CN205907929U CN201620912347.8U CN201620912347U CN205907929U CN 205907929 U CN205907929 U CN 205907929U CN 201620912347 U CN201620912347 U CN 201620912347U CN 205907929 U CN205907929 U CN 205907929U
Authority
CN
China
Prior art keywords
steel beam
zhongting
basal plate
column
barrage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620912347.8U
Other languages
Chinese (zh)
Inventor
郑忠
林铮
朱彤
胡伟坚
邱小维
邓继业
李胜林
李森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zhengzhong Design Co., Ltd
Original Assignee
SHENZHEN ASIANTIME INTERNATIONAL CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN ASIANTIME INTERNATIONAL CONSTRUCTION Co Ltd filed Critical SHENZHEN ASIANTIME INTERNATIONAL CONSTRUCTION Co Ltd
Priority to CN201620912347.8U priority Critical patent/CN205907929U/en
Application granted granted Critical
Publication of CN205907929U publication Critical patent/CN205907929U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a zhongting block a river handrail structure of light is hidden in area, this zhongting block a river handrail structure include that basal plate on the clad can fossil fragments of inferior skeleton and clad can fossil fragments on main skeleton of the main skeleton of fixed mounting on floor concrete layer, fixed mounting, fixed mounting, fixed mounting are at the handrail at basal plate top and hide in the basal plate or / and lamps and lanterns in the handrail. The utility model discloses a main skeleton all adopts the steel skeleton with time skeleton to the steel skeleton has light in weight, intensity is higher, the refractiveness good, the commonality strong and installs simple and easy characteristic as the base material of zhongting block a river, have the adaptation take precautions against earthquakes, dustproof, efficiency such as sound, constant temperature give sound insulation, inhale, still have simultaneously short, construction of time limit for a project portably, advantages such as non -deformable.

Description

The Zhongting barrage armrest of light hidden by a kind of band
Technical field
This utility model is related to Architectural Atrium guardrail furnishing fields, more particularly, it relates to a kind of band is hidden in light Front yard barrage armrest.
Background technology
With social progress, the design for building increasingly tends to hommization, is closer to the Nature, in building Thing mid portion or curtain wall region design Zhongting.Zhongting is a kind of space type, and as the interior space, it has the space of closing Form and pleasant weather conditions, it, again as a kind of export-oriented city space, contains certain urban activity simultaneously, enriches Avenue life.Atrium building, as a kind of development form of public building, is more and more widely accepted and adopts With, and serve important function in terms of urban design, human settlement's transformation.Modern architecture Zhongting is to dredge client's Vertical transportation hinge, be filled with sunlight and vigor again and rest with milk of human kindness, the communal space viewing and admiring and associate in the modern times In the case that down town is full of super large building, Zhongting is the calling to human's judgment, is to Traditional Space pattern Plant involution, be one kind extension to architecture indoor space for the city space.Meanwhile, in order to mitigate the load of agent structure, in The corridor in front yard to make the corridor encorbelmented mostly using steel construction, reaches the purpose of environmental protection and energy saving with this.
As Zhongting protection railing it is critical that, it is related to whether the life of people obtains safe guarantee, The beautiful together scenery in Zhongting of railing simultaneously.At present.In railing popular on the market or Zhongting barrage handrail, how with steel Change doubling glass and stainless steel column is combined as leading, form a penetrating landscape, but toughened rubber-laminated vacuum glass are heavier, to floor Load have strict requirements, crypticity is bad simultaneously, can reveal privacy, in addition, because safety glass is in the higher feelings of temperature Under condition, easily reveal, can give people to damage.Another kind of based on rustless steel railing, very succinctly, but for some little things Can drop down between the spacing of steel pipe, personal safety is not ensured.
Utility model content
The technical problems to be solved in the utility model is, for the drawbacks described above of prior art, provides a kind of band to hide The Zhongting barrage armrest of light, main framing of the present utility model and time skeleton all using steel skeleton, using steel skeleton as in The base material of front yard barrage, has that lightweight, intensity is higher, fire resistance is good, a highly versatile and install easy characteristic, has adaptation The effects such as shockproof, dust-proof, sound insulation, sound-absorbing, constant temperature, also there is short time limit, easy construction simultaneously, be unlikely to deform.
This utility model solves its technical problem and be the technical scheme is that the Zhongting providing a kind of band to hide light blocks River armrest, the secondary skeleton including the main framing being fixedly mounted on floor concrete layer, being fixedly mounted on main framing and Cover surface keel, the basal plate being fixedly mounted on cover surface keel, it is fixedly mounted on the handrail at basal plate top and hides in base Light fixture in laminate or/and in handrail.
The Zhongting barrage armrest of light hidden by band described in the utility model, wherein, described main framing include with advance It is embedded in the first column steel beam column and the second column steel beam column that floor concrete in the layer structural steel beam is fixedly connected, and fixing It is connected to the first column steel beam column top and the horizontal gird being fixedly connected on the second column steel beam column top and middle part.
The Zhongting barrage armrest of light hidden by band described in the utility model, wherein, described first and second column steel structure Part is fixedly connected with structural steel beam by solder bond chemical anchor bolts.
The Zhongting barrage armrest of light hidden by band described in the utility model, and wherein, described main framing also includes using Reinforce steel beam column in the diagonal brace strengthening first and second column steel beam column rigidity and intensity, steel beam column one end and second reinforced by this diagonal brace Column steel beam column abuts, and the other end abuts with being embedded in floor concrete in the layer structural steel beam.
The Zhongting barrage armrest of light hidden by band described in the utility model, and wherein, described skeleton includes fixing The level side connecting adjacent main framing leads to;Described level side leads to the top being separately mounted to adjacent first column steel beam column and bottom Portion, the top of adjacent second column steel beam column, middle part and bottom, and the two ends of horizontal gird.
The Zhongting barrage armrest of light hidden by band described in the utility model, and wherein, described cover surface keel is arranged on The both sides of horizontal gird.
The Zhongting barrage armrest of light hidden by band described in the utility model, and wherein, described basal plate includes arranging In the outside basal plate outside barrage, it is arranged on the inner side basal plate inside barrage and is arranged on outside basal plate and interior side base The top surface basal plate at laminate top;Described outside basal plate and inner side basal plate by internal layer to outer layer all include successively glass magnesium board, Plasterboard and emulsion paint facing;Described top surface basal plate is stone material or wooden facing.
The Zhongting barrage armrest of light hidden by band described in the utility model, and wherein, described handrail is widened wood Facing handrail.
The Zhongting barrage armrest of light hidden by band described in the utility model, and wherein, described light fixture is light bar or ground Footlights.
Implement Zhongting barrage armrest of the present utility model, have the advantages that
(1) main framing of the present utility model and time skeleton be all using steel skeleton, using steel skeleton as the basic unit of Zhongting barrage Material, has that lightweight, intensity is higher, fire resistance is good, a highly versatile and install easy characteristic, have adaptation shockproof, dust-proof, every The effects such as sound, sound-absorbing, constant temperature, also there is short time limit, easy construction simultaneously, be unlikely to deform;
(2) application glass magnesium board, as the basal plate of barrage, is a kind of green structural material, has high temperature resistant, fire-retardant, suction There are preferable coloring, intensity height, resist bending flexible, use in sound, shockproof, insect protected, anti-corrosion, nonpoisonous and tasteless pollution-free, surface The outstanding advantages such as life-span length.Application plasterboard as facing basic unit, double anti-plasterboards have moistureproof and waterproof have simultaneously anti-sink, The enhanced feature of crack resistence, bending property, be a kind of lightweight, intensity is high, the environmental protection of fire prevention and the excellent performance such as sound insulation Construction material.Two kinds of green structural materials are combined, as the basic unit of guardrail, more environmentally-friendly, and weight reduction simultaneously compares steel Change glass guardrail lower, steadiness strengthens simultaneously, reduce the load of floor, strengthen the safety coefficient of floor;
(3) furred ceiling of Zhongting barrage guardrail and handrail and next layer, by the installation of material plasterboard basic unit of the same race, will block River and the entirety of furred ceiling composition organic assembling, instead of Zhongting barrage railing, the side decoration of floor that traditional layering makes And the construction method of furred ceiling, easier for installation quick, decrease the generation of accident, enhance security performance;
(4) light is hidden in each floor application of Zhongting, strengthens Zhongting stereovision and comfort level, the barrage of arc, joins Embody stereovision and the fluency of decoration with light, build Lux Vivens environment;
(5) Zhongting barrage arc plays oblique process, makes side plate more slim and graceful, builds more warm Spatial ambience;
(6) application of the light trough of Zhongting barrage, just as the camber line that a horizontal line makes Zhongting feels more strong, and So that originally more dull hurdle river side wall becomes there has been details, increased stereovision.
Brief description
Below in conjunction with drawings and Examples, the utility model is described in further detail, in accompanying drawing:
Fig. 1 be this utility model preferred embodiment band hide light Zhongting barrage armrest top view;
Fig. 2 is the enlarged diagram in a region in Fig. 1;
Fig. 3 be this utility model preferred embodiment band hide light Zhongting barrage armrest side cross-sectional, view;
Fig. 4 is the enlarged diagram of the Zhongting barrage armrest in Fig. 3;
Fig. 5 is main framing and the structural representation of secondary skeleton;
Fig. 6 is the scheme of installation of column steel beam column;
Fig. 7 is the enlarged diagram in b region in Fig. 4;
Fig. 8 is the scheme of installation of the first column steel beam column;
Fig. 9 is the enlarged diagram in c region in Fig. 8;
Figure 10 is the scheme of installation of the second column steel beam column;
Figure 11 is the enlarged diagram in d region in Figure 10;
Figure 12 is the scheme of installation of column steel beam column and cover surface keel;
Figure 13 is the enlarged diagram in e region in Figure 12;
Wherein, 1, main framing;101st, the first column steel beam column;102nd, the second column steel beam column;103rd, horizontal gird;104、 Steel beam column reinforced by diagonal brace;2nd, secondary skeleton;201st, level side leads to;3rd, cover surface keel;4th, basal plate;401st, glass magnesium board;402nd, Gypsum Fibrosum Plate;403rd, emulsion paint facing;404th, stone material or wooden facing;5th, handrail;6th, light fixture;601st, the light bar of handrail low groove;602nd, interior Ground footlight in side base laminate;603rd, lower margin facing hide light bar;604th, hide light bar in the basal plate of outside;7th, chemical anchors Bolt;A, structural steel beam.
Specific embodiment
Below, in conjunction with accompanying drawing and specific embodiment, this utility model is described further:
As shown in figures 1-13, the Zhongting barrage armrest of light hidden by a kind of band, including being fixedly mounted on flooring coagulation Main framing 1 on soil layer, the secondary skeleton 2 being fixedly mounted on main framing and cover surface keel 3, it is fixedly mounted on cover surface keel Basal plate 4, it is fixedly mounted on the handrail 5 at basal plate top and hides the light fixture 6 in basal plate or/and in handrail.
Wherein, described main framing 1 includes standing be embedded in that floor concrete in the layer structural steel beam is fixedly connected first Post steel beam column 101 and the second column steel beam column 102, be fixedly connected on the first column steel beam column top and be fixedly connected on second stand The horizontal gird 103 at post steel beam column top and middle part, and for strengthening the diagonal brace of first and second column steel beam column rigidity and intensity Reinforce steel beam column 104.Described first and second column steel beam column is fixedly connected with structural steel beam by solder bond chemical anchor bolts 7.Should Diagonal brace reinforce steel beam column one end abut with the second column steel beam column lower end, the other end be embedded in floor concrete in the layer structure Girder steel a abuts.
Described skeleton 2 includes the level side logical 201 being fixedly connected adjacent main framing;Described level side is logical to be separately mounted to The top of adjacent first column steel beam column and bottom, the top of adjacent second column steel beam column, middle part and bottom, and level are horizontal The two ends of beam.
Described cover surface keel 3 is arranged on the both sides of horizontal gird.
Described basal plate 4 includes being arranged on outside basal plate outside barrage, is arranged on inner side basal plate inside barrage And it is arranged on the top surface basal plate at outside basal plate and inner side basal plate top;Described outside basal plate and inner side basal plate by Internal layer all includes glass magnesium board 401, plasterboard 402 and emulsion paint facing 403 successively to outer layer;Described top surface basal plate be stone material or Wooden facing 404.
Described handrail 5 is widened wood facing handrail.
Described light fixture 6 is light bar or ground footlight.Specifically include light bar 601, the inner side basal plate being arranged on handrail low groove Interior ground footlight 602 and lower margin facing hide light bar 603, hide light bar 604 in the basal plate of outside.
This utility model also provides a kind of mounting process of the Zhongting barrage armrest that band hides light, walks including following Rapid:
(1) line setting and the processing of column steel beam column:
According to design drawing, complete line what metope ejected mortar basic unit face, column steel is ejected on related wall, cylinder Component installation location line simultaneously ejects construction level line and vertical line, is easy to smooth vertical and horizontal during vertical columns steel beam column, reaches design And code requirement;
Unwrapping wire in civil engineering basic unit, draws chemical anchor bolts built-in fitting position, then carries out applying of chemical anchor bolts built-in fitting again Work, after built-in fitting has been constructed, column steel beam column install before again unwrapping wire it is ensured that chemical anchor bolts are accurate with what column steel beam column welded Property;
The processing of column steel beam column, carry out cutting according to design requirement column steel beam column, bore crab-bolt fixing hole, welding plus Work;
(2) chemical anchor bolts are installed:
According to first and second column steel beam column fixed position line in main framing in floor slab tops and side the impact drilling, After being drilled hole, the dust of cleaning in the hole, chemical bolt is installed, drilling depth meets design and code requirement, meets master simultaneously The stability of skeleton, the spacing of wells is consistent with hole on skeleton;
(3) main framing is installed:
The column steel beam column of main framing is installed: the first column steel beam column processing first is installed, the first column that will install The hole position be aligned crab-bolt of steel beam column, is fixed with nut temporarily, after all first column steel beam column installations, adjusts flatness And levelness, the fixation in adjustment;Then, the second column steel beam column, the installation method with the first column steel beam column are installed Identical, the fixation in adjustment, the first column steel beam column and the second column steel beam column will overlap, so that in follow-up weldering simultaneously Connect one entirety of middle formation;
The welding of column steel beam column and structural steel beam: the second column steel beam column is leaning closely against in structural steel beam, and with peace Fill firm second column steel beam column to weld together;Then again the first column steel beam column and the second column steel beam column are welded Connect;Note wanting bilateral to weld in fact during welding, firm welding, must not rosin joint, solder joint is necessary for full weld, no solder skip, no sand holes;Weld After complete passed examination, in spot area brushing antirust paint;
Steel beam column reinforced by erecting and welding diagonal brace: reinforces steel beam column in the concave side of structural steel beam and the second column steel with diagonal brace The lower end reinforcement of weld of component, the rigidity that column steel skeleton is strengthened with this and intensity;
Horizontal gird is installed: respectively in top and the interposition of the top of the first column steel beam column and the second column steel beam column Put weld horizontal crossbeam;
(4) time skeleton is installed:
Be separately mounted to top and the bottom of adjacent first column steel beam column, the top of adjacent second column steel beam column, in Portion and bottom, and the two ends weld horizontal side of horizontal gird is logical;
(5) cover surface keel is installed:
After main framing and time skeleton erecting and welding, check flatness and perpendicularity, after meeting the requirements, carry out cover surface keel Installation, the spacing of the installation of cover surface keel meets design and job specfication requires, spacing general control 300-400mm it Interior;The installation of cover surface keel and main framing and time skeleton is fixed using bolt, adjustment levelness and perpendicularity, then fix tightly Gu;
(6) the pre-buried installation of electric lighting circuit in suspended ceiling indoor motor and barrage handrail:
On demand in furred ceiling install electric wiring pre-buried;Electric wiring in Zhongting barrage armrest is installed as Four groups of circuits, the respectively light bar of handrail low groove, ground footlight, lower margin facing hide light bar, the concealed lamp of Zhongting lateral surface Carry four groups of illuminating lines, along in the top surface → metope → ground → barrage steel skeleton of floor, carry out pre-buried installation;Pre-buried plating Zinc wire pipe wants fixation on main framing and time skeleton, prevents from loosening;
(7) basal plate is installed:
After the hidden project inspection of barrage is qualified, it is packaged basal plate;Described basal plate includes being arranged on outside barrage Outside basal plate, be arranged on the inner side basal plate inside barrage and be arranged on outside basal plate and inner side basal plate top Top surface basal plate;Described outside basal plate and inner side basal plate all include glass magnesium board, plasterboard and breast successively by internal layer to outer layer Shellac varnish facing;Described top surface basal plate is stone material or wooden facing;Erection sequence be glass magnesium board → plasterboard → emulsion paint facing → Stone material or wooden facing;
(8) special-shaped wood facing baseboard is installed:
Abnormity wood facing baseboard is installed, carries out pasting after the completion of ground construction and install;Needing opposite sex wood decorations are installed Brushing moisture-proof coating on the plasterboard of face baseboard, simultaneously by wooden facing back side brushing moisture-proof coating to be installed, after parching, The relevant position brushing bonding agent of abnormity wood facing baseboard, smears one layer of bonding agent, then by lower margin on basal plate simultaneously Line is pasted onto on basal plate, with rifle nail in hidden place by special-shaped baseboard fixation;
Before abnormity wood facing baseboard is installed, first in the hidden groove of wooden facing at interval of 2000mm about fixing The fixing card code of one lamp bar;
(9) handrail and ligthing paraphernalia are installed:
After the basal plate of Zhongting guardrail both sides completes, carry out the installation of handrail and ligthing paraphernalia;
The LED lamp bar of Zhongting suspended ceiling modeling is installed first: the lamp bar of installation, at interval of 2 meters about, installs a fixation Card code, prevents the lamp bar of hiding installed from loosening, does not reach lighting effects;
Mounting foot lamp: first will reserved power line pull-out out, the ground footlight of pre-installation is fixed on reserved position Put, with screw, light fixture is fixed on two side rail facings, fixation, then power line is connected;
Mounting foot line hide light bar: during installation, lamp bar is stuck in preassembled card code, as far as possible by lamp during installation Bar stretches;
Install and hide lamp bar under handrail: hiding in handrail facing be after lamp bar treats that facing is installed, then carry out installation and help Subordinate hides lamp bar, during installation, is then being stuck on card code through lamp bar by reserved installation hole;
(10) stickup of barrage handrail facing is assembled:
In three face brushing bonding agents of basal plate, simultaneously in assembled wooden facing back side brushing bonding agent, according to snap the line position Put, by wooden facing Adhesive clip in the flatness that handrail is adjusted on basal plate, after adjustment, around the wooden facing pasting With screw by wooden facing and steel skeleton fixation;
(11) stainless steel guard rail is installed:
After the completion of wooden facing assembly, carry out the installation of stainless steel guard rail, stainless steel guard rail is all formed with wooden facing handrail Modularity, it is fixed in wooden facing hole prefabricated for two pillars insertions of nonfloating rail, is screwed into screw from the side, and guardrail is solid It is scheduled in wooden facing handrail.
It will be apparent to those skilled in the art that can technical scheme as described above and design, make other various Corresponding change and deformation, and all these change and deformation all should belong to the protection of this utility model claim Within the scope of.

Claims (9)

1. a kind of band hides the Zhongting barrage armrest of light it is characterised in that including being fixedly mounted on floor concrete layer On main framing, the secondary skeleton being fixedly mounted on main framing and cover surface keel, the basal plate being fixedly mounted on cover surface keel, It is fixedly mounted on the handrail at basal plate top and hide the light fixture in basal plate or/and in handrail.
2. band according to claim 1 hides the Zhongting barrage armrest of light it is characterised in that described main framing bag Include and be embedded in the first column steel beam column and the second column steel beam column that floor concrete in the layer structural steel beam is fixedly connected, with And it is fixedly connected on the first column steel beam column top and the horizontal gird being fixedly connected on the second column steel beam column top and middle part.
3. band according to claim 2 hides the Zhongting barrage armrest of light it is characterised in that described first and second Column steel beam column is fixedly connected with structural steel beam by solder bond chemical anchor bolts.
4. band according to claim 1 hide light Zhongting barrage armrest it is characterised in that described main framing also Reinforce steel beam column including the diagonal brace for strengthening first and second column steel beam column rigidity and intensity, steel beam column one end reinforced by this diagonal brace Abut with the second column steel beam column, the other end abuts with being embedded in floor concrete in the layer structural steel beam.
5. band according to claim 2 hides the Zhongting barrage armrest of light it is characterised in that described skeleton bag Include be fixedly connected adjacent main framing level side lead to;Described level side leads to the top being separately mounted to adjacent first column steel beam column And bottom, the top of adjacent second column steel beam column, middle part and bottom, and the two ends of horizontal gird.
6. band according to claim 2 hides the Zhongting barrage armrest of light it is characterised in that described cover surface keel It is arranged on the both sides of horizontal gird.
7. band according to claim 1 hides the Zhongting barrage armrest of light it is characterised in that described basal plate bag Include be arranged on outside basal plate outside barrage, be arranged on the inner side basal plate inside barrage and be arranged on outside basal plate and The top surface basal plate at inner side basal plate top;Described outside basal plate and inner side basal plate all include glass successively by internal layer to outer layer Magnesium plate, plasterboard and emulsion paint facing;Described top surface basal plate is stone material or wooden facing.
8. band according to claim 1 hides the Zhongting barrage armrest of light it is characterised in that described handrail is to add Wide type wood facing handrail.
9. band according to claim 1 hides the Zhongting barrage armrest of light it is characterised in that described light fixture is lamp Band or ground footlight.
CN201620912347.8U 2016-08-19 2016-08-19 Zhongting block a river handrail structure of light is hidden in area Active CN205907929U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620912347.8U CN205907929U (en) 2016-08-19 2016-08-19 Zhongting block a river handrail structure of light is hidden in area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620912347.8U CN205907929U (en) 2016-08-19 2016-08-19 Zhongting block a river handrail structure of light is hidden in area

Publications (1)

Publication Number Publication Date
CN205907929U true CN205907929U (en) 2017-01-25

Family

ID=57800966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620912347.8U Active CN205907929U (en) 2016-08-19 2016-08-19 Zhongting block a river handrail structure of light is hidden in area

Country Status (1)

Country Link
CN (1) CN205907929U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150005A (en) * 2016-08-19 2016-11-23 深圳市亚泰国际建设股份有限公司 Zhongting barrage armrest and the mounting process of light hidden by a kind of band
CN107724613A (en) * 2017-09-25 2018-02-23 上海宝冶建筑装饰有限公司 Banister structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150005A (en) * 2016-08-19 2016-11-23 深圳市亚泰国际建设股份有限公司 Zhongting barrage armrest and the mounting process of light hidden by a kind of band
WO2018032773A1 (en) * 2016-08-19 2018-02-22 深圳市亚泰国际建设股份有限公司 Atrium barrier handrail structure with hidden lamplight and installation process
CN106150005B (en) * 2016-08-19 2018-10-23 深圳市亚泰国际建设股份有限公司 A kind of Zhongting barrage armrest and mounting process with hidden lights
CN107724613A (en) * 2017-09-25 2018-02-23 上海宝冶建筑装饰有限公司 Banister structure

Similar Documents

Publication Publication Date Title
CN106150005B (en) A kind of Zhongting barrage armrest and mounting process with hidden lights
CN106168067A (en) A kind of construction method of light steel keel partition
CA3118407C (en) Modular stairwell and elevator shaft system and method
CN205907929U (en) Zhongting block a river handrail structure of light is hidden in area
CN105421818A (en) Embedded steel structure assembling residence
CN105040899B (en) The column in aluminium alloy house and wallboard and door and window attachment structure
CN108035455A (en) Modularization Timberwork wall and its assemble method
US7588343B1 (en) Decorative backlit structural members incorporating glass
KR101048470B1 (en) Observation platform having pavilion structure
US20170234515A1 (en) Luminous panel
CN110029790A (en) A kind of multi-functional floor of mating formation of assembled
CN202627566U (en) Detachable suspended house of steel-wood structure
CN204899076U (en) Balcony balustrade and crossbeam installation connection structure in aluminum alloy house
CN100560941C (en) The syndeton and the job practices thereof of each cavern of a kind of underground power house
JP2018178573A (en) Staircase structure and method of manufacturing steel staircase
US20120011786A1 (en) Structural stringer for stairways
CN107246152A (en) A kind of method that steel structure frame is assembled with combined light floor modules
CN204850113U (en) Modular acoustic celotex board
CN105839869A (en) Cantilever type glass stairs and method for constructing same
CN110847378A (en) Building and decoration integrated house and manufacturing method thereof
CN201339333Y (en) Tower-type suspension house building
CN204876451U (en) Installed part and have decorative board installation component of this installed part
CN211396777U (en) Wind-resistant environment-friendly assembled module mobile public toilet
KR200467064Y1 (en) Pergola post
NL1043996B1 (en) Aluminium frame building, build element and method therefor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 518000 Guangdong city of Shenzhen province Yitian Futian District District Road and Fuhua Road Interchange, 4B02 4B01 excellence Times Square

Patentee after: Shenzhen Zhengzhong Design Co., Ltd

Address before: 518000 Guangdong city of Shenzhen province Yitian Futian District District Road and Fuhua Road Interchange, 4B02 4B01 excellence Times Square