CN205888474U - Pipeline assembling device - Google Patents

Pipeline assembling device Download PDF

Info

Publication number
CN205888474U
CN205888474U CN201620727208.8U CN201620727208U CN205888474U CN 205888474 U CN205888474 U CN 205888474U CN 201620727208 U CN201620727208 U CN 201620727208U CN 205888474 U CN205888474 U CN 205888474U
Authority
CN
China
Prior art keywords
air bag
pipeline
lateral movement
movement mechanism
gasbag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620727208.8U
Other languages
Chinese (zh)
Inventor
王礼来
丁英利
尹中霞
吴大伟
王利群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum Natural Gas Pipeline No2 Engineering Co
China National Petroleum Corp
China Petroleum Pipeline Bureau Co Ltd
Original Assignee
China Petroleum Natural Gas Pipeline No2 Engineering Co
China National Petroleum Corp
China Petroleum Pipeline Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum Natural Gas Pipeline No2 Engineering Co, China National Petroleum Corp, China Petroleum Pipeline Bureau Co Ltd filed Critical China Petroleum Natural Gas Pipeline No2 Engineering Co
Priority to CN201620727208.8U priority Critical patent/CN205888474U/en
Application granted granted Critical
Publication of CN205888474U publication Critical patent/CN205888474U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a pipeline assembling device, include: the base links to each other with slide mechanism, be used for confirming the first gasbag of pipeline height, first gasbag is fixed on slide mechanism, first side telephone -moving constructs to be fixed slide mechanism's one end, be used for adjusting the second gasbag of pipeline angle is installed on first side telephone -moving constructs, the telephone -moving of second side constructs, the telephone -moving of second side constructs to be fixed slide mechanism's the other end, be used for adjusting the third gasbag of pipeline angle, the third gasbag is installed on the telephone -moving of second side constructs, so, inflate first gasbag through air compressor machine or foot pump, can adjust the pipeline height, inflate to incline to the pipeline to second gasbag and third gasbag and move, regulation when accomplishing the pipeline and being geared to the needs of the job about from top to bottom, and the device light in weight, easy dismounting, the mouth of pipe is organized fast, has reduced large -scale lifting device's use, has reduced construction cost, has reduced workman's intensity of labour simultaneously.

Description

A kind of pipeline assembling device
Technical field
This utility model belongs to network of rivers pipe technology field, more particularly, to a kind of pipeline assembling device.
Background technology
When dense waterway net region carries out large diameter pipeline construction, welding under ditch is unavoidable, particularly in pipeline Even it is necessary to carry out welding under ditch during head construction.
Mainly using two kinds of line-up clamp, pipeline is grouping in prior art.Specifically, one kind is internal clamp, another Planting is external clamp;Internal clamp is mainly used gas to carry out boil on the nape opposite the mouth as driving force to pipeline, but internal clamp is from heavy sensation of the body Amount is big, needs Large-scale Hoisting equipment to carry out lifting carrying, be not suitable for dense waterway net region mouth of pipe group pair during boil on the nape opposite the mouth.External clamp is in steel Carry out boil on the nape opposite the mouth outside pipe, still need hanging device the steel pipe needing boil on the nape opposite the mouth is adjusted to behind suitable position to use outer right The group that mouthpart carries out steel pipe is right.But because construction area level of ground water is high, pipe trench width suitable for reading, soft soil around pipe trench, large-scale Hanging device can make pipe trench cave in apart from pipe trench edge is too near, carries out mouth of pipe group to more difficult, have impact on construction quality and Progress.
Based on this, need a kind of pipeline assembling device at present badly, to solve the problems referred to above of the prior art.
Utility model content
The problem existing for prior art, this utility model embodiment provides a kind of pipeline assembling device, in order to solve Certainly in prior art during line up group pair, need the auxiliary of Large-scale Hoisting equipment, due to around pipe trench soft soil lead to organize right Difficult technical problem.
This utility model provides a kind of pipeline assembling device, and described device includes:
Base, described base is connected with slide mechanism;
For adjusting the first air bag of described duct height, described first air bag is fixed on described slide mechanism;
First lateral movement mechanism, described first lateral movement mechanism is fixed on one end of described slide mechanism;
For adjusting the second air bag of described pipe angle, described second air bag is arranged on described first lateral movement mechanism;
Second lateral movement mechanism, described second lateral movement mechanism is fixed on the other end of described slide mechanism;
For adjusting the 3rd air bag of described pipe angle, described 3rd air bag is arranged on described second lateral movement mechanism.
In such scheme, described base includes: base plate and slideway;Wherein, described slideway is welded on described base plate.
In such scheme, described slide mechanism includes:
Slide block, described slide block is placed on described slideway;
Slipper bracket, described slipper bracket is welded on described slide block;
Limiting plate, described limiting plate is welded on described slipper bracket.
In such scheme, described first lateral movement mechanism includes:
First support base, described first support base is connected with one end of described slideway by connecting pin;
First gripper shoe, described first gripper shoe is welded on described first support base;
First supporting plate, described first supporting plate is welded in described first gripper shoe.
In such scheme, described second lateral movement mechanism includes:
Second support base, described second support base is connected with the other end of described slideway by connecting pin;
Second gripper shoe, described second gripper shoe is welded on described second support base;
Second supporting plate, described second supporting plate is welded in described second gripper shoe.
In such scheme, described first air bag is specially double-layer air bag, is respectively as follows: ground floor air bag and second layer air bag.
In such scheme, described ground floor air bag is provided with the first charging connector;It is provided with described second layer air bag Two charging connectors.
In such scheme, described device also includes: first pressure table, described first pressure table and described first air bag phase Even.
In such scheme, described second air bag is provided with the 3rd charging connector.
In such scheme, described 3rd air bag is provided with the 4th charging connector.
This utility model provides a kind of pipeline assembling device, and described device includes: base, described base and slide mechanism It is connected;For determining the first air bag of described duct height, described first air bag is fixed on described slide mechanism;First sidesway Mechanism, described first lateral movement mechanism is fixed on one end of described slide mechanism;For adjusting the second air bag of described pipe angle, Described second air bag is arranged on described first lateral movement mechanism;Second lateral movement mechanism, described second lateral movement mechanism is fixed on described The other end of slide mechanism;For adjusting the 3rd air bag of described pipe angle, described 3rd air bag is arranged on described second side On telephone-moving structure;So, by air compressor machine or foot pump to the first airbag aeration, duct height can be adjusted;To second Air bag and the 3rd air bag are inflated to carry out sidesway to pipeline, complete regulation up and down during pipeline butt;And this dress Put lightweight, easy accessibility, mouth of pipe group is fast to speed, decreases the use of Large-scale Hoisting equipment, reduces construction cost, simultaneously Decrease the labor intensity of workman.
Brief description
The overall structure diagram of the pipeline assembling device that Fig. 1 provides for this utility model embodiment.
Description of reference numerals:
1- first air bag;2- second air bag;3- the 3rd air bag;4- base plate;5- slideway;6- slide block;7- slipper bracket;8- limits Position plate;9- first support base;10- first gripper shoe;11- first supporting plate;12- second support base;13- second gripper shoe;14- Two supporting plates;15 first charging connectors;16- second charging connector;17- the 3rd charging connector;18- the 4th charging connector;19- pressure gauge.
Specific embodiment
In order to solve, in mouth of pipe group pair, to need the auxiliary of Large-scale Hoisting equipment, because around pipe trench, soft soil leads to To difficult technical problem, this utility model provides a kind of pipeline assembling device to group, and described device includes: base, described bottom Seat is connected with slide mechanism;For determining the first air bag of described duct height, described first air bag is fixed on described skate machine On structure;First lateral movement mechanism, described first lateral movement mechanism is fixed on one end of described slide mechanism;For adjusting described pipeline angle Second air bag of degree, described second air bag is arranged on described first lateral movement mechanism;Second lateral movement mechanism, described second lateral machine Structure is fixed on the other end of described slide mechanism;For adjusting the 3rd air bag of described pipe angle, described 3rd air bag is installed On described second lateral movement mechanism.
Below by drawings and the specific embodiments, the technical solution of the utility model is described in further detail.
The present embodiment provides a kind of pipeline assembling device, and described pipeline can be steel pipe;As shown in figure 1, described device bag Include: base, the first air bag 1, slide mechanism, the first lateral movement mechanism, the second air bag 2, the second lateral movement mechanism, the 3rd air bag 3;Its In,
Described base is connected with slide mechanism;Described first air bag 1 is fixed on described slide mechanism, described for adjusting Duct height;Described first lateral movement mechanism is fixed on one end of described slide mechanism;Described second air bag 2 is arranged on described first On lateral movement mechanism, for adjusting described pipe angle, described second lateral movement mechanism is fixed on the other end of described slide mechanism;Institute State the 3rd air bag 3 to be arranged on described second lateral movement mechanism, for adjusting described pipe angle.Wherein, described first air bag 1 is Double-layer air bag, is respectively as follows: ground floor air bag and second layer air bag;Described ground floor air bag and second layer air bag inflation/deflation are mutually only Vertical, for the service life of augmented airbag, described ground floor air bag, second layer air bag, described second air bag 2 and described 3rd gas Capsule 3 adopts rubber disposal molding, and balloon surface is processed into matsurface.
Specifically, described base includes: base plate 4 and slideway 5;Wherein, described slideway 5 is welded on described base plate 4;Described Slideway 5 is I shape slideway.
Described slide mechanism includes: slide block 6, slipper bracket 7 and limiting plate 8;Wherein, described slide block 6 is placed on described cunning On road 5;Described slipper bracket 7 is welded on described slide block 6;Described limiting plate 8 is welded on described slipper bracket 7, for solid Fixed described first air bag 1, the described upper surface of the first air bag 1 is close to the first side of pipeline.
Described first lateral movement mechanism is used for adjusting the sidesway displacement of described pipeline, comprising: the first support base 9, first supports Plate 10 and the first supporting plate 11;Wherein, described first support base 9 is connected with one end of described slideway 5 by connecting pin;Described first Gripper shoe 10 is welded on described first support base 9;Described first supporting plate 11 is welded in described first gripper shoe 10, and described One supporting plate 11 is used for fixing described second air bag 2, and described second air bag 2 is connected with the second side of described pipeline.
Described second lateral movement mechanism is used for adjusting the sidesway displacement of described pipeline, comprising: the second support base 12, second supports Plate 13 and the second supporting plate 14;Wherein, described second support base 12 is connected with the other end of described slideway 5 by connecting pin;Described Second gripper shoe 13 is welded on described second support base 12;Described second supporting plate 14 is welded in described second gripper shoe 13, Described second supporting plate 14 is used for fixing described 3rd air bag 3, and described 3rd air bag 3 is connected with the 3rd side of described pipeline.Here, Described first support base 9 is welded using rectangle steel with described second support base 12, described first lateral movement mechanism and described the Two lateral movement mechanisms can be adjusted according to the location hole of slideway 5 and each support base connection.
Here, described first air bag 1 includes: the first charging connector 15, the second charging connector 16, first row air valve and second exhaust Valve;Wherein, described first charging connector 15 is arranged on one end of described ground floor air bag (lower floor's air bag), described first row air valve peace It is contained in the other end of described ground floor air bag.Described second charging connector 16 is arranged on one end of described second layer air bag, and described Two air bleeding valves are arranged on the other end of described second layer air bag (upper strata air bag).
Described second air bag 2 includes: the 3rd charging connector 17 and the 3rd air bleeding valve;Described 3rd charging connector 17 is arranged on described One end of second air bag 2, for inflating in the second air bag 2;Described 3rd air bleeding valve is arranged on the another of described second air bag 2 End, for discharging the gas in the second air bag 2.
Described 3rd air bag 3 includes: the 4th charging connector 18 and the 4th air bleeding valve;Described 4th charging connector 18 is arranged on described One end of 3rd air bag 3, for inflating in described 3rd air bag 3;Described 3rd air bleeding valve is arranged on described 3rd air bag 3 The other end, for the gas in discharge the 3rd air bag 3.
Here, described device also includes: first pressure table 19, second pressure table 20 and the 3rd pressure gauge 21, and described first Pressure gauge 19 is connected with described first air bag 1, for monitoring the pressure in described first air bag 1;
Described second pressure table is connected with described second air bag 2, for monitoring the pressure in described second air bag 2;Described 3rd pressure gauge is connected with described 3rd air bag 3, for monitoring the pressure in described 3rd air bag 3.
In practical application, when needing pipeline opening is grouping, provide gases at high pressure pair using air compressor machine or foot pump First air bag 1 is inflated, and described first air bag 1 expands under the driving of gas, and the height of lifting pipeline, when duct height arrives When reaching default position, the gas in second layer air bag is slowly excluded by second row air valve, to increase pipeline and the first air bag 1 Contact area, increase pipeline stability.
When duct height reaches default position, inflated in the second air bag 2 using air compressor machine or foot pump, by cunning Block promotes pipe side to move to predeterminated position, to adjust pipe mouth angle.Finally think to be filled with a small amount of gas to fix in the 3rd air bag 3 The position of pipeline is not it is ensured that pipeline rolls.
Now pipeline butt finishes, and reuses after external clamp completes being relatively fixed of two steel pipes, carries out weld job ?.First air bag 1, the second air bag 2 and the 3rd air bag 3 can be exitted one by one after the completion of welding, finally withdraw from pipe string dress Put.
The pipeline assembling device that this utility model provides carries out sidesway and jacking using air bag to pipeline, completes steel pipe aligning When regulation up and down.This installation weight is light, easy accessibility, and mouth of pipe group is fast to speed, decreases making of Large-scale Hoisting equipment With reducing construction cost, decreasing the labor intensity of workman simultaneously.
The above, preferred embodiment only of the present utility model, it is not intended to limit protection of the present utility model Scope, all any modification, equivalent and improvement made within spirit of the present utility model and principle etc., should be included in Within protection domain of the present utility model.

Claims (10)

1. a kind of pipeline assembling device is it is characterised in that described device includes:
Base, described base is connected with slide mechanism;
For adjusting the first air bag of described duct height, described first air bag is fixed on described slide mechanism;
First lateral movement mechanism, described first lateral movement mechanism is fixed on one end of described slide mechanism;
For adjusting the second air bag of described pipe angle, described second air bag is arranged on described first lateral movement mechanism;
Second lateral movement mechanism, described second lateral movement mechanism is fixed on the other end of described slide mechanism;
For adjusting the 3rd air bag of described pipe angle, described 3rd air bag is arranged on described second lateral movement mechanism.
2. device as claimed in claim 1 is it is characterised in that described base includes: base plate and slideway;Wherein, described slideway It is welded on described base plate.
3. device as claimed in claim 2 is it is characterised in that described slide mechanism includes:
Slide block, described slide block is placed on described slideway;
Slipper bracket, described slipper bracket is welded on described slide block;
Limiting plate, described limiting plate is welded on described slipper bracket.
4. device as claimed in claim 3 is it is characterised in that described first lateral movement mechanism includes:
First support base, described first support base is connected with one end of described slideway by connecting pin;
First gripper shoe, described first gripper shoe is welded on described first support base;
First supporting plate, described first supporting plate is welded in described first gripper shoe.
5. device as claimed in claim 3 is it is characterised in that described second lateral movement mechanism includes:
Second support base, described second support base is connected with the other end of described slideway by connecting pin;
Second gripper shoe, described second gripper shoe is welded on described second support base;
Second supporting plate, described second supporting plate is welded in described second gripper shoe.
6. device as claimed in claim 1, it is characterised in that described first air bag is specially double-layer air bag, is respectively as follows: first Layer air bag and second layer air bag.
7. device as claimed in claim 6 is it is characterised in that be provided with the first charging connector on described ground floor air bag;Described Second charging connector is provided with second layer air bag.
8. device as claimed in claim 7 is it is characterised in that described device also includes: first pressure table, described first pressure Table and described first airbags.
9. device as claimed in claim 1 is it is characterised in that be provided with the 3rd charging connector on described second air bag.
10. device as claimed in claim 1 is it is characterised in that be provided with the 4th charging connector on described 3rd air bag.
CN201620727208.8U 2016-07-11 2016-07-11 Pipeline assembling device Active CN205888474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620727208.8U CN205888474U (en) 2016-07-11 2016-07-11 Pipeline assembling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620727208.8U CN205888474U (en) 2016-07-11 2016-07-11 Pipeline assembling device

Publications (1)

Publication Number Publication Date
CN205888474U true CN205888474U (en) 2017-01-18

Family

ID=57771160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620727208.8U Active CN205888474U (en) 2016-07-11 2016-07-11 Pipeline assembling device

Country Status (1)

Country Link
CN (1) CN205888474U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106695227A (en) * 2017-02-17 2017-05-24 重庆市永川区富强机械制造有限公司 Machining assistant platform
CN109110295A (en) * 2018-08-17 2019-01-01 北京睿力恒物流技术股份公司 A kind of air-cushion type pallet
CN110318547A (en) * 2019-06-19 2019-10-11 广州城建职业学院 A kind of building pipe the service of connection devices
CN110329891A (en) * 2019-06-28 2019-10-15 安徽省潜山县富源特种制刷有限公司 A kind of safe hairbrush of double escalator
CN110587515A (en) * 2019-09-19 2019-12-20 金法银 Automatic centering device for installing pipeline fastener
CN112775599A (en) * 2020-12-27 2021-05-11 马自波 Machining equipment for welding steel pipes

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106695227A (en) * 2017-02-17 2017-05-24 重庆市永川区富强机械制造有限公司 Machining assistant platform
CN109110295A (en) * 2018-08-17 2019-01-01 北京睿力恒物流技术股份公司 A kind of air-cushion type pallet
CN109110295B (en) * 2018-08-17 2023-12-19 北京睿泽恒镒科技股份公司 Air cushion type tray
CN110318547A (en) * 2019-06-19 2019-10-11 广州城建职业学院 A kind of building pipe the service of connection devices
CN110329891A (en) * 2019-06-28 2019-10-15 安徽省潜山县富源特种制刷有限公司 A kind of safe hairbrush of double escalator
CN110587515A (en) * 2019-09-19 2019-12-20 金法银 Automatic centering device for installing pipeline fastener
CN112775599A (en) * 2020-12-27 2021-05-11 马自波 Machining equipment for welding steel pipes

Similar Documents

Publication Publication Date Title
CN205888474U (en) Pipeline assembling device
CN203856485U (en) Inflating equipment for mounting wide waterproof plate of tunnel
CN201406680Y (en) Double-airbag inflatable oil containment boom
CN110424448B (en) Sedimentation monitoring compensation system and method for underground conveying pipeline
CN210549035U (en) Plugging device for pipeline welding
CN108699795A (en) For guiding and the holder with multiple guiding mechanisms of brace foundation component
CN206036390U (en) Pipeline rising -falling tone is put by paper -back edition
CN104563590B (en) Inner steel cylinder of chimney hydraulic pressure lift constructing device and method thereof
CN204619304U (en) A kind of basketball inflation portable support frame
CN206738816U (en) A kind of four limbs are provided with the pipe robot of anti-skid structure
CN207348882U (en) Exploit excavation supporting mechanism in a kind of tunnel
CN211821057U (en) Hydraulic engineering construction is with consolidating strutting arrangement
CN113153213A (en) Gas collection hole plugging device and plugging method thereof
CN210890408U (en) Tunnel wind water pipe freely removes support
CN202938968U (en) Air-water double-detection apparatus for cylinder-body seal performance
CN202047782U (en) Swabbing steel wire rope spray-prevention device
CN210977545U (en) Tunnel support device
CN210050393U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN208669331U (en) A kind of New-support
CN208089630U (en) A kind of pumping plant for the leak detection of pipeline applied voltage test
CN207794172U (en) For acting the integrated steel pad case apparatus for pulling out chain saw case
CN110117144A (en) A kind of in-situ repairing device of river bottom mud
CN206071598U (en) Self-propelled for tunnel excavation supporting bores quick-fried chassis
CN207047234U (en) Device for microalgae embedded immobilization
CN105923571B (en) A kind of fluid pressure type cross slide rail deliverance apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant