CN205887711U - 预埋件矫正平台 - Google Patents
预埋件矫正平台 Download PDFInfo
- Publication number
- CN205887711U CN205887711U CN201620919349.XU CN201620919349U CN205887711U CN 205887711 U CN205887711 U CN 205887711U CN 201620919349 U CN201620919349 U CN 201620919349U CN 205887711 U CN205887711 U CN 205887711U
- Authority
- CN
- China
- Prior art keywords
- built
- fitting
- steel
- screw jack
- support platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型公开了一种预埋件矫正平台,包括支撑平台,所述支撑平台的上端面沿水平方向放置有两根用于支撑预埋件的活动支撑钢,两根所述活动支撑钢分别设置于所述预埋件的凸起部位两侧;所述支撑平台的上方设置有门形架,所述门形架的横梁上倒置一台螺旋千斤顶,所述螺旋千斤顶位于所述预埋件的凸起部位上方。本实用新型利用钢板、角钢等钢材可塑性强的特点,采用机械压力对预埋件扭曲变形部位进行施压,使预埋件恢复原状,操作安全方便,利于预埋件焊接变形矫正工作的快速进行,利于推动施工进度,缩短施工周期,提高施工质量。
Description
技术领域
本实用新型涉及预埋件制作技术领域,具体涉及一种预埋件矫正平台,尤其适用于质量要求较为严格的电建行业预埋件的制作。
背景技术
核电站将成为中国电力产业的主要构成部分,但由于核电站的危险性较大且目前国内对核电事故处理的经验还不够成熟,故为保证核电站的正常运行,必须从点滴开始将质量及安全性尽最大努力做到最好。而预埋件的制作也是整个结构中不可或缺的重要部分。
众所周知,预埋件在焊接过程中尤其是规格较为细长和锚筋分布密集的预埋件,焊接时极易产生焊接变形,治理钢材变形的方式主要分为冷矫正及加热矫正两种,但这两种方法各有利弊,冷加工机械的造价昂贵,如用锤头进行敲击整形便费工费时,尤其是厚板钢板的刚性较大,手工矫正比较困难,如用大锤敲击,也非常危险,且属于重体力工作。不适用于预埋件整形作业。
而加热矫正受限制较多,加热后需浇水急冷,但要注意被矫材料的材质,具有淬硬倾向的材料(如中碳钢、低合金结构钢等),不可浇水急冷,较厚材料加热后,在其表层和内部冷却速度不一致时,容易在交界处出现裂纹,不宜采用浇水急冷,故也此方法也不可取。
实用新型内容
本实用新型所要解决的技术问题是提供一种操作使用方便、对于因钢板焊接时受热不均匀而产生的扭曲变形有较好调节矫正效果的预埋件矫正平台。
为解决上述技术问题,本实用新型的技术方案是:
预埋件矫正平台,包括支撑平台,所述支撑平台的上端面沿水平方向放置有两根用于支撑预埋件的活动支撑钢,两根所述活动支撑钢分别设置于所述预埋件的凸起部位两侧;所述支撑平台的上方设置有门形架,所述门形架的横梁上倒置一台螺旋千斤顶,所述螺旋千斤顶位于所述预埋件的凸起部位上方。
作为优选的技术方案,所述支撑平台由工字钢焊接制成,所述门形架亦由工字钢焊接制成;所述支撑平台与所述门形架相焊接。
作为优选的技术方案,所述螺旋千斤顶通过扁钢与所述门形架的横梁工字钢相扣合连接。
作为优选的技术方案,所述螺旋千斤顶的顶杆与预埋件之间设置有施压木垫块。
由于采用了上述技术方案,本实用新型利用钢板、角钢等钢材可塑性强的特点,通过螺旋千斤顶施加的压力作用于预埋件(钢板)产生变形的部位,采用机械压力对预埋件扭曲变形部位进行施压,使预埋件的钢板处于平整顺直状态,使其恢复原状,操作安全方便,利于预埋件焊接变形矫正工作的快速进行,利于推动施工进度,缩短施工周期,提高施工质量。
附图说明
以下附图仅旨在于对本实用新型做示意性说明和解释,并不限定本实用新型的范围。其中:
图1是本实用新型实施例的主视结构示意图;
图2是本实用新型实施例的侧视结构示意图。
图中:1-支撑平台;2-预埋件;3-活动支撑钢;4-门形架;5-螺旋千斤顶;6-扁钢;7-施压木垫块。
具体实施方式
下面结合附图和实施例,进一步阐述本实用新型。在下面的详细描述中,只通过说明的方式描述了本实用新型的某些示范性实施例。毋庸置疑,本领域的普通技术人员可以认识到,在不偏离本实用新型的精神和范围的情况下,可以用各种不同的方式对所描述的实施例进行修正。因此,附图和描述在本质上是说明性的,而不是用于限制权利要求的保护范围。
如图1和图2所示,预埋件矫正平台,包括用16#工字钢焊接制成的支撑平台1,所述支撑平台1的上端面沿水平方向放置有两根用于支撑预埋件2的活动支撑钢3,活动支撑钢3也采用工字钢,两根所述活动支撑钢3分别设置于所述预埋件2的凸起部位两侧;所述支撑平台1的上方设置有由16#工字钢焊接制成的门形架4,所述支撑平台1与所述门形架4相焊接;所述门形架4的横梁上倒置一台螺旋千斤顶5,可以采用QL32t螺旋千斤顶;所述螺旋千斤顶5位于所述预埋件2的凸起部位上方,螺旋千斤顶5可以通过扁钢与所述门形架4的横梁工字钢相扣合连接,不可太紧,以螺旋千斤顶可以自由移动为宜,以适用因较重不易移动预埋件的多个部位矫正。
两根活动支撑钢3可以适用于各种规格型号的预埋件,需要对预埋件进行调节矫正时,直接挪至预埋件的凸起部位两侧即可;这样便于用螺旋千斤顶施加的压力作用于钢板产生变形的部位,使其恢复原状。
参考图2,使用时将需矫正的预埋件2凸面朝上放在支撑平台1上,用两根活动支撑钢3担在凸起部位两侧,操纵螺旋千斤顶5旋钮(必要时可在千斤顶旋钮操纵杆上套一根加力杆),使千斤顶杆缓慢下降,钢板回弹力较大时可在顶杆端部垫一块施压木垫块7(即小木板)以防钢板表面被压出凹痕,对钢板凸起处施加压力。当钢板被压直时,升起顶杆,观察钢板的回弹情况,然后再操纵螺旋千斤顶下压,使被矫正钢材产生少许向下凹弯,以抵消回弹,直至将预埋件钢材矫直。
以上所述仅为本实用新型示意性的具体实施方式,并非用以限定本实用新型的范围。任何本领域的技术人员,在不脱离本实用新型的构思和原则的前提下所作出的等同变化与修改,均应属于本实用新型保护的范围。
Claims (4)
1.预埋件矫正平台,其特征在于:包括支撑平台,所述支撑平台的上端面沿水平方向放置有两根用于支撑预埋件的活动支撑钢,两根所述活动支撑钢分别设置于所述预埋件的凸起部位两侧;所述支撑平台的上方设置有门形架,所述门形架的横梁上倒置一台螺旋千斤顶,所述螺旋千斤顶位于所述预埋件的凸起部位上方。
2.如权利要求1所述的预埋件矫正平台,其特征在于:所述支撑平台由工字钢焊接制成,所述门形架亦由工字钢焊接制成;所述支撑平台与所述门形架相焊接。
3.如权利要求2所述的预埋件矫正平台,其特征在于:所述螺旋千斤顶通过扁钢与所述门形架的横梁工字钢相扣合连接。
4.如权利要求1、2或3所述的预埋件矫正平台,其特征在于:所述螺旋千斤顶的顶杆与预埋件之间设置有施压木垫块。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620919349.XU CN205887711U (zh) | 2016-08-23 | 2016-08-23 | 预埋件矫正平台 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620919349.XU CN205887711U (zh) | 2016-08-23 | 2016-08-23 | 预埋件矫正平台 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205887711U true CN205887711U (zh) | 2017-01-18 |
Family
ID=57778002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620919349.XU Active CN205887711U (zh) | 2016-08-23 | 2016-08-23 | 预埋件矫正平台 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205887711U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107542275A (zh) * | 2017-11-01 | 2018-01-05 | 江苏安荣电气设备股份有限公司 | 一种曲状预埋滑槽矫形设备 |
CN108500082A (zh) * | 2018-04-10 | 2018-09-07 | 中国能源建设集团江苏省电力建设第三工程有限公司 | 一种便于埋件矫正变形的装置及工作方法 |
CN110593299A (zh) * | 2019-08-07 | 2019-12-20 | 国家电网有限公司 | 变压器预埋件调平装置 |
-
2016
- 2016-08-23 CN CN201620919349.XU patent/CN205887711U/zh active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107542275A (zh) * | 2017-11-01 | 2018-01-05 | 江苏安荣电气设备股份有限公司 | 一种曲状预埋滑槽矫形设备 |
CN108500082A (zh) * | 2018-04-10 | 2018-09-07 | 中国能源建设集团江苏省电力建设第三工程有限公司 | 一种便于埋件矫正变形的装置及工作方法 |
CN110593299A (zh) * | 2019-08-07 | 2019-12-20 | 国家电网有限公司 | 变压器预埋件调平装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205887711U (zh) | 预埋件矫正平台 | |
CN206981474U (zh) | 一种f轨矫正设备 | |
CN202667904U (zh) | 一种三角桁架点焊机 | |
CN203778516U (zh) | 一种h型钢柱焊接变形矫正装置 | |
CN202291954U (zh) | 一种防止长板条类金属零件焊接变形的装置 | |
CN209578577U (zh) | 一种板材焊接固定装置 | |
CN209021121U (zh) | 一种建筑用钢筋矫正装置 | |
CN110359935A (zh) | 隧道衬砌台车加装中埋式止水带用堵头板模具 | |
CN107978799B (zh) | 一种高效的锂离子电池折烫边装置 | |
CN206912516U (zh) | 一种利用千斤顶调节不锈钢焊接变形的装置 | |
CN207414670U (zh) | 一种集装箱前板组焊工装 | |
CN201693038U (zh) | 铸锭车运转台扶手一次成型装置 | |
CN205684602U (zh) | 一种圆钢夹紧装置 | |
CN209503313U (zh) | 钢箱梁板单元焊接反形变胎架 | |
CN205816467U (zh) | 扁钢或方钢在线矫直装置 | |
CN207942129U (zh) | 一种防止罐车变截面处焊接变形的装置 | |
CN208853991U (zh) | 一种方便固定的机械半管焊接装置 | |
CN203426220U (zh) | 手动式热弯管机 | |
CN206614202U (zh) | 一种可伸缩的四工位的操作机器人 | |
CN202479692U (zh) | 可调式单滑杆轻便电渣压力焊机夹具 | |
CN205363497U (zh) | 一种打磨砂轮机 | |
CN205111118U (zh) | 一种焊接装置 | |
CN213378655U (zh) | 角度可调的弯管机 | |
CN210725384U (zh) | 一种石墨烯发热膜焊接固定装置 | |
CN208409027U (zh) | 一种轮毂对圈装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan Patentee after: POWERCHINA NUCLEAR ENGINEERING Co.,Ltd. Address before: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan Patentee before: POWERCHINA NUCLEAR ENGINEERING Co. |
|
CP01 | Change in the name or title of a patent holder |