CN106150005B - A kind of Zhongting barrage armrest and mounting process with hidden lights - Google Patents

A kind of Zhongting barrage armrest and mounting process with hidden lights Download PDF

Info

Publication number
CN106150005B
CN106150005B CN201610697547.0A CN201610697547A CN106150005B CN 106150005 B CN106150005 B CN 106150005B CN 201610697547 A CN201610697547 A CN 201610697547A CN 106150005 B CN106150005 B CN 106150005B
Authority
CN
China
Prior art keywords
steel member
column steel
basal plate
barrage
zhongting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610697547.0A
Other languages
Chinese (zh)
Other versions
CN106150005A (en
Inventor
郑忠
林铮
朱彤
胡伟坚
邱小维
邓继业
李胜林
李森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zhengzhong Design Co., Ltd
Original Assignee
SHENZHEN ASIANTIME INTERNATIONAL CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN ASIANTIME INTERNATIONAL CONSTRUCTION Co Ltd filed Critical SHENZHEN ASIANTIME INTERNATIONAL CONSTRUCTION Co Ltd
Priority to CN201610697547.0A priority Critical patent/CN106150005B/en
Publication of CN106150005A publication Critical patent/CN106150005A/en
Priority to PCT/CN2017/079040 priority patent/WO2018032773A1/en
Application granted granted Critical
Publication of CN106150005B publication Critical patent/CN106150005B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Signs Or Road Markings (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention discloses a kind of Zhongting barrage armrest and mounting process with hidden lights, which includes the main framing being fixedly mounted on floor concrete layer, the secondary skeleton that is fixedly mounted on main framing and cover surface keel, the basal plate being fixedly mounted on cover surface keel, the handrail being fixedly mounted at the top of basal plate and hides lamps and lanterns in basal plate or/and in handrail.The main framing of the present invention and time skeleton are all made of steel skeleton, using steel skeleton as the base material of Zhongting barrage, with light-weight, intensity is higher, fire resistance is good, versatile and simple to install characteristic, have and adapt to shockproof, dust-proof, sound insulation, sound-absorbing, constant temperature and other effects, while also having many advantages, such as short time limit, easy construction, being unlikely to deform.

Description

A kind of Zhongting barrage armrest and mounting process with hidden lights
Technical field
The present invention relates to Architectural Atrium guardrail furnishing fields, are blocked more specifically to a kind of Zhongting with hidden lights River armrest and mounting process.
Background technology
With the development of the society, the design for building increasingly tends to hommization, it is closer to the Nature, is being built Zhongting is designed in object middle section or curtain wall region.Zhongting is a kind of space type, and as the interior space, it has closed space Form and pleasant weather conditions, while it contains certain urban activity again as a kind of city space of extroversion, enriches Avenue life.A kind of development form of the atrium building as public building, more and more extensive being accepted and adopting With, and play important function in terms of urban design, living environment's transformation.Modern architecture Zhongting is both to dredge customer's Vertical transportation hinge, but be filled with sunlight and vigor and rest with milk of human kindness, ornamental and contacts the communal space in the modern times In the case that down town is full of super large building, Zhongting is the calling to human's judgment, is one to Traditional Space pattern Kind involution, is a kind of extension of the city space to architecture indoor space.Meanwhile in order to mitigate the load of agent structure, in The corridor in front yard mostly uses greatly steel construction to make the corridor of overhanging, achievees the purpose that environmental protection and energy saving with this.
Railing as Zhongting protection is vital, it is related to whether the life of people obtains safe guarantee, Railing one of beautiful landscape line in Zhongting simultaneously.At present.In popular on the market railing or Zhongting barrage handrail, mostly with steel Change doubling glass and stainless steel column is combined as leading, forms a penetrating landscape, but toughened rubber-laminated vacuum glass is heavier, to floor Load have strict requirements, while crypticity is bad, can reveal privacy, in addition, since tempered glass is in the higher feelings of temperature Under condition, easily reveals, can be damaged to people.Another kind is based on stainless steel railing, very succinctly, but for some small things It can be fallen down between the spacing of steel pipe, personal safety is not ensured.
Invention content
The technical problem to be solved in the present invention is, for the drawbacks described above of the prior art, provides a kind of band hidden lights Zhongting barrage armrest and mounting process, main framing of the invention and time skeleton be all made of steel skeleton, using steel skeleton as The base material of Zhongting barrage, have it is light-weight, intensity is higher, fire resistance is good, versatile and simple to install characteristic, have suitable Shockproof, dust-proof, sound insulation, sound-absorbing, constant temperature and other effects are answered, while also having many advantages, such as short time limit, easy construction, being unlikely to deform.
The technical solution adopted by the present invention to solve the technical problems is:A kind of Zhongting barrage with hidden lights is provided to help Hand structure, including the main framing being fixedly mounted on floor concrete layer, the secondary skeleton and the clad can that are fixedly mounted on main framing It keel, the basal plate being fixedly mounted on cover surface keel, the handrail being fixedly mounted at the top of basal plate and hides in basal plate Lamps and lanterns in interior or/and handrail;
The main framing includes the first column steel structure being fixedly connected with the structural steel beam being embedded in floor concrete layer Part and the second column steel member, and be fixedly connected at the top of the first column steel member and be fixedly connected on the second column steel member The horizontal gird on top and middle part;
The main framing further includes reinforcing steel member for enhancing the diagonal brace of the first and second column steel member rigidity and intensity, The diagonal brace is reinforced steel member one end and is abutted with the second column steel member, the other end and the structural steel being embedded in floor concrete layer Beam abuts.
Zhongting barrage armrest of the present invention with hidden lights, wherein the first and second column steel member is logical Solder bond chemical anchor bolts are crossed to be fixedly connected with structural steel beam.
Zhongting barrage armrest of the present invention with hidden lights, wherein the secondary skeleton includes being fixedly connected The level side of adjacent main framing is logical;The logical top and bottom for being separately mounted to adjacent first column steel member in the level side, phase Adjacent top, middle part and the bottom of second column steel member and the both ends of horizontal gird.
Zhongting barrage armrest of the present invention with hidden lights, wherein the cover surface keel is mounted on level The both sides of crossbeam.
Zhongting barrage armrest of the present invention with hidden lights, wherein the basal plate includes that setting is being blocked Outside basal plate on the outside of river, the inside basal plate being arranged on the inside of barrage and setting basal plate and inside basal plate on the outside The top surface basal plate at top;The outside basal plate and inside basal plate include glass magnesium board, gypsum successively by internal layer to outer layer Plate and emulsion paint facing;The top surface basal plate is stone material or the wooden facing.
Zhongting barrage armrest of the present invention with hidden lights, wherein the handrail is the widened wooden facing Handrail.
Zhongting barrage armrest of the present invention with hidden lights, wherein the lamps and lanterns are light bar or ground footlight.
The mounting process of the present invention also provides a kind of Zhongting barrage armrest with hidden lights, includes the following steps:
(1) line setting and the processing of column steel member:
According to design drawing, the completion line in metope pop-up mortar base face pops up column steel on relevant wall, cylinder Component installation location line simultaneously pops up construction level line and vertical line, smooth vertical and horizontal when convenient for vertical columns steel member, reaches design And code requirement;
The unwrapping wire in civil engineering base draws chemical anchor bolts built-in fitting position, then carries out applying for chemical anchor bolts built-in fitting again Work, after built-in fitting has been constructed, unwrapping wire again before the installation of column steel member, it is ensured that it is accurate that chemical anchor bolts are welded with column steel member Property;
The processing of column steel member is cut according to design requirement column steel member, bores anchor bolt mounting hole, welding adds Work;
(2) chemical anchor bolts are installed:
According to the first and second column steel member fixed position line in main framing in floor slab tops and side the impact drilling, It is drilled after hole, the dust in cleaning eye, chemical anchor bolts is installed, drilling depth meets design and code requirement, while meeting master The stability of skeleton, the spacing of wells are consistent with hole on skeleton;
(3) main framing is installed:
The column steel member of main framing is installed:The the first column steel member processed is first installed, by the first column of installation The hole position alignment anchor bolt of steel member, is fixed temporarily with nut, will all first column steel members after installation is complete, adjusting flatness And levelness, the fixation in adjustment;Then, the second column steel member, the installation method with the first column steel member are installed It is identical, the fixation in adjustment, while the first column steel member and the second column steel member will overlap, so as in subsequent weldering Connect one entirety of middle formation;
The welding of column steel member and structural steel beam:Second column steel member is leaning closely against in structural steel beam, and with knot Structure girder steel welds together;Then the first column steel member and the second column steel member are welded again;Pay attention to wanting when welding Bilateral in fact weld, firm welding, must not rosin joint, solder joint be necessary for full weld, without solder skip, without sand holes;After welding finishes passed examination, Spot area brushing antirust paint;
Erecting and welding diagonal brace reinforces steel member:With diagonal brace reinforce steel member structural steel beam concave side and the second column steel The lower end reinforcement of weld of component enhances the rigidity and intensity of column steel skeleton with this;
Horizontal gird is installed:Respectively on the top and interposition of the top of the first column steel member and the second column steel member Set weld horizontal crossbeam;
(4) time skeleton is installed:
Respectively in the top and bottom of adjacent first column steel member, the top of adjacent second column steel member, middle part and Bottom and the both ends weld horizontal side of horizontal gird are logical;
(5) cover surface keel is installed:
Main framing checks flatness and verticality, cover surface keel is carried out after meeting the requirements with after time skeleton erecting and welding Installation, the spacing of the installation of cover surface keel meets design and job specfication requirement, spacing general control 300-400mm it It is interior;The installation of cover surface keel and main framing and time skeleton is fixed by bolts, and adjusts levelness and verticality, then fix tightly Gu;
(6) the pre-buried installation of electric lighting circuit in suspended ceiling indoor motor and barrage handrail:
On demand in furred ceiling install electric wiring it is pre-buried;Electric wiring in Zhongting barrage armrest is installed as The concealed lamp band of four groups of circuits, the respectively light bar of handrail lower groove, ground footlight, lower margin facing, the concealed lamp of Zhongting lateral surface Four groups of illuminating lines of band carry out pre-buried installation in top surface → metope → ground → barrage steel skeleton of floor;Pre-buried plating Zinc wire pipe wants fixation on main framing and time skeleton, prevents from loosening;
(7) basal plate is installed:
After the hidden project inspection qualification of barrage, it is packaged basal plate;The basal plate includes being arranged on the outside of barrage Outside basal plate, the inside basal plate that is arranged on the inside of barrage and setting on the outside at the top of basal plate and inside basal plate Top surface basal plate;The outside basal plate and inside basal plate include glass magnesium board, plasterboard and breast successively by internal layer to outer layer Shellac varnish facing;The top surface basal plate is stone material or the wooden facing;Erection sequence be glass magnesium board → plasterboard → emulsion paint facing → Stone material or the wooden facing;
(8) the wooden facing baseboard of installation abnormity:
The wooden facing baseboard of installation abnormity, carries out stickup installation after the completion of ground construction;It is needing that abnormity wood decorations are installed Brushing moisture-proof coating on the plasterboard of face baseboard, while by the wooden facing back side brushing moisture-proof coating to be installed, after parching, The relevant position brushing bonding agent of special-shaped wood facing baseboard, while one layer of bonding agent is smeared on basal plate, then by lower margin Line is pasted onto on basal plate, with rifle nail in hidden place by special-shaped baseboard fixation;
(9) handrail and luminaire are installed:
After the basal plate of Zhongting guardrail both sides is completed, the installation of handrail and luminaire is carried out.
The Zhongting barrage armrest and mounting process for implementing the present invention, have the advantages that:
(1) main framing of the invention and time skeleton are all made of steel skeleton, using steel skeleton as the base material of Zhongting barrage, With light-weight, intensity is higher, fire resistance is good, versatile and simple to install characteristic, has and adapt to shockproof, dust-proof, sound insulation, suction Sound, constant temperature and other effects, while also having many advantages, such as short time limit, easy construction, being unlikely to deform;
(2) basal plate of the glass magnesium board as barrage is applied, is a kind of green structural material, there is high temperature resistant, fire-retardant, suction Sound, shockproof, insect prevention, anti-corrosion, non-toxic and tasteless pollution-free, surface have preferable coloring, intensity high resist bending flexible, to use Outstanding advantages of long lifespan.Using plasterboard as facing base, double anti-plasterboards have moistureproof and waterproof have simultaneously it is anti-sink, The characteristics of crack resistence, bending property enhancing, be it is a kind of it is light-weight, intensity is high, fire prevention and sound insulation etc. have excellent performance it is environmentally protective Construction material.Two kinds of green structural materials are combined, more environmentally-friendly as the base of guardrail, while weight reduces, and compares steel It is lower to change glass guardrail, while stability enhances, and reduces the load of floor, enhances the safety coefficient of floor;
(3) Zhongting barrage guardrail and handrail and next layer of furred ceiling will be blocked by the installation of material plasterboard of the same race base The entirety in river and furred ceiling composition organic assembling, the side of the Zhongting barrage railing, floor that are made instead of traditional layering are decorated And the construction method of furred ceiling, it is easier for installation quick, reduce the generation of accident, enhances security performance;
(4) each floor application hidden lights of Zhongting enhance Zhongting stereovision and comfort level, the barrage of arc and match The stereovision and fluency that decoration is embodied with light, build Lux Vivens environment;
(5) Zhongting barrage arc plays oblique processing, keeps side plate more slim and graceful, builds more warm Spatial ambience;
(6) application of the light trough of Zhongting barrage, like a horizontal line makes the camber line of Zhongting feel stronger, and So that more dull column river side wall becomes had details originally, stereovision is increased.
Description of the drawings
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is the vertical view of the Zhongting barrage armrest with hidden lights of present pre-ferred embodiments;
Fig. 2 is the enlarged diagram in the regions a in Fig. 1;
Fig. 3 is the side cross-sectional, view of the Zhongting barrage armrest with hidden lights of present pre-ferred embodiments;
Fig. 4 is the enlarged diagram of the Zhongting barrage armrest in Fig. 3;
Fig. 5 is the structural schematic diagram of main framing and secondary skeleton;
Fig. 6 is the scheme of installation of column steel member;
Fig. 7 is the enlarged diagram in the regions b in Fig. 4;
Fig. 8 is the scheme of installation of the first column steel member;
Fig. 9 is the enlarged diagram in the regions c in Fig. 8;
Figure 10 is the scheme of installation of the second column steel member;
Figure 11 is the enlarged diagram in the regions d in Figure 10;
Figure 12 is the scheme of installation of column steel member and cover surface keel;
Figure 13 is the enlarged diagram in the regions e in Figure 12;
Wherein, 1, main framing;101, the first column steel member;102, the second column steel member;103, horizontal gird;104, Diagonal brace reinforces steel member;2, secondary skeleton;201, level side is logical;3, cover surface keel;4, basal plate;401, glass magnesium board;402, gypsum Plate;403, emulsion paint facing;404, stone material or the wooden facing;5, handrail;6, lamps and lanterns;601, the light bar of handrail lower groove;602, interior Ground footlight in side group laminate;603, the concealed lamp band of lower margin facing;604, the concealed lamp band in the basal plate of outside;7, chemical anchors Bolt;A, structural steel beam.
Specific implementation mode
In the following, in conjunction with attached drawing and specific implementation mode, the present invention is described further:
As shown in figures 1-13, a kind of Zhongting barrage armrest with hidden lights, including it is fixedly mounted on flooring coagulation Main framing 1 on soil layer, the secondary skeleton 2 being fixedly mounted on main framing and cover surface keel 3 are fixedly mounted on cover surface keel Basal plate 4, the handrail 5 being fixedly mounted at the top of basal plate and hide lamps and lanterns 6 in basal plate or/and in handrail.
Wherein, the main framing 1 includes that first be fixedly connected with the structural steel beam being embedded in floor concrete layer stands Column steel member 101 and the second column steel member 102 are fixedly connected at the top of the first column steel member and are fixedly connected on second and stand The horizontal gird 103 on column steel member top and middle part, and the diagonal brace for enhancing the first and second column steel member rigidity and intensity Reinforce steel member 104.The first and second column steel member is fixedly connected by solder bond chemical anchor bolts 7 with structural steel beam.It should Diagonal brace is reinforced steel member one end and is abutted with the second column steel member lower end, the other end and the structure being embedded in floor concrete layer Girder steel A is abutted.
The secondary skeleton 2 includes the level side logical 201 for being fixedly connected with adjacent main framing;The level side is logical to be separately mounted to The top and bottom of adjacent first column steel member, top, middle part and the bottom of adjacent second column steel member, and it is horizontal horizontal The both ends of beam.
The cover surface keel 3 is mounted on the both sides of horizontal gird.
The basal plate 4 includes the outside basal plate being arranged on the outside of barrage, the inside basal plate being arranged on the inside of barrage And the top surface basal plate at the top of basal plate on the outside and inside basal plate is set;The outside basal plate and inside basal plate by Internal layer includes glass magnesium board 401, plasterboard 402 and emulsion paint facing 403 successively to outer layer;The top surface basal plate be stone material or The wooden facing 404.
The handrail 5 is the widened wooden facing handrail.
The lamps and lanterns 6 are light bar or ground footlight.It specifically includes and light bar 601 in handrail lower groove, inside basal plate is set The concealed lamp band 603 of interior ground footlight 602 and lower margin facing, the concealed lamp band 604 in the basal plate of outside.
The mounting process of the present invention also provides a kind of Zhongting barrage armrest with hidden lights, includes the following steps:
(1) line setting and the processing of column steel member:
According to design drawing, the completion line in metope pop-up mortar base face pops up column steel on relevant wall, cylinder Component installation location line simultaneously pops up construction level line and vertical line, smooth vertical and horizontal when convenient for vertical columns steel member, reaches design And code requirement;
The unwrapping wire in civil engineering base draws chemical anchor bolts built-in fitting position, then carries out applying for chemical anchor bolts built-in fitting again Work, after built-in fitting has been constructed, unwrapping wire again before the installation of column steel member, it is ensured that it is accurate that chemical anchor bolts are welded with column steel member Property;
The processing of column steel member is cut according to design requirement column steel member, bores anchor bolt mounting hole, welding adds Work;
(2) chemical anchor bolts are installed:
According to the first and second column steel member fixed position line in main framing in floor slab tops and side the impact drilling, It is drilled after hole, the dust in cleaning eye, chemical anchor bolts is installed, drilling depth meets design and code requirement, while meeting master The stability of skeleton, the spacing of wells are consistent with hole on skeleton;
(3) main framing is installed:
The column steel member of main framing is installed:The the first column steel member processed is first installed, by the first column of installation The hole position alignment anchor bolt of steel member, is fixed temporarily with nut, will all first column steel members after installation is complete, adjusting flatness And levelness, the fixation in adjustment;Then, the second column steel member, the installation method with the first column steel member are installed It is identical, the fixation in adjustment, while the first column steel member and the second column steel member will overlap, so as in subsequent weldering Connect one entirety of middle formation;
The welding of column steel member and structural steel beam:Second column steel member is leaning closely against in structural steel beam, and with knot Structure girder steel welds together;Then the first column steel member and the second column steel member are welded again;Pay attention to wanting when welding Bilateral in fact weld, firm welding, must not rosin joint, solder joint be necessary for full weld, without solder skip, without sand holes;After welding finishes passed examination, Spot area brushing antirust paint;
Erecting and welding diagonal brace reinforces steel member:With diagonal brace reinforce steel member structural steel beam concave side and the second column steel The lower end reinforcement of weld of component enhances the rigidity and intensity of column steel skeleton with this;
Horizontal gird is installed:Respectively on the top and interposition of the top of the first column steel member and the second column steel member Set weld horizontal crossbeam;
(4) time skeleton is installed:
Respectively in the top and bottom of adjacent first column steel member, the top of adjacent second column steel member, middle part and Bottom and the both ends weld horizontal side of horizontal gird are logical;
(5) cover surface keel is installed:
Main framing checks flatness and verticality, cover surface keel is carried out after meeting the requirements with after time skeleton erecting and welding Installation, the spacing of the installation of cover surface keel meets design and job specfication requirement, spacing general control 300-400mm it It is interior;The installation of cover surface keel and main framing and time skeleton is fixed by bolts, and adjusts levelness and verticality, then fix tightly Gu;
(6) the pre-buried installation of electric lighting circuit in suspended ceiling indoor motor and barrage handrail:
On demand in furred ceiling install electric wiring it is pre-buried;Electric wiring in Zhongting barrage armrest is installed as The concealed lamp band of four groups of circuits, the respectively light bar of handrail lower groove, ground footlight, lower margin facing, the concealed lamp of Zhongting lateral surface Four groups of illuminating lines of band carry out pre-buried installation in top surface → metope → ground → barrage steel skeleton of floor;Pre-buried plating Zinc wire pipe wants fixation on main framing and time skeleton, prevents from loosening;
(7) basal plate is installed:
After the hidden project inspection qualification of barrage, it is packaged basal plate;The basal plate includes being arranged on the outside of barrage Outside basal plate, the inside basal plate that is arranged on the inside of barrage and setting on the outside at the top of basal plate and inside basal plate Top surface basal plate;The outside basal plate and inside basal plate include glass magnesium board, plasterboard and breast successively by internal layer to outer layer Shellac varnish facing;The top surface basal plate is stone material or the wooden facing;Erection sequence be glass magnesium board → plasterboard → emulsion paint facing → Stone material or the wooden facing;
(8) the wooden facing baseboard of installation abnormity:
The wooden facing baseboard of installation abnormity, carries out stickup installation after the completion of ground construction;It is needing that abnormity wood decorations are installed Brushing moisture-proof coating on the plasterboard of face baseboard, while by the wooden facing back side brushing moisture-proof coating to be installed, after parching, The relevant position brushing bonding agent of special-shaped wood facing baseboard, while one layer of bonding agent is smeared on basal plate, then by lower margin Line is pasted onto on basal plate, with rifle nail in hidden place by special-shaped baseboard fixation;
It is first fixed at interval of 2000mm or so in the hidden groove of the wooden facing before the wooden facing baseboard of installation abnormity The fixing card code of one lamp bar;
(9) handrail and luminaire are installed:
After the basal plate of Zhongting guardrail both sides is completed, the installation of handrail and luminaire is carried out;
The LED light bar of Zhongting suspended ceiling modeling is installed first:The lamp bar of installation installs a fixation at interval of 2 meters or so Card code, prevent installation hides lamp bar loosening, and lighting effects are not achieved;
Mounting foot lamp:The power cord come will first be reserved to pull out, the ground footlight of pre-installation is fixed on to reserved position On, lamps and lanterns are fixed on two side rail facings with screw, fixation, then power cord is connected;
The concealed lamp band of mounting foot line:Lamp bar is stuck in preassembled card code when installation, as possible by lamp when installation Item stretches;
Lamp bar is hidden under installation handrail:Lamp bar of hiding in handrail facing waits for facing installation and then install to help It is subordinate to hide lamp bar, when installation, by reserved installation hole come across lamp bar then on being stuck in card code;
(10) barrage handrail facing is pasted assembled:
In three face brushing bonding agents of basal plate, while in the assembled wooden facing back side brushing bonding agent, according to snap the line position It sets, by the wooden facing Adhesive clip in the flatness for adjusting handrail on basal plate, after adjustment, around the wooden facing pasted With screw by the wooden facing and steel skeleton fixation;
(11) stainless steel guard rail is installed:
After the completion of the wooden facing assembly, the installation of stainless steel guard rail is carried out, stainless steel guard rail and the wooden facing handrail are all formed Two pillars of nonfloating rail are inserted into the prefabricated wooden facing hole, are screwed into screw from the side, guardrail is consolidated by modularization, fixation It is scheduled in the wooden facing handrail.
It will be apparent to those skilled in the art that technical solution that can be as described above and design, make various other Corresponding change and deformation, and all these changes and deformation should all belong to the protection domain of the claims in the present invention Within.

Claims (8)

1. a kind of Zhongting barrage armrest with hidden lights, which is characterized in that including being fixedly mounted on floor concrete layer On main framing, the secondary skeleton that is fixedly mounted on main framing and cover surface keel, be fixedly mounted on cover surface keel basal plate, The handrail that is fixedly mounted at the top of basal plate and hide lamps and lanterns in basal plate or/and in handrail;
The main framing include the first column steel member being fixedly connected with the structural steel beam being embedded in floor concrete layer and Second column steel member, and be fixedly connected at the top of the first column steel member and be fixedly connected on the second column steel member top With the horizontal gird at middle part;
The main framing further includes reinforcing steel member for enhancing the diagonal brace of the first and second column steel member rigidity and intensity, this is tiltedly Support is reinforced steel member one end and is abutted with the second column steel member, and the other end is supported with the structural steel beam being embedded in floor concrete layer It connects.
2. the Zhongting barrage armrest according to claim 1 with hidden lights, which is characterized in that described first and second Column steel member is fixedly connected by solder bond chemical anchor bolts with structural steel beam.
3. the Zhongting barrage armrest according to claim 1 with hidden lights, which is characterized in that the secondary skeleton packet Include be fixedly connected adjacent main framing level side it is logical;The logical top for being separately mounted to adjacent first column steel member in the level side And bottom, top, middle part and the bottom of adjacent second column steel member and the both ends of horizontal gird.
4. the Zhongting barrage armrest according to claim 1 with hidden lights, which is characterized in that the cover surface keel Mounted on the both sides of horizontal gird.
5. the Zhongting barrage armrest according to claim 1 with hidden lights, which is characterized in that the basal plate packet Include the outside basal plate being arranged on the outside of barrage, the inside basal plate that is arranged on the inside of barrage and setting on the outside basal plate and Top surface basal plate at the top of the basal plate of inside;The outside basal plate and inside basal plate include glass successively by internal layer to outer layer Magnesium plate, plasterboard and emulsion paint facing;The top surface basal plate is stone material or the wooden facing.
6. the Zhongting barrage armrest according to claim 1 with hidden lights, which is characterized in that the handrail is to add Wide type wood facing handrail.
7. the Zhongting barrage armrest according to claim 1 with hidden lights, which is characterized in that the lamps and lanterns are lamp Band or ground footlight.
8. a kind of mounting process of the Zhongting barrage armrest with hidden lights, which is characterized in that include the following steps:
(1)Line setting and the processing of column steel member:
According to design drawing, the completion line in metope pop-up mortar base face pops up column steel member on relevant wall, cylinder Installation site line simultaneously pops up construction level line and vertical line, smooth vertical and horizontal when convenient for vertical columns steel member, reaches design and rule Model requirement;
The unwrapping wire in civil engineering base draws chemical anchor bolts built-in fitting position, then carries out the construction of chemical anchor bolts built-in fitting again, in advance After embedded part has been constructed, unwrapping wire again before the installation of column steel member, it is ensured that the accuracy that chemical anchor bolts are welded with column steel member;
The processing of column steel member is cut according to design requirement column steel member, bores anchor bolt mounting hole, welding processing;
(2)Chemical anchor bolts are installed:
It is drilled in floor slab tops and side the impact drilling according to the first and second column steel member fixed position line in main framing After hole, the dust in cleaning eye installs chemical anchor bolts, and drilling depth meets design and code requirement, while meeting main framing Stability, the spacing of wells is consistent with hole on skeleton;
(3)Main framing is installed:
The column steel member of main framing is installed:The the first column steel member processed is first installed, by the first column steel structure of installation The hole position alignment anchor bolt of part, is fixed temporarily with nut, will all first column steel members after installation is complete, adjusting flatness and water Pingdu, the fixation in adjustment;Then, the second column steel member is installed, it is identical as the installation method of the first column steel member, The fixation in adjustment, while the first column steel member and the second column steel member will overlap, so as in subsequent welding Form an entirety;
The welding of column steel member and structural steel beam:Second column steel member is leaning closely against in structural steel beam, and and structural steel Beam welds together;Then the first column steel member and the second column steel member are welded again;Pay attention to wanting bilateral when welding Real weldering, firm welding, must not rosin joint, solder joint be necessary for full weld, without solder skip, without sand holes;After welding finishes passed examination, in solder joint Region brushing antirust paint;
Erecting and welding diagonal brace reinforces steel member:With diagonal brace reinforce steel member structural steel beam concave side and the second column steel member Lower end reinforcement of weld, enhance the rigidity and intensity of column steel skeleton with this;
Horizontal gird is installed:It is welded respectively on the top and centre position of the top of the first column steel member and the second column steel member Connect horizontal gird;
(4)Installation time skeleton:
Respectively in the top and bottom of adjacent first column steel member, top, middle part and the bottom of adjacent second column steel member, And the both ends weld horizontal side of horizontal gird is logical;
(5)Cover surface keel is installed:
Main framing checks flatness and verticality, the peace of cover surface keel is carried out after meeting the requirements with after time skeleton erecting and welding The spacing of dress, the installation of cover surface keel meets design and job specfication requirement, and spacing general control is within 300-400mm;It covers Face keel and the installation of main framing and time skeleton are fixed by bolts, and adjust levelness and verticality, then fixation;
(6)The pre-buried installation of electric lighting circuit in suspended ceiling indoor motor and barrage handrail:
On demand in furred ceiling install electric wiring it is pre-buried;Electric wiring in Zhongting barrage armrest is installed as four groups The concealed lamp band of circuit, the respectively light bar of handrail lower groove, ground footlight, lower margin facing, the concealed lamp band four of Zhongting lateral surface Group illuminating line, pre-buried installation is carried out in top surface → metope → ground → barrage steel skeleton of floor;Pre-buried galvanized wire Pipe wants fixation on main framing and time skeleton, prevents from loosening;
(7)Basal plate is installed:
After the hidden project inspection qualification of barrage, it is packaged basal plate;The basal plate include be arranged on the outside of barrage it is outer Side group laminate, the inside basal plate being arranged on the inside of barrage and the top surface being arranged at the top of basal plate on the outside and inside basal plate Basal plate;The outside basal plate and inside basal plate include glass magnesium board, plasterboard and emulsion paint successively by internal layer to outer layer Facing;The top surface basal plate is stone material or the wooden facing;Erection sequence is glass magnesium board → plasterboard → emulsion paint facing → stone material Or the wooden facing;
(8)The wooden facing baseboard of installation abnormity:
The wooden facing baseboard of installation abnormity, carries out stickup installation after the completion of ground construction;It is needing the wooden facing of abnormity is installed Brushing moisture-proof coating on the plasterboard of payment to a porter, while by the wooden facing back side brushing moisture-proof coating to be installed, after parching, in abnormity The relevant position brushing bonding agent of the wooden facing baseboard, while one layer of bonding agent is smeared on basal plate, then baseboard is glued It is attached on basal plate, with rifle nail in hidden place by special-shaped baseboard fixation;
(9)Handrail and luminaire are installed:
After the basal plate of Zhongting guardrail both sides is completed, the installation of handrail and luminaire is carried out.
CN201610697547.0A 2016-08-19 2016-08-19 A kind of Zhongting barrage armrest and mounting process with hidden lights Active CN106150005B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610697547.0A CN106150005B (en) 2016-08-19 2016-08-19 A kind of Zhongting barrage armrest and mounting process with hidden lights
PCT/CN2017/079040 WO2018032773A1 (en) 2016-08-19 2017-03-31 Atrium barrier handrail structure with hidden lamplight and installation process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610697547.0A CN106150005B (en) 2016-08-19 2016-08-19 A kind of Zhongting barrage armrest and mounting process with hidden lights

Publications (2)

Publication Number Publication Date
CN106150005A CN106150005A (en) 2016-11-23
CN106150005B true CN106150005B (en) 2018-10-23

Family

ID=57342665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610697547.0A Active CN106150005B (en) 2016-08-19 2016-08-19 A kind of Zhongting barrage armrest and mounting process with hidden lights

Country Status (2)

Country Link
CN (1) CN106150005B (en)
WO (1) WO2018032773A1 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150005B (en) * 2016-08-19 2018-10-23 深圳市亚泰国际建设股份有限公司 A kind of Zhongting barrage armrest and mounting process with hidden lights
CN107313565B (en) * 2017-06-26 2022-08-30 羿天设计集团有限责任公司 Atrium glass railing and installation method thereof
CN109025111B (en) * 2018-08-24 2020-06-30 中冶建工集团有限公司 Structure with light transmission and light decoration and construction process thereof
CN109811975A (en) * 2019-02-28 2019-05-28 上海聚通装饰集团有限公司 A kind of light trough wall thickness expansion vertically adjusts structure and its mounting process
CN110158881B (en) * 2019-05-28 2024-03-15 苏州美瑞德建筑装饰有限公司 Atrium external cantilever glass guardrail mounting structure
CN110984447A (en) * 2019-12-26 2020-04-10 苏州金螳螂幕墙有限公司 Embedded lamp area formula stone material curtain wall construction
CN113323301B (en) * 2021-05-08 2022-10-18 中国建筑第八工程局有限公司 Special-shaped outward-inclined glass railing structure of overhanging floor slab
CN113882721B (en) * 2021-10-26 2023-10-03 中建二局装饰工程有限公司 Mountain top view ring corridor
CN114856104A (en) * 2022-05-12 2022-08-05 中建八局总承包建设有限公司 Structure and mounting method of super-large arc-shaped curved surface glass anti-collision railing

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090077459A (en) * 2008-01-11 2009-07-15 박윤서 Guardrail prop
CN201330480Y (en) * 2008-12-22 2009-10-21 中色科技股份有限公司 Stair guardrail with lighting facility
CN102287034A (en) * 2011-06-29 2011-12-21 中建二局第三建筑工程有限公司 Special-shaped rail and construction method thereof
CN202644876U (en) * 2012-07-12 2013-01-02 刘波 Middle water-heating hand rail in lobby upstairs
CN103696618A (en) * 2013-12-24 2014-04-02 中建四局第六建筑工程有限公司 Assembled guard handrail for constructional engineering and road engineering
CN104727498A (en) * 2015-03-10 2015-06-24 成都赋阳技术开发有限公司 Environment-friendly stair railing with emergency instruction and light pollution prevention functions
CN205907929U (en) * 2016-08-19 2017-01-25 深圳市亚泰国际建设股份有限公司 Zhongting block a river handrail structure of light is hidden in area

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110073824A1 (en) * 2009-09-25 2011-03-31 Lappin Rick A Railing system and coupling element and methods of assembly
CN106150005B (en) * 2016-08-19 2018-10-23 深圳市亚泰国际建设股份有限公司 A kind of Zhongting barrage armrest and mounting process with hidden lights

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090077459A (en) * 2008-01-11 2009-07-15 박윤서 Guardrail prop
CN201330480Y (en) * 2008-12-22 2009-10-21 中色科技股份有限公司 Stair guardrail with lighting facility
CN102287034A (en) * 2011-06-29 2011-12-21 中建二局第三建筑工程有限公司 Special-shaped rail and construction method thereof
CN202644876U (en) * 2012-07-12 2013-01-02 刘波 Middle water-heating hand rail in lobby upstairs
CN103696618A (en) * 2013-12-24 2014-04-02 中建四局第六建筑工程有限公司 Assembled guard handrail for constructional engineering and road engineering
CN104727498A (en) * 2015-03-10 2015-06-24 成都赋阳技术开发有限公司 Environment-friendly stair railing with emergency instruction and light pollution prevention functions
CN205907929U (en) * 2016-08-19 2017-01-25 深圳市亚泰国际建设股份有限公司 Zhongting block a river handrail structure of light is hidden in area

Also Published As

Publication number Publication date
WO2018032773A1 (en) 2018-02-22
CN106150005A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN106150005B (en) A kind of Zhongting barrage armrest and mounting process with hidden lights
CN103510631B (en) A kind of indoor sound insulation constructing structure and construction method thereof
CN105102092B (en) A kind of wall and its construction method
CN107407089A (en) Facing ceiling system
CN113338516B (en) Novel metal suspended ceiling structure of mountain type roof and installation method thereof
CN205907929U (en) Zhongting block a river handrail structure of light is hidden in area
US20080229686A1 (en) Stringer and Step Support Kit for Stairways
CN211007141U (en) Fixed subassembly in shutoff fire hose backing entrance to a cave
GB2524025A (en) Modular building system
US7588343B1 (en) Decorative backlit structural members incorporating glass
US20170234515A1 (en) Luminous panel
US8806817B2 (en) Structural stringer for stairways
JP2006132240A (en) Staircase structure
Dangel Sustainable architecture in Vorarlberg: energy concepts and construction systems
WO2005093180A2 (en) Building structure and building fixture arrangement
CN107130722B (en) Attack climbing animal cage protection roof and construction method thereof
CN110847378A (en) Building and decoration integrated house and manufacturing method thereof
NL1043996B1 (en) Aluminium frame building, build element and method therefor
CN211396777U (en) Wind-resistant environment-friendly assembled module mobile public toilet
CN219671981U (en) Mounting structure for ground block-shaped metal facing
CN2752374Y (en) Composite house
JP5266147B2 (en) Sleeve wall of the entrance of the apartment
CN107795064A (en) A kind of assembled wood imitation structure and molding body
CN212716073U (en) Glass gallery frame
CN206521886U (en) Protective angle for stairs

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 518000 Guangdong city of Shenzhen province Yitian Futian District District Road and Fuhua Road Interchange, 4B02 4B01 excellence Times Square

Patentee after: Shenzhen Zhengzhong Design Co., Ltd

Address before: 518000 Guangdong city of Shenzhen province Yitian Futian District District Road and Fuhua Road Interchange, 4B02 4B01 excellence Times Square

Patentee before: SHENZHEN ASIANTIME INTERNATIONAL CONSTRUCTION Co.,Ltd.