CN106049567B - Detecting device and method for determining the length of foundation piles by parallel seismic method - Google Patents

Detecting device and method for determining the length of foundation piles by parallel seismic method Download PDF

Info

Publication number
CN106049567B
CN106049567B CN201610645232.1A CN201610645232A CN106049567B CN 106049567 B CN106049567 B CN 106049567B CN 201610645232 A CN201610645232 A CN 201610645232A CN 106049567 B CN106049567 B CN 106049567B
Authority
CN
China
Prior art keywords
trigger
drill
pile
foundation pile
drilling equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610645232.1A
Other languages
Chinese (zh)
Other versions
CN106049567A (en
Inventor
吴宝杰
杨桦
侯宏伟
黄林伟
徐芫蕾
臧端
唐绍明
顾晓卫
钱志华
金鑫
郑威
刘博�
饶秋琛
凌捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Provincial Construction Engineering Quality Inspection Station Co ltd
Original Assignee
Zhejiang Provincial Construction Engineering Quality Inspection Station Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Provincial Construction Engineering Quality Inspection Station Co ltd filed Critical Zhejiang Provincial Construction Engineering Quality Inspection Station Co ltd
Priority to CN201711264721.3A priority Critical patent/CN107975076B/en
Priority to CN201711264724.7A priority patent/CN107869156B/en
Priority to CN201610645232.1A priority patent/CN106049567B/en
Priority to CN201711264553.8A priority patent/CN107869155A/en
Publication of CN106049567A publication Critical patent/CN106049567A/en
Application granted granted Critical
Publication of CN106049567B publication Critical patent/CN106049567B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Earth Drilling (AREA)

Abstract

平行地震法确定基桩长度的检测装置,包括激振锤、主机、钻孔设备、扶正下钻设备和触发器,触发器放置在所述基桩的承台上,主机与触发器连接有数据线路组,其特征在于,所述钻孔设备包括钻体,所述钻体的底端设置有钻头、顶端安装有电机,所述钻体内安装有电机带动旋转的螺旋杆,所述螺旋杆与钻头之间安装有碾碎柱子,本发明的有益效果:本发明通过将检测装置布设为一体结构,检测的时候速度快,可随时检测不需要预打孔,减少施工时间,适合推广使用。

A detection device for determining the length of a foundation pile using the parallel seismic method includes an exciting hammer, a host computer, a drilling device, a straightening and drilling device, and a trigger. The trigger is placed on the base of the foundation pile, and the host computer and the trigger are connected by a data line group. The device is characterized in that the drilling device includes a drill body, a drill bit is provided at the bottom end of the drill body, a motor is installed at the top end, a spiral rod driven by the motor for rotation is installed in the drill body, and a crushing column is installed between the spiral rod and the drill bit. The beneficial effects of the present invention are as follows: the present invention arranges the detection device as an integrated structure, has a high detection speed, can detect at any time without pre-drilling, reduces construction time, and is suitable for popularization and use.

Description

Parallel seismic wave method determines the detection means and its detection method of foundation pile length
Technical field
The present invention relates to one kind based on parallel seismic wave method detection foundation pile device for detecting length, belong to building detection technique neck Domain.
Background technology
With the fast development of economic construction, high buildings and large mansions are continued to bring out, and pile foundation engineering is developed on an unprecedented scale, pile foundation It is the base form being most widely used at present.Because pile foundation engineering construction has height disguised, it is found that quality problems are relative More difficult, industry is due to much caused by the quality problems of pile foundation engineering with the quality accident in civil buildings.
Test Technology of Pile Foundation has obtained significant progress in recent years, and coherent detection standard, specification are promulgated and implemented in succession, right Ensure that construction quality serves good effect.But conventional Test Technology of Pile Foundation at present, such as static load test, core drilling method, height Strain Method, low strain dynamic method and sound wave transmission method etc., be both needed to directly contact foundation pile stake top, thus its use occasion receive it is certain Limitation, before normally only not yet being constructed suitable for top-out structure.
The foundation pile length under existing buildings or structures or integrality are suspected however, being frequently encountered in engineering construction And contradiction and disputes are produced, and or because existing building is of the remote past, when lacking that stake is long to wait capsule information in subsequent adaptation engineering, with And need to build to existing because of situations such as causing pile foundation there occurs other reasonses such as surface subsidence, earthquakes later stage destruction Pile foundation under building is detected, but because now top-out structure has been present, and can not directly contact stake top, thus conventional Pile foundation inspection method is helpless.
Because the system research of Test Technology of Pile Foundation under current domestic existing buildings or structures still belongs to blank, therefore study one Kind strong adaptability, the pile detection new technology being restricted under the few existing buildings or structures of condition, to objectively and accurately evaluating work Cheng Zhiliang, solve the contradiction and disputes in engineering construction and improve existing buildings or structures performance rating or dilapidated house secure authentication refers to Mark system etc., there is larger realistic meaning, will also promote the further development of architecture foundation pile detection technique.
As an Application No. CN101570974A discloses one kind side hole transmitted wave method detection existing building foundation pile matter The method of amount, it is that utilizing works seismic detector is along PVC by burying the pvc pipe parallel to foundation pile by existing building foundation pile Pipe depth direction is tested through foundation pile transmitted through the seismic wave come, the first arrival time and amplitude of seismic wave according to received by wave detector To judge the method for foundation pile length and integrality.The principle of the method for testing is:Seismic wave is much big in the spread speed of foundation pile In in soil around pile, and attenuation coefficient is less than soil around pile, and when wave detector is away from foundation pile bottom, the seismic wave received is in soil The distance increase of propagation, prolongs after necessarily increasing first arrival time and accelerates the decay of amplitude, similarly in the position of pile defect The unexpected increase of first arrival time and the unexpected decay of amplitude occurs, therefore can be by seismic wave wave train first arrival time and amplitude Comprehensive analysis, judge foundation pile length and integrality.
And for example an Application No. CN103255785A disclose it is a kind of using single tube normal beam technique carry out quality inspection of the piles and The technology of geology detecting, it is characterised in that the compressional wave for producing and being propagated downwards along pile body is tapped on foundation pile top surface, by sounding The reaching time-difference of compressional wave is detected in pipe, the longitudinal wave velocity of Accurate Determining foundation pile and stake are long, judge pile body concrete quality;In neighbour Compressional wave is surveyed in the pipeline or geotechnical boring of stake along the reaching time-difference for being tapped pile body downwards and being propagated from Pile side soil, determines base Pile length, pile quality and reaming degree;And the velocity of wave of geology soil layer can be measured, judge the situation of stake week geology soil layer, analyze Foundation pile enters rock situation.The present invention can outside match somebody with somebody on the basis of the detection devices such as existing low strain dynamic, ultrasonic wave or be embedded in signal transacting Device, realizes the technology of a kind of new pile quality Non-Destructive Testing and geology detecting, and economic, ready-made nondestructive quality detection of pile foundation is auxiliary Verification method is helped, the accuracy and service level of pile foundation quality judgement can be significantly improved.
The problem of above-mentioned two documents are the immediate prior arts of pre- the application, but it has is as follows:Preliminary examination Survey cumbersome, it is necessary to punch, note clear water, process is comparatively laborious.
The content of the invention
The problem of existing instant invention overcomes prior art, it is proposed that a kind of that foundation pile length is determined based on parallel seismic wave method Detection means and its detection method, the present invention are structure as a whole by the way that detection means is laid, and speed is fast when detection, can be with When detection need not be pre-perforated, reduce the engineering time.
The concrete technical scheme of the present invention is as follows:
Determined based on parallel seismic wave method under the detection means of foundation pile length, including exciting hammer, main frame, rig, righting Rig and trigger, trigger are placed on the cushion cap of the foundation pile, and main frame is connected with data circuit group with trigger, and it is special Sign is,
The rig includes drill body, and the bottom of the drill body is provided with drill bit, top is provided with motor, the drill body The screw rod of motor driven rotation is inside installed, is provided between the screw rod and drill bit and pulverizes pillar, it is described to pulverize pillar Top be provided with the upper planet wheel that is meshed with the gear one of screw rod, the bottom for pulverizing pillar is provided with the gear with drill bit Two are meshed lower planetary gear;Protection pipe is provided with the drill body, wave detector, the wave detector and master are placed with the protection pipe Machine is connected with data circuit group two;By guiding conduit on horizontal cross bar, the cross bar is fixed to be set up the exciting hammer Above foundation pile, described guide into is provided with tripping gear between conduit and cross bar, for adjust exciting hammer fall away from.
Preferably, the drill bit be routed over it is multiple lead native hole one and be passed through in drill body, the top for pulverizing pillar is also Filtering is installed and leads native dividing plate.
Preferably, the top of the drill body is also equipped with the unearthed pipe communicated with screw rod, the opening of the unearthed pipe to Under.
Preferably, rig includes car body under the righting, and one end of the car body is provided with mobile fixed cover, car body The other end is provided with rotary box, is provided with draw ring on mobile fixed cover, the rotary box end of the car body is provided with strander, described Steel wire rope is connected between draw ring and strander, the interlude of the steel wire rope is propped up by the support bar on car body.
Based on said apparatus, present invention also offers a kind of detection method that foundation pile length is determined based on parallel seismic wave method, It is characterised in that it includes following steps:
1) test point is chosen, rig is placed under righting above rig, is consolidated by mobile fixed cover and rotary box Live calmly, wherein:Mobile fixed cover fixes the top for entangling rig, and rotary box entangles the lower end of rig;
2) drive steel wire rope pull-up rig is vertically attentioned by strander, unclamp mobile fixed cover, and start electricity Machine drives and bores set depth under drill bit;Wherein:In going down process, soil is by leading native hole one into drill body and leading soil by filtering Dividing plate, which enters in screw rod to be discharged to, to be unearthed outside pipe;
3) trigger is placed on the cushion cap of foundation pile, and by the data circuit group of trigger and the data circuit group of wave detector Two connection main frames, set up cross bar above foundation pile, exciting hammer are arranged on below cross bar, Job readiness is completed before detection;
4) wave detector is first placed in the mouth of pipe or ttom of pipe of protection pipe when detecting, machine is generated on engineering pile by exciting mode While tool ripple, vibration signal is detected in protection pipe, the quality of signal Analysis collection, the resampling if quality is bad is no Then preserve the waveform of the measuring point, and decline the height of wave detector or lifting 0.5-1m in an exciting-after the detection cycle, after Continuous hammering sampling, until wave detector drop to ttom of pipe or on mention the mouth of pipe untill;5) output image of main frame 400, by as follows Judge criterion:1st, when m- depth map in first arrival time slope change;2nd, the significantly decay amplitude of energy;I.e. to seismic wave The first arrival time of the wave train and the comprehensive analysis of amplitude, judge pile body length and integrality.
Beneficial effects of the present invention:The present invention is structure as a whole by the way that detection means is laid, and speed is fast when detection, Can detect at any time need not be pre-perforated, reduces the engineering time, is adapted to promote the use of.
Brief description of the drawings
Fig. 1 is the structural representation for the detection means that the present invention determines foundation pile length based on parallel seismic wave method;
Fig. 2 is the structural representation of rig;
Fig. 3 is the structural representation of rig under righting;
Structural representation when Fig. 4 is rig operation under righting.
Embodiment
Embodiment 1:
As illustrated, the detection means of foundation pile length is determined based on parallel seismic wave method, including exciting hammer 300, exciting hammer 300 For generating mechanical wave on engineering pile by exciting mode;The exciting hammer 300 is arranged on horizontal horizontal stroke by guiding conduit 301 into On bar 302, the fixed mount of cross bar 302 located at the top of foundation pile 100, it is described guide between conduit 301 and cross bar 302 be provided with it is de- Hook device 303, for ensureing that exciting hammer 300 falls away from every time identical.
Rig 600 and trigger 800, trigger 800 are placed on the base under main frame 400, rig 500, righting On the cushion cap of stake 100.
Main frame 400 is connected with data circuit group with trigger 800.Wherein, rig 500 is by rig under righting 600 Auxiliary accomplishes vertical lower brill.
Rig 500 includes drill body 501, and the bottom of the drill body 501 is provided with drill bit 1, top is provided with motor 12, The screw rod 5 that motor 12 drives rotation is installed in the drill body 501, is provided between the screw rod 5 and drill bit 1 and pulverizes post Son 7, the top for pulverizing pillar 7 is provided with the upper planet wheel 8 being meshed with the gear 1 of screw rod 5, described to pulverize pillar 7 Bottom be provided with the lower planetary gear that is meshed with the gear 2 502 of drill bit 1;The drill body 501 is provided with interior protection pipe, the protection Wave detector 4 is placed with pipe, the wave detector 4 is connected with data circuit group two with main frame 400.Motor 12 drives the spiral of rotation The rotation of bar 5 is rotated again to drive drill bit 1 to rotate by lower planetary gear so as to pulverize pillar 7 by the drive of upper planet wheel 8.
In addition, drill bit 1 be routed over it is multiple lead native hole 1 and be passed through in drill body 501, the top for pulverizing pillar 7 is also Filtering is installed and leads native dividing plate 9.The top of the drill body 501 is also equipped with the unearthed pipe 11 communicated with screw rod 5, described to be unearthed Open Side Down for pipe 11.In lower brill, the soil body enters spiral shell by leading native hole 1 into drill body 501 and leading native dividing plate 9 by filtering Be discharged in swing arm 5 outside unearthed pipe 11, such rig 500 can quickly under get into up to designated depth.
Rig 600 includes car body 25 under righting, and one end of the car body 25 is provided with mobile fixed cover 22, car body 25 The other end is provided with rotary box 28, is provided with draw ring 20 on mobile fixed cover 22, the end of rotary box 28 of the car body 25 is provided with Strander 16, is connected with steel wire rope 19 between the draw ring 20 and strander 16, the interlude of the steel wire rope 19 passes through installation Support bar on car body 25 is propped up.
Based on said apparatus, present invention also offers a kind of detection method that foundation pile length is determined based on parallel seismic wave method, It is characterised in that it includes following steps:
1) test point is chosen, rig 500 is placed under righting above rig 600, passes through the mobile He of fixed cover 22 Rotary box 28 is fixed, wherein:Mobile fixed cover 22 fixes the top for entangling rig 500, and rotary box 28 entangles drilling and set Standby 500 lower end;
2) drive the pull-up of steel wire rope 19 rig 500 is vertically attentioned by strander 16, unclamp mobile fixed cover 22, And start motor 12 and drive 1 time brill set depth of drill bit;Wherein:In going down process, soil enters drill body by leading native hole 1 501 and native dividing plate 9 is led by filtering entered in screw rod 5 and be discharged to outside unearthed pipe 11;
3) trigger 800 is placed on the cushion cap of foundation pile 100, and by the data circuit group of trigger 800 and wave detector 4 Data circuit group two connects main frame 400, and cross bar 302 is set up above foundation pile, exciting hammer 300 is arranged on below cross bar, detection Preceding Job readiness is completed;
4) wave detector is first placed in the mouth of pipe or ttom of pipe of protection pipe when detecting, generated by exciting hammer 300 on engineering pile While mechanical wave, vibration signal is detected in protection pipe, the quality of signal Analysis collection, the resampling if quality is bad, Otherwise preserve the waveform of the measuring point, and decline the height of wave detector 4 or lifting 0.5- in an exciting-after the detection cycle 1m, continue hammering sampling, until wave detector drop to ttom of pipe or on mention the mouth of pipe untill;
5) output image of main frame 400, by judging criterion to following:1st, when m- depth map in first arrival time slope Change;2nd, the significantly decay amplitude of energy;The comprehensive analysis of first arrival time and amplitude i.e. to the seismic wave wave train, judge that pile body is grown Degree and integrality.
Embodiment 2:
The present embodiment and the difference of embodiment 1 are that the wave detector 4 and main frame 400 are described by wireless connection Increase wireless transmitter module 41 on wave detector 4, also increasing in the trigger 800 has wireless transmitter module two, in main frame 400 Corresponding wireless receiving module is installed in portion,
Based on said apparatus, present invention also offers a kind of detection method that foundation pile length is determined based on parallel seismic wave method, It is characterised in that it includes following steps:
1) test point is chosen, rig 500 is placed under righting above rig 600, passes through the mobile He of fixed cover 22 Rotary box 28 is fixed, wherein:Mobile fixed cover 22 fixes the top for entangling rig 500, and rotary box 28 entangles drilling and set Standby 500 lower end;
2) drive the pull-up of steel wire rope 19 rig 500 is vertically attentioned by strander 16, unclamp mobile fixed cover 22, And start motor 12 and drive 1 time brill set depth of drill bit;Wherein:In going down process, soil enters drill body by leading native hole 1 501 and native dividing plate 9 is led by filtering entered in screw rod 5 and be discharged to outside unearthed pipe 11;
3) trigger 800 is placed on the cushion cap of foundation pile 100, and by the data circuit group of trigger 800 and wave detector 4 Data circuit group two connects main frame 400, and cross bar is set up above foundation pile, exciting hammer 300 is arranged on below cross bar, work before detection Prepare completion;
4) wave detector is first placed in the mouth of pipe or ttom of pipe of protection pipe when detecting, generated by exciting hammer 300 on engineering pile While mechanical wave, vibration signal is detected in protection pipe, the quality of signal Analysis collection, the resampling if quality is bad, Otherwise preserve the waveform of the measuring point, and decline the height of wave detector 4 or lifting 0.5- in an exciting-after the detection cycle 1m, continue hammering sampling, until wave detector drop to ttom of pipe or on mention the mouth of pipe untill;
5) output image of main frame 400, by judging criterion to following:1st, when m- depth map in first arrival time slope Change;2nd, the significantly decay amplitude of energy;The comprehensive analysis of first arrival time and amplitude i.e. to the seismic wave wave train, judge that pile body is grown Degree and integrality.
Embodiment 3:
As illustrated, the detection means of foundation pile length is determined based on parallel seismic wave method, including exciting hammer 300, exciting hammer 300 For generating mechanical wave on engineering pile by exciting mode;The exciting hammer 300 is arranged on horizontal horizontal stroke by guiding conduit 301 into On bar 302, the fixed mount of cross bar 302 located at the top of foundation pile 100, it is described guide between conduit 301 and cross bar 302 be provided with it is de- Hook device 303, for ensureing that exciting hammer 300 falls away from every time identical.
Rig 600 and trigger 800, trigger 800 are placed on the base under main frame 400, rig 500, righting On the cushion cap of stake 100.
Main frame 400 is connected with data circuit group with trigger 800.Wherein, rig 500 is by rig under righting 600 Auxiliary accomplishes vertical lower brill.
Rig 500 includes drill body 501, and the bottom of the drill body 501 is provided with drill bit 1, top is provided with motor 12, The screw rod 5 that motor 12 drives rotation is installed in the drill body 501, is provided between the screw rod 5 and drill bit 1 and pulverizes post Son 7, the top for pulverizing pillar 7 is provided with the upper planet wheel 8 being meshed with the gear 1 of screw rod 5, described to pulverize pillar 7 Bottom be provided with the lower planetary gear that is meshed with the gear 2 502 of drill bit 1;Protection pipe, the protection are provided with the drill body 501 Wave detector 4 is placed with pipe, the wave detector 4 has data circuit group two to be wrapped on lifting device 401, data line group two Terminal and main frame 400.A control module is provided with the lifting device 401, the control module is connected by wireless device Main frame.Motor 12 drives the rotation of screw rod 5 of rotation to be rotated again and under so as to pulverize pillar 7 by the drive of upper planet wheel 8 Planetary gear drives drill bit 1 to rotate.
In addition, drill bit 1 be routed over it is multiple lead native hole 1 and be passed through in drill body 501, the top for pulverizing pillar 7 is also Filtering is installed and leads native dividing plate 9.The top of the drill body 501 is also equipped with the unearthed pipe 11 communicated with screw rod 5, described to be unearthed Open Side Down for pipe 11.In lower brill, the soil body enters spiral shell by leading native hole 1 into drill body 501 and leading native dividing plate 9 by filtering Be discharged in swing arm 5 outside unearthed pipe 11, such rig 500 can quickly under get into up to designated depth.
Rig 600 includes car body 25 under righting, and one end of the car body 25 is provided with mobile fixed cover 22, car body 25 The other end is provided with rotary box 28, is provided with draw ring 20 on mobile fixed cover 22, the end of rotary box 28 of the car body 25 is provided with Strander 16, is connected with steel wire rope 19 between the draw ring 20 and strander 16, the interlude of the steel wire rope 19 passes through installation Support bar on car body 25 is propped up.
Based on said apparatus, present invention also offers a kind of detection method that foundation pile length is determined based on parallel seismic wave method, It is characterised in that it includes following steps:
1) test point is chosen, rig 500 is placed under righting above rig 600, passes through the mobile He of fixed cover 22 Rotary box 28 is fixed, wherein:Mobile fixed cover 22 fixes the top for entangling rig 500, and rotary box 28 entangles drilling and set Standby 500 lower end;
2) drive the pull-up of steel wire rope 19 rig 500 is vertically attentioned by strander 16, unclamp mobile fixed cover 22, And start motor 12 and drive 1 time brill set depth of drill bit;Wherein:In going down process, soil enters drill body by leading native hole 1 501 and native dividing plate 9 is led by filtering entered in screw rod 5 and be discharged to outside unearthed pipe 11;
3) trigger 800 is placed on the cushion cap of foundation pile 100, and by the data circuit group of trigger 800 and wave detector 4 Data circuit group two connects main frame 400, and cross bar 302 is set up above foundation pile, exciting hammer 300 is arranged on below cross bar, detection Preceding Job readiness is completed;
4) wave detector is first placed in the mouth of pipe or ttom of pipe of protection pipe when detecting, generated by exciting hammer 300 on engineering pile While mechanical wave, vibration signal is detected in protection pipe, the quality of signal Analysis collection, the resampling if quality is bad, Otherwise the waveform of the measuring point is preserved, and in an exciting-after the detection cycle, control module receive information, control lifting device 401 start and decline the height of wave detector 4 or lifting 0.5-1m, continue hammering sampling, until wave detector drop to ttom of pipe or on Untill mentioning the mouth of pipe;
5) output image of main frame 400, by judging criterion to following:1st, when m- depth map in first arrival time slope Change;2nd, the significantly decay amplitude of energy;The comprehensive analysis of first arrival time and amplitude i.e. to the seismic wave wave train, judge that pile body is grown Degree and integrality.
In addition to the implementation, the present invention can also have other embodiment.It is all to use equivalent substitution or equivalent transformation shape Into technical scheme, all fall within the protection domains of application claims.

Claims (4)

1.基于平行地震法确定基桩长度的检测装置,包括激振锤(300)、主机(400)、钻孔设备(500)、扶正下钻设备(600)和触发器(800),触发器(800)放置在所述基桩(100)的承台上,主机(400)与触发器(800)连接有数据线路组,其特征在于,1. The detection device for determining the length of the foundation pile based on the parallel seismic method, including the vibrating hammer (300), the main engine (400), the drilling equipment (500), the righting drilling equipment (600) and the trigger (800), the trigger (800) is placed on the cap of the foundation pile (100), the host (400) and the trigger (800) are connected with a data line group, characterized in that, 所述钻孔设备(500)包括钻体(501),所述钻体(501)的底端设置有钻头(1)、顶端安装有电机(12),所述钻体(501)内安装有电机(12)带动旋转的螺旋杆(5),所述螺旋杆(5)与钻头(1)之间安装有碾碎柱子(7),所述碾碎柱子(7)的顶端设有与螺旋杆(5)的齿轮一(6)相啮合的上行星轮(8),所述碾碎柱子(7)的底端设有与钻头(1)的齿轮二(502)相啮合的下行星轮;所述钻体(501)内设有保护管,所述保护管内放置有检波器(4),所述检波器(4)与主机(400)连接有数据线路组二;The drilling equipment (500) includes a drill body (501), the bottom end of the drill body (501) is provided with a drill bit (1), the top end is equipped with a motor (12), and the drill body (501) is installed with a The motor (12) drives the rotating screw rod (5), and a crushing column (7) is installed between the screw rod (5) and the drill bit (1), and the top of the crushing column (7) is provided with a screw The upper planetary gear (8) meshed with the gear one (6) of the rod (5), and the lower planetary gear (8) meshed with the gear two (502) of the drill bit (1) is provided at the bottom of the crushing column (7) ; The drill body (501) is provided with a protection tube, and a geophone (4) is placed in the protection tube, and the geophone (4) is connected to the host (400) with a data line group 2; 所述激振锤(300)通过引向导管(301)安装在水平横杆(302)上,所述横杆(302)固定架设于基桩(100)上方,所述引向导管(301)和横杆(302)之间安装有脱钩装置(303),用于调整激振锤(300)的落距;The vibrating hammer (300) is installed on the horizontal bar (302) through the guiding guide tube (301), and the horizontal bar (302) is fixedly installed above the foundation pile (100). A decoupling device (303) is installed between the bar (302) and used to adjust the falling distance of the vibrating hammer (300); 所述扶正下钻设备(600)包括车体(25),所述车体(25)的一端安装有移动固定套(22),车体(25)的另一端安装有旋转箱(28),移动固定套 (22)上安装有拉环(20),所述车体(25)的旋转箱(28)端安装有绞绳机(16),所述拉环(20)与绞绳机(16)之间连接有钢丝绳(19),所述钢丝绳(19)的中间段通过安装在车体(25)上的支撑杆撑起。The righting drilling equipment (600) includes a car body (25), a mobile fixing sleeve (22) is installed at one end of the car body (25), and a rotating box (28) is installed at the other end of the car body (25), A draw ring (20) is installed on the mobile fixed sleeve (22), and a winch (16) is installed at the end of the rotating box (28) of the car body (25), and the draw ring (20) and the winch ( 16) is connected with a steel wire rope (19), and the middle section of the steel wire rope (19) is supported by a support rod installed on the vehicle body (25). 2.如权利要求1所述基于平行地震法确定基桩长度的检测装置,其特征在于,所述钻头(1)上面布设有多个导土孔一(2)通入钻体(501)内,所述碾碎柱子(7)的上方还安装有过滤导土隔板(9)。2. The detection device for determining the length of foundation piles based on the parallel seismic method according to claim 1, characterized in that, the drill bit (1) is provided with a plurality of soil guide holes (2) which pass into the drill body (501) , a filtering soil guide partition (9) is also installed above the crushing column (7). 3.如权利要求1所述基于平行地震法确定基桩长度的检测装置,其特征在于,所述钻体(501)的顶端还安装有与螺旋杆(5)相通的出土管(11),所述出土管(11)的开口向下。3. The detection device for determining the length of foundation piles based on the parallel seismic method according to claim 1, characterized in that, the top of the drill body (501) is also equipped with an excavation pipe (11) communicated with the screw rod (5), The opening of the unearthed pipe (11) is downward. 4.如权利要求1所述的基于平行地震法确定基桩长度的检测装置的检测方法,其特征在于,包括如下步骤:4. the detection method of the detection device that determines foundation pile length based on parallel seismic method as claimed in claim 1, is characterized in that, comprises the steps: 1)选好检测点,将钻孔设备(500)放在扶正下钻设备(600)上面,通过移动固定套 (22)和旋转箱(28)固定住,其中:移动固定套 (22)固定套住钻孔设备(500)的上方,旋转箱(28)套住钻孔设备(500)的下端;1) Select the detection point, place the drilling equipment (500) on the uprighting and drilling equipment (600), and fix it by moving the fixing sleeve (22) and the rotating box (28), in which: the moving fixing sleeve (22) is fixed Cover the top of the drilling equipment (500), and the rotary box (28) covers the lower end of the drilling equipment (500); 2)通过绞绳机(16)带动钢丝绳(19)拉起使钻孔设备(500)垂直立正,松开移动固定套(22),并启动电机(12)带动钻头(1)下钻设定深度;其中:下钻过程中,土壤通过导土孔一(2)进入钻体(501)并通过过滤导土隔板(9)进入螺旋杆(5)内排出到出土管(11)外;2) Pull up the wire rope (19) through the rope twisting machine (16) to make the drilling equipment (500) stand vertically, loosen the moving fixing sleeve (22), and start the motor (12) to drive the drill bit (1) to drill down and set Depth; where: during the drilling process, the soil enters the drill body (501) through the soil guide hole one (2) and enters the screw rod (5) through the filter soil guide partition (9) and is discharged to the outside of the excavation pipe (11); 3)在基桩(100)的承台上放置触发器(800),并将触发器(800)的数据线路组和检波器(4)的数据线路组二连接主机(400),在基桩上方架设横杆(302),将激振锤(300)安装在横杆下方,检测前工作准备完成;3) Place the trigger (800) on the cap of the foundation pile (100), and connect the data line group 2 of the trigger (800) and the data line group 2 of the geophone (4) to the host computer (400). Set up a cross bar (302) above, install the vibrating hammer (300) under the cross bar, and complete the work before testing; 4)检测时先将检波器置于保护管的管口或管底,通过激振锤(300)在工程桩上生成机械波的同时,在保护管内检测振动信号,分析信号采集的质量,若质量不佳则重新采样,否则保存该测点的波形,并且在一个激振‐检波周期后将检波器(4)的高度下降或提升0.5-1m,继续锤击采样,直至检波器下降到管底或上提到管口为止;4) When testing, first place the geophone at the nozzle or bottom of the protection tube, and while generating mechanical waves on the engineering pile through the vibrating hammer (300), detect the vibration signal in the protection tube and analyze the quality of signal collection. If it is not good, re-sample, otherwise save the waveform of the measuring point, and after one excitation-detection cycle, lower or raise the height of the geophone (4) by 0.5-1m, and continue hammering sampling until the geophone drops to the bottom of the tube or up to the mouth of the nozzle; 5)主机(400)输出图像,通过对如下评判准则:1、在时间-深度图中初至时间斜率的变化;2、能量的大幅衰减振幅;即对地震波波列的初至时间及振幅的综合分析,判断桩身长度和完整性。5) The main engine (400) outputs the image, through the following judging criteria: 1, the change of the slope of the first arrival time in the time-depth map; 2, the large attenuation amplitude of the energy; Comprehensive analysis to judge the length and integrity of the pile body.
CN201610645232.1A 2016-08-09 2016-08-09 Detecting device and method for determining the length of foundation piles by parallel seismic method Active CN106049567B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201711264721.3A CN107975076B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection device and its detection method of foundation pile length
CN201711264724.7A CN107869156B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection method of foundation pile length
CN201610645232.1A CN106049567B (en) 2016-08-09 2016-08-09 Detecting device and method for determining the length of foundation piles by parallel seismic method
CN201711264553.8A CN107869155A (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection means and its detection method of foundation pile length

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610645232.1A CN106049567B (en) 2016-08-09 2016-08-09 Detecting device and method for determining the length of foundation piles by parallel seismic method

Related Child Applications (3)

Application Number Title Priority Date Filing Date
CN201711264721.3A Division CN107975076B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection device and its detection method of foundation pile length
CN201711264553.8A Division CN107869155A (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection means and its detection method of foundation pile length
CN201711264724.7A Division CN107869156B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection method of foundation pile length

Publications (2)

Publication Number Publication Date
CN106049567A CN106049567A (en) 2016-10-26
CN106049567B true CN106049567B (en) 2018-01-05

Family

ID=57481827

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201711264724.7A Active CN107869156B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection method of foundation pile length
CN201711264553.8A Pending CN107869155A (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection means and its detection method of foundation pile length
CN201711264721.3A Expired - Fee Related CN107975076B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection device and its detection method of foundation pile length
CN201610645232.1A Active CN106049567B (en) 2016-08-09 2016-08-09 Detecting device and method for determining the length of foundation piles by parallel seismic method

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN201711264724.7A Active CN107869156B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection method of foundation pile length
CN201711264553.8A Pending CN107869155A (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection means and its detection method of foundation pile length
CN201711264721.3A Expired - Fee Related CN107975076B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection device and its detection method of foundation pile length

Country Status (1)

Country Link
CN (4) CN107869156B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547332B (en) * 2018-05-12 2020-06-16 山东百泰建设监理有限公司 A kind of building pile foundation detection technology
CN108956766B (en) * 2018-06-09 2021-07-16 广东穗芳智慧建设科技有限公司 Pile foundation quality detection method
CN110779475B (en) * 2019-10-16 2021-05-14 广西电网有限责任公司电力科学研究院 Method for measuring size of power transmission tower foundation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10311813A (en) * 1997-05-12 1998-11-24 Takenaka Komuten Co Ltd Method for detecting damage of foundation pile from ground surface and device used for this method
CN101074872A (en) * 2007-06-13 2007-11-21 南昌大学 Apparatus for measuring pile length by reflected wave method and method for measuring pile length
JP2008185426A (en) * 2007-01-29 2008-08-14 Takenaka Komuten Co Ltd Integrity evaluation support device, method, and program of concrete pile
CN101477084A (en) * 2008-12-22 2009-07-08 铁道第三勘察设计院集团有限公司 Method for detecting integrality of concrete pile body by elastic wave transmission mode
CN202177602U (en) * 2011-07-27 2012-03-28 北京市康科瑞工程检测技术有限责任公司 Foundation pile integrity detection device utilizing acoustical wave transmission method
CN203551516U (en) * 2013-10-30 2014-04-16 天津市建联工程勘测有限公司 Device for detecting integrality of pile body by using low strain method
CN205875237U (en) * 2016-08-09 2017-01-11 浙江省建设工程质量检验站有限公司 Detection apparatus for foundation pile length is confirmed to parallel seismic wave method

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5099696A (en) * 1988-12-29 1992-03-31 Takechi Engineering Co., Ltd. Methods of determining capability and quality of foundation piles and of designing foundation piles, apparatus for measuring ground characteristics, method of making hole for foundation pile such as cast-in-situ pile and apparatus therefor
KR100655479B1 (en) * 2004-05-20 2006-12-14 미승씨엔에스검사주식회사 Non-destructive testing method for analyzing and measuring the root penetration length and the existence of piles buried in the ground and the non-destructive testing device used in the method
JP4667228B2 (en) * 2005-12-21 2011-04-06 株式会社竹中工務店 Pile inspection method and sensor crimping device
CN101570974A (en) * 2009-03-26 2009-11-04 浙江省建筑科学设计研究院有限公司 Method for detecting quality of existing building foundation piles with parallel seismic method
CN101775959B (en) * 2009-12-25 2013-01-23 王来朋 Drilling machine of coaxial double-drill large-caliber multifunctional foundation pile
CN102296645B (en) * 2011-06-02 2013-10-23 朱德兵 Pile foundation quality detection method and device
CN202170756U (en) * 2011-07-18 2012-03-21 海城市石油机械制造有限公司 Lifting device of drilling machine headframe
CN102535529A (en) * 2011-12-08 2012-07-04 中铁五局(集团)有限公司 Construction method of self-balancing method pile foundation bearing capacity test device
CN103255785A (en) * 2012-02-15 2013-08-21 陈彦平 Technology for performing foundation pile quality detection and geology survey by adopting single tube longitudinal wave method
CN203846537U (en) * 2014-04-10 2014-09-24 中国葛洲坝集团三峡建设工程有限公司 Portable pile foundation hole inspection device
CN103953076B (en) * 2014-05-06 2016-01-13 上海交通大学 Method for Determination of Pile Bottom Depth Based on Side Hole Transmitted Wave Inflection Point Method
CN104264722B (en) * 2014-09-30 2016-08-24 云南航天工程物探检测股份有限公司 Become bridge Nondestructive Pile-inspection Methods
CN104594395B (en) * 2015-01-15 2016-06-29 中铁第四勘察设计院集团有限公司 A kind of method utilizing railway in operation roadbed side Bored Pile Foundation detection structure to carry out pile measurement
CN204662519U (en) * 2015-04-02 2015-09-23 福建省建筑工程质量检测中心有限公司 A kind of checkout gear of foundation pile integrity and weight thereof
CN105155504B (en) * 2015-10-09 2017-06-06 铁道第三勘察设计院集团有限公司 The lateral seismic transmission nondestructive detection system of railway bed and detection method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10311813A (en) * 1997-05-12 1998-11-24 Takenaka Komuten Co Ltd Method for detecting damage of foundation pile from ground surface and device used for this method
JP2008185426A (en) * 2007-01-29 2008-08-14 Takenaka Komuten Co Ltd Integrity evaluation support device, method, and program of concrete pile
CN101074872A (en) * 2007-06-13 2007-11-21 南昌大学 Apparatus for measuring pile length by reflected wave method and method for measuring pile length
CN101477084A (en) * 2008-12-22 2009-07-08 铁道第三勘察设计院集团有限公司 Method for detecting integrality of concrete pile body by elastic wave transmission mode
CN202177602U (en) * 2011-07-27 2012-03-28 北京市康科瑞工程检测技术有限责任公司 Foundation pile integrity detection device utilizing acoustical wave transmission method
CN203551516U (en) * 2013-10-30 2014-04-16 天津市建联工程勘测有限公司 Device for detecting integrality of pile body by using low strain method
CN205875237U (en) * 2016-08-09 2017-01-11 浙江省建设工程质量检验站有限公司 Detection apparatus for foundation pile length is confirmed to parallel seismic wave method

Also Published As

Publication number Publication date
CN107869156A (en) 2018-04-03
CN107869155A (en) 2018-04-03
CN107975076A (en) 2018-05-01
CN107869156B (en) 2019-11-15
CN107975076B (en) 2019-10-11
CN106049567A (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN101914912B (en) In-situ testing method for deep underground engineering during rockburst preparation and evolution process
CN103953076B (en) Method for Determination of Pile Bottom Depth Based on Side Hole Transmitted Wave Inflection Point Method
CN105672371B (en) A kind of existing engineering pile pile body integrity and defect type method of discrimination
CN103774700B (en) Method for detecting integrity of high flat bed pile under existing building through overtone response function method
CN104181581B (en) Earthquake wave underground construction space observation system and method based on random arrangement
Rausche Non-destructive evaluation of deep foundations
CN103669428B (en) With the integrity detection system of cushion cap foundation pile
CN101570974A (en) Method for detecting quality of existing building foundation piles with parallel seismic method
CN108318584A (en) Single-hole sound-wave combines the method for across hole CT detections pile quality and gradient
CN206090647U (en) Pile foundation detection equipment
CN106088170B (en) The detection means and its detection method of foundation pile length are determined based on parallel seismic wave method
CN108797662B (en) Nondestructive testing method and device for length of pile foundation under stand column
CN109469119B (en) Test method of offshore wind power socketed steel pipe pile
CN111638269A (en) Transmission wave detection method of pile side indentation probe for quality detection of high-cap pile
JPH0988110A (en) Method of diagnosing defect of foundation pile
CN106049567B (en) Detecting device and method for determining the length of foundation piles by parallel seismic method
CN106049566B (en) Side hole transmitted wave method determines the detection means and its detection method of foundation pile length
CN104594395A (en) Operation railroad bed side drilling pile foundation detection structure and detection method
CN111158043B (en) System and method for detecting hidden danger at pile bottom of bored pile
CN105971037B (en) A kind of existing engineering pile stake bottom depth determination method
CN115822579A (en) A detection technique for unfavorable geological bodies in sub-azimuth holes
CN205954717U (en) Detection device based on foundation pile length is confirmed to parallel seismic wave method
CN110306606A (en) Pile foundation quality monitoring method and device used in construction process
CN205875237U (en) Detection apparatus for foundation pile length is confirmed to parallel seismic wave method
CN205875236U (en) Detection apparatus for foundation pile length is confirmed to other hole penetrated wave method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant