CN205875236U - Detection apparatus for foundation pile length is confirmed to other hole penetrated wave method - Google Patents

Detection apparatus for foundation pile length is confirmed to other hole penetrated wave method Download PDF

Info

Publication number
CN205875236U
CN205875236U CN201620852669.8U CN201620852669U CN205875236U CN 205875236 U CN205875236 U CN 205875236U CN 201620852669 U CN201620852669 U CN 201620852669U CN 205875236 U CN205875236 U CN 205875236U
Authority
CN
China
Prior art keywords
foundation pile
trigger
drill bit
drill body
rig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620852669.8U
Other languages
Chinese (zh)
Inventor
黄林伟
杨桦
吴宝杰
侯宏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG PROVINCIAL CONSTRUCTION ENGINEERING QUALITY INSPECTION STATION Co Ltd
Original Assignee
ZHEJIANG PROVINCIAL CONSTRUCTION ENGINEERING QUALITY INSPECTION STATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG PROVINCIAL CONSTRUCTION ENGINEERING QUALITY INSPECTION STATION Co Ltd filed Critical ZHEJIANG PROVINCIAL CONSTRUCTION ENGINEERING QUALITY INSPECTION STATION Co Ltd
Priority to CN201620852669.8U priority Critical patent/CN205875236U/en
Application granted granted Critical
Publication of CN205875236U publication Critical patent/CN205875236U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The detection device of foundation pile length is confirmed to other hole penetrated wave method, and including excitation hammer (300), host computer (400), drilling equipment (500), right the equipment of running the drilling tool into the well (600) and trigger (800), place trigger (800) on the cushion cap of foundation pile (100), host computer (400) are connected with data circuit group with trigger (800), its characterized in that, drilling equipment (500) are including boring the body (501), physically the bottom of (501) is provided with drill bit (1) to the brill, motor (12) are installed on the top, it drives rotatory hob (5) to install motor (12) in the brill body (501), install between hob (5) and drill bit (1) and pulverize post (7), the beneficial effect of the utility model: the utility model discloses a lay structure as an organic whole with detection device, fast in the time of the detection, can detect does not at any time need to punch in advance, reduces the engineering time, is fit for using widely.

Description

Side hole transmitted wave method determines the detection device of foundation pile length
Technical field
This utility model relates to a kind of side hole transmitted wave method and determines detection foundation pile device for detecting length, belongs to building detection skill Art field.
Background technology
Along with the fast development of economic construction, high buildings and large mansions continue to bring out, and pile foundation engineering obtains and develops on an unprecedented scale, pile foundation It it is the base form being most widely used at present.Owing to pile foundation engineering construction has highly disguised, find that quality problems are relative More difficult, industry is much owing to the quality problems of pile foundation engineering cause with the quality accident in civil buildings.
Test Technology of Pile Foundation has obtained significant progress in recent years, and coherent detection standard, specification are in succession promulgated and implement, right Ensure that construction quality serves good effect.But the most conventional Test Technology of Pile Foundation, such as static load test, core drilling method, height Strain Method, low strain dynamic method and sound wave transmission method etc., be both needed to directly contact Under Pile top, thus its use occasion receive certain Limit, be normally only applicable to before top-out structure not yet constructs.
But, engineering construction is frequently encountered the foundation pile length under existing buildings or structures or integrity are suspected And produce contradiction and disputes, or owing to existing building is of the remote past, when subsequent adaptation engineering lacks stake capsule information such as long grade, with And owing to there occurs that the other reasons such as surface subsidence, earthquake causes the situations such as later stage destruction to pile foundation and needs to build existing Pile foundation under building detects, but owing to now top-out structure has existed, it is impossible to directly contact stake top, thus routine Pile foundation inspection method is helpless.
Owing under current domestic existing buildings or structures, the systematic study of Test Technology of Pile Foundation still belongs to blank, therefore research one Pile detection new technique under the existing buildings or structures that kind strong adaptability, restricted condition are few, to objectively and accurately evaluating work Cheng Zhiliang, the contradiction and disputes solved in engineering construction and improve existing buildings or structures performance rating or dilapidated house secure authentication refers to Mark systems etc., have bigger realistic meaning, also will promote the further development of architecture foundation pile detection technique.
As Application No. CN103953076A disclose a kind of civil engineering pile foundation engineering quality testing field based on Depth determination method at the bottom of the existing engineering pile stake of side hole transmitted wave bathmometry, by detection in inspecting hole after stake sidetracking inspecting hole, And generate time depth signal graph according to different depth signal along the degree of depth, by determining flex point in time depth signal graph, And to the flex point degree of depth by the degree of depth at the bottom of obtaining after flex point adjusting for depth formula correction.This utility model not by superstructure to ripple The impact of shape, easy to detect, determine that corner position is simple and directly perceived.Stake is determined based on two line intersection points with existing side hole transmitted wave method The method of the end degree of depth is compared, and drilling depth is required relatively low by side hole transmitted wave bathmometry, only requires more than and treats peg 2~3m, Reduce inspecting hole hole depth requirement, cost-effective, for also there is preferable operability without the technical staff of engineering experience, preferably Solve a difficult problem for a degree of depth at the bottom of current existing engineering pile is difficult to determine.
And for example Application No. CN103898931A disclose a kind of foundation pile three-dimensional detection device based on borehole radar and Foundation pile 3 D detection method, described detection device includes foundation pile three-dimensional detection device based on borehole radar, sets through hole based on interior Foundation pile, described through hole along foundation pile axial direction extend, including borehole radar, traction module and central control module, described brill Hole radar includes antenna and radar host computer in interconnective well, and described radar host computer is connected with central control module, described inspection Survey method includes positioning antenna in well, 3-D scanning detection, displacement detection, transmission data, generates the steps such as 3-D view, uses Technical scheme described in the utility model can realize foundation pile integrity, pile bottom sediment thickness and the detection of length of reinforcing cage, And 3-D view can be obtained, allow detection personnel intuitively arrive foundation pile and the situation of foundation pile periphery.
Above-mentioned two documents is the immediate prior art of pre-the application, but its problem having is as follows: preliminary examination Surveying cumbersome, need punching, note clear water, operation is comparatively laborious.
Summary of the invention
This utility model overcomes the problem that prior art exists, it is proposed that a kind of side hole transmitted wave method determines foundation pile length Detection device and detection method, this utility model by by detection device laying be structure as a whole, the speed when of detection Hurry up, can detect at any time and need not pre-punching, reduce the engineering time.
Concrete technical scheme of the present utility model is as follows:
Side hole transmitted wave method determines the detection device of foundation pile length, bores including under exciting hammer, main frame, rig, righting Equipment and trigger, trigger is placed on the cushion cap of described foundation pile, and main frame is connected with trigger data circuit group, its feature It is,
Described rig includes drill body, and the bottom of described drill body is provided with drill bit, top is provided with motor, described drill body Inside be provided with driven by motor rotate screw rod, be provided with between described screw rod and drill bit and pulverize pillar, described in pulverize pillar Top be provided with the upper planet wheel that the gear one with screw rod is meshed, the bottom of described broken pillar is provided with the gear two with drill bit Be meshed lower planetary gear;It is provided with protection pipe in described drill body, in described protection pipe, is placed with cymoscope, described cymoscope and main frame Connect and have data circuit group two.The top of described drill body is also associated with water inlet pipe;Described data circuit group two is walked around to be laid in and is put Metering circle on equipment, described metering circle is provided with swinging handle.
Preferentially, described drill bit be routed over multiple lead soil hole one be passed through in drill body, described in pulverize the top of pillar also Filtration is installed and leads soil dividing plate.The top of described drill bit is also equipped with the unearthed pipe communicated with screw rod, opening of described unearthed pipe Mouth is downwards.
Preferentially, under described righting, rig includes that car body, the two ends of described car body are provided with mobile fixed cover and rotation Case, mobile fixed cover is provided with draw ring, and the rotary box end of described car body is provided with strander, between described draw ring and strander Connecting has steel wire rope, the interlude of described steel wire rope to be propped up by the support bar being arranged on car body.
Based on said apparatus, this utility model additionally provides a kind of side hole transmitted wave method and determines the detection side of foundation pile length Method, it is characterised in that comprise the steps:
1) test point is chosen, by being placed under righting above rig by rig, by mobile fixed cover and rotation Case is fixed, wherein: mobile fixed cover fixes the top entangling rig, and rotary box entangles the lower end of rig;
2) drive steel wire rope pull-up to make rig vertically attention by strander, unclamp mobile fixed cover, and start electricity Machine drives and bores set depth under drill bit;Wherein: in going down process, soil enters drill body by leading soil hole one and leads soil by filtration Dividing plate is discharged in entering screw rod be unearthed outside pipe;
3) on the cushion cap of foundation pile, trigger is placed, and by the data circuit group of trigger and the data circuit group of cymoscope Two connect main frame, and before detection, Job readiness completes;
44) first cymoscope is placed in during detection at the bottom of the mouth of pipe or the pipe of protection pipe, on engineering pile, generates machine by exciting hammer While tool ripple, in test tube, detect vibration signal, analyze the quality of signals collecting, if quality is the best, resampling, otherwise Preserve the waveform of this measuring point, and one exciting detection week after date swinging handle regulation metering circle rotation will be utilized to make detection The height of device declines or promotes 0.5-1m, continues hammering sampling, till mentioning on cymoscope at the bottom of the mouth of pipe or pipe;
5) main frame 400 exports image, by passing judgment on criterion as follows: 1, time m-depth map in first arrival time slope Change;2, the significantly decay amplitude of energy;I.e. first arrival time and the comprehensive analysis of amplitude to the seismic wave wave train, it is judged that pile body is long Degree and integrity.
The beneficial effects of the utility model: this utility model by by detection device laying be structure as a whole, detection time Time speed is fast, can detect at any time and need not pre-punching, reduces the engineering time, is suitable for promoting the use of.
Accompanying drawing explanation
Fig. 1 is the structural representation that this utility model side hole transmitted wave method determines the detection device of foundation pile length;
Fig. 2 is the structural representation of rig;
Fig. 3 is the structural representation of rig under righting;
Structural representation time Fig. 4 is rig operation under righting.
Detailed description of the invention
As it can be seen, side hole transmitted wave method determines the detection device of foundation pile length, hammer 300 into shape including exciting, exciting hammer 300 use On engineering pile, to generate mechanical wave by exciting mode;, main frame 400, rig 500, rig 600 and touching under righting Sending out device 800, trigger 800 is placed on the cushion cap of described foundation pile 100, and main frame 400 is connected with trigger 800 data circuit Group.Wherein, rig 500 is accomplished vertical lower brill by rig under righting 600 auxiliary.
Rig 500 includes drill body 501, and the bottom of described drill body 501 is provided with drill bit 1, top is provided with motor 12, The screw rod 5 that motor 12 is rotated is installed in described drill body 501, is provided with between described screw rod 5 and drill bit 1 and pulverizes post Son 7, described in pulverize the top of pillar 7 and be provided with the upper planet wheel 8 that the gear 1 with screw rod 5 is meshed, described broken pillar 7 Bottom is provided with the gear 2 502 with drill bit 1 and is meshed lower planetary gear;Protection pipe it is provided with, in described protection pipe in described drill body 501 Being placed with cymoscope 4, described cymoscope 4 is connected with main frame 400 data circuit group two.The screw rod 5 that motor 12 is rotated Rotate thus by upper planet wheel 8 drive pulverize pillar 7 rotate again and by lower planetary gear drive drill bit 1 rotate.Described drill body The top of 501 is also associated with water inlet pipe 44, and water inlet pipe toward water delivery in drill body 501, can be so drill bit 1 during lower brill Cooling;Described data circuit group two is walked around and is laid in the metering circle 41 put on equipment 43, and described metering circle 41 is provided with shake Handle 42.Swinging handle 42 rotary metering circle 41 can be passed through when regulating the upper and lower displacement of cymoscope, can may insure that every Rising or the decline displacement of secondary cymoscope are all consistent, increase the accuracy of detection.
Additionally, drill bit 1 be routed over multiple lead soil hole 1 be passed through in drill body 501, described in pulverize the top of pillar 7 also Filtration is installed and leads soil dividing plate 9.The top of described drill bit 1 is also equipped with the unearthed pipe 11 communicated with screw rod 5, described unearthed pipe 11 Open Side Down.When lower boring, the soil body enters drill body 501 by leading soil hole 1 and leads native dividing plate 9 by filtration and enter spiral Be discharged in bar 5 be unearthed outside pipe 11, such rig 500 can quickly under get into and reach designated depth.
Under righting, rig 600 includes that car body 25, the two ends of described car body 25 are provided with mobile fixed cover 22 and rotary box 28, mobile fixed cover 22 is provided with draw ring 20, rotary box 28 end of described car body 25 is provided with strander 16, described draw ring Being connected between 20 with strander 16 and have steel wire rope 19, the interlude of described steel wire rope 19 is by being arranged on the support bar on car body 25 Prop up.
Based on said apparatus, this utility model additionally provides a kind of side hole transmitted wave method and determines the detection side of foundation pile length Method, it is characterised in that comprise the steps:
1) test point is chosen, by being placed under righting above rig 600 by rig 500, by mobile fixed cover 22 and rotary box 28 fix, wherein: the mobile fixing top entangling rig 500 of fixed cover 22, rotary box 28 entangles brill The lower end of hole equipment 500;
2) drive steel wire rope 19 pull-up to make rig 500 vertically attention by strander 16, unclamp mobile fixed cover 22, and start motor 12 and drive drill bit 1 time to bore set depth;Wherein: in going down process, soil enters brill by leading soil hole 1 Body 501 is also led in soil dividing plate 9 enters screw rod 5 by filtration and is discharged to be unearthed outside pipe 11;
3) on the cushion cap of foundation pile 100, trigger 800 is placed, and by the data circuit group of trigger 800 and cymoscope 4 Data circuit group two connects main frame 400, and before detection, Job readiness completes;
4) first cymoscope is placed in during detection at the bottom of the mouth of pipe or the pipe of protection pipe, is generated on engineering pile by exciting hammer 300 While mechanical wave, in test tube, detect vibration signal, analyze the quality of signals collecting, if quality is the best, resampling, no Then preserve the waveform of this measuring point, and one exciting detection week after date swinging handle 42 will be utilized to regulate metering circle 41 rotation The height making cymoscope 4 declines or promotes 0.5-1m, continues hammering sampling, till mentioning on cymoscope at the bottom of the mouth of pipe or pipe;
5) main frame 400 exports image, by passing judgment on criterion as follows: 1, time m-depth map in first arrival time slope Change;2, the significantly decay amplitude of energy;I.e. first arrival time and the comprehensive analysis of amplitude to the seismic wave wave train, it is judged that pile body is long Degree and integrity.
In addition to the implementation, this utility model can also have other embodiments.All employing equivalents or equivalence become Change the technical scheme of formation, all fall within the protection domain of this utility model requirement.

Claims (3)

1. transmitted wave method in side hole determines the detection device of foundation pile length, hammers (300), main frame (400), rig into shape including exciting (500), putting rig (600) and trigger (800) under equipment (43), righting, trigger (800) is placed on described foundation pile (100), on cushion cap, main frame (400) is connected with trigger (800) data circuit group, it is characterised in that
Described rig (500) includes that drill body (501), the bottom of described drill body (501) are provided with drill bit (1), top is installed There is motor (12), the screw rod (5) that motor (12) is rotated, described screw rod (5) and brill are installed in described drill body (501) Be provided with and pulverize pillar (7) between head (1), described in pulverize the top of pillar (7) and be provided with gear one (6) phase with screw rod (5) The upper planet wheel (8) of engagement, the bottom of described broken pillar (7) is provided with the gear two (502) with drill bit (1) and is meshed lower planet Wheel;It is provided with protection pipe in described drill body (501), in described protection pipe, is placed with cymoscope (4), described cymoscope (4) and main frame (400) connection has data circuit group two, the top of described drill body (501) to be also associated with water inlet pipe (44);Described data circuit group Two walk around and are laid in the metering circle (41) put on equipment (43), and described metering circle (41) is provided with swinging handle (42).
2. side hole transmitted wave method determines the detection device of foundation pile length as claimed in claim 1, it is characterised in that described drill bit (1) be routed over and multiple led in soil hole one (2) is passed through drill body (501), described in pulverize the top of pillar (7) and be also equipped with filtering Lead soil dividing plate (9).
3. side hole transmitted wave method determines the detection device of foundation pile length as claimed in claim 1, it is characterised in that described drill bit (1) top is also equipped with the unearthed pipe (11) communicated with screw rod (5), and Open Side Down for described unearthed pipe (11).
CN201620852669.8U 2016-08-09 2016-08-09 Detection apparatus for foundation pile length is confirmed to other hole penetrated wave method Active CN205875236U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620852669.8U CN205875236U (en) 2016-08-09 2016-08-09 Detection apparatus for foundation pile length is confirmed to other hole penetrated wave method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620852669.8U CN205875236U (en) 2016-08-09 2016-08-09 Detection apparatus for foundation pile length is confirmed to other hole penetrated wave method

Publications (1)

Publication Number Publication Date
CN205875236U true CN205875236U (en) 2017-01-11

Family

ID=57701040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620852669.8U Active CN205875236U (en) 2016-08-09 2016-08-09 Detection apparatus for foundation pile length is confirmed to other hole penetrated wave method

Country Status (1)

Country Link
CN (1) CN205875236U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049566A (en) * 2016-08-09 2016-10-26 浙江省建设工程质量检验站有限公司 Detection device and method for determining length of foundation pile through bypass port transmission wave method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049566A (en) * 2016-08-09 2016-10-26 浙江省建设工程质量检验站有限公司 Detection device and method for determining length of foundation pile through bypass port transmission wave method

Similar Documents

Publication Publication Date Title
CN106088170B (en) The detection means and its detection method of foundation pile length are determined based on parallel seismic wave method
US9605404B2 (en) High strain dynamic load testing procedure
CN205638225U (en) Drilling equipment for building
CN108318584A (en) Single-hole sound-wave combines the method for across hole CT detections pile quality and gradient
CN205349223U (en) Drilling equipment for building
CN104652501A (en) Pile foundation quality detection device and pile foundation quality detection method of shock excitation in pile side prospect hole
CN105928803A (en) Soil shear strength parameter in-situ test apparatus and test method thereof
BR112013023690B1 (en) METHOD AND APPARATUS TO ESTIMATE A ROCK RESISTANCE PROFILE OF A TRAINING
CN106049567B (en) Parallel seismic wave method determines the detection means and its detection method of foundation pile length
CN101761311A (en) Underwater geotechnical drilling equipment and underwater geotechnical exploration method
CN106049566B (en) Side hole transmitted wave method determines the detection means and its detection method of foundation pile length
CN205954717U (en) Detection device based on foundation pile length is confirmed to parallel seismic wave method
CN205875236U (en) Detection apparatus for foundation pile length is confirmed to other hole penetrated wave method
CN109898569A (en) The detection construction method of composite cement soil stake
CN205875237U (en) Detection apparatus for foundation pile length is confirmed to parallel seismic wave method
CN201886155U (en) Device adopting resonance wave imaging to detect karst caves
CN203768955U (en) Three-dimensional foundation pile detecting device based on drill radar
CN113756781B (en) Low-cost ground stress testing method
CN216717360U (en) Dig stake hole straightness measuring device that hangs down soon
JP6850624B2 (en) Construction status confirmation method of high-pressure injection agitator and construction method of ground improvement body using this method
CN108825136B (en) Building pile foundation detection device
CN202645430U (en) Vibration punching device
CN108956766B (en) Pile foundation quality detection method
CN111158043A (en) System and method for detecting hidden danger at pile bottom of bored pile
CN210829234U (en) Along with boring sounding device with downthehole centralizer

Legal Events

Date Code Title Description
GR01 Patent grant