of this clamping transmission Fixed, so that it will not be offset and be sent to set position well in mode position.
After transmission puts in place, lift brick device 300 rises to setting position, and the first clamping transport unit 220 and the second clamping transmit Portion 230 motion is opened, and polished bricks 80 are placed on lift brick device 300.
In this utility model one embodiment, clamping transfer plate 222 is provided with multiple transmission directive wheels 225, transmission is led Spring (not shown) is provided with wheel 225, clamping conveyer belt 223 is arranged on transmission directive wheel 225.
It is noted that transmission directive wheel 225 plays the effect of transmission guiding so that the first clamping transport unit 210 and the Two clamping transport units 230 can be clamped to polished bricks 80, make the clamping conveyer belt being arranged on transmission directive wheel 225 simultaneously 223 can locate tensioning state, such that it is able to transmit to polished bricks 80, transmission directive wheel 225 is provided with spring, the bullet of spring Property power play the effect of buffering during clamping.
As shown in figure 4, lift brick device 300 includes the first lift brick portion 310 and lifts what brick portion 310 was symmetrically set with first Second lift brick portion 320, the first lift brick portion 310 is identical with the second lift brick portion 320 structure.
Further, the first lift brick portion 310 includes:Lift brick bracing frame 311 and the lift of lift brick bracing frame 311 drive connection Brick lifting assembly 312, slided on lift brick bracing frame 311 polished bricks mounting sheet 313 and being driven even with polished bricks mounting sheet 313 The mounting sheet driving cylinder 314 connecing.
It is noted that after the polished bricks 80 on gripper feeder 200 put in place, the first lift brick portion 310 and second lifts Lift brick bracing frame 311 in brick portion 320 passes through lift brick lifting assembly 312 and rises to setting position, so that polished bricks 80 is smoothly pacified It is put on polished bricks mounting sheet 313.Polished bricks mounting sheet 313 often lays that to complete one piece of polished bricks after 80s, lifts brick lifting assembly 312 Lift brick bracing frame 311 can be made to decline certain position, thus there being next block polished bricks of enough space overlapping.
In this utility model one embodiment, polished bricks mounting sheet 313 is provided with the elastic components such as block rubber or unit of plastic 313a, and elastic component 313a be higher than polished bricks mounting sheet 313 lay surface.By arranging elastic component 313a under polished bricks 80 Play the effect of buffering when dropping down onto polished bricks mounting sheet 313, so that polished bricks 80 is hardly damaged.
Further, lift brick lifting assembly 312 includes:First lead 312a, the second lead 312b, lead located at first (scheme to the elevating screw 312C between post 312a and the second lead 312b and with elevating screw 312c drive connection lifting motor Do not show), the first lead 312a and the second lead 312b be arranged in lift brick bracing frame 311 on, elevating screw 312c with lift brick Bracing frame 311 drive connection.
It is noted that when lift brick bracing frame 311 needs to carry out elevating movement to make, being driven by elevating screw 312c makes lift Brick bracing frame 311 is moved, and the first lead 312a and the second lead 312b plays the effect of guiding so that lift brick supports Frame 311 is more stable during falling.And due to the larger heavier-weight of polished bricks 80 volume, by arranging the first guiding Post 312a and the second lead 312b can strengthen the first lift brick portion 310 and the second lift brick portion 320 structural so as to more steady Gu.And the kinematic accuracy height of elevating screw 312c, transmission efficiency, life-span length, no back clearance can be accomplished, thus strengthen lifting brick dress Put kinematic accuracy during 300 work and efficiency.
In this utility model one embodiment, lift brick bracing frame 311 is provided with lift brick sliding rail 311a, polished bricks mounting sheet 313 are slidably mounted on lift brick sliding rail 311a.Polished bricks mounting sheet 313 can be made to slide more by lifting brick sliding rail 311a Plus stable, position will not be occurred to offset.Polished bricks mounting sheet 313 is driven into line slip by mounting sheet driving cylinder 314, thus The position of polished bricks mounting sheet 313 can be adjusted according to the polished bricks of different size, thereby enhance practicality of the present utility model.
As shown in figure 5, folded brick buffer unit 400 is included the first folded brick buffer part 410 and is tied with the first folded brick buffer part 410 Structure is identical and the second folded brick buffer part 420 of being symmetrically set.
First folded brick buffers 410 inclusions:Cushioning supportive frame 411, the buffering slided on cushioning supportive frame 411 are slided Block 412 and the buffered-display driver cylinder 413 with buffering sliding shoe 412 drive connection.
Further, buffering sliding shoe 412 is provided with the first snubber contact end 412a and the second snubber contact end 412b, the The end face of one snubber contact end 412a and the second snubber contact end 412b is respectively provided with gradient.
It is noted that when gripper feeder 200 carries out when stacking of second piece of polished bricks 80, due to lifting brick device It is placed with first piece of polished bricks 80 at 300, if face carries out laying superposition directly over, be easily caused two pieces of polished bricks 80 straight Receive and send collision or phase mutual friction leads to damage or scratch.Now, buffering sliding shoe 412 is driven by buffered-display driver cylinder 413 Moved, so that the first snubber contact end 412a is stretched out with the second snubber contact end 412b, so that on gripper feeder 200 Polished bricks 80 fall into buffering sliding shoe 412 on.So, exist necessarily between first piece of polished bricks 80 and second piece of polished bricks 80 Gap, now by blob of viscose erecting device 500, blob of viscose is arranged in second piece of polished bricks 80, after completing blob of viscose installation, buffering Sliding shoe 412 resets, and second piece of polished bricks 80 smoothly falls on lift brick device 300.
The setting one side of folded brick buffer unit 400 can reduce the distance between two pieces of polished bricks 80, thus reducing potential energy Play the effect of buffering, on the other hand make blob of viscose erecting device 500 have enough spaces, with the time, blob of viscose is installed, it is to avoid two Collide between block polished bricks 80 friction, thus ensureing the quality of polished bricks 80.
In utility model one embodiment, buffering sliding shoe 412 is in " Contraband " font shape, the first snubber contact end 412a and the Two snubber contact end 412b are the elastic component such as block rubber or unit of plastic.First snubber contact end 412a and the second snubber contact end 412b plays the effect of protection polished bricks 80 for the elastic component such as block rubber or unit of plastic, it is to avoid polished bricks 80 are falling into the first buffering Cause during contact jaw 412a and the second snubber contact end 412b to damage.
As shown in fig. 6, blob of viscose erecting device 500 is included the first blob of viscose installation portion 510 and is tied with the first blob of viscose installation portion 510 Structure is identical and the second blob of viscose installation portion 520 of being symmetrically set.
First blob of viscose installation portion 510 includes:Blob of viscose lays disk 511, blob of viscose feeding pushing block 512 and blob of viscose conveyer belt 513, glue Block lays disk 511 located between blob of viscose feeding pushing block 512 and blob of viscose conveyer belt 513, and blob of viscose feeding pushing block 512 passes near blob of viscose The direction slip with 513 is sent to lay the top of disk 511 located at blob of viscose.
Further, blob of viscose feeding pushing block 512 offers multiple blob of viscose pusher groove 512a, multiple blob of viscose pusher groove 512a Arrange in yi word pattern.
Blob of viscose conveyer belt 513 is provided with the first blob of viscose feeding breach 513a and the second blob of viscose feeding breach 513b, the first glue All slide at block feeding breach 513a and the second blob of viscose feeding breach 513b and be provided with blob of viscose installation pushing block 513c.
In order to strengthen the reasonable structure of blob of viscose erecting device 500 further, blob of viscose conveyer belt 513 passes located at the first clamping Send portion 220 with the second clamping transport unit 230 underface and be arranged in a mutually vertical manner with clamping conveyer belt 223.
It is noted that blob of viscose lays disk 511 lays blob of viscose, make fixture block equal by the promotion of blob of viscose feeding pushing block 512 Fall on blob of viscose conveyer belt 513.The setting of blob of viscose pusher groove 512a can make blob of viscose forced position when being promoted fix, thus not Easily there is position skew or come off.
Blob of viscose is transmitted in clamping conveyer belt 223, when folded brick buffer unit 400 works and catches second piece of polished bricks 80 When, blob of viscose installs pushing block 513c motion, thus by the first blob of viscose feeding breach 513a and the second blob of viscose feeding breach 513b Blob of viscose pushes and is attached to second piece of polished bricks 80 two ends, due to the first blob of viscose installation portion 510 and the second blob of viscose installation portion 520 structure Identical and be symmetrically set, the corresponding both sides of therefore second piece polished bricks 80 are mounted on two blob of viscoses so that second piece of throwing Light brick 80 falls into and directly will not come in contact collision with first piece of polished bricks 80 during lift brick device 300.
In this utility model one embodiment, the quantity that polished bricks Die Zhuan mechanism 20 is superimposed ceramic tile is three pieces, by the On two blocks of ceramic tiles, blob of viscose is installed so that the ceramic tile after superposition avoids the damage bringing of mutually colliding or rub, thus ensure that porcelain The quality of brick product.
Referring to Fig. 2, blanking conveyer 600 is blanking conveyer belt and lifts located at the first lift brick portion 310 and second Between brick portion 320.
After the completion of polished bricks 80 superposition of lift brick device 300, under the first lift brick portion 310 is direct with the second lift brick portion 320 Drop to the height of blanking conveyer 600, piled bricks, hence into blanking conveyer 600, is transmitted by blanking conveyer 600 To next station.
By setting blanking conveyer 600 between the first lift brick portion 310 and the second lift brick portion 320 so that folded brick passes Send and separate with blanking transmission, shorten the working time, it is to avoid wait in folded brick.
A kind of polished bricks packaging production line 10, including above-mentioned polished bricks Die Zhuan mechanism 20, polished bricks packaging production line 10 Also include polished bricks connecting gear 30, polished bricks switching mechanism 40, carton installing mechanism 50, strap installing mechanism 60 and polishing Brick blanking carrying mechanism 70, polished bricks Die Zhuan mechanism 20 is between polished bricks switching mechanism 40 and carton installing mechanism 50.
Compared with prior art, this utility model has advantages below:
Polished bricks Die Zhuan mechanism 20 of the present utility model passes through the folded brick buffer unit 400 of setting so that folding porcelain during brick The distance between brick reduces, thus playing the effect of buffering, it is to avoid because too big potential energy is broken suitable with collision between ceramic tile, simultaneously By arranging blob of viscose erecting device 500, blob of viscose is cleverly installed between the tiles, it is to avoid directly come in contact between ceramic tile, make Obtain ceramic tile will not scratch.Polished bricks Die Zhuan mechanism 20 of the present utility model not only ensure that the quality of production, by ingenious rational Design also greatly improves production efficiency.
The above embodiment only have expressed several embodiments of the present utility model, and its description is more concrete and detailed Carefully, but therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that it is general for this area For logical technical staff, without departing from the concept of the premise utility, some deformation can also be made and improve, these are all Belong to protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be defined by claims.

Claims (10)

1. a kind of polished bricks Die Zhuan mechanism, for carrying out folded brick transmission it is characterised in that including to polished bricks:Frame, for right Polished bricks are clamped gripper feeder, the lift brick dress for laying the polished bricks on described gripper feeder transmitting Put, the folded brick buffer unit between described gripper feeder and described lift brick device, for installing to polished bricks The blob of viscose erecting device of blob of viscose and the blanking conveyer for the polished bricks completing to be superimposed are carried out with blanking transmission;
Described gripper feeder includes:Clamping brace frame, the first clamping slided located at described clamping brace frame both sides transmit Portion and the second clamping transport unit, described first clamping transport unit is identical with the described second clamping transport unit structure and symmetrically sets Put;
Described first clamping transport unit includes:Clamping driving cylinder and the clamping transmission of described clamping driving cylinder drive connection Plate, the clamping conveyer belt being arranged on described clamping transfer plate and the clamping transmission electricity being connected with described clamping belt-driven Machine, described clamping transfer plate is driven by described clamping driving cylinder and slides on described clamping brace frame.
2. polished bricks Die Zhuan mechanism according to claim 1 has clamping to slide it is characterised in that described clamping brace sets up Track, described clamping transfer plate is slidably mounted on described clamping sliding rail.
3. polished bricks Die Zhuan mechanism according to claim 1 is it is characterised in that described lift brick device includes the first lift brick portion And lift, with described first, the second lift brick portion that brick portion is symmetrically set.
4. polished bricks Die Zhuan mechanism according to claim 3 is it is characterised in that described first lift brick portion includes:Lift brick props up The lift brick lifting assembly of support and described lift brick bracing frame drive connection, the polished bricks slided on described lift brick bracing frame Mounting sheet and the mounting sheet driving cylinder with described polished bricks mounting sheet drive connection.
5. polished bricks Die Zhuan mechanism according to claim 4 is it is characterised in that described lift brick lifting assembly includes:First Lead, the second lead, the elevating screw between described first lead and described second lead and with described liter Fall screw mandrel drive connection lifting motor, described first lead and described second lead are arranged on described lift brick bracing frame, Described elevating screw and described lift brick bracing frame drive connection.
6. polished bricks Die Zhuan mechanism according to claim 5 is it is characterised in that described lift brick bracing frame is provided with lift brick slip Track, described polished bricks mounting sheet is slidably mounted on described lift brick sliding rail.
7. polished bricks Die Zhuan mechanism according to claim 6 is it is characterised in that described first lift brick portion lifts with described second Brick portion structure is identical.
8. polished bricks Die Zhuan mechanism according to claim 3 is it is characterised in that described blanking conveyer is located at described Between one lift brick portion and described second lift brick portion.
9. polished bricks Die Zhuan mechanism according to claim 8 is it is characterised in that described blanking conveyer transmits for blanking Band.
10. a kind of polished bricks packaging production line is it is characterised in that the polished bricks including described in claim 1 to 9 any one are folded Brick mechanism, described polished bricks packaging production line also include polished bricks connecting gear, polished bricks switching mechanism, carton installing mechanism, Strap installing mechanism and polished bricks blanking carrying mechanism, described polished bricks Die Zhuan mechanism located at described polished bricks switching mechanism with Between described carton installing mechanism.
CN201620798699.5U 2016-07-26 2016-07-26 Brick mechanism is folded to polishing brick and production line thereof Expired - Fee Related CN205931424U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620798699.5U CN205931424U (en) 2016-07-26 2016-07-26 Brick mechanism is folded to polishing brick and production line thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620798699.5U CN205931424U (en) 2016-07-26 2016-07-26 Brick mechanism is folded to polishing brick and production line thereof

Publications (1)

Publication Number Publication Date
CN205931424U true CN205931424U (en) 2017-02-08

Family

ID=57927576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620798699.5U Expired - Fee Related CN205931424U (en) 2016-07-26 2016-07-26 Brick mechanism is folded to polishing brick and production line thereof

Country Status (1)

Country Link
CN (1) CN205931424U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106081235A (en) * 2016-07-26 2016-11-09 惠州市三协精密有限公司 A kind of polished bricks Die Zhuan mechanism and production line thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106081235A (en) * 2016-07-26 2016-11-09 惠州市三协精密有限公司 A kind of polished bricks Die Zhuan mechanism and production line thereof
CN106081235B (en) * 2016-07-26 2019-09-20 惠州市三协精密有限公司 A kind of polished bricks Die Zhuan mechanism and its production line

Similar Documents

Publication Publication Date Title
CN206345449U (en) A kind of intelligent crystal holder feeder
CN204470002U (en) A kind of removable preposition glue head vertical type full automatic glass glue sealing line
CN202507051U (en) Screw locking device
CN109795887A (en) A kind of double-station battery loading equipment
CN205087591U (en) Tray hacking machine
WO2022267581A1 (en) Packaging machine which quickly switches specifications
CN207658669U (en) A kind of magazine elevating mechanism of material-transporting system
CN205931424U (en) Brick mechanism is folded to polishing brick and production line thereof
CN205708728U (en) A kind of conveying transferring device of heat insulating decorative board
CN204189723U (en) The automatic Material moving device of circuit breaker interpolation type retainer
CN105947693B (en) A kind of full-automatic fired brick setting machine
CN201864059U (en) Corner wrapping device for tile
CN204189722U (en) Circuit breaker interpolation type retainer automatic assembling machine
CN209956329U (en) Horizontal moving device for strip nail paper box
CN203268927U (en) Automobile damper piston rod feeding device with batch material conveying mechanism
CN106081235B (en) A kind of polished bricks Die Zhuan mechanism and its production line
CN109841554B (en) Shaping and feeding equipment for hundred silicon wafers
CN102826348A (en) Single-rail shifting device with double manipulators
CN206288687U (en) A kind of mainboard of the automatic read-write system of cell phone mainboard label information takes mechanism away
CN207810538U (en) A kind of conveying device
CN202753549U (en) Fitting transfer device
CN207657160U (en) A kind of load bottle is mobile and rotating mechanism
CN206561419U (en) A kind of full-automatic material all in one piece system
CN210023633U (en) Automatic rivet lamp equipment
CN209667425U (en) A kind of eyebrow pencil cap capping machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208