CN205907656U - Overflow dam body structure is prevented blockking up by water conservancy projects - Google Patents

Overflow dam body structure is prevented blockking up by water conservancy projects Download PDF

Info

Publication number
CN205907656U
CN205907656U CN201620697894.9U CN201620697894U CN205907656U CN 205907656 U CN205907656 U CN 205907656U CN 201620697894 U CN201620697894 U CN 201620697894U CN 205907656 U CN205907656 U CN 205907656U
Authority
CN
China
Prior art keywords
overflow pipe
dam
dam body
overflow
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620697894.9U
Other languages
Chinese (zh)
Inventor
吴泰成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620697894.9U priority Critical patent/CN205907656U/en
Application granted granted Critical
Publication of CN205907656U publication Critical patent/CN205907656U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an overflow dam body structure is prevented blockking up by water conservancy projects, including the dam body and the dam foundation, the dam foundation sets up in the dam body lower part, and the upstream face of dam body and the bottom of back side are provided with stable base respectively, and the lower extreme of dam body is provided with overflow pipe I, and the one end of overflow pipe I sets up in the outside of the upstream face of dam body, and the other end of overflow pipe I sets up in the dam body, and overflow pipe I sets up to be provided with in the one end of the outside of the upstream face of dam body prevents the blanking cover board, and the lower part of overflow pipe I is provided with sedimentation chamber I, the one end that overflow pipe I set up in the dam body is connected with the siphunculus, goes up the siphunculus and is 127 degrees contained angles with overflow pipe I. The utility model has the advantages of prior art's drawback, the reasonable novelty of structural design can be overcome to it.

Description

A kind of water conservancy projects anti-clogging overflow dam structure
Technical field
The utility model is related to a kind of water conservancy projects anti-clogging overflow dam structure, belongs to building field.
Background technology
Overfall dam is typically built up by concrete or stone masonry.There are overflow gravity dam, overflow arch dam, overflow buttress dam by dam type With overflow earth and rockfill dam.The latter is only limitted to spillwag chute and base of dam has the smaller weir of reliable protection facility, discharge per unit width.And factory building It is combined together, as the power-house within the dam overfall dam of flood releasing structure, overflow type and the factory dam choosing more factory building top earial drainage Joint flood discharge mode, can be used on high mountain glen area, and when being to lead big flow off, solution spillway and Power Plant position are not A kind of approach of foot, is also the new model growing up from overfall dam.The overfall of overfall dam is due to being mingled with a large amount of silts in water Easily block, make troubles to the overflow of dam body.
Content of the invention
In view of the shortcomings of the prior art, technical problem to be solved in the utility model is to provide a kind of water conservancy and sets Apply anti-clogging overflow dam structure, prevent overfall from blocking, improve the reliability of overfall dam.
For solving above-mentioned technical problem, the utility model adopts the technical scheme that, a kind of water conservancy projects anti-clogging overflow Dam structure, including dam body and the dam foundation, the dam foundation is arranged at dam body bottom, and the upstream face of dam body and the bottom of back side are respectively provided with There is stable base, the lower end of dam body is provided with overflow pipe, and one end of overflow pipe is arranged at the outside of the upstream face of dam body, overflow pipe The other end be arranged in dam body, one end that overflow pipe is arranged at the outside of the upstream face of dam body is provided with anti-blocking cover plate, overflow The bottom of flow tube is provided with precipitation chamber;One end that described overflow pipe is arranged in dam body is connected with siphunculus, upper siphunculus with overflow Flow tube is in 127 degree of angles, and upper siphunculus tail end is connected with lower through-tube, and lower through-tube is vertically arranged with upper siphunculus, and the bottom of lower through-tube is even It is connected to a precipitation chamber;The middle part of described lower through-tube is connected with some overflow pipes be arrangeding in parallel, overflow pipe and overflow Pipe be arranged in parallel, and overflow pipe bottom is provided with precipitation chamber.
Optimize, above-mentioned water conservancy projects anti-clogging overflow dam structure, in described precipitation chamber and precipitation chamber, be provided with net Plate.
Optimize, above-mentioned water conservancy projects anti-clogging overflow dam structure, described overflow pipe top is provided with partial pressure plate, point Pressing plate is bending plate, and the bending angle of partial pressure plate is 94.5 degree.
The utility model has the advantage of the drawbacks of it can overcome prior art, reasonable in design novelty.The application's Overflow pipe is divided into four sections by design, and river first passes through overflow pipe, and due to the setting of upper siphunculus, river is in overflow pipe and upper siphunculus Junction hindered form backflow, so silt of some can be deposited in precipitation chamber, and then river is by lower logical Pipe, forms impact to lower through-tube bottom under gravity, and in impact process, a part of silt can be deposited to precipitation chamber Interior, pass through overflow pipe overflow after river backflow, at this moment the flow velocity of river has been by the effect of upper siphunculus and lower through-tube Reduce, in the river after the sediment overflow precipitating chamber, sediment charge substantially reduces.In order to improve river in overflow pipe Sedimentation effect, upper siphunculus and overflow pipe are set in 127 degree of angles, in order to improve impact effect after lower through-tube for the river Really, lower through-tube and upper siphunculus are vertically arranged.Dam body can be fallen overflow pipe for the pressure partial pressure of overflow pipe by the design of partial pressure plate Both sides, prevent from being crushed by dam body using after body weathering for a long time because of overflow pipe.
Brief description
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of partial pressure plate of the present utility model;
In figure: 1 be dam body, 2 be the dam foundation, 3 be stablize base, 4 be overflow pipe, 5 be precipitation chamber, 6 be upper siphunculus, 7 be under Siphunculus, 8 be precipitation chamber, 9 be overflow pipe, 10 be precipitation chamber, 11 be partial pressure plate.
Specific embodiment
The technical characterstic of the present invention is expanded on further below in conjunction with the accompanying drawings with specific embodiment.
The utility model is a kind of water conservancy projects anti-clogging overflow dam structure, and including dam body and the dam foundation, the dam foundation is arranged at Dam body bottom, the upstream face of dam body and the bottom of back side are respectively arranged with stable base, and the lower end of dam body is provided with overflow pipe, One end of overflow pipe is arranged at the outside of the upstream face of dam body, and the other end of overflow pipe is arranged in dam body, and overflow pipe is arranged One end of the outside of the upstream face of dam body is provided with anti-blocking cover plate, the bottom of overflow pipe is provided with precipitation chamber;Described overflow One end that pipe is arranged in dam body is connected with siphunculus, and upper siphunculus and overflow pipe are in 127 degree of angles, and upper siphunculus tail end is connected with Lower through-tube, lower through-tube is vertically arranged with upper siphunculus, and the bottom of lower through-tube is connected with a precipitation chamber;The middle part of described lower through-tube It is connected with some overflow pipes be arrangeding in parallel, overflow pipe is be arranged in parallel with overflow pipe, and overflow pipe bottom is provided with precipitation Chamber.It is provided with web plate in described precipitation chamber and precipitation chamber.Described overflow pipe top is provided with partial pressure plate, and partial pressure plate is folding Bent plate, the bending angle of partial pressure plate is 94.5 degree.
The utility model has the advantage of the drawbacks of it can overcome prior art, reasonable in design novelty.The application's Overflow pipe is divided into four sections by design, and river first passes through overflow pipe, and due to the setting of upper siphunculus, river is in overflow pipe and upper siphunculus Junction hindered form backflow, so silt of some can be deposited in precipitation chamber, and then river is by lower logical Pipe, forms impact to lower through-tube bottom under gravity, and in impact process, a part of silt can be deposited to precipitation chamber Interior, pass through overflow pipe overflow after river backflow, at this moment the flow velocity of river has been by the effect of upper siphunculus and lower through-tube Reduce, in the river after the sediment overflow precipitating chamber, sediment charge substantially reduces.In order to improve river in overflow pipe Sedimentation effect, upper siphunculus and overflow pipe are set in 127 degree of angles, in order to improve impact effect after lower through-tube for the river Really, lower through-tube and upper siphunculus are vertically arranged.Dam body can be fallen overflow pipe for the pressure partial pressure of overflow pipe by the design of partial pressure plate Both sides, prevent from being crushed by dam body using after body weathering for a long time because of overflow pipe.
Certainly, described above is not to restriction of the present utility model, and the utility model is also not limited to the example above, this The those of ordinary skill of technical field, in essential scope of the present utility model, change, remodeling, interpolation or the replacement made, all Protection domain of the present utility model should be belonged to.

Claims (3)

1. a kind of water conservancy projects anti-clogging overflow dam structure it is characterised in that: include dam body and the dam foundation, the dam foundation is arranged at dam body Bottom, the upstream face of dam body and the bottom of back side are respectively arranged with stable base, and the lower end of dam body is provided with overflow pipe, overflow One end of pipe is arranged at the outside of the upstream face of dam body, and the other end of overflow pipe is arranged in dam body, and overflow pipe is arranged at dam One end of the outside of the upstream face of body is provided with anti-blocking cover plate, and the bottom of overflow pipe is provided with precipitation chamber;Described overflow pipe sets The one end being placed in dam body is connected with siphunculus, and upper siphunculus and overflow pipe are in 127 degree of angles, and upper siphunculus tail end is connected with lower logical Pipe, lower through-tube is vertically arranged with upper siphunculus, and the bottom of lower through-tube is connected with a precipitation chamber;The middle part of described lower through-tube connects There are some overflow pipes be arrangeding in parallel, overflow pipe is be arranged in parallel with overflow pipe, overflow pipe bottom is provided with precipitation chamber ⅲ.
2. water conservancy projects anti-clogging overflow dam structure according to claim 1 it is characterised in that: described precipitation chamber and Precipitation is provided with web plate in chamber.
3. water conservancy projects anti-clogging overflow dam structure according to claim 1 it is characterised in that: on described overflow pipe Portion is provided with partial pressure plate, and partial pressure plate is bending plate, and the bending angle of partial pressure plate is 94.5 degree.
CN201620697894.9U 2016-07-05 2016-07-05 Overflow dam body structure is prevented blockking up by water conservancy projects Expired - Fee Related CN205907656U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620697894.9U CN205907656U (en) 2016-07-05 2016-07-05 Overflow dam body structure is prevented blockking up by water conservancy projects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620697894.9U CN205907656U (en) 2016-07-05 2016-07-05 Overflow dam body structure is prevented blockking up by water conservancy projects

Publications (1)

Publication Number Publication Date
CN205907656U true CN205907656U (en) 2017-01-25

Family

ID=57805152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620697894.9U Expired - Fee Related CN205907656U (en) 2016-07-05 2016-07-05 Overflow dam body structure is prevented blockking up by water conservancy projects

Country Status (1)

Country Link
CN (1) CN205907656U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409385A (en) * 2019-08-20 2019-11-05 湖北水总水利水电建设股份有限公司 The new structure of settling pit built in a kind of overflow dam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409385A (en) * 2019-08-20 2019-11-05 湖北水总水利水电建设股份有限公司 The new structure of settling pit built in a kind of overflow dam

Similar Documents

Publication Publication Date Title
CN105839605B (en) Slope surface drain dyke and its design method
CN103628488B (en) A kind of damming method of mine tailing embankment dam
CN205907656U (en) Overflow dam body structure is prevented blockking up by water conservancy projects
CN205296100U (en) Husky equipment is arranged in reservoir segmentation
CN205035768U (en) Enrockment concrete permeable dike
CN109868878A (en) A kind of large size Karst depression hydrophobic structure and its construction method
CN209482259U (en) It is a kind of to cross water landscape earth dam structure
CN203174663U (en) Device for pouring rainwater on high-rise building roof underground
CN206693158U (en) Plugging structure under a kind of CFRD percolating water
CN110453653A (en) A kind of landscape water pond and its construction method
CN104727267B (en) It is a kind of to form the compound shingle trap of longitudinal spiral stream sediment trapping sand discharge
CN206173879U (en) Gravity dam construction diversion structure
CN201843125U (en) Channel structure for collecting slope subsurface flow
CN103614986A (en) Free surface flow water inflow method suitable for draining off floodwaters of tailing pond
CN104929081A (en) Enrockment concrete permeable dike and construction method thereof
CN208235444U (en) Contain high water head plugging structure in a kind of dam foundation water delivery bottom
CN203096696U (en) High and low composite backwater weir
CN208831025U (en) A kind of hydrous fluids underground chamber concrete construction anti-seepage device
CN103981838B (en) A kind of bank protection construction method
CN210621642U (en) Drainage structure for high-speed flow area of stilling pool
CN209584969U (en) A kind of water conservancy construction protective slope structure
CN209429109U (en) A kind of discharge structure of hillside ditch
CN203080480U (en) Upstream blanket structure of concrete face rockfill dam
CN203701071U (en) Sub-dam of tailing dam
CN209099484U (en) A kind of loessial gulch bridge site drainage system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170125

Termination date: 20170705