CN206036390U - Pipeline rising -falling tone is put by paper -back edition - Google Patents
Pipeline rising -falling tone is put by paper -back edition Download PDFInfo
- Publication number
- CN206036390U CN206036390U CN201621087140.8U CN201621087140U CN206036390U CN 206036390 U CN206036390 U CN 206036390U CN 201621087140 U CN201621087140 U CN 201621087140U CN 206036390 U CN206036390 U CN 206036390U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- carrier block
- arc
- formation plate
- leveling device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model relates to a pipeline rising -falling tone is put by paper -back edition, it includes leveling plate, leveling plate fixes subaerial through a plurality of gim pegs, leveling plate's top surface four corners fixed mounting has a plurality of pneumatic cylinders, the piston rod top supporting of pneumatic cylinder has the carrier block, the top center processing of carrier block has the arc wall, the reducing arc has been placed in the cooperation on the arc wall, the reducing arc passes through the bolt to be fixed on the arc wall, leveling plate's lower bottom surface is fixed with pressure sensor. Whole conduit flattening of fast speed adjusting and gradient, it is fast, with low costs to have a construction speed, advantages such as convenient operation.
Description
Technical field
This utility model relate to a kind of pipeline lifting leveling device, belong to aqueduct construction safety mounting technique neck
Domain.
Background technology
In recent years, with national economy develop rapidly and urban public infrastructure increasingly perfect, engineering construction
The scale expanding day of project, quantity are continuously increased, and are to build livable urban life environment to be made that positive contribution.Many
During projects are built, pipe-line construction is particularly important, directly affects the living environment of urbanite, and urban economy development is made
Into directly affecting, be ensure city it is lasting, stable, sound development core content.During urban infrastructure construction.
As, in pipe shaft backfill work progress, tube coupling is promoted by external force to be caused to shift or occur crack, pipeline pressure test
When, interface leak or the de- mouth of pipeline section two ends closure plate interface or pipeline corner, basic and ground are insecure, occur not
Uniform settlement and cause crack between tube coupling, occur.Foundation ditch sinks, and causes the mouth of pipe to ftracture, without according to design requirement during channel excavation
Cutting depth carry out, or encounter unfavorable geology in digging process and carry out the reinforcement measure of geology, cause Guan Ji's
Sink, cause pipe joint cracking or deformation and affect its normal use, this utility model solve uneven settlement of foundation and
Cause crack problem between tube coupling, occur, while accelerate adjustment aqueduct flatness, simple structure fast with construction, operation side
Just the advantages of.
Utility model content
The purpose of this utility model:Solve uneven settlement of foundation and cause crack between tube coupling, occur, meanwhile, it is quick to adjust
Aqueduct is flattened and gradient, and fast with speed of application, low cost, the advantages of easy to operate.
In order to solve above-mentioned technical problem, the utility model proposes technical scheme below:A kind of pipeline lifting leveling device,
It includes formation plate, and the formation plate is fixed on the ground by multiple gim pegs, the top surface Corner Strapped peace of the formation plate
Equipped with multiple hydraulic cylinders, the piston rod part of the hydraulic cylinder is supported by carrier block, and the top center of the carrier block is machined with
Arcuate groove, coordinates on the arcuate groove and is placed with reducing arc, and the reducing arc is fixed on arcuate groove by latch,
The bottom surface of the formation plate is fixed with pressure transducer.
The hydraulic cylinder is all passed through fluid pressure line and is connected with Hydraulic Station, provides hydraulic power to hydraulic cylinder.
The gim peg includes bulb top, and the lower surface on the bulb top is drill steel, is machined with the end of drill steel
Tapering point, is provided with positioning gripping block on drill steel.
The reducing arc includes a series of different sizes, and the arcuate groove at its center is engaged with the outer tube wall of pipeline,
Arc groove radius includes various different specifications, can adapt to the pipeline of different size.
The through hole being engaged with latch is machined with the reducing arc, is machined with and matches with latch on the carrier block
The jack of conjunction.
Compared with prior art, the beneficial effects of the utility model are:
1st, by arranging formation plate, easily whole device can be fixed on the ground, by formation plate to hydraulic cylinder
It is supported with carrier block, it is ensured that the safety and stability of follow-up adjustment, and then ensure that job safety.
2nd, easily by carrier block jack-up, and then can adjust carrying by multiple hydraulic cylinders being installed in the bottom of carrier block
The height at four angles of block, reaches the purpose for adjusting its top duct.
3rd, the pipeline of different-diameter and different size is can adapt to by arranging reducing arc, and then improves device
Adaptability, improves the motility of operation process.
4th, can grasp the pressure to ground by pressure transducer being installed in the bottom of formation plate, and then ensure that in time
The safety of operation.
5th, by power being provided using hydraulic system, improve bearing capacity.
6th, pipeline is carried by Hydraulic Cylinder, adjustment carries the gradient of pipeline, each recorded using pressure transducer
The pressure of aqueduct, what formation plate prevented ground do not have sedimentation, and the height of raise-lower hydraulic arm prevents from occurring splitting between tube coupling
Seam, quick adjustment aqueduct flatness have construction fast, and simple structure, the advantages of easy to operate.
Description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is this utility model overall structure diagram.
Fig. 2 is this utility model
In figure:Formation plate 1, hydraulic cylinder 2, piston rod 3, carrier block 4, arcuate groove 5, reducing arc 6, latch 7, gim peg
8th, pressure transducer 9, fluid pressure line 10, Hydraulic Station 11, positioning gripping block 12, tapering point 13, bulb top 14.
Specific embodiment
Below in conjunction with the accompanying drawings embodiment of the present utility model is described further.
Embodiment 1:
Such as Fig. 1-2, a kind of pipeline lifting leveling device, it includes formation plate 1, and the formation plate 1 passes through multiple gim pegs 8
Fix on the ground, the top surface Corner Strapped of the formation plate 1 is provided with multiple hydraulic cylinders 2, the piston rod 3 of the hydraulic cylinder 2
The top center that top braces have carrier block 4, the carrier block 4 is machined with arcuate groove 5, coordinates and be placed with the arcuate groove 5
Reducing arc 6, the reducing arc 6 are fixed on arcuate groove 5 by latch 7, and the bottom surface of the formation plate 1 is fixed with
Pressure transducer 9.By installing the height that hydraulic cylinder 2 can easily adjust carrier block 4, Jin Erda in the bottom of carrier block 4
To the purpose for adjusting its top duct, it is ensured that the normal mounting of pipeline.
Further, the hydraulic cylinder 2 is all passed through fluid pressure line 10 and is connected with Hydraulic Station 11, provides hydraulic pressure to hydraulic cylinder 2
Power.Power is provided by hydraulic system, it is ensured that the reliability of power source, also improve bearing capacity.
Further, the gim peg 8 includes bulb top 14, and the lower surface on the bulb top 14 is drill steel, in pricker
The end of bar is machined with tapering point 13, is provided with positioning gripping block 12 on drill steel.Can will be formation plate 1 tight by gim peg 8
Gu on ground, improve fixing intensity, it is ensured that the safety of follow-up adjustment operation.
Further, the reducing arc 6 includes a series of different sizes, the arcuate groove at its center and the outer tube of pipeline
Wall is engaged, and arc groove radius includes various different specifications, can adapt to the pipeline of different size.
Further, the through hole being engaged with latch 7 is machined with the reducing arc 6, process on the carrier block 4
There is the jack being engaged with latch 7.Effectively reducing arc 6 can be fixed on carrier block 4 by latch 7, prevent which
Generation sliding.
Embodiment 2:
1. a length of 1.2m of formation plate, a width of 1.2m, a height of 4cm;
2. the material for carrying pipeline is PP plastics, and the material of bolt is galvanized iron;
3. a length of 1m, a width of 1m, a height of 0.8m of pipeline are carried;
In the present embodiment, above example explanation, this utility model provide a kind of pipeline lifting leveling device, solve
Uneven settlement of foundation and cause crack problem between tube coupling, occur, while accelerating adjustment aqueduct flatness, implementation is strong, behaviour
Make simple.
Operation principle of the present utility model and the course of work are:
In the course of work, when needing to be adjusted the pipeline installed, first formation plate 1 is inserted by gim peg 8
Fix on the ground, then multiple hydraulic cylinders 2 be fixed on the top surface of formation plate 1, and hydraulic cylinder 2 is connected with hydraulic system,
According to required pipe diameter to be mounted, the reducing arc 6 of suitable diameter is selected, finally reducing arc 6 is fixed on and is held
Carry inside the arcuate groove of block 4, which is fixed by latch 7, it would be desirable to which the pipeline support of adjustment is placed on reducing arc 6
Top, by controlling the piston rod action jack-up carrier block 4 of hydraulic cylinder 2 and then reaching the purpose for adjusting pipeline angle of inclination.
Embodiment of the present utility model is explained in detail with reference to accompanying drawing, but this utility model be not limited to it is above-mentioned
Embodiment.Technical staff can be without prejudice to innovative point of the present utility model and operating procedure, in claims
It is interior, above-described embodiment is modified.Protection domain of the present utility model, should cover such as claims of the present utility model.
Claims (5)
1. a kind of pipeline lifting leveling device, it is characterised in that:It includes formation plate(1), the formation plate(1)By multiple solid
Determine bolt(8)Fix on the ground, the formation plate(1)Top surface Corner Strapped multiple hydraulic cylinders are installed(2), the hydraulic cylinder
(2)Piston rod(3)Top braces have carrier block(4), the carrier block(4)Top center be machined with arcuate groove(5), it is described
Arcuate groove(5)Upper cooperation is placed with reducing arc(6), the reducing arc(6)By latch(7)It is fixed on arcuate groove
(5)On, the formation plate(1)Bottom surface be fixed with pressure transducer(9).
2. a kind of pipeline lifting leveling device according to claim 1, it is characterised in that:The hydraulic cylinder(2)All pass through
Fluid pressure line(10)With Hydraulic Station(11)It is connected, to hydraulic cylinder(2)Hydraulic power is provided.
3. a kind of pipeline lifting leveling device according to claim 1, it is characterised in that:The gim peg(8)Including ball
Crown end(14), the bulb top(14)Lower surface be drill steel, be machined with tapering point in the end of drill steel(13), in drill steel
On be provided with positioning gripping block(12).
4. a kind of pipeline lifting leveling device according to claim 1, it is characterised in that:The reducing arc(6)Bag
A series of different sizes are included, the arcuate groove at its center is engaged with the outer tube wall of pipeline, and arc groove radius includes various different
Specification, can adapt to the pipeline of different size.
5. a kind of pipeline lifting leveling device according to claim 1, it is characterised in that:The reducing arc(6)On
It is machined with and latch(7)The through hole being engaged, the carrier block(4)On be machined with and latch(7)The jack being engaged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621087140.8U CN206036390U (en) | 2016-09-28 | 2016-09-28 | Pipeline rising -falling tone is put by paper -back edition |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621087140.8U CN206036390U (en) | 2016-09-28 | 2016-09-28 | Pipeline rising -falling tone is put by paper -back edition |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206036390U true CN206036390U (en) | 2017-03-22 |
Family
ID=58297033
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621087140.8U Expired - Fee Related CN206036390U (en) | 2016-09-28 | 2016-09-28 | Pipeline rising -falling tone is put by paper -back edition |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206036390U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107906254A (en) * | 2017-11-28 | 2018-04-13 | 李广喜 | A kind of petroleum pipeline ply stacking angle regulating device |
CN108361440A (en) * | 2018-02-07 | 2018-08-03 | 中建八局第三建设有限公司 | A kind of quick positioning apparatus of pipeline and its construction method |
CN112268155A (en) * | 2020-10-13 | 2021-01-26 | 吕敦玉 | Urban building drainage pipe prevents subsiding protection device that goes out family |
CN113217711A (en) * | 2021-05-06 | 2021-08-06 | 刘瑞昆 | Water conservancy pipeline supporting and connecting assembly |
CN115095711A (en) * | 2022-06-21 | 2022-09-23 | 广东易力建安工程有限公司 | Construction method of double-anticorrosion plastic-coated composite pipe |
-
2016
- 2016-09-28 CN CN201621087140.8U patent/CN206036390U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107906254A (en) * | 2017-11-28 | 2018-04-13 | 李广喜 | A kind of petroleum pipeline ply stacking angle regulating device |
CN107906254B (en) * | 2017-11-28 | 2019-09-27 | 江苏嘉胜石油科技有限公司 | A kind of petroleum pipeline ply stacking angle regulating device |
CN108361440A (en) * | 2018-02-07 | 2018-08-03 | 中建八局第三建设有限公司 | A kind of quick positioning apparatus of pipeline and its construction method |
CN112268155A (en) * | 2020-10-13 | 2021-01-26 | 吕敦玉 | Urban building drainage pipe prevents subsiding protection device that goes out family |
CN113217711A (en) * | 2021-05-06 | 2021-08-06 | 刘瑞昆 | Water conservancy pipeline supporting and connecting assembly |
CN115095711A (en) * | 2022-06-21 | 2022-09-23 | 广东易力建安工程有限公司 | Construction method of double-anticorrosion plastic-coated composite pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206036390U (en) | Pipeline rising -falling tone is put by paper -back edition | |
CN105862874B (en) | A kind of means of defence for controlling closing foundation ditch construction of structures to deform | |
CN105465481A (en) | Construction method for jacking structure of pipe jacking work well | |
CN105203080B (en) | Roadbed settlement observation device and observation method thereof | |
CN202298628U (en) | Automatic steel pipe column perpendicularity adjusting device using reverse construction method | |
CN204475334U (en) | Large diameter steel pipe sunk pile pile holding device | |
CN110359540A (en) | A kind of shallow earthing Large Diameter Pipeline high water level wears the artificial jacking construction engineering method of existing road | |
CN105421474A (en) | Integral construction method of pile planting cofferdam platform used for rock strata low-pile cap | |
CN107268688A (en) | I-shaped steel joint of diaphragm wall reinforces the construction method of sealing | |
CN103321212A (en) | One-column-one-pile post inserting method construction process | |
CN203357324U (en) | Embedding device for ultra-long inclinometer tubes | |
CN208034022U (en) | A kind of nozzle for Large Diameter Pipeline steel pipe and nozzle docking facilities | |
CN102400473A (en) | Construction method for gas suction vertical shaft of waste landfill gas and collection device | |
CN204941551U (en) | A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction | |
CN104074195A (en) | Method for controlling sedimentation of ground outside foundation pit through horizontal grouting | |
CN214994477U (en) | Pipeline changes structure in foundation ditch | |
CN102758434B (en) | Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof | |
CN205066754U (en) | Subgrade settlement observation device | |
CN204199288U (en) | A kind of pile tube correction means for correcting | |
CN204941343U (en) | The vertical anchor rod drilling device in tunnel | |
CN209479705U (en) | Transport vehicle is used in a kind of reinforcing of jacking construction tube head | |
CN208074285U (en) | A kind of existing pipeline reinforcement protection adjustable hanging board device | |
CN203514353U (en) | Glass fiber reinforced plastics inspection well | |
CN202989929U (en) | Underwater concrete guide pipe bottom sealing device | |
CN205371804U (en) | Equipment that shallow buried depth push pipe control ground structure warp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170322 Termination date: 20170928 |
|
CF01 | Termination of patent right due to non-payment of annual fee |