CN107724613A - Banister structure - Google Patents

Banister structure Download PDF

Info

Publication number
CN107724613A
CN107724613A CN201710876573.4A CN201710876573A CN107724613A CN 107724613 A CN107724613 A CN 107724613A CN 201710876573 A CN201710876573 A CN 201710876573A CN 107724613 A CN107724613 A CN 107724613A
Authority
CN
China
Prior art keywords
fixed
balustrade
panel
banister
concrete foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710876573.4A
Other languages
Chinese (zh)
Inventor
潘润军
周健
周州
田俊年
韦如益
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Construction Decoration Co Ltd
Original Assignee
Shanghai Baoye Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Construction Decoration Co Ltd filed Critical Shanghai Baoye Construction Decoration Co Ltd
Priority to CN201710876573.4A priority Critical patent/CN107724613A/en
Publication of CN107724613A publication Critical patent/CN107724613A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1812Details of anchoring to the wall or floor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1817Connections therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a kind of banister structure, including:Concrete foundation, balustrade assemblies, exterior trim board component and furred ceiling component, the balustrade assemblies are fixed in the concrete foundation, and the exterior trim board component is fixed on the side of the balustrade assemblies, and the furred ceiling component is fixed on the bottom surface of the concrete foundation.Banister structure provided by the invention, solve construction based on entity steel frame because the excessive difficult point for being not easy to construction of conducting oneself with dignity, eliminate because conduct oneself with dignity it is excessive existing for difficulty of construction and hidden danger of quality;Decoration panel installation need not worry live structural deviation, can quickness and high efficiency carry out shrouding;Solves the problems, such as side steel plate seam deformation;There is cost-effective, green construction, shorten the duration, ensure quality.

Description

Banister structure
Technical field
The present invention relates to technical field of building construction, is a kind of banister structure specifically.
Background technology
Modern many decoration projects wish that the two characteristics to conflict seemingly are mixed with safe and practical property by the aesthetic property of railing It is combined.Steel components have the characteristics that intensity high, plasticity and good toughness, structural stability are high, large-scale stadium, The fields such as Exhibition Architecture, large-scale commercial building, large-span industrial building use.The fire proof veneer dress very common as decorations Exterior material, have the characteristics that fire protecting performance is good, deco-functional is strong, attractive in appearance.But the railing work progress of both combinations of materials It is middle to be unfavorable for constructing greatly in the presence of deadweight;Complex procedures, intersect influence, influences efficiency of construction;Decoration panel material is installed to original There is the flatness requirement of structural plan high;Cooling strain be present after steel material welding sequence, influence component and use aesthetic property etc. Problem.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of banister structure, solve asking in above-mentioned background technology Topic.
In order to solve the above technical problems, the invention provides a kind of banister structure, including:Concrete foundation, railing Component, exterior trim board component and furred ceiling component, the balustrade assemblies are fixed in the concrete foundation, and the exterior trim board component is consolidated Due to the side of the balustrade assemblies, the furred ceiling component is fixed on the bottom surface of the concrete foundation;
Wherein, multiple buried plates are fixed with concrete foundation;
The balustrade assemblies include:Vertical rod one-to-one with the buried plate, balustrade panel, multiple trim panels, more first Connecting rod and the connecting rods of Duo Gen second, each described vertical rod are vertically arranged, and its lower end is fixed with the buried plate, its upper end and institute State balustrade panel to fix, the length direction of the balustrade panel is consistent with the bearing of trend of stair, and the trim panel is fixed on each two Between the vertical rod, second connecting rod is connected by the head rod with the vertical rod, and is fixed on the outside of stair;
The exterior trim board component is fixed in second connecting rod.
Further, the concrete foundation, which includes, turns over bank, and the buried plate is arranged in described turn on the right angle of bank.
Further, the lower end of each column offers right-angle notch, and institute is arranged in by the right-angle notch State on buried plate and be secured to.
Further, the upper end of the vertical rod and the tie point of the balustrade panel are located at the balustrade panel towards stair side.
Further, the balustrade assemblies also include multiple supporting plates, and each described supporting plate bearing diagonal is helped in described Between palm and the vertical rod, the tie point of itself and the balustrade panel is located at the balustrade panel away from stair side.
Further, the exterior trim board component includes:Panel, basic unit and multiple adjustment blocks, the basic unit pass through the tune Monoblock is fixed in second connecting rod, and the panel is fixed on outside the basic unit.
Further, the furred ceiling component includes:Multiple push rods, multiple main joists, multiple false keels and more block gypsum plates, Each main joist is fixed on the bottom surface of the concrete foundation by the push rod, and the false keel is fixed on the master Under keel, the plasterboard is fixed on the false keel.
Further, in addition to multiple ornamental strips, the ornamental strip are covered in the exterior trim board component and the furred ceiling group Part seam crossing.
Further, the balustrade panel includes:Balustrade panel main body and the bead structure for being arranged at its both sides, the crimping Structure is towards ground.
Further, the bead structure is shaped as " C " shape or " u "-shaped.
Banister structure provided by the invention, solves the construction based on entity steel frame because of excessive be not easy to of conducting oneself with dignity The difficult point of construction, eliminate because conduct oneself with dignity it is excessive existing for difficulty of construction and hidden danger of quality;Decoration panel installs the live structure that need not worry Deviation, can quickness and high efficiency carry out shrouding;Solves the problems, such as side steel plate seam deformation;With cost-effective, green construction, contracting Casual labourer's phase, ensure the advantages that quality.
Brief description of the drawings
Fig. 1 is the schematic diagram of banister structure of the present invention;
Fig. 2 is the schematic diagram of foundation structure in banister structure of the present invention;
Fig. 3 is the structural representation of balustrade assemblies and foundation structure junction in banister structure of the present invention;
Fig. 4 is Fig. 3 top view;
Fig. 5 is Fig. 3 right view;
Fig. 6 is the structural representation of banister architecture neutral bar of the present invention;
Fig. 7 is the structural representation of balustrade assemblies in banister structure of the present invention;
Fig. 8 is Fig. 7 top view;
Fig. 9 is Fig. 7 left view;
Figure 10 is the enlarged drawing of the partial view A in Fig. 7;
Figure 11 is the enlarged drawing of the partial view B in Fig. 1;
Figure 12 is the structural representation of furred ceiling component in banister structure of the present invention.
In figure, 1. concrete foundations, 11. turn over bank, 1101. horizontal planes, 1102. vertical planes, 12. buried plates, 13. fasteners, 2. balustrade assemblies, 21. vertical rods, 2101. breach, 22. trim panels, 23. balustrade panels, 2301. balustrade panel main bodys, 2302. crimping knots Structure, 24. supporting plates, 25. head rods, 26. second connecting rods, 3. exterior trim board components, 31. panels, 32. basic units, 33. adjustment Block, 4. furred ceiling components, 41. push rods, 42. first connectors, 43. main joists, 44. second connectors, 45. false keels, 46. gypsum Plate, 47. ornamental strips.
Embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings, so that those skilled in the art can be with More fully understand the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
A kind of banister structure, as shown in figure 1, including:Concrete foundation 1, balustrade assemblies 2, exterior trim board component 3 and hang Top component 4, the balustrade assemblies 2 are fixed in the concrete foundation 1, and the exterior trim board component 3 is fixed on the railing group The side of part 2, the furred ceiling component 4 are fixed on the bottom surface of the concrete foundation 1;
Wherein, as shown in Fig. 2 being fixed with multiple buried plates 12 in concrete foundation 1;
As shown in Fig. 7~10, the balustrade assemblies 2 include:Vertical rod 21 one-to-one with the buried plate 12, balustrade panel 23rd, multiple trim panels 22, more head rods 25 and the second connecting rods of Duo Gen 26, each described vertical rod 21 are vertically arranged, Its lower end is fixed with the buried plate 12, and its upper end is fixed with the balustrade panel 23, the length direction and stair of the balustrade panel 23 Bearing of trend it is consistent, the trim panel 22 is fixed between vertical rod 21 described in each two, and second connecting rod 26 passes through institute State head rod 25 to be connected with the vertical rod 21, and be fixed on the outside of stair;
The exterior trim board component 3 is fixed in second connecting rod 26.
In one optional embodiment of the present embodiment, as figures 2-6, the concrete foundation 1 includes:Turn over bank 11, more Individual buried plate 12 and multiple fasteners 13, the buried plate 12 are arranged in described turn on the right angle of bank 11.The bank 11 that turns over is a rectangle Step, it includes horizontal plane 1101 and vertical plane 1102, and both form a right angle, and the buried plate 12 is right angle metallic plate, with water Plane 1101 is fixed with fastener 13 described in the patch merga pass of vertical plane 1102 with the bank 11 that turns over, the vertical rod 21 and horizontal plane 1101 are vertically arranged, and its lower end is provided with right-angle notch 2101 (as shown in Figure 6), and institute is arranged in by the right-angle notch 2101 State on buried plate 12 and be welded and fixed with it.The vertical rod 21 is flat, perpendicular to vertical plane 1102.The right angle of vertical rod 21 lacks Mouth 2101 is arranged at side, and opposite side is completely out of vertical plane 1102.Horizontal plane 1101 is respectively provided with least with vertical plane 1102 One fastener 13.As shown in Figure 4 and Figure 5, horizontal plane 1101 sets four fasteners 13 respectively with vertical plane 1102.It is described tight Firmware 13 is expansion bolt, it is preferable that expansion bolt specification is 10mm.The thickness of slab of buried plate 12 is 8~12mm, it is preferable that is buried The thickness of slab of plate 12 is 10mm.The thickness of slab of vertical rod 21 is 8~14mm, it is preferable that the thickness of slab of vertical rod 21 is 12mm.The top surface of square buried plate 12 and Side is fixed on concrete with expansion bolt and turns over bank, increases the lifting surface area of buried plate 12, and the equally cutting of the soldering opening of vertical rod 21 is at a right angle Shape, increase buried plate 12 and vertical rod bonding area, ensure that railing installation is stable.
In one optional embodiment of the present embodiment, the upper end of the vertical rod 21 and the tie point of the balustrade panel 23 are located at The balustrade panel 23 is towards stair side.As shown in fig. 7, it is located at right side in figure.To ensure the intensity of balustrade assemblies 2, such as Fig. 7 and Shown in Fig. 8, in addition to multiple supporting plates 24, each described bearing diagonal of supporting plate 24 is in the balustrade panel 23 and the vertical rod 21 Between, the tie point of itself and the balustrade panel 21 is located at the balustrade panel 21 away from stair side.So, the width of vertical rod 21 compared with It is narrow, without with the same widths of balustrade panel 23, you can meet strength demand.
In one optional embodiment of the present embodiment, as shown in figure 11, the exterior trim board component 3 includes:Panel 31, basic unit 32 and multiple adjustment blocks 33, the basic unit 32 be fixed on by the adjustment block 33 in second connecting rod 44, the panel 31 are fixed on outside the basic unit 32.As shown in figures 7 and 9, vertical direction is provided with three and ranked first connecting rod 25, its perpendicular to Panel 31 is set, and the length direction and the length direction of balustrade panel 23 of second connecting rod 26 are in the same direction, and are fixed on the first company The free end of extension bar 25.Wherein, the connecting rod 26 of head rod 25 and second is angle steel, and on the one hand its intensity can meet to want Ask, on the other hand its is light, and cost is low.Adjustment block 33 is fixed in the second connecting rod 26.Adjust the length of head rod 25 And/or adjustment the adjustable structure error of adjustment block 33 cause exterior trim board component 3 can not installation question, regulation angle steel can increase facing Plate fixing point, ensure installation quality, adjustment block 33 can adjust construction error, make after the installation of panel 31 in a vertical plane.
In one optional embodiment of the present embodiment, as shown in figure 12, the furred ceiling component 4 includes:It is multiple push rods 41, more Individual main joist 43, multiple first connectors 42, multiple second connectors 44, multiple false keels 45 and more block gypsum plates 46, it is each The individual main joist 43 is fixed on the bottom surface of the concrete foundation 1 by the push rod 41, between main joist 43 and push rod 41 Connected by the first connector 42, the false keel 45 is fixed under the main joist 43 by the second connector 44, the stone Cream plate 46 is fixed on the false keel 45.Stair stringer bottom lightgage steel joist calcium silicate board furred ceiling, complete beam bottom packaging.
In one optional embodiment of the present embodiment, as shown in figure 12, in addition to multiple ornamental strips 47, the ornamental strip 47 It is covered in the exterior trim board component 3 and the seam crossing of furred ceiling component 4.The ornamental strip 47 can be L-type aluminium sheet bound edge, and it will The seam of exterior trim board component 3 and the furred ceiling component 4 covers.Such a closing in mode can avoid directly accepting pass between process System.
In one optional embodiment of the present embodiment, as shown in Figure 10, the balustrade panel 23 includes:Balustrade panel main body 2301 And the bead structure 2302 of its both sides is arranged at, the bead structure 2302 is towards ground.The shape of the bead structure 2302 Shape is " C " shape or " u "-shaped.By the way that the Edge Bend of sheet metal two is increased into intensity, steel plate is substituted, not only saving steel, is being installed When, lightening material weight, reduce difficulty of construction;Stair corner looks for angle convenient, can just be constructed during cutting, subtracted with portable cutting machine Small job site oxygen-acetylene uses, the potential safety hazard for preventing naked light from bringing.Also facilitate trim panel 22 to install, ensure welding junction Locate attractive in appearance.
Construction method, comprise the following steps:
A:Surveying setting-out, including physical dimension repetition measurement, the location and installation of buried plate 12, at half space vertical rod 21 highly determine and Positioning.
B:Buried plate 12 is installed, and the step is installed after the completion of surveying setting-out positioning.Lime light is that buried plate 12 is right angle Structure, while riding over concrete turns over bank top surface, another side is close to turn over bank side, with the expansion bolts of Φ 10 respectively turn over bank top surface and Side is fixed.
C:Vertical rod 21 is installed, and column 21 is that 100mm is wide, 12mm steel plates, and clipping room is away from 1100mm, and the height of vertical rod 21 is from building Ladder can tread count 1100mm.The lower margin of vertical rod 21 sets right-angle notch 2101, matches with buried plate 12, during welding breach 2101 with Buried plate 12 is in close contact full weld, it is ensured that welding quality.Determine the perpendicularity of vertical rod 21 in 2mm with horizon rule when vertical rod 21 is fixed.
D:Balustrade panel 23 is installed, and with 3mm galvanized steel plain sheets flanging to required 20mm thickness c-type ironwares, mitigates member dead weight, peace The height of half space vertical rod 21 up and down is determined during dress, is then fixed on two with construction line, according between construction line two bars of installation Balustrade panel.Ensure during welding enough with the pad of vertical rod 21.In the step, because balustrade panel 23 is wider, in half space corner Place needs much room, to ensure that rail height is unified, had not only occurred without concentric reducer but also had not influenceed half space width, and set at turning Put climbing.
E:Head rod 25 is installed, and the step mainly positions according to balustrade panel 23, and installation method is by plumb bob magnet It is fixed on balustrade panel 23, the length of head rod 25 is determined by plumb bob.
F:Decoration panel is installed, and by the fixed base 32 of adjustment block 33, panel 31 is fixed on into base after the installation of basic unit 32 On layer 32.When the alignment error of head rod 25 is more than 5mm, with the fixed base 32 of adjustment block 33, adjustment block 33 is consolidated with screw It is scheduled in the second connecting rod 26;When the alignment error of head rod 25 is less than 5mm, basic unit 32 can directly be screwed in In two connecting rods 26.Adjustment block 33 can increase according to live structural failure.
G:Trim panel 22 is installed, and processing is drawn according to the mounted structural slab in-site measurement in scene before step installation Figure.Every block of plate it is of different sizes, numbered when factory cuts by manuscript.In-site installation is fixed with spot welding, trim panel 22 away from Side 25mm of the vertical rod 21 near stair.
H:Stainless steel handrail is installed, and the step mounting means is universal, construction in line with the drawings.To stainless after handrail installation Steel handrail and exterior trim board component 3 are protected, and paint spraying is carried out to steel frame.
I:Furred ceiling component 4 is installed, conventional mounting means, and coating, outer plaque group are carried out to plasterboard 46 after the completion of the step Part 3 and the seam crossing ornamental strip 47 of furred ceiling component 4 cover.
Protection scope of the present invention not limited to this.What those skilled in the art were made on the basis of the present invention is equal Substitute or convert, within protection scope of the present invention.Protection scope of the present invention is defined by claims.

Claims (9)

  1. A kind of 1. banister structure, it is characterised in that including:Concrete foundation, balustrade assemblies, exterior trim board component and furred ceiling group Part, the balustrade assemblies are fixed in the concrete foundation, and the exterior trim board component is fixed on the side of the balustrade assemblies, The furred ceiling component is fixed on the bottom surface of the concrete foundation;
    Wherein, multiple buried plates are fixed with concrete foundation;
    The balustrade assemblies include:Vertical rod one-to-one with the buried plate, balustrade panel, multiple trim panels, more first be connected Bar and the connecting rods of Duo Gen second, each described vertical rod are vertically arranged, and its lower end is fixed with the buried plate, and its upper end is helped with described Palm is fixed, and the length direction of the balustrade panel is consistent with the bearing of trend of stair, and the trim panel is fixed on described in each two Between vertical rod, second connecting rod is connected by the head rod with the vertical rod, and is fixed on the outside of stair;
    The exterior trim board component is fixed in second connecting rod.
  2. 2. banister structure as claimed in claim 1, it is characterised in that the concrete foundation, which includes, turns over bank, described Buried plate is arranged in described turn on the right angle of bank.
  3. 3. banister structure as claimed in claim 2, it is characterised in that the lower end of each column offers right angle Breach, it is arranged on the buried plate and is secured to by the right-angle notch.
  4. 4. banister structure as claimed in claim 1, it is characterised in that the upper end of the vertical rod and the company of the balustrade panel Contact is located at the balustrade panel towards stair side.
  5. 5. banister structure as claimed in claim 4, it is characterised in that the balustrade assemblies also include multiple supporting plates, For each described supporting plate bearing diagonal between the balustrade panel and the vertical rod, the tie point of itself and the balustrade panel is located at institute Balustrade panel is stated away from stair side.
  6. 6. banister structure as claimed in claim 1, it is characterised in that the exterior trim board component includes:Panel, basic unit and Multiple adjustment blocks, the basic unit are fixed in second connecting rod by the adjustment block, and the panel is fixed on the base Layer is outer.
  7. 7. banister structure as claimed in claim 1, it is characterised in that also covered including multiple ornamental strips, the ornamental strip It is placed on the exterior trim board component and the furred ceiling component seam crossing.
  8. 8. the banister structure as described in claim 1~7 is any, it is characterised in that the balustrade panel includes:Balustrade panel master Body and the bead structure for being arranged at its both sides, the bead structure is towards ground.
  9. 9. banister structure as claimed in claim 8, it is characterised in that the bead structure is shaped as " C " shape or " U " Shape.
CN201710876573.4A 2017-09-25 2017-09-25 Banister structure Pending CN107724613A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710876573.4A CN107724613A (en) 2017-09-25 2017-09-25 Banister structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710876573.4A CN107724613A (en) 2017-09-25 2017-09-25 Banister structure

Publications (1)

Publication Number Publication Date
CN107724613A true CN107724613A (en) 2018-02-23

Family

ID=61206420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710876573.4A Pending CN107724613A (en) 2017-09-25 2017-09-25 Banister structure

Country Status (1)

Country Link
CN (1) CN107724613A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3342668A1 (en) * 1983-11-25 1985-06-05 Neucon Maschinen- Und Bausysteme Gmbh U. Co Kg, 7100 Heilbronn Banister rod
JP2004300676A (en) * 2003-03-28 2004-10-28 Panahome Corp Spandrel wall structure
JP2005299366A (en) * 2004-04-15 2005-10-27 Shinei Kinzoku Seisakusho:Kk Screen, curtain, blind and handrail movable after attachment of panel
JP2006183246A (en) * 2004-12-27 2006-07-13 Seiko Industry Co Ltd Mounting device for handrail wall tiled panel
CN205907929U (en) * 2016-08-19 2017-01-25 深圳市亚泰国际建设股份有限公司 Zhongting block a river handrail structure of light is hidden in area
CN106677452A (en) * 2017-03-15 2017-05-17 佛山市联智新创科技有限公司 Installing structure for balcony railing of villa

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3342668A1 (en) * 1983-11-25 1985-06-05 Neucon Maschinen- Und Bausysteme Gmbh U. Co Kg, 7100 Heilbronn Banister rod
JP2004300676A (en) * 2003-03-28 2004-10-28 Panahome Corp Spandrel wall structure
JP2005299366A (en) * 2004-04-15 2005-10-27 Shinei Kinzoku Seisakusho:Kk Screen, curtain, blind and handrail movable after attachment of panel
JP2006183246A (en) * 2004-12-27 2006-07-13 Seiko Industry Co Ltd Mounting device for handrail wall tiled panel
CN205907929U (en) * 2016-08-19 2017-01-25 深圳市亚泰国际建设股份有限公司 Zhongting block a river handrail structure of light is hidden in area
CN106677452A (en) * 2017-03-15 2017-05-17 佛山市联智新创科技有限公司 Installing structure for balcony railing of villa

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
江正荣 著: "《大型设备基础施工技术》", 31 October 1997, 中国建筑工业出版社 *
鲁毅 等主编: "《建筑装饰施工》", 30 September 2010, 冶金工业出版社 *

Similar Documents

Publication Publication Date Title
CN204781329U (en) Pin -connected panel standard turnover room
CN110158826B (en) Construction method of large-span special-shaped steel keel glass curtain wall
CN105421818A (en) Embedded steel structure assembling residence
CN111561074B (en) Light ultrahigh sound-insulation fireproof steel partition wall and construction method thereof
CN110388047A (en) A kind of concrete wooden frame template system
CN102465606A (en) Installation and construction process of curtain wall aluminum-plastic plate
CN205296893U (en) Embedded steel construction assembly house
CN202324501U (en) Full clamping piece connecting member for mounting low carbon board on building outer brim
CN103821373A (en) Ceiling hanging construction technology of light steel keel gypsum boards
CN110130551A (en) A kind of bolt method cell cube GRC curtain wall construction and its construction method
CN108756109A (en) A kind of decoration integrated heat-insulation wall plate of separate assembling and its mounting process
CN203213348U (en) Large space NALC (Autoclaved Lightweight Concrete) wall board structure
CN207348343U (en) Frame-type banister
CN102864926A (en) Construction method of steel structure conversion layer furred ceiling
CN107724613A (en) Banister structure
CN104047457A (en) Light steel structure anti-seismic house
CN100560908C (en) The ceiling structure that is used for prefabricated house
CN114934673B (en) Construction method of glass curtain wall of wood structure system
CN102493620A (en) Through long folded fastener type wall body connecting piece of heat insulation integrated plate and mounting method thereof
CN211818281U (en) Net frame sandwich module passive room
CN203160503U (en) Invertedly concave connecting structure of indoor ceiling and wall body
CN205189295U (en) Novel externally -hanging wallboard
CN211114334U (en) Blue or green brick furred ceiling basic unit structure
CN105507490B (en) A kind of fast-assembling environmental protection assembled wall board and preparation method thereof
CN211369529U (en) A template for expansion joint department

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180223